Presented by
Sunil Hotkar
 Microsoft Project is a project management software
program developed and sold by Microsoft
 Designed to assist project managers in developing plans,
assigning resources to tasks, tracking progress,
managing budgets and analyzing workloads.
 The application creates critical path schedules, and
critical chain which can be visualized in a Gantt chart.
 Available currently in two editions, Standard and
Professional.
 MS Project's proprietary file format is *.mpp.
 Initially proposed by Microsoft's Manager of Product
Development, Alan M. Boyd as an internal tool to help
manage the huge number of software projects that were in
development at any time inside the company.
 The first commercial version of Project was released
for DOS in 1984. Subsequent DOS versions: V2 (1985), V3
(1986) and V4 (1986)
 First Windows version-1990
 Macintosh version -1991
 Subsequent versions-V3 (1992), V4 (1993), 1995, 1998,
2000, 2002, 2003, 2007 and 2010.
Gantt Project
Genius Inside
LiquidPlanner
MicroPlanner X-Pert
NavalPlan
OpenProj
Open Workbench
Primavera (software)
Project.net
Basecamp (software)
 List each task necessary to complete a project in the
order they should be performed.
 Assign start and finish dates to tasks or let the program
set them for you by you specifying the duration of the
task.
 Display the tasks graphically over a time line to get an
overall view of the project.
 Assign workers, contractors, and other resources to
tasks and print their schedules.
 Compute the hours and cost necessary to complete a
task or the entire project.
 Monitor a project’s progress and compare it to your
original estimate.
 Analyze such items as cost, hours, slack time, resource
allocation, etc. using tables and graphs
 Define Goals
 Develop Tasks
 Establish Timeframes
 Resource Availability
 Organize
Define the Project
Build the Plan
Set a start date
Enter tasks/durations
Assign resources
Link tasks
Fine tune the plan
Track and Manage
Set a baseline
Enter actuals
Adjust plan
Close Project
 The objective of the project should be defined by the
person/group that is going to manage the project.
 Tasks, start times, and deadlines should be clearly
established.
1. Set up Project Defaults:
 Set working order. (Schedule from Start Date forward or Finish Date
backwards)
 Set a start or finish date.
 Select/create the project calendar to use. (Controls working days and hours)
2. Enter tasks:
 In chronological order, enter the tasks necessary to complete the project.
 Set the task’s duration.
 When appropriate, set a task’s Start / Finish date.
3. Set Task Sequencing:
 Link tasks that must be completed sequentially.
 Do not link tasks that can be completed simultaneously.
4. Create a Resource List:
 Create a list of contractors, laborers, equipment rental, fees, etc. and their
corresponding rates.
 Set working hours for each resource.
5. Assign Resources to Tasks
6. Analyze/Reevaluate/Adjust Project
7. Document Task Progress
When tasks must either end on a specific date or begin on a specific
date, you can create constraints.
As the project proceeds, you may wish to record its progress, noting any
deviations from your planned schedule.
A baseline is a snapshot of you project before actual work begins
and changes are made to the schedule.
The baseline includes task start and finish dates, resources, and
costs.
Compare the actual project to the baseline.
The sequence of activities which have no float or slack is
called the critical path.
Slack = Late Start – Early Start OR Late Finish - Early Finish
i.e. A critical path is the sequence of project
network activities which add up to the longest
overall duration. This determines the shortest time possible
to complete the project.
Any delay of an activity on the critical path directly impacts
the planned project completion date.
A project can have several, parallel, near critical paths. An
additional parallel path through the network with the total
durations shorter than the critical path is called a sub-
critical or non-critical path.
When we say that an activity
will take a certain number of
days or weeks, what we really
mean is this activity normally
takes this many days or weeks.
We could make it take less
time, but to do so would cost
more money.
Crashing is a process of
expediting project schedule by
compressing the total project
duration.
• The key is to attain maximum decrease in schedule time with minimum cost.
• More resources are needed to speed-up a part of a project
• Depends on what slack is available in a non-critical activity
The key to project crashing is attaining maximum reduction
in schedule time with minimum cost. Quite simply, the time
to stop crashing is when it no longer becomes cost
effective. A simple guideline is:
 Crash only activities that are critical.
 Crash from the least expensive to most expensive.
 Crash an activity only until:
 It reaches its maximum time reduction.
 It causes another path to also become critical.
 It becomes more expensive to crash than not to crash.
 Identify the critical path and the corresponding tasks.
Export the work package tasks (ID and Task Name fields), the
original duration (Duration field), and the original cost (Cost field)
from your MS Project schedule, and open that file in Excel.
 You must calculate the potential crash duration for each critical
path task and the cost to crash each task.
 On the Excel worksheet, add a column to calculate crash
reduction, which is how many weeks you can crash each task. Crash
reduction is simply the original duration minus the crash duration.
 Add another column to calculate the crash cost per week, which is
the crash cost divided by the crash reduction value.
ms-project-presentation.pptx

More Related Content

Similar to ms-project-presentation.pptx

Devry university mgmt404 complete course
Devry university mgmt404 complete courseDevry university mgmt404 complete course
Devry university mgmt404 complete coursedsvxxcvxc
 
Devry university mgmt404 complete course
Devry university mgmt404 complete courseDevry university mgmt404 complete course
Devry university mgmt404 complete coursegjghnmgmghm
 
Devry university mgmt404 complete course
Devry university mgmt404 complete courseDevry university mgmt404 complete course
Devry university mgmt404 complete coursegnffg
 
Devry university mgmt404 complete course
Devry university mgmt404 complete courseDevry university mgmt404 complete course
Devry university mgmt404 complete coursedfdhdfhdg
 
Devry university mgmt404 complete course
Devry university mgmt404 complete courseDevry university mgmt404 complete course
Devry university mgmt404 complete coursefdbdfbdx
 
Devry university mgmt404 complete course
Devry university mgmt404 complete courseDevry university mgmt404 complete course
Devry university mgmt404 complete coursescorpiosns123
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole coursesacascscasc
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole coursefdbdfbdx
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole coursescorpiosns123
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole coursedfdhdfhdg
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole courseadadscacascas
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole courseiutiuriaolcom
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole coursedsvxxcvxc
 
Project management
Project managementProject management
Project managementervinod
 
Project control tools by Samuel obino mokaya
Project control tools by Samuel obino mokayaProject control tools by Samuel obino mokaya
Project control tools by Samuel obino mokayaDiscover JKUAT
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universitykghkghfh
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityiutiuriaolcom
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityliam111221
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityfnfgnvcn
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universitysmith54655
 

Similar to ms-project-presentation.pptx (20)

Devry university mgmt404 complete course
Devry university mgmt404 complete courseDevry university mgmt404 complete course
Devry university mgmt404 complete course
 
Devry university mgmt404 complete course
Devry university mgmt404 complete courseDevry university mgmt404 complete course
Devry university mgmt404 complete course
 
Devry university mgmt404 complete course
Devry university mgmt404 complete courseDevry university mgmt404 complete course
Devry university mgmt404 complete course
 
Devry university mgmt404 complete course
Devry university mgmt404 complete courseDevry university mgmt404 complete course
Devry university mgmt404 complete course
 
Devry university mgmt404 complete course
Devry university mgmt404 complete courseDevry university mgmt404 complete course
Devry university mgmt404 complete course
 
Devry university mgmt404 complete course
Devry university mgmt404 complete courseDevry university mgmt404 complete course
Devry university mgmt404 complete course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Project management
Project managementProject management
Project management
 
Project control tools by Samuel obino mokaya
Project control tools by Samuel obino mokayaProject control tools by Samuel obino mokaya
Project control tools by Samuel obino mokaya
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs  devry universityMgmt404 entire class course project + all 7 weeks i labs  devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 

Recently uploaded

Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...jabtakhaidam7
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 

Recently uploaded (20)

Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 

ms-project-presentation.pptx

  • 2.  Microsoft Project is a project management software program developed and sold by Microsoft  Designed to assist project managers in developing plans, assigning resources to tasks, tracking progress, managing budgets and analyzing workloads.  The application creates critical path schedules, and critical chain which can be visualized in a Gantt chart.  Available currently in two editions, Standard and Professional.  MS Project's proprietary file format is *.mpp.
  • 3.  Initially proposed by Microsoft's Manager of Product Development, Alan M. Boyd as an internal tool to help manage the huge number of software projects that were in development at any time inside the company.  The first commercial version of Project was released for DOS in 1984. Subsequent DOS versions: V2 (1985), V3 (1986) and V4 (1986)  First Windows version-1990  Macintosh version -1991  Subsequent versions-V3 (1992), V4 (1993), 1995, 1998, 2000, 2002, 2003, 2007 and 2010.
  • 4. Gantt Project Genius Inside LiquidPlanner MicroPlanner X-Pert NavalPlan OpenProj Open Workbench Primavera (software) Project.net Basecamp (software)
  • 5.  List each task necessary to complete a project in the order they should be performed.  Assign start and finish dates to tasks or let the program set them for you by you specifying the duration of the task.  Display the tasks graphically over a time line to get an overall view of the project.  Assign workers, contractors, and other resources to tasks and print their schedules.  Compute the hours and cost necessary to complete a task or the entire project.  Monitor a project’s progress and compare it to your original estimate.  Analyze such items as cost, hours, slack time, resource allocation, etc. using tables and graphs
  • 6.  Define Goals  Develop Tasks  Establish Timeframes  Resource Availability  Organize
  • 7. Define the Project Build the Plan Set a start date Enter tasks/durations Assign resources Link tasks Fine tune the plan Track and Manage Set a baseline Enter actuals Adjust plan Close Project
  • 8.  The objective of the project should be defined by the person/group that is going to manage the project.  Tasks, start times, and deadlines should be clearly established.
  • 9.
  • 10. 1. Set up Project Defaults:  Set working order. (Schedule from Start Date forward or Finish Date backwards)  Set a start or finish date.  Select/create the project calendar to use. (Controls working days and hours) 2. Enter tasks:  In chronological order, enter the tasks necessary to complete the project.  Set the task’s duration.  When appropriate, set a task’s Start / Finish date. 3. Set Task Sequencing:  Link tasks that must be completed sequentially.  Do not link tasks that can be completed simultaneously. 4. Create a Resource List:  Create a list of contractors, laborers, equipment rental, fees, etc. and their corresponding rates.  Set working hours for each resource. 5. Assign Resources to Tasks 6. Analyze/Reevaluate/Adjust Project 7. Document Task Progress
  • 11.
  • 12. When tasks must either end on a specific date or begin on a specific date, you can create constraints.
  • 13.
  • 14.
  • 15. As the project proceeds, you may wish to record its progress, noting any deviations from your planned schedule. A baseline is a snapshot of you project before actual work begins and changes are made to the schedule. The baseline includes task start and finish dates, resources, and costs. Compare the actual project to the baseline.
  • 16. The sequence of activities which have no float or slack is called the critical path. Slack = Late Start – Early Start OR Late Finish - Early Finish i.e. A critical path is the sequence of project network activities which add up to the longest overall duration. This determines the shortest time possible to complete the project. Any delay of an activity on the critical path directly impacts the planned project completion date. A project can have several, parallel, near critical paths. An additional parallel path through the network with the total durations shorter than the critical path is called a sub- critical or non-critical path.
  • 17. When we say that an activity will take a certain number of days or weeks, what we really mean is this activity normally takes this many days or weeks. We could make it take less time, but to do so would cost more money. Crashing is a process of expediting project schedule by compressing the total project duration. • The key is to attain maximum decrease in schedule time with minimum cost. • More resources are needed to speed-up a part of a project • Depends on what slack is available in a non-critical activity
  • 18. The key to project crashing is attaining maximum reduction in schedule time with minimum cost. Quite simply, the time to stop crashing is when it no longer becomes cost effective. A simple guideline is:  Crash only activities that are critical.  Crash from the least expensive to most expensive.  Crash an activity only until:  It reaches its maximum time reduction.  It causes another path to also become critical.  It becomes more expensive to crash than not to crash.
  • 19.  Identify the critical path and the corresponding tasks. Export the work package tasks (ID and Task Name fields), the original duration (Duration field), and the original cost (Cost field) from your MS Project schedule, and open that file in Excel.  You must calculate the potential crash duration for each critical path task and the cost to crash each task.  On the Excel worksheet, add a column to calculate crash reduction, which is how many weeks you can crash each task. Crash reduction is simply the original duration minus the crash duration.  Add another column to calculate the crash cost per week, which is the crash cost divided by the crash reduction value.