SAP
Human Capital Management Components Overview
Rapture, Principal Consultant- SAP HCM & Success Factors
Budgeting/ workforce
planning exercise/
new org exercise
Vacancy created through Org
Management
Ahmed applies for
vacancy through e-
recruitment
Ahmed is interviewed,
accepted, and hired
Ahmed is hired and
assumes responsibilities
Employee Self
Service
Ahmed Clocks In
and Out every day
Ahmed applies for
Trip Approval
Ahmed settles trip
expenses upon return
Manager assesses
Ahmed’s
Performance in the
previous period
Ahmed receives a bonus
for a job well done!
Ahmed gets paid his
bonus and salary at
the end of the month
Contract is
renewed
Ahmed gets
promoted
Ahmed assumes
his new
responsibilities in a
new organization
Ahmed discusses
his career options
with his Manager
Ahmed develops
his skills
Ahmed violates org
policies
Disciplinary action
Ahmed is Terminated/ Separation
Why Organization Management
1. OM helps to maintain the hierarchy structure
2. It gives authorization to control the organization structure
3. It helps in creating verticals of business
4. Automation of work flows. (Relationships)
5. Manpower planning
6. Planned job descriptions for employees (Assignment)
7. Planned compensation for jobs (predefined budgets)
8. Structural authorizations (Access)
What is Organization management
1. Organization Management (OM) is one of the fundamental HCM
sub modules.
2. OM comprises of several components, known as Objects. E.g.
Organization, Position, Person.
3. Manages the organizational structure comprising of
Organizational Plan which shows hierarchical relationship
between OM objects.
4. Organization Management is the basis of defining reporting
structure and workflow.
5. OM provides a comprehensive view of the organization in past,
present & future.
6. To execute end-to-end business scenarios, the module is
integrated with other HCM sub-modules.
7. OM reporting structure is maintained by establishing position to
position relationship in organization unit.
Organizational objects Org. key
Organizational unit O
Job C
Position S
Person P
Cost center K
Task T
Task group Ts
1. Object – 1000
2. Relationships - 1001
3. Description - 1002
4. Department/staff - 1003
5. Character - 1004
6. Planned Compensation - 1005
7. Restrictions - 1006
8. Vacancy - 1007
9. Account Assignment - 1008
10. Health Examinations - 1009
11. Authorities/Resources - 1010
12. Work Schedule - 1011
13. Employee Group/Subgroup - 1013
14. Obsolete - 1014
15. Cost Distribution - 1018
16. Quota Planning - 1019
17. Address - 1028
18. Mail Address - 1032.
Organization Management
Overview of HCM Core Modules
Personnel Administration
PA - Master Data
Overview of HCM Core Modules
Personnel Time Management
Time off as well as time worked is tracked and
accounted for in Time Management.
TM allows:
 To create and assign various work schedules to
employees, defining both their working hours and
nonworking hours, such as holidays, breaks.
 To manage leave and illness times
 Plan the workforce requirements situation
 Valuate attendance and absence times to manage
time accounts
Overview of HCM Core Modules : Time Data Recording
Time recording can be done in number of ways, depending on the
operations of each entity.
You can record time actively, meaning that all working time as
well as time off is entered into the system.
Also, you can record time as an exception basis, meaning you
are assumed to be working your schedule hours unless you say
otherwise. In this scenario, you typically only report absences,
such as sick time or vacation.
Additionally, the SAP system can accept time from other
systems, such as time clock in/out or card system.
Overview of HCM Core Modules : Payroll Overview
• Standardized data retention enables you to
use master data and other payroll relevant
data from Personnel Administration.
• Time data, entered via Time Management, is
automatically included in the Payroll and is
valuated during the payroll run.
• Information on expenses and payables from
Payroll is posted for accounting directly in
Financial Accounting, and you assign the
costs to the appropriate cost center. You can
also control the financial system of third-
party providers.
You can use this component to calculate the remuneration for
work done for each employee.
Overview of HCM Core Modules
Payroll Overview
Overview of HCM Advanced Modules
Overview of HCM Advanced Modules
Employee Self-Service (ESS)
Employee Self-Service (ESS) software delivers the personalized
information, tools, and services your employees need to do their jobs,
manage their own important life and work events, and focus on
contributing to business goals.
ESS - is a web enabled tool used by employees to update own data or to
access services for various business functions.
In this way, employees can keep their own data up-to-date, while
simultaneously reducing the number of time-consuming and expensive
activities performed by the Human Resources Department.
Overview of HCM Advanced Modules :
ESS - Overview
• View Profile
• Bank Details
• Display salary
statements
• Display address
• Change address
• Creating leave request
• Return from leave
• Leave overview
Working
Time
Address
Book
Personal
Information
Benefits &
Payment
Overview of HCM Advanced Modules :
MSS Overview
• Manager Self-Service equips your managers with tools that make it easier
to complete daily tasks – from routine HR transactions to compensation
assessments. With a global view of employee information at their
fingertips, managers can complete processes more quickly and make better,
faster decisions.
• MSS - Manager Self-Service is a web enabled tool which enables managers
to keep their own data up-to-date, while simultaneously managing their
team various activities.
• Empower managers to have a quick overview of their team activities and
information as and when required.
Overview of HCM Advanced Modules
MSS - Key Activities
•
Work
Overview
Team
Information
Reports
Organization
Chart
Team Graphical Display
Tasks
Notifications
Tracking
General Information
Leaves
ECC Reports
BI Reports
Overview of HCM Advanced Modules
Travel Management
Overview of HCM Advanced Modules
Travel Management
• Plan trips based on the travel requests.
• Tracking of the approval status and display
trips details and view them at a later date.
• Booking advance in the request stage makes
the settlement more accurate.
Overview of HCM Advanced Modules
Performance Management
 The PM module is part of the Talent Management which
is an integrated part of the SAP HCM.
 It is a complete process that integrates company
planning and initiatives with measurable employee
objectives, appraisals, feedback and compensation
administrations.
 Its main purpose is to assess the employee performance
over the year by the setting goals and see if it were
achieved.
Employee performance management with SAP ERP HCM helps you plan, assess, improve, and analyze the
performance of your workforce.
Overview of HCM Advanced Modules : Performance
Management Benefits
• Specific training requirements are created and cascaded to the specific employees
• Utilization of automated workflows for approvals and notification of employees and
managers
• Managers and Employees are able to access the Performance Appraisal documents
through the Portal
• Availability of pre-defined template
• Standardized tool for review
• More open communications at all entity levels
Overview of HCM Advanced Modules
Personnel Cost Planning
Personnel Cost Planning focuses on a company’s personnel costs such as:
Wages and salaries
Allowances
Employer contributions to social insurance etc.
PCP helps to:
To determine the current personnel costs as well as experiment with future
costs by creating different scenarios.
To work with costs that are not directly related to salaries and allowances. For
example, calculate education and training costs.
PCP offers various display options such as:
 Download cost data into EXCEL spreadsheets.
 Display cost data and plan scenarios as bar charts in SAP BI Reports.
Overview of HCM Advanced Modules
PCP – Generic Process
Overview of HCM Advanced Modules
Enterprise Compensation Management
The SAP HCM Enterprise Compensation Management (ECM) module supports larger
organizations in defining, streamlining, and putting into practice a strategic performance-
based compensation program throughout the organisation.
Main components of ECM are:
 Compensation Administration
 Long Term Incentives
 Budgeting
 Job Pricing
However as part of the Mawared project we will be focusing on Compensation
Administration and Budgeting.
Overview of HCM Advanced Modules
ECM - Budgeting
Compensation Budgeting will be done at each entity level as per
their Personnel Cost Planning, and the Budgets are created from
the Personnel Cost planning proposals.
The following parameters are taken as base for Budgeting:
• Personnel Cost Planning/ Manpower Planning
• Encouragement Performance Bonus and Salary Increase
These parameters determine the budgeting guidelines and also
the way forward for the financial year.
The Budgeting component in SAP enables creating, modifying,
and monitoring compensation-related budgets within the
organization.
Overview of HCM Advanced Modules
ECM – Compensation Administration
Compensation Administration lets you:
• Perform compensation reviews including fixed pay, variable
pay.
• Apply eligibility rules and guidelines based on different criteria
such as performance ratings.
• Implement approval cycles if required feedback, and
compensation administration.
Overview of HCM Advanced Modules
ECM - Integration
Overview of HCM Advanced Modules
E-Recruiting
 SAP E-Recruiting provides a suite of tools to create and
approve job requisitions and post the jobs.
 Allows candidates to register and apply for job or submit
applications.
 Applicant tracking and reporting functions help organize
the processing of job applications and monitor the
effectiveness of the recruiting organization.
 In SAP E-recruiting you can monitor each step in the
recruiting process.
Overview of HCM Advanced Modules
E-Recruiting process
Requisition
Candidadate
Pre-selection
Candidate
Assessment
Candidate
Hiring /
Requisition
Closing
These are 4 stages of the recruitment processes:
The recruiting lifecycle follows a four-step process from requisition creation through the hiring of the
candidate and closure of the requisition.
Overview of HCM Advanced Modules
C&SP and Personnel Development
• SAP Personnel development and Career & Succession planning lets you avoid business disruption when key
positions are vacated by helping you proactively identify, develop, and track high-potential employees best
suited to fill those positions.
• You can prepare future leaders for new positions from within.
• You can identify successors for key positions before the positions are vacated.
• HR can create a talent profile of every employee. Using the talent profile, they can identify the top talents
• During talent calibration, line managers can discuss the performance and potential of all employee.
Overview of HCM Advanced Modules
Personnel Development
Overview of HCM Advanced Modules
C&SP
Overview of HCM Advanced Modules
Learning Solution (LSO)
• SAP Learning Solution enables the organizations to
provide learning opportunities to their employees
anytime anywhere.
• By managing enterprise learning with the SAP
Enterprise Learning environment, Entities can
structure, deliver and track knowledge transfer.
• Learning Portal can be accessed by staff to
complete their trainings.
• Training administrators use the Learning Portal to
identify courses and assign them to employees.
SAP ERP HCM Learning Solution, or simply Learning Solution for short, is the SAP module for managing,
tracking, and deploying a variety of learning courses.
Thank You

Saphcm presentation

  • 1.
    SAP Human Capital ManagementComponents Overview Rapture, Principal Consultant- SAP HCM & Success Factors
  • 2.
    Budgeting/ workforce planning exercise/ neworg exercise Vacancy created through Org Management Ahmed applies for vacancy through e- recruitment Ahmed is interviewed, accepted, and hired Ahmed is hired and assumes responsibilities Employee Self Service Ahmed Clocks In and Out every day Ahmed applies for Trip Approval Ahmed settles trip expenses upon return Manager assesses Ahmed’s Performance in the previous period Ahmed receives a bonus for a job well done! Ahmed gets paid his bonus and salary at the end of the month Contract is renewed Ahmed gets promoted Ahmed assumes his new responsibilities in a new organization Ahmed discusses his career options with his Manager Ahmed develops his skills Ahmed violates org policies Disciplinary action Ahmed is Terminated/ Separation
  • 3.
    Why Organization Management 1.OM helps to maintain the hierarchy structure 2. It gives authorization to control the organization structure 3. It helps in creating verticals of business 4. Automation of work flows. (Relationships) 5. Manpower planning 6. Planned job descriptions for employees (Assignment) 7. Planned compensation for jobs (predefined budgets) 8. Structural authorizations (Access) What is Organization management 1. Organization Management (OM) is one of the fundamental HCM sub modules. 2. OM comprises of several components, known as Objects. E.g. Organization, Position, Person. 3. Manages the organizational structure comprising of Organizational Plan which shows hierarchical relationship between OM objects. 4. Organization Management is the basis of defining reporting structure and workflow. 5. OM provides a comprehensive view of the organization in past, present & future. 6. To execute end-to-end business scenarios, the module is integrated with other HCM sub-modules. 7. OM reporting structure is maintained by establishing position to position relationship in organization unit. Organizational objects Org. key Organizational unit O Job C Position S Person P Cost center K Task T Task group Ts 1. Object – 1000 2. Relationships - 1001 3. Description - 1002 4. Department/staff - 1003 5. Character - 1004 6. Planned Compensation - 1005 7. Restrictions - 1006 8. Vacancy - 1007 9. Account Assignment - 1008 10. Health Examinations - 1009 11. Authorities/Resources - 1010 12. Work Schedule - 1011 13. Employee Group/Subgroup - 1013 14. Obsolete - 1014 15. Cost Distribution - 1018 16. Quota Planning - 1019 17. Address - 1028 18. Mail Address - 1032. Organization Management
  • 4.
    Overview of HCMCore Modules Personnel Administration PA - Master Data
  • 5.
    Overview of HCMCore Modules Personnel Time Management Time off as well as time worked is tracked and accounted for in Time Management. TM allows:  To create and assign various work schedules to employees, defining both their working hours and nonworking hours, such as holidays, breaks.  To manage leave and illness times  Plan the workforce requirements situation  Valuate attendance and absence times to manage time accounts
  • 6.
    Overview of HCMCore Modules : Time Data Recording Time recording can be done in number of ways, depending on the operations of each entity. You can record time actively, meaning that all working time as well as time off is entered into the system. Also, you can record time as an exception basis, meaning you are assumed to be working your schedule hours unless you say otherwise. In this scenario, you typically only report absences, such as sick time or vacation. Additionally, the SAP system can accept time from other systems, such as time clock in/out or card system.
  • 7.
    Overview of HCMCore Modules : Payroll Overview • Standardized data retention enables you to use master data and other payroll relevant data from Personnel Administration. • Time data, entered via Time Management, is automatically included in the Payroll and is valuated during the payroll run. • Information on expenses and payables from Payroll is posted for accounting directly in Financial Accounting, and you assign the costs to the appropriate cost center. You can also control the financial system of third- party providers. You can use this component to calculate the remuneration for work done for each employee.
  • 8.
    Overview of HCMCore Modules Payroll Overview
  • 9.
    Overview of HCMAdvanced Modules
  • 10.
    Overview of HCMAdvanced Modules Employee Self-Service (ESS) Employee Self-Service (ESS) software delivers the personalized information, tools, and services your employees need to do their jobs, manage their own important life and work events, and focus on contributing to business goals. ESS - is a web enabled tool used by employees to update own data or to access services for various business functions. In this way, employees can keep their own data up-to-date, while simultaneously reducing the number of time-consuming and expensive activities performed by the Human Resources Department.
  • 11.
    Overview of HCMAdvanced Modules : ESS - Overview • View Profile • Bank Details • Display salary statements • Display address • Change address • Creating leave request • Return from leave • Leave overview Working Time Address Book Personal Information Benefits & Payment
  • 12.
    Overview of HCMAdvanced Modules : MSS Overview • Manager Self-Service equips your managers with tools that make it easier to complete daily tasks – from routine HR transactions to compensation assessments. With a global view of employee information at their fingertips, managers can complete processes more quickly and make better, faster decisions. • MSS - Manager Self-Service is a web enabled tool which enables managers to keep their own data up-to-date, while simultaneously managing their team various activities. • Empower managers to have a quick overview of their team activities and information as and when required.
  • 13.
    Overview of HCMAdvanced Modules MSS - Key Activities • Work Overview Team Information Reports Organization Chart Team Graphical Display Tasks Notifications Tracking General Information Leaves ECC Reports BI Reports
  • 14.
    Overview of HCMAdvanced Modules Travel Management
  • 15.
    Overview of HCMAdvanced Modules Travel Management • Plan trips based on the travel requests. • Tracking of the approval status and display trips details and view them at a later date. • Booking advance in the request stage makes the settlement more accurate.
  • 16.
    Overview of HCMAdvanced Modules Performance Management  The PM module is part of the Talent Management which is an integrated part of the SAP HCM.  It is a complete process that integrates company planning and initiatives with measurable employee objectives, appraisals, feedback and compensation administrations.  Its main purpose is to assess the employee performance over the year by the setting goals and see if it were achieved. Employee performance management with SAP ERP HCM helps you plan, assess, improve, and analyze the performance of your workforce.
  • 17.
    Overview of HCMAdvanced Modules : Performance Management Benefits • Specific training requirements are created and cascaded to the specific employees • Utilization of automated workflows for approvals and notification of employees and managers • Managers and Employees are able to access the Performance Appraisal documents through the Portal • Availability of pre-defined template • Standardized tool for review • More open communications at all entity levels
  • 18.
    Overview of HCMAdvanced Modules Personnel Cost Planning Personnel Cost Planning focuses on a company’s personnel costs such as: Wages and salaries Allowances Employer contributions to social insurance etc. PCP helps to: To determine the current personnel costs as well as experiment with future costs by creating different scenarios. To work with costs that are not directly related to salaries and allowances. For example, calculate education and training costs. PCP offers various display options such as:  Download cost data into EXCEL spreadsheets.  Display cost data and plan scenarios as bar charts in SAP BI Reports.
  • 19.
    Overview of HCMAdvanced Modules PCP – Generic Process
  • 20.
    Overview of HCMAdvanced Modules Enterprise Compensation Management The SAP HCM Enterprise Compensation Management (ECM) module supports larger organizations in defining, streamlining, and putting into practice a strategic performance- based compensation program throughout the organisation. Main components of ECM are:  Compensation Administration  Long Term Incentives  Budgeting  Job Pricing However as part of the Mawared project we will be focusing on Compensation Administration and Budgeting.
  • 21.
    Overview of HCMAdvanced Modules ECM - Budgeting Compensation Budgeting will be done at each entity level as per their Personnel Cost Planning, and the Budgets are created from the Personnel Cost planning proposals. The following parameters are taken as base for Budgeting: • Personnel Cost Planning/ Manpower Planning • Encouragement Performance Bonus and Salary Increase These parameters determine the budgeting guidelines and also the way forward for the financial year. The Budgeting component in SAP enables creating, modifying, and monitoring compensation-related budgets within the organization.
  • 22.
    Overview of HCMAdvanced Modules ECM – Compensation Administration Compensation Administration lets you: • Perform compensation reviews including fixed pay, variable pay. • Apply eligibility rules and guidelines based on different criteria such as performance ratings. • Implement approval cycles if required feedback, and compensation administration.
  • 23.
    Overview of HCMAdvanced Modules ECM - Integration
  • 24.
    Overview of HCMAdvanced Modules E-Recruiting  SAP E-Recruiting provides a suite of tools to create and approve job requisitions and post the jobs.  Allows candidates to register and apply for job or submit applications.  Applicant tracking and reporting functions help organize the processing of job applications and monitor the effectiveness of the recruiting organization.  In SAP E-recruiting you can monitor each step in the recruiting process.
  • 25.
    Overview of HCMAdvanced Modules E-Recruiting process Requisition Candidadate Pre-selection Candidate Assessment Candidate Hiring / Requisition Closing These are 4 stages of the recruitment processes: The recruiting lifecycle follows a four-step process from requisition creation through the hiring of the candidate and closure of the requisition.
  • 26.
    Overview of HCMAdvanced Modules C&SP and Personnel Development • SAP Personnel development and Career & Succession planning lets you avoid business disruption when key positions are vacated by helping you proactively identify, develop, and track high-potential employees best suited to fill those positions. • You can prepare future leaders for new positions from within. • You can identify successors for key positions before the positions are vacated. • HR can create a talent profile of every employee. Using the talent profile, they can identify the top talents • During talent calibration, line managers can discuss the performance and potential of all employee.
  • 27.
    Overview of HCMAdvanced Modules Personnel Development
  • 28.
    Overview of HCMAdvanced Modules C&SP
  • 29.
    Overview of HCMAdvanced Modules Learning Solution (LSO) • SAP Learning Solution enables the organizations to provide learning opportunities to their employees anytime anywhere. • By managing enterprise learning with the SAP Enterprise Learning environment, Entities can structure, deliver and track knowledge transfer. • Learning Portal can be accessed by staff to complete their trainings. • Training administrators use the Learning Portal to identify courses and assign them to employees. SAP ERP HCM Learning Solution, or simply Learning Solution for short, is the SAP module for managing, tracking, and deploying a variety of learning courses.
  • 30.