The document describes a system for electronic process management of construction permits in Macedonia. It allows citizens and construction companies to apply for permits online, and allows municipalities, institutions, and the government to manage the permit approval process electronically. Over 80 employees work on the system, which is used by over 1,000 trained staff across 81 municipalities and over 200 institutions. It aims to increase transparency, efficiency and digitize the entire permit process.
What should tax professionals expect for the upcoming tax season? Here is our slide presentation from the Accounting Today Pre-Tax Season Update webinar held December 3rd 2015.
What should tax professionals expect for the upcoming tax season? Here is our slide presentation from the Accounting Today Pre-Tax Season Update webinar held December 3rd 2015.
Slovenia - AJPES Digitisation a more transparent non possessory lien rights r...Corporate Registers Forum
The CRF Innovation Awards celebrate the spirit of innovation and honours CRF jurisdictions which have successfully put in place world-class initiatives, as well as those which have creatively implemented customised solutions, to make a real difference to their stakeholders. There are two categories of awards: CRF Innovation Award (Excellence) and CRF Innovation Award (Commendation).
Digital Signatures: The Law and Best Practices for ComplianceCoSign by ARX
The CoSign Digital Signature solution automates your signature-based approvals compliantly and affordably, allowing you to cut costs and automate business processes.
An Indepth Understanding of e-Procurement: A Case Study Approach iosrjce
IOSR Journal of Computer Engineering (IOSR-JCE) is a double blind peer reviewed International Journal that provides rapid publication (within a month) of articles in all areas of computer engineering and its applications. The journal welcomes publications of high quality papers on theoretical developments and practical applications in computer technology. Original research papers, state-of-the-art reviews, and high quality technical notes are invited for publications.
Slovenia - AJPES Digitisation a more transparent non possessory lien rights r...Corporate Registers Forum
The CRF Innovation Awards celebrate the spirit of innovation and honours CRF jurisdictions which have successfully put in place world-class initiatives, as well as those which have creatively implemented customised solutions, to make a real difference to their stakeholders. There are two categories of awards: CRF Innovation Award (Excellence) and CRF Innovation Award (Commendation).
Digital Signatures: The Law and Best Practices for ComplianceCoSign by ARX
The CoSign Digital Signature solution automates your signature-based approvals compliantly and affordably, allowing you to cut costs and automate business processes.
An Indepth Understanding of e-Procurement: A Case Study Approach iosrjce
IOSR Journal of Computer Engineering (IOSR-JCE) is a double blind peer reviewed International Journal that provides rapid publication (within a month) of articles in all areas of computer engineering and its applications. The journal welcomes publications of high quality papers on theoretical developments and practical applications in computer technology. Original research papers, state-of-the-art reviews, and high quality technical notes are invited for publications.
A complete study about how Estonia did its digital revolution of government and public services ... till new concepts such as e-residents ... and full traceability by each citizen of which civil agent consulted what data and if legitimate (possibility to claim if not) ... total reciprocity and transparency building a trust relationship between state & citizens ...
Валерия Калчевa – главен директор на Главна дирекция „Оперативна програма „Ок...Emil Hristov
Валерия Калчевa – главен директор на Главна дирекция „Оперативна програма „Околна среда“ в МОСВ: Изпълнение на ОП „Околна среда 2014 – 2020“. Работна програма за 2019 г.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
Presented at NUS: Fuzzing and Software Security Summer School 2024
This keynote talks about the democratization of fuzzing at scale, highlighting the collaboration between open source communities, academia, and industry to advance the field of fuzzing. It delves into the history of fuzzing, the development of scalable fuzzing platforms, and the empowerment of community-driven research. The talk will further discuss recent advancements leveraging AI/ML and offer insights into the future evolution of the fuzzing landscape.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
Maintaining high-quality standards in the production of TMT bars is crucial for ensuring structural integrity in construction. Addressing common defects through careful monitoring, standardized processes, and advanced technology can significantly improve the quality of TMT bars. Continuous training and adherence to quality control measures will also play a pivotal role in minimizing these defects.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Courier management system project report.pdfKamal Acharya
It is now-a-days very important for the people to send or receive articles like imported furniture, electronic items, gifts, business goods and the like. People depend vastly on different transport systems which mostly use the manual way of receiving and delivering the articles. There is no way to track the articles till they are received and there is no way to let the customer know what happened in transit, once he booked some articles. In such a situation, we need a system which completely computerizes the cargo activities including time to time tracking of the articles sent. This need is fulfilled by Courier Management System software which is online software for the cargo management people that enables them to receive the goods from a source and send them to a required destination and track their status from time to time.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
Sasha Gavrilovic
1. System for process management of
construction e-permits
www.gradezna-dozvola.mk
(construction-permit)
Sasha Gavrilovic
2. Nextsense, IT company established in 2001 is specialized
in building complete IT solutions to improve the
business performance for wide range of companies
Nextsense has vast experience in developing software
solutions for the following industries:
Government
Telecommunications
Finance
Production industries
More than 80 employees with 150 certifications and
specializations:
• software development,
• security and messaging,
• database development and administration etc.
Quality certifications
• ISO 9001
• ISO 20000
• ISO 27000
• IT Mark
NEXTSENSE COMPANY PROFILE
3. International Herald Tribune;
infoWorld;
Sys-con en Espanol;
FinanzNachrichten;
Newsratings;
Harvard University - JFK School
of Government;
LePoint.fr;
Balkan analysis;
PR Newswire;
Microsoft in Government
Worldwide Edition…
Press reviews
4. Nextsense Government industry
references
e-Parliament
Parliament of the Republic of Macedonia
Parliament of the Republic of Albania
Assessment - Parliament of the Republic of Kosovo
Assessment - Parliament of Ghana
e-Cabinet
Government of the Republic of Albania
Government of the Republic of Macedonia
Government Process Management System
Cabinet of the Prime Minister of Macedonia
General Secretariat of the Government of
Macedonia
Ministries of the Government of Macedonia
Ministries of the Government of Albania
System for the Approximation of national
legislation with EU Acquis
Ministry for European Integration in Albania
Legislative Knowledge Management
Official Gazette of the Republic of Macedonia
Online Services Portal
Uslugi.gov.mk - the Government of the Republic of
Macedonia
Apply Online
Civil Servants Agency of the Republic of Macedonia
Automatic Distribution of Licenses
Ministry of Transport & Communication of the Republic
of Macedonia
Government HRMS
Civil Servants Agency of Macedonia
Ministries of the Government of Macedonia
Employment Service Agency of Macedonia
Anticorruption asset declaration management
information system
Anticorruption agency, Macedonia
e-Employment Portal
Employment Service Agency of Macedonia
Construction e-Permits
E-Urban plans
5. E-system for process management of
construction permits
The goal:
The main goal of the solution is tracking the process of
issuing construction permits through management of
required legal steps, documents and inter-institutional
communication, everything monitored by legal time-frames
and responsibilities.
6. In numbers
Municipalities: 81 + City of Skopje
Roles per municipality: 8
Institutions: over 200
Trained stuff: over 1.000 (municipalities: >500,
institutions: >300, companies: >200, …)
100% digital: All users have Digital signatures
7. Type of permits
Construction of 2nd category (constructions under the authority for
administering by municipalities, like houses, residential and office buildings,
…)
Construction of 1st category (constructions under the authority for
administering by the central government institutions, like power plants,
national roads, railways, …)
Constructions for Development Industrial Zones
Constructions under the authority for administering by capital city of Skopje
(city roads, city tunnels, tram roads, …)
Every citizen or construction company can apply for all of above categories for:
Permit for new construction, extending of existing construction,
reconstruction, adaptation, request for technical review, connection to
electrical network, … total of 18 different types of procedures.
8. Admin & data center
Overview of involved sides
Citizens
Const.
comp.
Munici
pality
Institu
tions
Ministry
Inspect
orate
• Internet based system
• E-Mail notifications
• SMS notifications
• Digital signatures
• HTTPS connection
• Transparency
• Efficiency
• Effectiveness
• Security
• Paperless
10. Process in segments
SUBMITTION
request
Filling data
into forms
Attaching
scanned data
Electronic
signing
CHECKING
of application
Archiving
Distribution
within
employees
Checking
submitted
documents
Approval from
Controller or
Manager
Collecting
OPINIONS from
institutions
Opinion
requests
Collecting
opinions
Final opinion
conclusion
CALCULATION
communal tax
Preparing
calculation
Informing
applicant
Checking
payments
ISSUING
Permit
Conclusion Approval
Issuing
Permit
Informing
applicant
11. For investors
Who can apply?
The investor (legal company or private person)
Other authorized private or legal entity
What is required?
PC with Internet connection
Digital signature from authorized issuer
APPLYING
request
Filling
data into
forms
Attaching
scanned
data
Electronic
signing
12. For investors
How?
Register (if you are first time)
Filling all required data
Type of construction and Municipality
Attaching all required documents
Scanned files
Plans, signed with digital signature
Other required documents
Signing with digital signature
APPLYING
request
Filling
data into
forms
Attaching
scanned
data
Electronic
signing
13. Notified investors
APPLYING
request
Filling data
into forms
Attaching
scanned data
Electronic
signing
CHECKING
of application
Archiving
Distribution
within
employees
Checking
submitted
documents
Approval from
Controller or
Manager
Collecting
OPINIONS from
institutions
Opinion
requests
Collecting
opinions
Final opinion
conclusion
CALCULATION
communal tax
Preparing
calculation
Informing
applicant
Checking
payments
ISSUING
Permit
Conclusion Approval
Issuing
Permit
Informing
applicant
14. Features for investors
Creating profile
Preparing request
Wizard based uploading documents
Overview of all requests
E-mail and SMS notifications
Digital signing
APPLYING
request
Filling
data into
forms
Attaching
scanned
data
Electronic
signing
15. For Municipalities
APPLYING
request
Filling data
into forms
Attaching
scanned data
Electronic
signing
CHECKING
of application
Archiving
Distribution
within
employees
Checking
submitted
documents
Approval from
Controller or
Manager
Collecting
OPINIONS from
institutions
Opinion
requests
Collecting
opinions
Final opinion
conclusion
CALCULATION
communal tax
Preparing
calculation
Informing
applicant
Checking
payments
ISSUING
Permit
Conclusion Approval
Issuing
Permit
Informing
applicant
16. Roles and users within Municipality
Municipality Administrator
Defines all users and roles within his municipality only
Mayer
Department Manager
Controller
Architect
Finance, calculating communal tax
Finance, controlling payments and bank accounts
Archive administration desk
17. APPLYING
request
Filling data
into forms
Attaching
scanned data
Electronic
signing
CHECKING
of application
Archiving
Distribution
within
employees
Checking
submitted
documents
Approval from
Controller or
Manager
Collecting
OPINIONS from
institutions
Opinion
requests
Collecting
opinions
Final opinion
conclusion
CALCULATION
communal tax
Preparing
calculation
Informing
applicant
Checking
payments
ISSUING
Permit
Conclusion Approval
Issuing
Permit
Informing
applicant
Roles within Municipality
Archive Manager Architect
Controller
Manager
Architect Manager
Tax Calculat. Finance
Architect MayerManager
18. Features for municipalities
Archiving arrived requests
Distributing and re-scheduling
requests within employees
Generating templates for all key
documents
Dynamical select of institutions
Possibility to return the requests
for corrections
Tracking time per employee and
per request
Integration with Cadaster for
receiving additional info
Overview of personal tasks
Overview of all requests
Overview of all documents, by
type and groups
Overview of time frames per
phases
E-mail notifications
Digital signing
19. For Institutions
APPLYING
request
Filling data
into forms
Attaching
scanned data
Electronic
signing
CHECKING
of application
Archiving
Distribution
within
employees
Checking
submitted
documents
Approval from
Controller or
Manager
Collecting
OPINIONS from
institutions
Opinion
requests
Collecting
opinions
Final opinion
conclusion
CALCULATION
communal tax
Preparing
calculation
Informing
applicant
Checking
payments
ISSUING
Permit
Conclusion Approval
Issuing
Permit
Informing
applicant
20. Involved Institutions
~200 institutions:
Electric power company (12 regional entities)
Public water management companies (>40)
Agency for protection and rescue (>40)
Heating power company
Agency for protection of cultural heritage
Cadaster
Ministry for Internal Affairs (>30)
Other institutions
The list is open, so administrators can add other institutions upon request and
needs for issuing procedure.
21. For Institutions
What is required?
PC with Internet connection
Digital signature from authorized issuer
22. For Institutions
How?
Receive e-mail from the system, that has a new
request
Login to the system
Overview of new received requests
Overview of all documents for each request
Prepare and attach scanned letter with opinion
and define the status (positive or negative)
Sign with digital signature
23. Integration with other Institutions
Ministry for transport (related Ministry)
Monitoring the process, submitted documents and generated documents from all involved
institutions
2nd tier commission for appeal cases
State inspectorate for administrative procedures
Monitoring all procedures and time legal time frames
Court
Receiving access to all cases that are subject on court procedure
Cadaster
Receiving data for neighboring locations in order to inform them for new constructional
permits and works
Sending all plans and data in order to integrate in their digital database
State statistical office
Electric power company
24. Features for institutions
E-mail notifications
Overview of personal tasks
Overview of all requests
Overview of all documents, by type and groups
Templates of documents
Overview of time frames per phases
Digital signing
26. Benefits
Fast and effective way of submitting
application without long queues,
misunderstandings and restrict working times
and breaks.
Transparency in the complete process of
issuing the permit, through overview of
process statuses.
Detail information for the application status
through SMS and e-mail notifications as well
as evidence and citizen involvement if some
additional documents are required in the
process.
Direct savings for application submission as
digital files and scans are required only, no
Complete overview of applications, by process
status;
Overview of legal time frames per application;
Digital interconnection with external institutions
in order for accurate response and receiving
their opinions for each application;
Greater working efficiency;
Process control;
Increasing productivity and capacity for
processing applications;
Transparency in each segment of issuing
process;
Covering the complete process of issuing
For Citizens
(private and legal companies)
For Institutions
(Ministry, Municipalities and
others)
27. In numbers
Submitted applications in system for 2 years:
8.700
Closed cases:
Approved/Refused: ~6.500
Withdrawn: ~1.150
Appeal cases: ~60
Average days for approved e-permits: 64 days
100% paperless 100% by law 100% transparent
28. Awards and recognitions
2014 National IT Award – Public sector
Microsoft CityNext Solutions – Top #10
Regional Municipality Conference, Opatija
2013
…
30. Solution functionalities
Accepting requests through web-based system directly in
digital form;
Overview and archiving received requests;
Distribution of requests to related municipalities and
institutions, based on construction category
Distribution of requests per employees within the
municipality
Central system for tracking legal time-frames for each
process phase;
Connection with relevant external institutions, distributing
and forwarding requests for collecting their opinion and
evidence of all opinions and institutional documents back in
the central system according legal time-frames;
Digital signing of all steps and actions by all involved users
in the system;
Generating template documents for most common needs
with appropriate municipality logo and data, their archiving
and possibility for their printing and forwarding through the
system;
Issuing construction permit and informing the applicants;
Document versioning;
Restricted access of each municipality to their
documents only
Defining roles and access rights;
Dynamic process flow based on the hierarchy in the
Municipality;
User switch between several roles in the process;
Possibility for each applicant to follow the status of his
requests;
SMS and e-mail notification for status change of
requests;
Integration with Ministry and State Inspectorate
Authority and their notification and access to each
application that exceeds legal time-frame for each
process phases;
Integration and forwarding requests to the Court for
applications that are under court investigation;
Reports and overviews by key parameters;
Restricted portal segment for each applicant, so he
can prepare for new requests and overview and follow
existing;