CURRICULUM VITAE
Asif Mahmood Fida
Qualification:
B.Tech (Hons) in Civil Engineering
Preston University of Islamabad Campus
B.Tech (Pass) in Civil Engineering
Preston University of Islamabad Campus
DIPLOMA IN CIVIL ENGINEERING
Punjab Board of Technical Education Lahore, Pakistan
COMPUTER SKILLS
• AUTOCAD (Advance)
• AUTOCAD 3D CIVIL2016
• AUTOCAD STRUCTURAL DETAIL 2015
• SAP2000 (working Medium level and knowledge
• GOOGLE EARTH
• MS EXCEL (Advance)
• MS WORLD
• I soft for Irrigation Channel X- Section Prog
• Prog Road ( Profile & X-Section Prog & Irrigation channel.
Building & bridges Drawings .GPS
Experience: 12 years.
Present Company : Irrigation and Power Department Government of Punjab
Period : October 2006 to Present
Position : Sub Engineer
Project : Construction Division Project Circle
Location : Deara Ghazi Khan (Pakistan)
Client : Government of Pakistan
Road Work:
Responsible for preparation of Embankment Sub grade, Sub Base, Aggregate, Base Course,
Asphaltic Base course & Asphaltic Wearing course, Prime coat, Take coat, Kerb Stone , Inter
Locking, Asphalt Parking Area as per Approved drawings and Specifications and preparation of
bar bending schedule for structure work and maintenance.Costruction of Road in hill Areas,
Construction of precast Bridges.
Concrete Work
Asif Mahmood Fida Page 1
Supervised Concrete at site Blinding concrete Pedestals, Wall, Road Crossing Ducts, Sewer
Manholes, Krebs Stone Blinding & Hunching, MOL Protections, Raft ,column Footing, Beams,
Lintel, Slab.
SURVEY & INVESTIGATION
Survey work of road , building , Irrigation Channel , Dames, River, With Coordinates
system, Topography , GPS . Contours, Layout, Alignments, Through Total Station. Auto
Level. And Preparation in Autocad 3d civil, Autocad,
Irrigation & Head Regulators and Building Works
Supervision Rafts, columns Footing, Columns, Beams, Roof slabs, Electrical & Instruments cables
Trenches, Cover slabs. Drainage pits, excavation, Formation, Bending Bing of Steel Works, Concrete
works. Checked Layout and Alignment of wall and column and other . Sub grade compaction, sanitary
work and electricity.
Area as per Approved drawings and Specifications
Irrigation channel & head regulators, Fall structures, Retaining walls, Dams, Seepage Drainage
system (water Logging Areas) X-ing Structures and Precast Bridges, inlet. Water course. Etc.
SEWER LINES
• Excavation and Blinding Concrete of Sewer Manholes
• Excavation Formation lying of (UPVC & GRP) Different Dia of pipes 200,
300,400,450,500,600,700,550, Bedding Surrounding backfilling Air test (GRP) Lamination etc.
• Pre-Casting & installation, Benching, Covers Slabs, Fixing of GRP liners formworks and Concrete
of Sewer Manholes Shafts with Safety.
• Waterproofing membrane & protection boards of manholes.
• Fixing of short pieces & Concrete foundation
• over excavation
• Pre-Casting of cover slabs telephones chambers JRC chambers base walls & light poles
Pipe Protection slabs, Electrical Cable Ducts, Flooring, etc. preparation of bar bending
schedule for structure work and maintenance.
STORMWATER
Excavation of Soak ways laying Geotextile Aggregate UPVC Filter pipes placing of Storm water Gully
fixing of fitting & surrounding concrete
IRRIGATION & POTEABLE WATER
Excavation, Formation, Bedding of Lines (HDPE-GRE-UPVC) pipe laying- Power cables laying,
Warming Tape, Pressure Test, Thrust Block Chamber & Valves Installed.
GASS & FIRE WORKS
Excavation & Formation HDPE pipe Laying Road Crossing Chamber & Valves Fixing Fitting Checking.
TELE COMMUNICATION WORKS
Supervision Excavation & Formation Bedding, UPVC pipe laying Installation JRC junction, Concrete
Laying, Warning Tape, Mandrel Test Lines, Installation of water proofing membrane & protection Board
Supervised High Voltage (220/132 KV) S/S or T/L project construction
132 KV, 11KV, LV CABLES DUCTS
Supervision Cables Ducts, Culverts & Slabs. Sand Filling etc
Asif Mahmood Fida Page 2
PIPELINES TESTS
Supervision pressure Test, Water test, Air test, Deflection test, and Mandrel test.
RESPONSIBILITES:
Responsible for Controlling the Contractor for various site issues.
Responsible for check the Survey Work and control points coordinate.
Responsible for Controlling Concrete Works in infrastructure works.
Responsible for checking non conformity in site works and informing the QA/QC Manager.
Responsible for Witnessing Concrete crushing for 7 days & 28 Days and entering in log.
Responsible for checking the Laboratory instruments Calibration dates regularly.
Responsible for Field density, Proctor, soil/ sand sampling and testing and compare with
Specification.
Responsible for controlling the Contractor on various site issues.
Responsible for check lists inspections on site for pre Concrete, steel reinforcement.
Responsible for preparing weekly and monthly report
preparation of bar bending schedule for structure work and maintenance.
Farooq Abdullah Construction Company Pvt Limited
Period : July 2003 to October 2006
Client : National Highway Authority
Construction of Road& building works
Position : Site Engineer
Project : Govt: of Punjab Dera Ghazi Khan Rural Development Project
Construction of building works
Road Work
Supervision and preparation of Embankment. Sub grade, Sub Base, Aggregate
Base Course, Asphaltic Base Course & Asphaltic wearing Course.
Supervision Kerb Stone, Parking Area, Landscaping Irrigation etc.
Over all supervision of cutting filling sub grade sub base at main roads.
Structure of retaining walls, storm water drain pipe culverts And U turns culverts at over all projects
With Maintenance.
Plant Civil works
Rafts, columns Footing, Columns, Beams, Roof slabs, Electrical & Instruments cables
Trenches, Cover slabs. Drainage pits, excavation, Formation, Bending Bing of Steel Works, Concrete
works.
Plant Paving
Supervised of Marble tiles, Granite Tiles, Chips Flooring, Interlock Flooring and Parking
Area. Fire Proof Tile Flooring, Flooring plain cement concrete, lying sub base.
RESPONSIBILITES
Responsible for trouble shooting of site with consultant & Company
Management
Responsible for attending the daily weekly monthly meeting with higher management
Responsible for progress of site in against given machinery & manpower
Management
Responsible for cost control of work executed rate not exceed to given normal
Budgeted rates
Responsible for check request from consultant client
Arrangement of machinery & manpower as site requirement
Asif Mahmood Fida Page 3
Personal Information:
Nationality Pakistani
Date of Birth 15 March 1981
Passport No AF8494501
Visa Status Employment Visa
Mobile No +92-333-6498371
Email asifmahmood555@yahoo.com
Permanent Address: Asif Mahmood Fida Block No 25 House No 6-A Near
Police Station– B -Division , D.G.khan Punjab Pakistan
Asif Mahmood Fida Page 4

CV ASIF MAHMOOD

  • 1.
    CURRICULUM VITAE Asif MahmoodFida Qualification: B.Tech (Hons) in Civil Engineering Preston University of Islamabad Campus B.Tech (Pass) in Civil Engineering Preston University of Islamabad Campus DIPLOMA IN CIVIL ENGINEERING Punjab Board of Technical Education Lahore, Pakistan COMPUTER SKILLS • AUTOCAD (Advance) • AUTOCAD 3D CIVIL2016 • AUTOCAD STRUCTURAL DETAIL 2015 • SAP2000 (working Medium level and knowledge • GOOGLE EARTH • MS EXCEL (Advance) • MS WORLD • I soft for Irrigation Channel X- Section Prog • Prog Road ( Profile & X-Section Prog & Irrigation channel. Building & bridges Drawings .GPS Experience: 12 years. Present Company : Irrigation and Power Department Government of Punjab Period : October 2006 to Present Position : Sub Engineer Project : Construction Division Project Circle Location : Deara Ghazi Khan (Pakistan) Client : Government of Pakistan Road Work: Responsible for preparation of Embankment Sub grade, Sub Base, Aggregate, Base Course, Asphaltic Base course & Asphaltic Wearing course, Prime coat, Take coat, Kerb Stone , Inter Locking, Asphalt Parking Area as per Approved drawings and Specifications and preparation of bar bending schedule for structure work and maintenance.Costruction of Road in hill Areas, Construction of precast Bridges. Concrete Work Asif Mahmood Fida Page 1
  • 2.
    Supervised Concrete atsite Blinding concrete Pedestals, Wall, Road Crossing Ducts, Sewer Manholes, Krebs Stone Blinding & Hunching, MOL Protections, Raft ,column Footing, Beams, Lintel, Slab. SURVEY & INVESTIGATION Survey work of road , building , Irrigation Channel , Dames, River, With Coordinates system, Topography , GPS . Contours, Layout, Alignments, Through Total Station. Auto Level. And Preparation in Autocad 3d civil, Autocad, Irrigation & Head Regulators and Building Works Supervision Rafts, columns Footing, Columns, Beams, Roof slabs, Electrical & Instruments cables Trenches, Cover slabs. Drainage pits, excavation, Formation, Bending Bing of Steel Works, Concrete works. Checked Layout and Alignment of wall and column and other . Sub grade compaction, sanitary work and electricity. Area as per Approved drawings and Specifications Irrigation channel & head regulators, Fall structures, Retaining walls, Dams, Seepage Drainage system (water Logging Areas) X-ing Structures and Precast Bridges, inlet. Water course. Etc. SEWER LINES • Excavation and Blinding Concrete of Sewer Manholes • Excavation Formation lying of (UPVC & GRP) Different Dia of pipes 200, 300,400,450,500,600,700,550, Bedding Surrounding backfilling Air test (GRP) Lamination etc. • Pre-Casting & installation, Benching, Covers Slabs, Fixing of GRP liners formworks and Concrete of Sewer Manholes Shafts with Safety. • Waterproofing membrane & protection boards of manholes. • Fixing of short pieces & Concrete foundation • over excavation • Pre-Casting of cover slabs telephones chambers JRC chambers base walls & light poles Pipe Protection slabs, Electrical Cable Ducts, Flooring, etc. preparation of bar bending schedule for structure work and maintenance. STORMWATER Excavation of Soak ways laying Geotextile Aggregate UPVC Filter pipes placing of Storm water Gully fixing of fitting & surrounding concrete IRRIGATION & POTEABLE WATER Excavation, Formation, Bedding of Lines (HDPE-GRE-UPVC) pipe laying- Power cables laying, Warming Tape, Pressure Test, Thrust Block Chamber & Valves Installed. GASS & FIRE WORKS Excavation & Formation HDPE pipe Laying Road Crossing Chamber & Valves Fixing Fitting Checking. TELE COMMUNICATION WORKS Supervision Excavation & Formation Bedding, UPVC pipe laying Installation JRC junction, Concrete Laying, Warning Tape, Mandrel Test Lines, Installation of water proofing membrane & protection Board Supervised High Voltage (220/132 KV) S/S or T/L project construction 132 KV, 11KV, LV CABLES DUCTS Supervision Cables Ducts, Culverts & Slabs. Sand Filling etc Asif Mahmood Fida Page 2
  • 3.
    PIPELINES TESTS Supervision pressureTest, Water test, Air test, Deflection test, and Mandrel test. RESPONSIBILITES: Responsible for Controlling the Contractor for various site issues. Responsible for check the Survey Work and control points coordinate. Responsible for Controlling Concrete Works in infrastructure works. Responsible for checking non conformity in site works and informing the QA/QC Manager. Responsible for Witnessing Concrete crushing for 7 days & 28 Days and entering in log. Responsible for checking the Laboratory instruments Calibration dates regularly. Responsible for Field density, Proctor, soil/ sand sampling and testing and compare with Specification. Responsible for controlling the Contractor on various site issues. Responsible for check lists inspections on site for pre Concrete, steel reinforcement. Responsible for preparing weekly and monthly report preparation of bar bending schedule for structure work and maintenance. Farooq Abdullah Construction Company Pvt Limited Period : July 2003 to October 2006 Client : National Highway Authority Construction of Road& building works Position : Site Engineer Project : Govt: of Punjab Dera Ghazi Khan Rural Development Project Construction of building works Road Work Supervision and preparation of Embankment. Sub grade, Sub Base, Aggregate Base Course, Asphaltic Base Course & Asphaltic wearing Course. Supervision Kerb Stone, Parking Area, Landscaping Irrigation etc. Over all supervision of cutting filling sub grade sub base at main roads. Structure of retaining walls, storm water drain pipe culverts And U turns culverts at over all projects With Maintenance. Plant Civil works Rafts, columns Footing, Columns, Beams, Roof slabs, Electrical & Instruments cables Trenches, Cover slabs. Drainage pits, excavation, Formation, Bending Bing of Steel Works, Concrete works. Plant Paving Supervised of Marble tiles, Granite Tiles, Chips Flooring, Interlock Flooring and Parking Area. Fire Proof Tile Flooring, Flooring plain cement concrete, lying sub base. RESPONSIBILITES Responsible for trouble shooting of site with consultant & Company Management Responsible for attending the daily weekly monthly meeting with higher management Responsible for progress of site in against given machinery & manpower Management Responsible for cost control of work executed rate not exceed to given normal Budgeted rates Responsible for check request from consultant client Arrangement of machinery & manpower as site requirement Asif Mahmood Fida Page 3
  • 4.
    Personal Information: Nationality Pakistani Dateof Birth 15 March 1981 Passport No AF8494501 Visa Status Employment Visa Mobile No +92-333-6498371 Email asifmahmood555@yahoo.com Permanent Address: Asif Mahmood Fida Block No 25 House No 6-A Near Police Station– B -Division , D.G.khan Punjab Pakistan Asif Mahmood Fida Page 4