SlideShare a Scribd company logo
1
Sardar Sarovar Project
56 years of Controversary
Construction and Built Environment Sector
222
` Abhilash Pakhmode
Hrishikesh Jadhav
Siddhesh Patil
Tarsem Chauhan
Team
Members
Source: http://www.hydroresearch.se/en/about-us/fantastic-dam-water-flow-scenery-
wallpaper/
3
Background
of the Project
• .
1946
1961
1987
2017
Initiation of Narmada Valley Development Project
(NVDP) to utilise the Narmada River for Irrigation
First Prime minister Hon’ble
Jawaharlal Nehru initiated the
SSP.
Current Prime Minister Hon’ble Narendra
Modi inaugurated the SSP
Initiation of the
construction of the SSP
4
About the Project
Source:
www.google.co.in/maps/place/Sardar+Sarovar+Dam,+Gujarat+393155/@21.8379973,73.729694,14.53z/d
ata=!4m5!3m4!1s0x39601e75f68e3dd3:0x60d783d6475b6669!8m2!3d21.8305054!4d73.7485212
•
•Sardar Sarovar Dam (SSD) is a part of Narmada Valley
Development Project
•SSP will be projecting 1,450 MW of electricity generation
Length of main concrete gravity dam = 1210 m
Length of Reservoir = 214 km
Spillway Capacity = 87,000 cumecs
•Height from the deepest foundation level = 163 m
Catchment area of river above dam site = 88,000 sq. km
5
About the Project
•
30%
36%
34%
37,533 ha
Agricultural
Forest
River & Water Bed
Acquired Land
88.14%
1.7%
10.16%
Catchment Area
Madhya Pradesh
Mahrashtra
Gujarat
97,410
sq.km
57%
27%
16%
Funds Raised for Power generation
Madhya Pradesh
Mahrashtra
Gujarat
97,410
sq.km
6
Purpose
of the Project
Hydroelectricity
• Capacity of the Power Generation is 1,450
MW
• The Project will generate between 856 to
1,007 Million Units per year via cheap and
eco-friendly indigenous hydropower.
Irrigation
• Aim of the Project is to irrigated 18,000 sq.km mostly in
Drought Prone Area
• Capacity of Head Regulator 1,133 cu.m/s having 534 km
in Length which is largest irrigation canal in the world.
• Tribal area in Maharashtra and Drought Prone Area in
Rajasthan will also get irrigation benefits.
• Decrease in the Suicidal rate of Farmers
Sources: - http://misriote.com/sardarsarovarnarmadadam.html
http://www.indiawaterportal.org/articles/no-water-
7
Purpose
of the Project
Drinking Water
• Supply of 3571 MLD of Drinking Water (2900 MLD for
Domestic Consumption and 671 MLD of Industrial
Consumption) for 8215 villages and 135 Towns.
• Provision of Safe Drinking Water for 30 Million People
Other Benefits
• Fishery Development
• Source of Tourism
• Agroindustry Development
• Conserved Forest
• Recreational FacilitiesSource: - https://www.moneycontrol.com/news/business/economy/us-govts-opic-commits-12-5-mn-loan-for-clean-
drinking-water-in-india-2536723.html
https://www.tripadvisor.in/LocationPhotoDirectLink-g2009278-d2008993-i53468240-Sardar_Sarovar_Dam-
Songadh_Tapi_District_Gujarat.html
http://blogs.lse.ac.uk/southasia/2017/02/13/the-sardar-sarovar-dam-drowning-out-citizens-but-who-benefits/
8
Highlight
s of the
Project
Political
overtone
Interstate
river
sharing
dispute
Judicial
intervention
Human
Settlement
Media
coverage
9
Impacts Analysis Pre Construction StagePoliticalImpact
• Dispute between States for Water
Distribution
• Dispute to finalize the Height of the
Dam
86%
11.5%
2.5%
Water Distribution between States
Gujarat Rajasthan Maharashtra
21.28
Lac Ha
Problem Solution
• Proper Planning of Height of the Dam
including benefit to PAF
0
50
100
150
200
Change in Height
10
Impacts Analysis Pre Construction Stage
SocialImpact
• Improper Rehabilitation and
Resettlements
14.12%
70.45%
15.43%
Population Affected Due to
submergence
Gujarat Madhya Pradesh Maharashtra
1,27,446
Problem Solution
• Provision of 1.25 times of the
existing submerged land of
Families by Government
• 450 sq.m of residential plot are
provided free of cost per family
• Rs 45,000 are provided to the
PAF who were not interested in
land
11
Impacts Analysis Construction Stage
EnvironmentalImpact
Problem
• Mobilisation of Vehicles
• Combustion of Fuel
• Dumping of
Construction Materials
Solution
• Installation of Air Quality
Sensor Module
• Usage of Plastic Cover
while Dumping
Air pollution Land Pollution
Problem
• Sewage and Waste Generation
from Labour Camp.
• Impact due to runoff from
construction site causing water
logging and soil erosion
Solution
• Provision of mobile toilet and
different types of dustbins
• Substantial usage of water should
be carried out
Wildlife Impact
Problem
• Arising problem of Endangered
Species
• Adverse Effect on Plants and
Trees
Solution
• Wildlife Sanctuaries in Different
Forestry Land should be
provided
• Provision of 9 times the
Plantation and Mangrove
Afforestation.
12
Impacts Analysis Construction Stage
Economical&SocialImpact
Problem
• Stoppage of Funding by
stakeholder
• Cost Overrun
Solution
• Proper Per-Construction Planning
and Stakeholder Management
and DPR should be made
Economical Impact Social Impact
Problem
• Health Problems
• Problem faced by Rehabilitated People
due to New Culture and Habits
Solution
• Pesticides film on water to avoid Mosquito
generation
• Provision of Healthcare Centre
• Provision of Basic Facilities like School,
Proper connectivity
13
Impacts Analysis Operation Stage
Environmental Impact
• Accumulation of Earth Mass at point
• Seismic Effect on Reservoir
• Water Logging And Salination
Social Impact
• Increase in Job Opportunity
• Tourism
1414
Resettlement & Rehabilitation
Made comprehensive plan for that
high power committee made
Flood Control
Open all the gate of dam and Proper
function made by all cannel and their
distributaries.
Protection of Flora and fauna
Plantation and Making a new
sanctuaries
Financial Risk
Hurdle
s
Engineered solution
Provision financial strategic plan
syncing with proper project
implementation plan
15
Funding
Under supervision of Planning commission, Gov. of INDIA
4,103.72
1,100
40.63
0.35
252.5
Sources of Funds (Rs in Cr)
Equity Share Capital
Loan from GSFS Ltd.
Increase in other Long Term Liabilities
Increase in long term provisions
Decrease in Working Capital
5,497.5
162.27
1,100
197.3
264.26
264.26
3,368.99
Application of Funds (Rs in Cr)
Repayment of Long Term Loans of Banks
Repayment of Loan of P.F.C. Ltd.
Redemption of Deep Discount Bonds
Repayment of GSFS Loan
Purchase of Fixed Assets
Capital Expenditure on Project
4,716.9
1616
Grand Coulee Dam Sardar Sarovar Dam
Project Proposed 1925 1946
Construction Period 1933-1942 & 1967-1975 1987-2017
Cost of Construction $ 893mn ($ 4.95bn in 2016)
$ 8bn ($ 1.25bn initial
estimate in 1988)
Quantity of Concrete 91,74,658 m3 91,55,942 m3
Irrigated Land 6,70,000 acres 21,28,500 acres
Electricity Generation 21bn kWh-per year 1bn kWh-per year
Catchment Area 1,91,918 km2 88000 km2
https://www.usbr.gov/pn/grandcoulee/about/faq.html
Comparison of Major Dams
1717
Schedule of Resettlement and Rehabilitation
• Calculation of
Catchment Area
• Calculating Max.
Flood Level
Step 1:
Identification of
Catchment Area
• Identification of
Rehabilitation Area
• Identification of
Funds Required
Step 2:
Rehabilitation • Allocation of Funds
to the PAFs
• Rehabilitation of
PAFs
Step 3: Allocation
of Funds
1818
Recommendation and Conclusion
• The controlling authority such as Narmada Management Authority needs to ensure that
such Environment Management Plan does not remain only on paper but is implemented
• The required height of the dam needs to be specified during the Pre-Construction Phase
and all the Environmental, Political and Financial clearances to be taken prior to avoid
delay in the project
1919
Thankyou
20
Reference
• Annual, A. R., 2014. National Crime Reports Bureau, Government Of India. [Online] [Accessed 28 October 2018].
• Anon., 2017. The Economic Times. [Online] Available At: Https://Economictimes.Indiatimes.Com/News/Politics-and-nation/Modi-to-inaugurateworlds-second-biggest-dam-on-
september-17/Closed-to-raise-the-height/Slideshow/60512619.Cms [Accessed 28 October 2018].
• Anon., 2018. Catchment Area Treatment. [Online].
• Anon., 2018. Sardar Sarovar Dam (SSD), Gujarat. [Online] Available At: Https://Www.Water-technology.Net/Projects/Sardar-sarovar-dam-gujarat/ [Accessed 28 October 2018].
• Anon., 2018. Sardar Sarovar Narmada Nigam Ltd. [Online] Available At: Http://Www.Sardarsarovardam.Org/Features-of-project.Aspx [Accessed 28 October 2018].
• Cleveland, C., 2018. China's Monster Three Gorges Dam Is About To Slow The Rotation Of The Earth. [Online] Available At: Https://Www.Businessinsider.Com/Chinas-three-
gorges-dam-really-will-slow-the-earthsrotation-2010-6?IR=T [Accessed 28 October 2018].
• Flood, L. U., 1997. Sardar Sarovar Dam: A Case Study Of Development-induced Environmental Displacement. August, 16(3), Pp. 12-17.
• Goyal, D., April 2013. Environmental Impact And Risk Assessment For The Proposed Barrage Across Narmada River, Gandhinagar: Narmada, Water Resources, Water Supply
And Kalpasar Department.
• Kumar, S., 2018. Youtube. [Online] Available At: Https://Youtu.Be/1GTDX58K_G0 [Accessed 27 October 2018].
• Parasuraman, S., Upadhyaya, H. & Balasub, G., 2010. Sardar Sarovar Project: War Of Attrition. Economic & Political Weekly, 30 Jan, Volume Vol-xlv No 5, P. 39.
• Sardar Sarovar Punarvasvat Agency, 2017. Sardar Sarovar Punarvasvat Agency. [Online] Available At: Https://Sspa.Gujarat.Gov.In/ [Accessed 28 10 2018].
• Sardar Sarovar Punarvasvat Agency, 2018. About SSPA. [Online] Available At: Https://Sspa.Gujarat.Gov.In/About-us [Accessed 27 October 2018].
• Shelat, U., N.D. Report On Rehabilitation And Resettlement, Gandhinagar: S.N.
• Shelat, U., N.D. Resettlement In River Narmada Basin, Baroda: S.N.
• Thakurta, P. G., 2013. World Bank Threatens To Withdraw Support To Sardar Sarovar Project. [Online] Available At:
Https://Www.Indiatoday.In/Magazine/Environment/Story/19890531-world-bankthreatens-to-withdraw-support-to-sardar-sarovar-project-816135-1989-05-31 [Accessed 28
October 2018].

More Related Content

What's hot

Tehri Dam
Tehri DamTehri Dam
Hydro policies of india
Hydro policies of indiaHydro policies of india
Hydro policies of india
Rohil Kumar
 
Dams and Hydropower Projects of Pakistan
Dams and Hydropower Projects of PakistanDams and Hydropower Projects of Pakistan
Dams and Hydropower Projects of Pakistan
Rizwan Sarwar Awan
 
Improving Water Security in Water Stressed Bagmati River Basin, Nepal (2)
Improving Water Security in Water Stressed Bagmati River Basin, Nepal (2)Improving Water Security in Water Stressed Bagmati River Basin, Nepal (2)
Improving Water Security in Water Stressed Bagmati River Basin, Nepal (2)
Oswar Mungkasa
 
pakistan indus basin irrigation system
pakistan indus basin irrigation system pakistan indus basin irrigation system
pakistan indus basin irrigation system
Usman Khawaja
 
Narmada bachao andolan
Narmada bachao andolanNarmada bachao andolan
Narmada bachao andolan
Krishna Belel
 
Ganga pollution
Ganga pollutionGanga pollution
Ganga pollution
Vasundhara Singh Gautam
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)
Nikhil Jaipurkar
 
Gift, Gujarat
Gift, GujaratGift, Gujarat
Gift, Gujarat
Farhana Farhath
 
Climate Change and Health of Sundarbans
Climate Change and Health of SundarbansClimate Change and Health of Sundarbans
Climate Change and Health of SundarbansWWF-India
 
Narmada bachao andolan
Narmada bachao andolanNarmada bachao andolan
Narmada bachao andolan
Andhra University
 
narmada river scheme con
narmada river scheme connarmada river scheme con
narmada river scheme con
Niraj Chand
 
LINKING OF RIVERS IN INDIA
LINKING OF RIVERS IN INDIALINKING OF RIVERS IN INDIA
LINKING OF RIVERS IN INDIA
Narendrareddy123
 
Present scenario of Renewable Energy in Bangladesh
Present scenario of Renewable Energy in BangladeshPresent scenario of Renewable Energy in Bangladesh
Present scenario of Renewable Energy in Bangladesh
Mustafa Momin
 
Tehri Dam
Tehri DamTehri Dam
Tehri Dam
soumyapugal
 
Interlinking of rivers in india
Interlinking of rivers in indiaInterlinking of rivers in india
Interlinking of rivers in india
Iqura Malik
 
India’s national river linking project [nrlp]
India’s national river linking project [nrlp]India’s national river linking project [nrlp]
India’s national river linking project [nrlp]
'Denish Makvana'
 
Kerala Floods
Kerala FloodsKerala Floods
Kerala Floods
Rohan Sahu
 
Narmada Bachao Andolan
Narmada Bachao AndolanNarmada Bachao Andolan
Narmada Bachao Andolan
Darshil Kapadiya
 
Narmada river valley project final
Narmada river valley project finalNarmada river valley project final
Narmada river valley project final
Harshit Sankhla
 

What's hot (20)

Tehri Dam
Tehri DamTehri Dam
Tehri Dam
 
Hydro policies of india
Hydro policies of indiaHydro policies of india
Hydro policies of india
 
Dams and Hydropower Projects of Pakistan
Dams and Hydropower Projects of PakistanDams and Hydropower Projects of Pakistan
Dams and Hydropower Projects of Pakistan
 
Improving Water Security in Water Stressed Bagmati River Basin, Nepal (2)
Improving Water Security in Water Stressed Bagmati River Basin, Nepal (2)Improving Water Security in Water Stressed Bagmati River Basin, Nepal (2)
Improving Water Security in Water Stressed Bagmati River Basin, Nepal (2)
 
pakistan indus basin irrigation system
pakistan indus basin irrigation system pakistan indus basin irrigation system
pakistan indus basin irrigation system
 
Narmada bachao andolan
Narmada bachao andolanNarmada bachao andolan
Narmada bachao andolan
 
Ganga pollution
Ganga pollutionGanga pollution
Ganga pollution
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)
 
Gift, Gujarat
Gift, GujaratGift, Gujarat
Gift, Gujarat
 
Climate Change and Health of Sundarbans
Climate Change and Health of SundarbansClimate Change and Health of Sundarbans
Climate Change and Health of Sundarbans
 
Narmada bachao andolan
Narmada bachao andolanNarmada bachao andolan
Narmada bachao andolan
 
narmada river scheme con
narmada river scheme connarmada river scheme con
narmada river scheme con
 
LINKING OF RIVERS IN INDIA
LINKING OF RIVERS IN INDIALINKING OF RIVERS IN INDIA
LINKING OF RIVERS IN INDIA
 
Present scenario of Renewable Energy in Bangladesh
Present scenario of Renewable Energy in BangladeshPresent scenario of Renewable Energy in Bangladesh
Present scenario of Renewable Energy in Bangladesh
 
Tehri Dam
Tehri DamTehri Dam
Tehri Dam
 
Interlinking of rivers in india
Interlinking of rivers in indiaInterlinking of rivers in india
Interlinking of rivers in india
 
India’s national river linking project [nrlp]
India’s national river linking project [nrlp]India’s national river linking project [nrlp]
India’s national river linking project [nrlp]
 
Kerala Floods
Kerala FloodsKerala Floods
Kerala Floods
 
Narmada Bachao Andolan
Narmada Bachao AndolanNarmada Bachao Andolan
Narmada Bachao Andolan
 
Narmada river valley project final
Narmada river valley project finalNarmada river valley project final
Narmada river valley project final
 

Similar to Sardar Sarovar Project - 56 Years of Controversary

Tamil nadu wb review tn_hpii_delhi_may2014
Tamil nadu wb review tn_hpii_delhi_may2014Tamil nadu wb review tn_hpii_delhi_may2014
Tamil nadu wb review tn_hpii_delhi_may2014hydrologyproject0
 
Design of Kawlewada Dam and its Components.
Design of Kawlewada Dam and its Components.Design of Kawlewada Dam and its Components.
Design of Kawlewada Dam and its Components.
Raj Bisen
 
RIVER INTERLINKING (BY CANAL AND TUNNELS)
RIVER INTERLINKING (BY CANAL AND TUNNELS)RIVER INTERLINKING (BY CANAL AND TUNNELS)
RIVER INTERLINKING (BY CANAL AND TUNNELS)
IRJET Journal
 
Manual on artificial recharge of ground water
Manual on artificial recharge of ground waterManual on artificial recharge of ground water
Manual on artificial recharge of ground waterhydrologyproject0
 
Cpec(salman's group)
Cpec(salman's group)Cpec(salman's group)
Cpec(salman's group)
Salman H. Sindhoo
 
Technical risk identification and analysis of river bridge project
Technical risk identification and analysis of river bridge projectTechnical risk identification and analysis of river bridge project
Technical risk identification and analysis of river bridge project
divpa1992
 
Groundwater Depletion and Land Subsidence
Groundwater Depletion and Land SubsidenceGroundwater Depletion and Land Subsidence
Groundwater Depletion and Land Subsidence
ShreSoni1
 
Groundwater scenario and Land Subsidence in Ahmedabad
Groundwater scenario and Land Subsidence in AhmedabadGroundwater scenario and Land Subsidence in Ahmedabad
Groundwater scenario and Land Subsidence in Ahmedabad
ShreSoni1
 
Mh sw effect of changing water allocation in nathsagar project, jayakawadi da...
Mh sw effect of changing water allocation in nathsagar project, jayakawadi da...Mh sw effect of changing water allocation in nathsagar project, jayakawadi da...
Mh sw effect of changing water allocation in nathsagar project, jayakawadi da...hydrologyproject0
 
Future of Hydro Power Development in India
Future of Hydro Power Development in IndiaFuture of Hydro Power Development in India
Future of Hydro Power Development in India
IPPAI
 
Report-on-the-heritage-city-project
Report-on-the-heritage-city-projectReport-on-the-heritage-city-project
Report-on-the-heritage-city-project
Dev Sunnasy
 
Planning of Water Resource Planning Projects
Planning of Water Resource Planning ProjectsPlanning of Water Resource Planning Projects
Planning of Water Resource Planning Projects
DARSHAN MEHTA
 
1. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 70520141. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 7052014hydrologywebsite1
 
Nl infrastructure oct 3 - oct 9, 2015
Nl infrastructure oct 3 - oct 9, 2015Nl infrastructure oct 3 - oct 9, 2015
Nl infrastructure oct 3 - oct 9, 2015
Gyan Research And Analytics
 
EXPERIMENTAL ANALYSIS OF SEQUENCING BATCH REACTOR DESIGN AND OPERATIONAL CONS...
EXPERIMENTAL ANALYSIS OF SEQUENCING BATCH REACTOR DESIGN AND OPERATIONAL CONS...EXPERIMENTAL ANALYSIS OF SEQUENCING BATCH REACTOR DESIGN AND OPERATIONAL CONS...
EXPERIMENTAL ANALYSIS OF SEQUENCING BATCH REACTOR DESIGN AND OPERATIONAL CONS...
IRJET Journal
 
2008 reservor &-gate_operation_schedule
2008 reservor &-gate_operation_schedule2008 reservor &-gate_operation_schedule
2008 reservor &-gate_operation_schedulePravin Kolhe
 
IRJET- Hydraulic Redesign and Analysis of Kotmara Dam: Kas River Basin
IRJET-  	  Hydraulic Redesign and Analysis of Kotmara Dam: Kas River BasinIRJET-  	  Hydraulic Redesign and Analysis of Kotmara Dam: Kas River Basin
IRJET- Hydraulic Redesign and Analysis of Kotmara Dam: Kas River Basin
IRJET Journal
 

Similar to Sardar Sarovar Project - 56 Years of Controversary (20)

Tamil nadu wb review tn_hpii_delhi_may2014
Tamil nadu wb review tn_hpii_delhi_may2014Tamil nadu wb review tn_hpii_delhi_may2014
Tamil nadu wb review tn_hpii_delhi_may2014
 
Design of Kawlewada Dam and its Components.
Design of Kawlewada Dam and its Components.Design of Kawlewada Dam and its Components.
Design of Kawlewada Dam and its Components.
 
RIVER INTERLINKING (BY CANAL AND TUNNELS)
RIVER INTERLINKING (BY CANAL AND TUNNELS)RIVER INTERLINKING (BY CANAL AND TUNNELS)
RIVER INTERLINKING (BY CANAL AND TUNNELS)
 
Manual on artificial recharge of ground water
Manual on artificial recharge of ground waterManual on artificial recharge of ground water
Manual on artificial recharge of ground water
 
Cpec(salman's group)
Cpec(salman's group)Cpec(salman's group)
Cpec(salman's group)
 
Technical risk identification and analysis of river bridge project
Technical risk identification and analysis of river bridge projectTechnical risk identification and analysis of river bridge project
Technical risk identification and analysis of river bridge project
 
Hemant_CV
Hemant_CVHemant_CV
Hemant_CV
 
Groundwater Depletion and Land Subsidence
Groundwater Depletion and Land SubsidenceGroundwater Depletion and Land Subsidence
Groundwater Depletion and Land Subsidence
 
Groundwater scenario and Land Subsidence in Ahmedabad
Groundwater scenario and Land Subsidence in AhmedabadGroundwater scenario and Land Subsidence in Ahmedabad
Groundwater scenario and Land Subsidence in Ahmedabad
 
Mh sw effect of changing water allocation in nathsagar project, jayakawadi da...
Mh sw effect of changing water allocation in nathsagar project, jayakawadi da...Mh sw effect of changing water allocation in nathsagar project, jayakawadi da...
Mh sw effect of changing water allocation in nathsagar project, jayakawadi da...
 
Kerala sw
Kerala swKerala sw
Kerala sw
 
Future of Hydro Power Development in India
Future of Hydro Power Development in IndiaFuture of Hydro Power Development in India
Future of Hydro Power Development in India
 
Report-on-the-heritage-city-project
Report-on-the-heritage-city-projectReport-on-the-heritage-city-project
Report-on-the-heritage-city-project
 
Planning of Water Resource Planning Projects
Planning of Water Resource Planning ProjectsPlanning of Water Resource Planning Projects
Planning of Water Resource Planning Projects
 
Final Project Report
Final Project ReportFinal Project Report
Final Project Report
 
1. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 70520141. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 7052014
 
Nl infrastructure oct 3 - oct 9, 2015
Nl infrastructure oct 3 - oct 9, 2015Nl infrastructure oct 3 - oct 9, 2015
Nl infrastructure oct 3 - oct 9, 2015
 
EXPERIMENTAL ANALYSIS OF SEQUENCING BATCH REACTOR DESIGN AND OPERATIONAL CONS...
EXPERIMENTAL ANALYSIS OF SEQUENCING BATCH REACTOR DESIGN AND OPERATIONAL CONS...EXPERIMENTAL ANALYSIS OF SEQUENCING BATCH REACTOR DESIGN AND OPERATIONAL CONS...
EXPERIMENTAL ANALYSIS OF SEQUENCING BATCH REACTOR DESIGN AND OPERATIONAL CONS...
 
2008 reservor &-gate_operation_schedule
2008 reservor &-gate_operation_schedule2008 reservor &-gate_operation_schedule
2008 reservor &-gate_operation_schedule
 
IRJET- Hydraulic Redesign and Analysis of Kotmara Dam: Kas River Basin
IRJET-  	  Hydraulic Redesign and Analysis of Kotmara Dam: Kas River BasinIRJET-  	  Hydraulic Redesign and Analysis of Kotmara Dam: Kas River Basin
IRJET- Hydraulic Redesign and Analysis of Kotmara Dam: Kas River Basin
 

More from Self-employed

Internship on restoration project
Internship on restoration projectInternship on restoration project
Internship on restoration project
Self-employed
 
Construction Cost Management Systems - RICSSBE
Construction Cost Management Systems - RICSSBE Construction Cost Management Systems - RICSSBE
Construction Cost Management Systems - RICSSBE
Self-employed
 
Human Resource and Skill Requirement in construction industry
Human Resource and Skill Requirement in construction industryHuman Resource and Skill Requirement in construction industry
Human Resource and Skill Requirement in construction industry
Self-employed
 
Ganga Action Plan
Ganga Action PlanGanga Action Plan
Ganga Action Plan
Self-employed
 
Summer Internship Presentation of Building
Summer Internship Presentation of Building Summer Internship Presentation of Building
Summer Internship Presentation of Building
Self-employed
 
Presentation on Summer internship on Road Construction
Presentation on Summer internship on Road ConstructionPresentation on Summer internship on Road Construction
Presentation on Summer internship on Road Construction
Self-employed
 

More from Self-employed (6)

Internship on restoration project
Internship on restoration projectInternship on restoration project
Internship on restoration project
 
Construction Cost Management Systems - RICSSBE
Construction Cost Management Systems - RICSSBE Construction Cost Management Systems - RICSSBE
Construction Cost Management Systems - RICSSBE
 
Human Resource and Skill Requirement in construction industry
Human Resource and Skill Requirement in construction industryHuman Resource and Skill Requirement in construction industry
Human Resource and Skill Requirement in construction industry
 
Ganga Action Plan
Ganga Action PlanGanga Action Plan
Ganga Action Plan
 
Summer Internship Presentation of Building
Summer Internship Presentation of Building Summer Internship Presentation of Building
Summer Internship Presentation of Building
 
Presentation on Summer internship on Road Construction
Presentation on Summer internship on Road ConstructionPresentation on Summer internship on Road Construction
Presentation on Summer internship on Road Construction
 

Recently uploaded

Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
Celine George
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
bennyroshan06
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdfESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
Fundacja Rozwoju Społeczeństwa Przedsiębiorczego
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
PedroFerreira53928
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
Steve Thomason
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
Vivekanand Anglo Vedic Academy
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
beazzy04
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 

Recently uploaded (20)

Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdfESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 

Sardar Sarovar Project - 56 Years of Controversary

  • 1. 1 Sardar Sarovar Project 56 years of Controversary Construction and Built Environment Sector
  • 2. 222 ` Abhilash Pakhmode Hrishikesh Jadhav Siddhesh Patil Tarsem Chauhan Team Members Source: http://www.hydroresearch.se/en/about-us/fantastic-dam-water-flow-scenery- wallpaper/
  • 3. 3 Background of the Project • . 1946 1961 1987 2017 Initiation of Narmada Valley Development Project (NVDP) to utilise the Narmada River for Irrigation First Prime minister Hon’ble Jawaharlal Nehru initiated the SSP. Current Prime Minister Hon’ble Narendra Modi inaugurated the SSP Initiation of the construction of the SSP
  • 4. 4 About the Project Source: www.google.co.in/maps/place/Sardar+Sarovar+Dam,+Gujarat+393155/@21.8379973,73.729694,14.53z/d ata=!4m5!3m4!1s0x39601e75f68e3dd3:0x60d783d6475b6669!8m2!3d21.8305054!4d73.7485212 • •Sardar Sarovar Dam (SSD) is a part of Narmada Valley Development Project •SSP will be projecting 1,450 MW of electricity generation Length of main concrete gravity dam = 1210 m Length of Reservoir = 214 km Spillway Capacity = 87,000 cumecs •Height from the deepest foundation level = 163 m Catchment area of river above dam site = 88,000 sq. km
  • 5. 5 About the Project • 30% 36% 34% 37,533 ha Agricultural Forest River & Water Bed Acquired Land 88.14% 1.7% 10.16% Catchment Area Madhya Pradesh Mahrashtra Gujarat 97,410 sq.km 57% 27% 16% Funds Raised for Power generation Madhya Pradesh Mahrashtra Gujarat 97,410 sq.km
  • 6. 6 Purpose of the Project Hydroelectricity • Capacity of the Power Generation is 1,450 MW • The Project will generate between 856 to 1,007 Million Units per year via cheap and eco-friendly indigenous hydropower. Irrigation • Aim of the Project is to irrigated 18,000 sq.km mostly in Drought Prone Area • Capacity of Head Regulator 1,133 cu.m/s having 534 km in Length which is largest irrigation canal in the world. • Tribal area in Maharashtra and Drought Prone Area in Rajasthan will also get irrigation benefits. • Decrease in the Suicidal rate of Farmers Sources: - http://misriote.com/sardarsarovarnarmadadam.html http://www.indiawaterportal.org/articles/no-water-
  • 7. 7 Purpose of the Project Drinking Water • Supply of 3571 MLD of Drinking Water (2900 MLD for Domestic Consumption and 671 MLD of Industrial Consumption) for 8215 villages and 135 Towns. • Provision of Safe Drinking Water for 30 Million People Other Benefits • Fishery Development • Source of Tourism • Agroindustry Development • Conserved Forest • Recreational FacilitiesSource: - https://www.moneycontrol.com/news/business/economy/us-govts-opic-commits-12-5-mn-loan-for-clean- drinking-water-in-india-2536723.html https://www.tripadvisor.in/LocationPhotoDirectLink-g2009278-d2008993-i53468240-Sardar_Sarovar_Dam- Songadh_Tapi_District_Gujarat.html http://blogs.lse.ac.uk/southasia/2017/02/13/the-sardar-sarovar-dam-drowning-out-citizens-but-who-benefits/
  • 9. 9 Impacts Analysis Pre Construction StagePoliticalImpact • Dispute between States for Water Distribution • Dispute to finalize the Height of the Dam 86% 11.5% 2.5% Water Distribution between States Gujarat Rajasthan Maharashtra 21.28 Lac Ha Problem Solution • Proper Planning of Height of the Dam including benefit to PAF 0 50 100 150 200 Change in Height
  • 10. 10 Impacts Analysis Pre Construction Stage SocialImpact • Improper Rehabilitation and Resettlements 14.12% 70.45% 15.43% Population Affected Due to submergence Gujarat Madhya Pradesh Maharashtra 1,27,446 Problem Solution • Provision of 1.25 times of the existing submerged land of Families by Government • 450 sq.m of residential plot are provided free of cost per family • Rs 45,000 are provided to the PAF who were not interested in land
  • 11. 11 Impacts Analysis Construction Stage EnvironmentalImpact Problem • Mobilisation of Vehicles • Combustion of Fuel • Dumping of Construction Materials Solution • Installation of Air Quality Sensor Module • Usage of Plastic Cover while Dumping Air pollution Land Pollution Problem • Sewage and Waste Generation from Labour Camp. • Impact due to runoff from construction site causing water logging and soil erosion Solution • Provision of mobile toilet and different types of dustbins • Substantial usage of water should be carried out Wildlife Impact Problem • Arising problem of Endangered Species • Adverse Effect on Plants and Trees Solution • Wildlife Sanctuaries in Different Forestry Land should be provided • Provision of 9 times the Plantation and Mangrove Afforestation.
  • 12. 12 Impacts Analysis Construction Stage Economical&SocialImpact Problem • Stoppage of Funding by stakeholder • Cost Overrun Solution • Proper Per-Construction Planning and Stakeholder Management and DPR should be made Economical Impact Social Impact Problem • Health Problems • Problem faced by Rehabilitated People due to New Culture and Habits Solution • Pesticides film on water to avoid Mosquito generation • Provision of Healthcare Centre • Provision of Basic Facilities like School, Proper connectivity
  • 13. 13 Impacts Analysis Operation Stage Environmental Impact • Accumulation of Earth Mass at point • Seismic Effect on Reservoir • Water Logging And Salination Social Impact • Increase in Job Opportunity • Tourism
  • 14. 1414 Resettlement & Rehabilitation Made comprehensive plan for that high power committee made Flood Control Open all the gate of dam and Proper function made by all cannel and their distributaries. Protection of Flora and fauna Plantation and Making a new sanctuaries Financial Risk Hurdle s Engineered solution Provision financial strategic plan syncing with proper project implementation plan
  • 15. 15 Funding Under supervision of Planning commission, Gov. of INDIA 4,103.72 1,100 40.63 0.35 252.5 Sources of Funds (Rs in Cr) Equity Share Capital Loan from GSFS Ltd. Increase in other Long Term Liabilities Increase in long term provisions Decrease in Working Capital 5,497.5 162.27 1,100 197.3 264.26 264.26 3,368.99 Application of Funds (Rs in Cr) Repayment of Long Term Loans of Banks Repayment of Loan of P.F.C. Ltd. Redemption of Deep Discount Bonds Repayment of GSFS Loan Purchase of Fixed Assets Capital Expenditure on Project 4,716.9
  • 16. 1616 Grand Coulee Dam Sardar Sarovar Dam Project Proposed 1925 1946 Construction Period 1933-1942 & 1967-1975 1987-2017 Cost of Construction $ 893mn ($ 4.95bn in 2016) $ 8bn ($ 1.25bn initial estimate in 1988) Quantity of Concrete 91,74,658 m3 91,55,942 m3 Irrigated Land 6,70,000 acres 21,28,500 acres Electricity Generation 21bn kWh-per year 1bn kWh-per year Catchment Area 1,91,918 km2 88000 km2 https://www.usbr.gov/pn/grandcoulee/about/faq.html Comparison of Major Dams
  • 17. 1717 Schedule of Resettlement and Rehabilitation • Calculation of Catchment Area • Calculating Max. Flood Level Step 1: Identification of Catchment Area • Identification of Rehabilitation Area • Identification of Funds Required Step 2: Rehabilitation • Allocation of Funds to the PAFs • Rehabilitation of PAFs Step 3: Allocation of Funds
  • 18. 1818 Recommendation and Conclusion • The controlling authority such as Narmada Management Authority needs to ensure that such Environment Management Plan does not remain only on paper but is implemented • The required height of the dam needs to be specified during the Pre-Construction Phase and all the Environmental, Political and Financial clearances to be taken prior to avoid delay in the project
  • 20. 20 Reference • Annual, A. R., 2014. National Crime Reports Bureau, Government Of India. [Online] [Accessed 28 October 2018]. • Anon., 2017. The Economic Times. [Online] Available At: Https://Economictimes.Indiatimes.Com/News/Politics-and-nation/Modi-to-inaugurateworlds-second-biggest-dam-on- september-17/Closed-to-raise-the-height/Slideshow/60512619.Cms [Accessed 28 October 2018]. • Anon., 2018. Catchment Area Treatment. [Online]. • Anon., 2018. Sardar Sarovar Dam (SSD), Gujarat. [Online] Available At: Https://Www.Water-technology.Net/Projects/Sardar-sarovar-dam-gujarat/ [Accessed 28 October 2018]. • Anon., 2018. Sardar Sarovar Narmada Nigam Ltd. [Online] Available At: Http://Www.Sardarsarovardam.Org/Features-of-project.Aspx [Accessed 28 October 2018]. • Cleveland, C., 2018. China's Monster Three Gorges Dam Is About To Slow The Rotation Of The Earth. [Online] Available At: Https://Www.Businessinsider.Com/Chinas-three- gorges-dam-really-will-slow-the-earthsrotation-2010-6?IR=T [Accessed 28 October 2018]. • Flood, L. U., 1997. Sardar Sarovar Dam: A Case Study Of Development-induced Environmental Displacement. August, 16(3), Pp. 12-17. • Goyal, D., April 2013. Environmental Impact And Risk Assessment For The Proposed Barrage Across Narmada River, Gandhinagar: Narmada, Water Resources, Water Supply And Kalpasar Department. • Kumar, S., 2018. Youtube. [Online] Available At: Https://Youtu.Be/1GTDX58K_G0 [Accessed 27 October 2018]. • Parasuraman, S., Upadhyaya, H. & Balasub, G., 2010. Sardar Sarovar Project: War Of Attrition. Economic & Political Weekly, 30 Jan, Volume Vol-xlv No 5, P. 39. • Sardar Sarovar Punarvasvat Agency, 2017. Sardar Sarovar Punarvasvat Agency. [Online] Available At: Https://Sspa.Gujarat.Gov.In/ [Accessed 28 10 2018]. • Sardar Sarovar Punarvasvat Agency, 2018. About SSPA. [Online] Available At: Https://Sspa.Gujarat.Gov.In/About-us [Accessed 27 October 2018]. • Shelat, U., N.D. Report On Rehabilitation And Resettlement, Gandhinagar: S.N. • Shelat, U., N.D. Resettlement In River Narmada Basin, Baroda: S.N. • Thakurta, P. G., 2013. World Bank Threatens To Withdraw Support To Sardar Sarovar Project. [Online] Available At: Https://Www.Indiatoday.In/Magazine/Environment/Story/19890531-world-bankthreatens-to-withdraw-support-to-sardar-sarovar-project-816135-1989-05-31 [Accessed 28 October 2018].

Editor's Notes

  1. Sardar Sarovar Project became a part of Narmada Valley Development Project (NVDP) It was based on Narmada river which is the 5th Longest River in South Asia and Longest Indian River Flowing Westward Direction. NVDP comprises of 30 Large Dam, 135 Medium Dam and 300 Small Dams.
  2. This Project is Situated in Navagam, Gujarat where also new Statue of Unity is at downstream of Sardar Sarovar Dam The estimated cost of the project in the year 2010-11 was ₨ 400bn from ₨ 64bn in 1988 as per Anon, 2018 due to which the project was extended. Sardar Sarovar Dam (SSD) is a part of Narmada Development Project (NDP) To meet the supply of electricity, drinking water and irrigation for the states of Gujarat, Madhya Pradesh and Maharashtra. Length of Reservoir = 214 km Max. width = 16.10 km Average width = 1.77 km Spillway Capacity = 87,000 cumecs Shoot Spillway = 7 (60’ x 60’) Service Spillway = 23 (60’ x 55’)
  3. Human Settlement Improper rehabilitation for 12,000 Families Insufficient Cash Payment Improper Provision of Basic Amenities Provision of resettlement outskirt of the city Requirement of purchasing of water.
  4. MH, MP GUJ and Raj were having dispute regarding water distribution. Body like NWDT narmada water dispute tribunal was set up. Balance benefit and cost among states was estimated. MP govt requested NCA for reduction of dam height from 455 feet to 436 feet. But the proposal was was beyond jurisdiction of NCA. By reducing 19 feet 38000 people would save from displacement & 25000 acre of land with good productive could be save from submergence. Mp govt requested NCA to
  5. Wildlife – 1) tiger and wolf species was almost going to obsolute. Plants and trees.. as contonious increase in height cause more submergence of plants and tress.  
  6. Economical impact- stoppage of funding..due to NBA protest world bank stop there funding in 92
  7. Earth masss—shifting of earth mass will affect the rotation of earth due to moment of inetia. The longer the distance of mass to it axis of rotation the slower it will spin. You make not know that earth is slightly round in middle and flat on top. It has also change it pole position by about 2 CM. Seismic effect… dam are susceptible to earth quake motion. Because there is sudden change in mass at upstream and downstream side. Water logging and salination --- due to increase in salt in land it adversely affetct plant growth and survival. Waster logging – casue due to choking of drainage.. heavy losses due to seppage from canal…poor drainage .. and heavy rrainfall..