The document provides details on several commercial construction and renovation projects completed by General Consolidated Constructors, including:
1) A tenant improvement project at Danco Metal Finishing involving modifying existing office and warehouse space and installing a mezzanine area.
2) Expanding production at Superior Quality Foods by installing two new boilers and demolishing an existing boiler.
3) Constructing a new production kitchen and waste line as a tenant improvement for La Zamorana Candy Co. to accommodate their expanding business.
Simon Design Engineering is a professional engineering services company focused on providing the latest in client-based concepts and solutions to owners, developers, public agencies, architects, and builders throughout the United States.
Central Eastern Works Open House - October 2019Crosstown TO
Contains current and upcoming stages of construction for the stations/stops of: Eglinton, Mount Pleasant, Leaside, Laird, Brentcliffe (Portal), Sunnybrook Park and Science Centre.
Simon Design Engineering is a professional engineering services company focused on providing the latest in client-based concepts and solutions to owners, developers, public agencies, architects, and builders throughout the United States.
Central Eastern Works Open House - October 2019Crosstown TO
Contains current and upcoming stages of construction for the stations/stops of: Eglinton, Mount Pleasant, Leaside, Laird, Brentcliffe (Portal), Sunnybrook Park and Science Centre.
I am a self-motivated individual. I put my all into everything I do to get the job done effectively and efficiently. I could say that challenging work and the pursuit of success drives me to deliver the best out of me. I always ensure that my clients get the best service which I can provide. I have always felt that it is important, both to me personally, and for my company that my clients are fully satisfied and provides a positive feedback. My drive to constantly develop my technical and interpersonal skills is the reason for my good reputation within my present organization and among all my clients.
Success is in the Details - Colocation Data CentersMcKenney's Inc
McKenney’s installed a new prefabricated chiller plant and piping loop to support up to nine megawatts of critical load for a colocation data center in North Carolina.
The purpose of this emergency project was to replace approximately 60-ft segment of 10-inch wastewater sewer pipe that was broken and to retrieve a Closed-Circuit Television Inspection (CCTV) camera that was stuck in the pipe during routine maintenance work. This project was substantially complete on May 14, 2021.
Thinking, Delivering On-the-fly - Data Center Mechanical Installation
Linkeden files
1. pg
DANCO METAL FINISHING
TENT IMPROVEMENT
MEZZANINE
LOCATION: 1745 Monticello
Ontario, CA 91761
PROJECT SUMMARY:
Danco Metal Surfacing Company is planed
to the following “tenant improved”, which
entailed Modifying the existing office and
warehouse space and the installation of a
mezzanine area.
SCOPE OF WORK: My participation
throughout this project started with task
of picking up existing redlines, and draft-
ing the missing details. Upon which i need
to coordinated between the various gov-
ernmental agencies and act as project
coordinator with the on site project man-
ager.
FINISHED FLOOR PLAN OF THE OVERALL
BUILDING.
GENERAL CONSOLIDATED CONSTRUCTORS
MANNING ENGINEERING
2. pg
MASONRY CONSTRUCTION DETAILS CRE-
ATED FOR THE MECHANICAL ROOM. ALL
DETAILS WHERE CREATED BY AUTOCAD
2012.
18'-6
16'-0
17'-0
(E) CONC.
SLAB
(E) TILT-UP
CONC. WALL
(N) MASONRY
COLUMN
7/8 WITH EPOXY COATING
CEMENT PLASTER AT
UNDERSIDE
(E) 2X15 RAFTER
10 OFF, EQ. SPACED
(E) SUB-PURLINS
2X4 @ 2' O.C. TYP
(E) 6X18 BEAM
(N) MASONRY
COLUMN
(E) CONC. COLUMN
(IN BACKGROUND)
(N) MASONRY
COLUMN
SAW CUT (E)SLAB
FOR (N) SLAB SLOPED
(N) CONC. BLOCK
WALL PER STRUCT.
(E) REINF. CONC.
SLAB
FLOOR PIT
PER DETAIL
LOWEST POINT
IN ROOM
CONT. PLASTIC LINER
SEE DETAIL 1 OF D-1
(N) REINF. CONC.
SLAB PER STRUCT.
1/4PER FT. SLOPE
(E) FOOTING
3X PLATE
(E) 6X18 BEAM
1/4 : 12
(E) CONC. COLUMN
(IN BACKGROUND)
(N) MASONRY
COLUMN
(N) MASONRY
COLUMN (N) EQUIPMENT ON RAISED
ON CONC. PAD
(N) 4X BEAM
SEE STRUCT.
SECTION A SCALE: 1/4 = 1'-0
14' - 0
TORCHDOWN
MODIFIED BITUMEN MEMBRANE ROOFING W/ MINERAL
GRANULAR SURFACE, COLOR; TBD AS MANUFACTURED
BY CERTAINTEED CORP, FLINTASTIC GTA,
ICC-ES ESR-1388 OVER 1-PLY 30# GLASBASE
(OR EQUAL) OVER CDX PLYWOOD
(E) PARAPET
(N) 8 THK CONC.
BLOCKWALL
(N) REINF. CONC. SLAB
PER STRUCT.
20' - 0
(E) ROLL - DOOR
TOALIGNTOADJACENTTILT-UPWALLALONGNORTHSIDE
TOALIGNTOADJACENTTILT-UPWALLALONGNORTHSIDE
20' - 0
GENERALCONSOLIDATEDINC.
DANCO,EN,LLC.
TENANTIMPROVEMENT
REVISIO
4/8/1
MEZZANINE
CONTAINMENT SECTION
DETAILS ELEVATIONS AND SECTION
3. pg
SUPERIOR QUALITY
FOODS
LOCATION: 2355 EAST FRANCIS ST.
Ontario, CA 91761
PROJECT SUMMARY:
Superior Quality Food wished to expand
the production of existing product line by
the installation of two new boilers and the
demolition of the existing boiler.
SCOPE OF WORK: This project was de-
sign build within General Consolidated
Constructors. The design was created by
Rob McCoy myself based on a previous
project. This project was created with
Autocad 2012.
FLOOR PLAN
GENERAL CONSOLIDATED CONSTRUCTORS
MANNING ENGINEERING
SITE PLAN
FLOOR PLAN OF THE NEW BOILER
EXTENSION.
4. pg
ELEVATION AND DETAILSROOF PLAN
ROOF PLAN OF THE BOILER CANOPY. STRUCTURAL SECTION OF THE CANOPY POST CONNECTION
EQUIPMENT ELEVATION
5. pg
LA ZAMORANA CANDY
CO.
LOCATION: 7700 WILSON AVE.
HUNTINGTON PARK , CA 91761
PROJECT SUMMARY:
La Zamorana Candy Co. required a new fa-
cility in order to me the expanding. So the
construction of a new production kitchen
and waste line as a “tenant improve-
ment” was required.
SCOPE OF WORK: This project was design
build within General Consolidated Con-
structors. The design was created by Rob
McCoy based on the requirement given
to us by the client. The difficulty of this
project was coordinate between Public
Health and Industrial Waste.
GENERAL CONSOLIDATED CONSTRUCTORS
HAITHAM ENGINEERING
FLOOR PLAN WAS CREATED IN AUTOCAD 2012. THEY
LAYOUT OF THE DESIGN WAS CREATED BY ROB MCCOY
AND MY SELF BASED ON THE FUTURE NEEDS OF THE
CLIENT
6. pg
STRUCTURAL DETAIL STAIR SECTION AND INTERIOR EQUIPMENT ELEVATION
THE STRUCTURAL DETAIL WAS
CREATED UNDER THE DIRECTION
OF THE PROJECT ENGINEER.