Wagman’s Geotechnical Construction group provided services for an earth retention
system in Baltimore, MD, including tiebacks, rakers with heel blocks, walers and
bracing and tie downs for a new apartment building with commercial space. Wagman
successfully removed the top four feet of the earth retention system. Additionally,
tiedowns were installed into the mat slab foundation for the elevator. The permanent
anchors were drilled and grouted to 40 feet.
The completed project will offer 157 apartments for Johns Hopkins University students,
31,500 SF of commerical space and a parking structure with 162 spaces for use by
both tenants and the public. Additionally, a grocery store and pharmacy is planned for
development.
Project		 33rd
St. Paul Street
Location		 Baltimore, MD
Project Type	 Micropiles, 		
		 Sheeting & Shoring
Construction Costs $508,000
Owner		 Hopkins Village, LLC
Duration	 	 April 2015 - 		
		 June 2015
KEY CHALLENGES & PROJECT DETAILS
•	Installation of the piles and tiebacks was challenging due to the gneiss bedrock underlying the site at shallow depths.
•	Drilling was performed at an angle so there was no damage to the caissons that were drilled prior to the start of Wagman’s
work.

More Related Content

What's hot

Joyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CV
Joyce Lee
 
Proper Maintenance for the Long Life of Concrete Pavements
Proper Maintenance for the Long Life of Concrete PavementsProper Maintenance for the Long Life of Concrete Pavements
Proper Maintenance for the Long Life of Concrete Pavements
Jill Reeves
 
Tim McAnallen - Construction Inspector 2104
Tim McAnallen - Construction Inspector 2104Tim McAnallen - Construction Inspector 2104
Tim McAnallen - Construction Inspector 2104
Timothy McAnallen
 
Belle View Pump Station Rehabilitation
Belle View Pump Station RehabilitationBelle View Pump Station Rehabilitation
Belle View Pump Station Rehabilitation
Fairfax County
 
IV Consulting - Architectural Projects
IV Consulting - Architectural ProjectsIV Consulting - Architectural Projects
IV Consulting - Architectural Projects
Lucian Gunter IV
 
A 1 Concrete Leveling (Western New York) 2010 Results
A 1 Concrete Leveling (Western New York) 2010 ResultsA 1 Concrete Leveling (Western New York) 2010 Results
A 1 Concrete Leveling (Western New York) 2010 Results
A-1 Concrete Leveling & Foundation Repair
 
dave resume sept 2015
dave resume sept 2015dave resume sept 2015
dave resume sept 2015
Dave Hoover
 
JAGMOC RESUME
JAGMOC RESUMEJAGMOC RESUME
JAGMOC RESUME
Ferdenand Jagmoc
 
CSA_Structural_2015
CSA_Structural_2015CSA_Structural_2015
CSA_Structural_2015
Patrick J. Morrissey
 
The Galleries 032116.1
The Galleries 032116.1The Galleries 032116.1
The Galleries 032116.1
Stewart Cardon
 
Planning Report; Assembly Halls, Monaghan
Planning Report; Assembly Halls, MonaghanPlanning Report; Assembly Halls, Monaghan
Planning Report; Assembly Halls, Monaghan
Paul Coyle
 
Lemon Road Elementary School Porous Pavement Replacement
Lemon Road Elementary School Porous Pavement ReplacementLemon Road Elementary School Porous Pavement Replacement
Lemon Road Elementary School Porous Pavement Replacement
Fairfax County
 
Concrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing StrategyConcrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing Strategy
Jill Reeves
 
Colter Cothren Resume 2016
Colter Cothren Resume 2016Colter Cothren Resume 2016
Colter Cothren Resume 2016
Colter Cothren
 
PowerPoint report of Hyatt Regency Walkway Collapse of 1981
PowerPoint report of Hyatt Regency Walkway Collapse of 1981PowerPoint report of Hyatt Regency Walkway Collapse of 1981
PowerPoint report of Hyatt Regency Walkway Collapse of 1981
Ash Bista
 
PIC 2 Display Boards
PIC 2 Display BoardsPIC 2 Display Boards
PIC 2 Display Boards
Toronto Public Consultation Unit
 
BPA Commercial
BPA CommercialBPA Commercial
BPA Commercial
Jason McDonald
 
Fontainebleau Article
Fontainebleau ArticleFontainebleau Article
Fontainebleau Article
Robert Meller
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
Toronto Public Consultation Unit
 
The kansas city hyatt regency walkway collapse
The kansas city hyatt regency walkway collapseThe kansas city hyatt regency walkway collapse
The kansas city hyatt regency walkway collapse
Arpit Modh
 

What's hot (20)

Joyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CVJoyce Lee_2016_ARCADIS_CV
Joyce Lee_2016_ARCADIS_CV
 
Proper Maintenance for the Long Life of Concrete Pavements
Proper Maintenance for the Long Life of Concrete PavementsProper Maintenance for the Long Life of Concrete Pavements
Proper Maintenance for the Long Life of Concrete Pavements
 
Tim McAnallen - Construction Inspector 2104
Tim McAnallen - Construction Inspector 2104Tim McAnallen - Construction Inspector 2104
Tim McAnallen - Construction Inspector 2104
 
Belle View Pump Station Rehabilitation
Belle View Pump Station RehabilitationBelle View Pump Station Rehabilitation
Belle View Pump Station Rehabilitation
 
IV Consulting - Architectural Projects
IV Consulting - Architectural ProjectsIV Consulting - Architectural Projects
IV Consulting - Architectural Projects
 
A 1 Concrete Leveling (Western New York) 2010 Results
A 1 Concrete Leveling (Western New York) 2010 ResultsA 1 Concrete Leveling (Western New York) 2010 Results
A 1 Concrete Leveling (Western New York) 2010 Results
 
dave resume sept 2015
dave resume sept 2015dave resume sept 2015
dave resume sept 2015
 
JAGMOC RESUME
JAGMOC RESUMEJAGMOC RESUME
JAGMOC RESUME
 
CSA_Structural_2015
CSA_Structural_2015CSA_Structural_2015
CSA_Structural_2015
 
The Galleries 032116.1
The Galleries 032116.1The Galleries 032116.1
The Galleries 032116.1
 
Planning Report; Assembly Halls, Monaghan
Planning Report; Assembly Halls, MonaghanPlanning Report; Assembly Halls, Monaghan
Planning Report; Assembly Halls, Monaghan
 
Lemon Road Elementary School Porous Pavement Replacement
Lemon Road Elementary School Porous Pavement ReplacementLemon Road Elementary School Porous Pavement Replacement
Lemon Road Elementary School Porous Pavement Replacement
 
Concrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing StrategyConcrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing Strategy
 
Colter Cothren Resume 2016
Colter Cothren Resume 2016Colter Cothren Resume 2016
Colter Cothren Resume 2016
 
PowerPoint report of Hyatt Regency Walkway Collapse of 1981
PowerPoint report of Hyatt Regency Walkway Collapse of 1981PowerPoint report of Hyatt Regency Walkway Collapse of 1981
PowerPoint report of Hyatt Regency Walkway Collapse of 1981
 
PIC 2 Display Boards
PIC 2 Display BoardsPIC 2 Display Boards
PIC 2 Display Boards
 
BPA Commercial
BPA CommercialBPA Commercial
BPA Commercial
 
Fontainebleau Article
Fontainebleau ArticleFontainebleau Article
Fontainebleau Article
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
 
The kansas city hyatt regency walkway collapse
The kansas city hyatt regency walkway collapseThe kansas city hyatt regency walkway collapse
The kansas city hyatt regency walkway collapse
 

Similar to 33rd and St Paul

GCS PSU Pegula2
GCS PSU Pegula2GCS PSU Pegula2
GCS PSU Pegula2
Ryan R. Smith, EIT
 
Lenny Roderick's Resume
Lenny Roderick's ResumeLenny Roderick's Resume
Lenny Roderick's Resume
Lenny Roderick
 
PRESENTATION 10-Reduced
PRESENTATION 10-ReducedPRESENTATION 10-Reduced
PRESENTATION 10-Reduced
Bill Rosselot
 
Nikolai Tim (01-24-11) (3)
Nikolai Tim (01-24-11) (3)Nikolai Tim (01-24-11) (3)
Nikolai Tim (01-24-11) (3)
Timothy Nikolai
 
Completed Projects Ex Brace Other
Completed Projects Ex Brace OtherCompleted Projects Ex Brace Other
Completed Projects Ex Brace Other
kingcrawford1
 
Fci Presentation Updated 8 11 08
Fci Presentation Updated 8 11 08Fci Presentation Updated 8 11 08
Fci Presentation Updated 8 11 08
aquarles
 
i+iconUSA Corporate Presentation
i+iconUSA Corporate Presentationi+iconUSA Corporate Presentation
i+iconUSA Corporate Presentation
i+iconUSA
 
New Jersey Projects
New Jersey ProjectsNew Jersey Projects
New Jersey Projects
Gilsanz Murray Steficek
 
WALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom CompWALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom Comp
Walid Tanbedawy, PE, MCM
 
Geo-Keller Project History
Geo-Keller Project HistoryGeo-Keller Project History
Geo-Keller Project History
Chad Smith
 
NJ Projects - Anthony Pagnotta
NJ Projects - Anthony PagnottaNJ Projects - Anthony Pagnotta
NJ Projects - Anthony Pagnotta
Gilsanz Murray Steficek
 
Peppercorn Drive Outfall Restoration
Peppercorn Drive Outfall RestorationPeppercorn Drive Outfall Restoration
Peppercorn Drive Outfall Restoration
Fairfax County
 
Merrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectMerrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation Project
Fairfax County
 
Guildford High School
Guildford High SchoolGuildford High School
Guildford High School
Gints Kantelis
 
Guildford High School
Guildford High SchoolGuildford High School
Guildford High School
Gints Kantelis
 
BECC Project Showcase
BECC Project ShowcaseBECC Project Showcase
BECC Project Showcase
Eric Polzin, P.E.
 
1926 concrete safety 2018
1926 concrete safety 20181926 concrete safety 2018
1926 concrete safety 2018
John Newquist
 
Shopping for a Solution
Shopping for a SolutionShopping for a Solution
Shopping for a Solution
Terry S. Aylward
 
Francisco Quintana Resume
Francisco Quintana Resume Francisco Quintana Resume
Francisco Quintana Resume
Francisco Quintana Anzures
 
Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Master_Resume__Ron_White_9
Master_Resume__Ron_White_9
Ron White
 

Similar to 33rd and St Paul (20)

GCS PSU Pegula2
GCS PSU Pegula2GCS PSU Pegula2
GCS PSU Pegula2
 
Lenny Roderick's Resume
Lenny Roderick's ResumeLenny Roderick's Resume
Lenny Roderick's Resume
 
PRESENTATION 10-Reduced
PRESENTATION 10-ReducedPRESENTATION 10-Reduced
PRESENTATION 10-Reduced
 
Nikolai Tim (01-24-11) (3)
Nikolai Tim (01-24-11) (3)Nikolai Tim (01-24-11) (3)
Nikolai Tim (01-24-11) (3)
 
Completed Projects Ex Brace Other
Completed Projects Ex Brace OtherCompleted Projects Ex Brace Other
Completed Projects Ex Brace Other
 
Fci Presentation Updated 8 11 08
Fci Presentation Updated 8 11 08Fci Presentation Updated 8 11 08
Fci Presentation Updated 8 11 08
 
i+iconUSA Corporate Presentation
i+iconUSA Corporate Presentationi+iconUSA Corporate Presentation
i+iconUSA Corporate Presentation
 
New Jersey Projects
New Jersey ProjectsNew Jersey Projects
New Jersey Projects
 
WALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom CompWALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom Comp
 
Geo-Keller Project History
Geo-Keller Project HistoryGeo-Keller Project History
Geo-Keller Project History
 
NJ Projects - Anthony Pagnotta
NJ Projects - Anthony PagnottaNJ Projects - Anthony Pagnotta
NJ Projects - Anthony Pagnotta
 
Peppercorn Drive Outfall Restoration
Peppercorn Drive Outfall RestorationPeppercorn Drive Outfall Restoration
Peppercorn Drive Outfall Restoration
 
Merrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectMerrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation Project
 
Guildford High School
Guildford High SchoolGuildford High School
Guildford High School
 
Guildford High School
Guildford High SchoolGuildford High School
Guildford High School
 
BECC Project Showcase
BECC Project ShowcaseBECC Project Showcase
BECC Project Showcase
 
1926 concrete safety 2018
1926 concrete safety 20181926 concrete safety 2018
1926 concrete safety 2018
 
Shopping for a Solution
Shopping for a SolutionShopping for a Solution
Shopping for a Solution
 
Francisco Quintana Resume
Francisco Quintana Resume Francisco Quintana Resume
Francisco Quintana Resume
 
Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Master_Resume__Ron_White_9
Master_Resume__Ron_White_9
 

33rd and St Paul

  • 1. wagman.com 33rd &St.PaulStreet Wagman’s Geotechnical Construction group provided services for an earth retention system in Baltimore, MD, including tiebacks, rakers with heel blocks, walers and bracing and tie downs for a new apartment building with commercial space. Wagman successfully removed the top four feet of the earth retention system. Additionally, tiedowns were installed into the mat slab foundation for the elevator. The permanent anchors were drilled and grouted to 40 feet. The completed project will offer 157 apartments for Johns Hopkins University students, 31,500 SF of commerical space and a parking structure with 162 spaces for use by both tenants and the public. Additionally, a grocery store and pharmacy is planned for development. Project 33rd St. Paul Street Location Baltimore, MD Project Type Micropiles, Sheeting & Shoring Construction Costs $508,000 Owner Hopkins Village, LLC Duration April 2015 - June 2015 KEY CHALLENGES & PROJECT DETAILS • Installation of the piles and tiebacks was challenging due to the gneiss bedrock underlying the site at shallow depths. • Drilling was performed at an angle so there was no damage to the caissons that were drilled prior to the start of Wagman’s work.