SlideShare a Scribd company logo
1 of 10
Aravind Kumar.V
No 2/4A Gangai Nagar,
Thiruvottiyur,
Chennai-600019.
Professional Summary
 Having more than 10.7 years of IT experience in which 9.5 years as SAP
BASIS/HANA consultant.
 Extensive experience performing installs, upgrades, and system copies of ABAP and
dual stack ABAP/Java instances.
 Expert knowledge in performance monitoring/tuning and daily Basis technical
support including troubleshooting of SAP, Oracle, UNIX and Windows based
systems.
 Extensive experience performing installs, upgrades, system copies of ABAP and dual
stack ABAP/Java instances.
 Expert knowledge in performance monitoring and tuning, and daily Basis technical
support including troubleshooting of SAP, Oracle, and UNIX based systems.
 Strong background assisting in architectural design, planning and providing SAP
technical architecture and support training.
 SAP HANA
 SAP R/3 4.x+Enterprise
 ECC 6.0 & Netweaver Consultant
 SAP BI 7.0
 SAP Sol Man 7.0
 SAP HCM
 SAP PI/SRM/CRM
 SAP Enterprise Portal
Mobile: +91-9884411332
aravind.kvs@gmail.com
Personal Skills
With exposure to SAP BASIS Consultant in the IT industry.
My core strengths are:
 Ability to adapt to any software environment.
 Organized, goal oriented and time management skills.
 Ability to maintain good rapport with the team members’ customers and the
management.
 In-depth understanding of emerging technologies and their commercial
applications.
SAP Technical Key-Expertise
Expertise:
• EHP 7 upgrade
• OS / Data center Migration
• System Landscape designing
• Solution Manager Integration
• High Availability/ Cluster
Administration
• HANA Administration
• LVM Administration
• ESS/MSS/E-Recruitment/Nakisa
• Enterprise Portal
• Live Cache (High Availability
Setup)
• Knowledge on Oracle/MS SQL
Server 2005/DB2 10.5
• Tape Backups
• Windows, AIX, Solaris, HP Unix
Exposure
• New dimensional products CRM, BI,
SRM, SCM, MDM, GRC, GTS.
• Hana Administration
• SLD, TREX, GRC, ADS,NWDI, SMD,
Wily Introscope, Apache,
SAPWebDispatcher, Siteminder, XIPay,
Vertex, Approva, BIZRights
• Best Practices Maintenance
• Oracle, MS SQL Server, DB2
• JSPM (Java Support Package
Manager)
• Hardware Sizing
• Handling KT Sessions
Domain Experience
• Net weaver Administration
• Hana Administration
• System Administration
• Network Administration
• Database Administration
Educational Qualifications
Bachelor Of Engineering
St. Peters Engineering College/Anna University.
2005 73%
Related Experience
s
SAP Technical Consultant
Wipro Technologies Ltd, Chennai Oct’ 11 – Till date
Sr. Software Engineer
Hexaware Technologies Ltd, Chennai Feb’ 10 – Oct’11
SAP BASIS Consultant
WDC Ltd, Chennai Apr ‘ 09 – Feb’ 10
SAP Technical Consultant,
Quintegra Solutions Ltd, Chennai Jul ‘ 08 – Apr’ 09
Consultant SAP Practice,
CMC Limited (TATA Enterprise), Mumbai Sep ‘ 06 – Jul ‘ 08
Certification Done
Cisco Certified Network Associate – [CCNA - CSCO11210429]
Microsoft Certified Professional [MCP - 3813520]
Career Profile
Project Associated with Wipro Technologies, India ( http://wipro.com)
Project # 1 SAP – Support Project (Cardinal Health)
Client (http://www.cardinal.com)
About the Client Cardinal Health is a Fortune 22 company that improves the cost-effectiveness of healthcare. As
the business behind healthcare, Cardinal Health helps pharmacies, hospitals and ambulatory
surgery centers, clinical laboratories and physician offices focus on patient care while reducing
costs, enhancing efficiency and improving quality. Cardinal Health employs more than 34,000
people worldwide.
Position SAP Technical Consultant
Location Chennai, Tamilnadu
Duration Dec 2013 to Till Date
Platform/OS /
Database used
ECC 6.0 EHP7/SRM/CRM/PI/BI/SCM/SNC/EP/ Linux, AIX, Windows / DB2/Oracle
Description Support Project
Responsibilities
 Experience in Implementations, Migrations, Upgrades, Maintenance, Operations
and Performance Tuning of various SAP technical environments.
 Performed Enhancement Pack 7 (Ehp7) upgrade on all ECC 6.0 Landscapes and
Ehp3 upgrade on NetWeaver Landscapes.
 Handled system refresh activities using LVM Tool & TDMS.
 Installation of Solution Manager and Performed Post –Installation activities.
 Experience in handling the solutions System monitoring, Change Management
System, Root cause analysis, Technical Monitoring, BPIM in Solution manager 7.1
 Installed Libelle tool & configured High availability for Live cache.
 Installed & configured SAP Test Acceleration and Optimization tool (SAP TAO)
 Worked as SAP HANA Administrator with responsibilities of Setup of HANA
Landscape, SIDECAR scenario, Upgrade, Troubleshooting and Performance Tuning.
HALM Configuration for HANA transports, Delivery Units (DU) creation
 Performed Hana sizing for ECC using /SDF/HDB_SIZING ABAP report.
 Installed SAP HANA system using unified LCM in Wipro COE and also done revision
upgrade from 60 to 96.
 Installed SAP HANA studio and SAP HANA clients.
 Performed SLT initial configuration, Mail Alert setup for Replication Issues.
 Configured SSO between windows AD and Hana server using Kerberos.
 Configured SSO between SAP HANA and SAP BO 4.1 using SAML.
 Configured alerts in HANA for memory consumption, disk usage etc.
 Worked in Sap Hana Studio(adding systems, Exporting and Importing Systems,
Changing Configurations, Installed License Keys, Configuring and Monitoring with
Alerts )
Client ( http://ab-Inbev.com)
About the Client
InBev generated revenues of 39 billion USD. With a dream to become The Best Beer Company in
a Better World, the company has a strong, balanced portfolio. the collective strength of
approximately 116,000 people based in operations in 23 countries across the world. The
company works through six operational Zones; North America, Latin America North, Latin
America South, Western Europe, Central & Eastern Europe, and Asia Pacific
Position SAP Technical Consultant
Location Chennai, Tamilnadu
Duration April 2013 to Till Date
Platform/OS /
Database used
ECC 6.0 / AIX UNIX / Oracle
Description Support Project
Responsibilities
 Extensively worked on EHP6 upgrade for E-recruit systems.
 Experience in Design, Developing, Testing and Implementing SAP Security Roles,
Profiles and Authorizations for various landscapes using Profile Generator.
 Worked on CATT / eCATT Scripts for creating and maintaining Mass Users.
 Handled system refresh activities.
 Implemented Nakisa Org Chart in HR systems.
 Extensively worked on data center migration
Project # 2 SAP – Support Project (AKZO Nobel)
Client ( http://akzonobel.com )
About the Client
Akzonobel is leading global paints and coatings company and a major producer of specialty
chemicals. Headquartered in Amsterdam, the Netherlands, around 50,000 Employees in
operations in 80 countries across the world.
Position SAP Technical Consultant
Location Chennai, Tamil nadu
Duration FEB 2012 to April 2013
Platform/OS /
Database used
ECC 6.0 /SRM/SCM/CRM/BI/PI/Solman 7.1 MS Windows 2003/2008 / Oracle/SQL Server
2005/2008
Description Support Project
Responsibilities
 Extensively worked on EHP5 upgrade for ECC & BI systems.
 Implemented SAP JVM Switch, Experience in Integration of third party interfaces.
 Extensively worked on hardware migration, Database Migration from Oracle 10g to
11, SQL Server 2005 to SQL Server 2008.
 Monitoring of SAP Systems in Clustered Environment. Cluster Administration of SAP
Systems running on MSSQL, Managing cluster groups from bringing online/offline,
stop/start, swapping between groups. Knowledge of Quorum resources, Virtual
Servers, Heartbeats, files structure, Upgrade of Windows O/S and MSSQL Patches
and Hotfix
 Proactively Involved in Blend by merging multiple Instances into a single
landscape.
 Handled system refresh activities for different platforms (SRM, CRM, ECC, BI, SCM)
 Implemented DVM (Data Volume Management), using the report we have
archived the files & stabilized the growth of the database.
 Successfully installed 30+ SAP technical systems for Global SAP Landscape roll-out.
SAP applications include ECC 6.0, PI 7.1, BI7.0, Portal 7.0, TREX 7.0, SLD, OLMAN
7.0(EhP1) on AIX 6.1/Oracle 10g. Created IQs, WI and other technical documents.
Performed client copies, SPs upgrades, post-installation, post-configurations, go-live
verification and analysis check. Provided supported for UAT, on-site, off-site during
pre and post go-live implementation.
 Implemented BPIM (Business Process Interface Monitoring) through solution
manager.
 To check Database, Operating System and SAP (daily) which includes operating
system file system space monitoring, check all Application servers, alerts & system
logs, background jobs, System locks, Update failures & ABAP Dump monitoring.
 Complete responsibility of Performance/Load Analysis of the system, which
includes Memory Management, Workload Analysis of the system, Profile
Maintenance for Central Instance and Application Servers, setting OP modes and
Instances, defining, and distribution of Work Processes.
Project # 3 SAP – Support Project (ADNH - COMPASS)
Client ( http://adnhcompassme.com)
About the Client
ADNH Compass is a Joint Venture (JV) established between Abu Dhabi National Hotels and
Compass Group PLC in Abu Dhabi with responsibility for managing business across the Middle
East.
Position SAP Technical Consultant
Location Chennai, Tamilnadu
Duration Oct 2011 to Feb 2012
Platform/OS /
Database used
ECC 6.0 / AIX UNIX / Oracle
Description Support Project
Responsibilities
 Extensively worked on EHP6 upgrade for E-recruit systems.
 Handled system refresh activities.
 To check Database, Operating System and SAP (daily) which includes operating
system file system space monitoring, check all Application servers, alerts & system
logs, background jobs, System locks, Update failures & ABAP Dump monitoring.
 Complete responsibility of Performance/Load Analysis of the system, which
includes Memory Management, Workload Analysis of the system, Profile
Maintenance for Central Instance and Application Servers, setting OP modes and
Instances, defining, and distribution of Work Processes.
Project Associated with Hexaware Technologies, India ( http://hexaware.com)
Project # 1 SAP – Support Project (INBEV)
Client ( http://ab-Inbev.com)
About the Client
InBev generated revenues of 39 billion USD. With a dream to become The Best Beer Company in
a Better World, the company has a strong, balanced portfolio. the collective strength of
approximately 116,000 people based in operations in 23 countries across the world. The
company works through six operational Zones; North America, Latin America North, Latin
America South, Western Europe, Central & Eastern Europe, and Asia Pacific
Position Seniour Software Engineer
Location Chennai, Tamilnadu
Duration FEB 2010 to OCT 2011
Platform/OS /
Database used
ECC 6.0 / AIX UNIX / Oracle
Description Support Project
Responsibilities
 Extensively worked on EHP4 upgrade for E-recruit systems.
 Handled system refresh activities.
Project Associated with WDC Ltd, India ( http://WDC.com)
Worked as Contract employee in IBM
Project # 1 SAP – Support Project (AMAT)
Client Applied Material, Santa Clara ( http://appliedmaterials.com)
About the Client
Applied Materials, Inc. (Nasdaq: AMAT) is the global leader in Nanomanufacturing Technology
solutions with a broad portfolio of innovative equipment, service and software products for the
fabrication of semiconductor chips, flat panel displays, solar photovoltaic cells, flexible
electronics and energy efficient glass. To support our customers, Applied Materials employs
approximately 12,800* people throughout the world. In fiscal year 2008, Applied Materials
recorded revenues of approximately U.S. $8.1 billion.
Position SAP BASIS Consultant
Location Bangalore, Karnataka
Duration April 2009 – FEB 2010
Platform/OS /
Database used
ECC 6.0 / HP UNIX / Oracle
Description Implementation Project
Responsibilities

 Complete responsibility of following business process based on SOX control.
 Handling more than 1500 users working in this project.
 Handling transport management system
 Closely monitoring critical background jobs cancelled & rescheduling as per the
customer requirement.
 Complete responsibility of CUA Administration.
 Spool Administration: Spool configuration, Monitoring Spool requests generated by
background jobs and informing the users.
 To check Database, Operating System and SAP (daily) which includes operating
system file system space monitoring, check all Application servers, alerts & system
logs, background jobs, System locks, Update failures & ABAP Dump monitoring.
 Complete responsibility of Performance/Load Analysis of the system, which
includes Memory Management, Workload Analysis of the system, Profile
Maintenance for Central Instance and Application Servers, setting OP modes and
Instances, defining, and distribution of Work Processes.
 Expertise in analyzing and translating business requirements into technical
specifications in collaboration with application developers
 Monitoring and collecting Key performance indicators like dialog average
response time, Hit-Ratio, swaps, Logs, Dumps, Cancelled Jobs etc and reporting
the same
 Applied SAP OSS notes as per the SAP recommendations in Early watch Alert
Report and also with reference to the requests of developers.
Project Associated with Quintegra Solutions Ltd, India ( http://quintegrasolutions.com)
Project # 1 SAP – Implementation for Leading Construction & Infrastructure Development Company.
Client MARG Limted, Chennai ( http://www.marggroup.com)
About the Client
Established in 1994, MARG Limited is listed on the Bombay Stock Exchange, Madras Stock
Exchange and the Luxembourg Stock Exchange (FCCB), Headquartered in Chennai. The
company pioneered the infrastructure development on the Chennai IT Corridor. The company’s
business roadmap encompasses development of Power Projects, SEZ's, Ports, Townships, IT Parks,
Malls, Airports, Hotels, Apartments, Resorts, and Roads.
Position SAP Technical Consultant
Location Chennai, Tamilnadu
Duration Jul 2008 – April 2009
Platform/OS /
Database used
ECC 6.0 / Windows Server 2003 R2 / Microsoft SQL 2005
Description Implementation Project
Responsibilities
 Installed Solution Manager 7.0 and define System Landscape.
 Collaboratively worked with CRM team to configure CRM Middleware setup.
 Configure ESS, MSS to work in SAP Enterprise Portal.
 Deployed Webdynpro and created Jco Destinations in the Content Administration.
 Configured two ways of Backup – SAP Backup and HP Data Loader Backups.
 Complete responsibility of system security. Created 120 SAP End users and assign
them authorizations and profiles.
 Handled transport management system
 Handled system refresh activities.
 To check Database, Operating System and SAP (daily) which includes operating
system file system space monitoring, check all Application servers, alerts & system
logs, background jobs, System locks, Update failures & ABAP Dump monitoring.
 Complete responsibility of Performance/Load Analysis of the system, which
includes Memory Management, Workload Analysis of the system, Profile
Maintenance for Central Instance and Application Servers, setting OP modes and
Instances, defining, and distribution of Work Processes.
Project # 3 SAP – Implementation for Leading Food Product Company.
Client Manjilas Agro Food Products Limted, Kerala ( http://www.manjilas.com)
About the Client
Manjilas is the first ISO 9002 company in the rice industry in kerala and presently the company
has been awarded with ISO 9001:2000 certificates. Manjilas has 6 manufacturing units,
employing 450 people. The units use the state of the art imported technology. A strong R & D
department and special development kitchen has helped to launch many innovative products,
giving novelty to the customer's taste and appetite.
Position SAP Technical Consultant
Location Thrissur, Kerala
Duration Jul 2008 – Oct 2008
Platform/OS /
Database used
ECC 6.0 / Solaris 10 / Oracle 10g
Description Implementation Project
Role Team member
Responsibilities  Define Transport Landscape Development to Production
 Support Package & Kernel Upgrade.
 To check Database, Operating System and SAP (daily) which includes operating
system file system space monitoring, check all Application servers, alerts & system
logs, background jobs, System locks, Update failures & ABAP Dump monitoring.
Project # 4 SAP – Implementation for Leading Construction & Infrastructure Development Company.
Client PSN Srivari Automobiles Private Ltd, Kerala( http://www.psnsrivari.com)
About the Client
It’s a part of PSN group of companies. Presently the company has been awarded with ISO 9001-
2000 QMS Certified by DNV & NABCB certificate. The name has proved inimitable and value
added epic service victory in various automotive fields for the past 84 years. We foster creativity,
value added advantages and integrity for our teamwork to attain this milestone.
Position SAP Technical Consultant
Location Thrissur, Kerala
Duration Jul 2008 – April 2009
Platform/OS /
Database used
ECC 6.0 / Solaris 10 / Oracle 10g
Description Implementation Project
Role Team member
Highlights Configured Adobe Document Services, Installed EP 6.0, and Updated JSPM in Stacks.
Responsibilities  Installed Solution Manager 4.0 and define System Landscape.
 Installed SAP router, Setup SNC remote connection to SAP.
 Installation of SAP, Oracle 10g in Solaris 10.
 Configured Adobe Document Services for the Interactive Forms.
 Configured backups using BRTOOLS.
 To check Database, Operating System and SAP (daily) which includes operating
system file system space monitoring, check all Application servers, alerts & system
logs, background jobs, System locks, Update failures & ABAP Dump monitoring.
Project Associated with CMC Ltd (TATA Enterprise), India ( http://cmcltd.com)
Project # 5 SAP – Implementation for one of the best University in Maharastra
Client NMU (North Maharastra University), Kerala ( http://www.nmu.ac.in )
About the Client
North Maharashtra University is one of the most promising upcoming universities in India. It was
established on 15th August 1989. The faculty members of the schools and the departments are
experienced and have come from reputed Institutes and Industries.
Position SAP Consultant Practice
Location Jalgaon, Maharastra.
Duration May 2008-Jun 2008
Platform/OS /
Database used
ECC 6.0 /Windows Server 2003 R2/ Microsoft SQL 2005
Description Of the
Project
Implementation Project
Responsibilities  Client Administration: Client Creation, Deletion and Copy (Local, Export/Import).
 Define Transport Landscape Development to Production
 Complete responsibility of system security. Created 25 SAP End users and assign
them authorizations and profiles.
 Configured SAP systems according to recommendations in Early watch report
 Complete responsibility of Performance/Load Analysis of the system, which
includes Memory Management, Workload Analysis of the system, Profile
Maintenance for Central Instance and Application Servers, setting OP modes and
Instances, defining, and distribution of Work Processes.
Project # 6 SAP – Implementation for leading manufacturing operation Company
Client Sanghvi Forging & Engineering Ltd ( http://www.sanghviforge.com )
About the Client
Sanghvi Forging & Engineering Limited (SFEL), is an ISO 9001:2000 Certified Indian company, is
engaged in the manufacture and marketing of Stainless Steel Forged and Machined Subtends,
Forged Flanges, Forged Fittings and CNC Machined Forged Parts & Automobile Components in
India, since 1990.
Position SAP Consultant Practice
Location Vadodara, Baroda
Duration Sep 2007 – May 2008
Team size 15
Platform/OS /
Database used
ECC 6.0 / Windows Server 2003 / Oracle 10g
Description Implementation Project
Role Team member
Responsibilities  As part of Implementation, Installed IDES & Production servers configured
 Installed and Configured SAP Solution Manager 7.0 for MOPZ, EWA and CCMS Alert
Configuration for Background job cancellation and ABAP Dumps.
 Configured WebGUI for Internal access
 To check Database, Operating System and SAP (daily) which includes operating
system file system space monitoring, check all Application servers, alerts & system
logs, background jobs, System locks, Update failures & ABAP Dump monitoring.
 Complete responsibility of Performance/Load Analysis of the system, which
includes Memory Management, Workload Analysis of the system, Profile
Maintenance for Central Instance and Application Servers, setting OP modes and
Instances, defining, and distribution of Work Processes.
Project # 7 SAP – Implementation for leading manufacturing operation Company
Client GHATGE PATIL Industries Ltd ( http://www.gplind.com )
About the Client
GHATGE PATIL Industries Ltd (GPIL), is an ISO 9001:2000 Certified company, is engaged in the
manufacture of Grey/Ductile Iron castings, Industrial Valves, xmas tree aggregates & well head
components, Power Transmission Products.
Location Kolhapur, Maharastra.
Duration Sep 2006-Aug 2007
Team size 12
Platform/OS /
Database used
ECC 5.0 / AIX 5.0, IBM P-series server / Oracle 9i
Description Of the
Project
Support Project
Responsibilities  Proficient in troubleshooting and problem resolution, root cause analysis,
bottlenecks elimination.
 Performed the workload analysis, monitored the operating system and the CPU
utilization.
 Backup strategy for the entire landscape
Responsibilities in Vertex Systems
Role Network Engineer
Duration 6 Months
Solution
Environment
Server 2003 Enterprise Edition, Server 2000, Cisco Routers & Switches
Highlights V-SAT configuration for wireless Internet, Router & Switch Installation, Server Installation &
configuring with LAN & WAN Network
Responsibility Designed and Implemented the LAN/WAN Networks, Backup/Restoration of User data’s and AD
database using Windows backup Utility. Installation and Administration of Mcafee antivirus/
Symantec Antivirus server and Client rollout
Responsibilities in CM Software Technologies
Role System Administration
Duration 5 Months
Solution
Environment
Server 2000 Enterprise Edition, WinNT, Dlink Switches and Hubs.
Highlights Server Support, Installed Active Directory & configured User permissions & added client Machines
into Domain Network, RAID-5, Implemented & Maintained Network Infrastructure (LAN/WAN).
Responsibility Installation and Configuring RAID- 1 and RAID-5, Managing users and groups, profiles, and rights,
Remote Administration, Backup/Restoration of User data’s and AD database using Windows
backup Utility. Monitored & Maintained Server Performance consistency.
Achievements
• Provided Extensive support during Roll out project recognized my efforts & been awarded as a “Best Performer
Award” In Hexaware Technologies.
• Rewarded for having solved the performance problem in Premier Foods Project.
• Ably solved major performance problem in SAP server, was appreciated by the customer.
• Achieved “SAP Hi Fliers Award “in 2015 in Wipro Technologies
Personal Details
Date Of Birth 10th
June 1984
Marital Status Single
Languages Known English, Tamil, Telugu, & Kannada
Nationality Indian
Passport Details F2626128
Personal Interests Playing Football & Watching English Premier League, Passion of Bike Riding.

More Related Content

What's hot (20)

Archit resume
Archit resumeArchit resume
Archit resume
 
My Profile
My ProfileMy Profile
My Profile
 
Thillipan
ThillipanThillipan
Thillipan
 
SAP HANA Overview
SAP HANA OverviewSAP HANA Overview
SAP HANA Overview
 
Resume_Kuldeep
Resume_KuldeepResume_Kuldeep
Resume_Kuldeep
 
Resume
ResumeResume
Resume
 
Vivek Resume
Vivek ResumeVivek Resume
Vivek Resume
 
SAP HANA SPS09- Administration Monitoring
SAP HANA SPS09- Administration MonitoringSAP HANA SPS09- Administration Monitoring
SAP HANA SPS09- Administration Monitoring
 
AEJAZERPDBA
AEJAZERPDBAAEJAZERPDBA
AEJAZERPDBA
 
SAP HANA SPS09 - SAP HANA Workload Management
SAP HANA SPS09 - SAP HANA Workload ManagementSAP HANA SPS09 - SAP HANA Workload Management
SAP HANA SPS09 - SAP HANA Workload Management
 
Sufaid Elampilavil-CV
Sufaid Elampilavil-CVSufaid Elampilavil-CV
Sufaid Elampilavil-CV
 
md raziuddin
md raziuddinmd raziuddin
md raziuddin
 
Ecc ad ldap
Ecc ad ldapEcc ad ldap
Ecc ad ldap
 
Ganesh_basis Resume
Ganesh_basis ResumeGanesh_basis Resume
Ganesh_basis Resume
 
Resume
ResumeResume
Resume
 
Rohit Singh(sap basis)
Rohit Singh(sap basis)Rohit Singh(sap basis)
Rohit Singh(sap basis)
 
Resume - sql server developer
Resume - sql server developerResume - sql server developer
Resume - sql server developer
 
Using sap-netweaver-with-dbim-2594359
Using sap-netweaver-with-dbim-2594359Using sap-netweaver-with-dbim-2594359
Using sap-netweaver-with-dbim-2594359
 
Rahul_Resume_310116
Rahul_Resume_310116Rahul_Resume_310116
Rahul_Resume_310116
 
Ayman_Resume - update
Ayman_Resume - updateAyman_Resume - update
Ayman_Resume - update
 

Viewers also liked

Upamanyu_Mukherjee_SAP_HANA_resume
Upamanyu_Mukherjee_SAP_HANA_resumeUpamanyu_Mukherjee_SAP_HANA_resume
Upamanyu_Mukherjee_SAP_HANA_resumeUpamanyu Mukherjee
 
Riya Bakshi resume
Riya Bakshi resumeRiya Bakshi resume
Riya Bakshi resumeRiya Bakshi
 
CV_Jyosthna_SAP BASIS
CV_Jyosthna_SAP BASISCV_Jyosthna_SAP BASIS
CV_Jyosthna_SAP BASISJYOSTHNA
 
Rakesh_Posimreddy_SAP_BASIS
Rakesh_Posimreddy_SAP_BASISRakesh_Posimreddy_SAP_BASIS
Rakesh_Posimreddy_SAP_BASISRakesh Reddy
 
Dick Kramer 2016 Resume
Dick Kramer 2016 ResumeDick Kramer 2016 Resume
Dick Kramer 2016 ResumeDick Kramer
 

Viewers also liked (8)

Upamanyu_Mukherjee_SAP_HANA_resume
Upamanyu_Mukherjee_SAP_HANA_resumeUpamanyu_Mukherjee_SAP_HANA_resume
Upamanyu_Mukherjee_SAP_HANA_resume
 
Riya Bakshi resume
Riya Bakshi resumeRiya Bakshi resume
Riya Bakshi resume
 
CV_Jyosthna_SAP BASIS
CV_Jyosthna_SAP BASISCV_Jyosthna_SAP BASIS
CV_Jyosthna_SAP BASIS
 
Jagan
JaganJagan
Jagan
 
Rakesh_Posimreddy_SAP_BASIS
Rakesh_Posimreddy_SAP_BASISRakesh_Posimreddy_SAP_BASIS
Rakesh_Posimreddy_SAP_BASIS
 
Maria_Joseph_Vimalan_Resume
Maria_Joseph_Vimalan_ResumeMaria_Joseph_Vimalan_Resume
Maria_Joseph_Vimalan_Resume
 
Dick Kramer 2016 Resume
Dick Kramer 2016 ResumeDick Kramer 2016 Resume
Dick Kramer 2016 Resume
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 

Similar to SAP_BASIS & HANA_with_Yrs_Exp-10.7_Aravind_Kumar

Similar to SAP_BASIS & HANA_with_Yrs_Exp-10.7_Aravind_Kumar (20)

SAP_BASIS & HANA_with_Yrs_Exp-10.7_Aravind_Kumar
SAP_BASIS & HANA_with_Yrs_Exp-10.7_Aravind_KumarSAP_BASIS & HANA_with_Yrs_Exp-10.7_Aravind_Kumar
SAP_BASIS & HANA_with_Yrs_Exp-10.7_Aravind_Kumar
 
Jayachandran_Resume
Jayachandran_ResumeJayachandran_Resume
Jayachandran_Resume
 
RESUME2015_Updated
RESUME2015_UpdatedRESUME2015_Updated
RESUME2015_Updated
 
cv
cvcv
cv
 
Souvik_cv
Souvik_cvSouvik_cv
Souvik_cv
 
Thyagarajan_Rajan_resume
Thyagarajan_Rajan_resumeThyagarajan_Rajan_resume
Thyagarajan_Rajan_resume
 
Sap CV
Sap CVSap CV
Sap CV
 
Sap CV
Sap CVSap CV
Sap CV
 
Praveen Kumar_CV
Praveen Kumar_CVPraveen Kumar_CV
Praveen Kumar_CV
 
Sa psolman[1]
Sa psolman[1]Sa psolman[1]
Sa psolman[1]
 
Nabanita Sen SAP Basis Resume_4+years
Nabanita Sen SAP Basis Resume_4+yearsNabanita Sen SAP Basis Resume_4+years
Nabanita Sen SAP Basis Resume_4+years
 
CV latest
CV latestCV latest
CV latest
 
CV_Chetan_Shenoy-SE_TCS
CV_Chetan_Shenoy-SE_TCSCV_Chetan_Shenoy-SE_TCS
CV_Chetan_Shenoy-SE_TCS
 
Tatrakal_Phanee_resume
Tatrakal_Phanee_resumeTatrakal_Phanee_resume
Tatrakal_Phanee_resume
 
RABI SHANKAR PAL_New
RABI SHANKAR PAL_NewRABI SHANKAR PAL_New
RABI SHANKAR PAL_New
 
Resume
Resume Resume
Resume
 
Shayne capo 2016
Shayne capo 2016Shayne capo 2016
Shayne capo 2016
 
Rahul_Vijay_Gosewade
Rahul_Vijay_GosewadeRahul_Vijay_Gosewade
Rahul_Vijay_Gosewade
 
ABAP EXP RESUME MALAYSIA 20072016
ABAP EXP RESUME MALAYSIA 20072016ABAP EXP RESUME MALAYSIA 20072016
ABAP EXP RESUME MALAYSIA 20072016
 
Mahesh_Resume
Mahesh_ResumeMahesh_Resume
Mahesh_Resume
 

SAP_BASIS & HANA_with_Yrs_Exp-10.7_Aravind_Kumar

  • 1. Aravind Kumar.V No 2/4A Gangai Nagar, Thiruvottiyur, Chennai-600019. Professional Summary  Having more than 10.7 years of IT experience in which 9.5 years as SAP BASIS/HANA consultant.  Extensive experience performing installs, upgrades, and system copies of ABAP and dual stack ABAP/Java instances.  Expert knowledge in performance monitoring/tuning and daily Basis technical support including troubleshooting of SAP, Oracle, UNIX and Windows based systems.  Extensive experience performing installs, upgrades, system copies of ABAP and dual stack ABAP/Java instances.  Expert knowledge in performance monitoring and tuning, and daily Basis technical support including troubleshooting of SAP, Oracle, and UNIX based systems.  Strong background assisting in architectural design, planning and providing SAP technical architecture and support training.  SAP HANA  SAP R/3 4.x+Enterprise  ECC 6.0 & Netweaver Consultant  SAP BI 7.0  SAP Sol Man 7.0  SAP HCM  SAP PI/SRM/CRM  SAP Enterprise Portal Mobile: +91-9884411332 aravind.kvs@gmail.com Personal Skills With exposure to SAP BASIS Consultant in the IT industry. My core strengths are:  Ability to adapt to any software environment.  Organized, goal oriented and time management skills.  Ability to maintain good rapport with the team members’ customers and the management.  In-depth understanding of emerging technologies and their commercial applications. SAP Technical Key-Expertise
  • 2. Expertise: • EHP 7 upgrade • OS / Data center Migration • System Landscape designing • Solution Manager Integration • High Availability/ Cluster Administration • HANA Administration • LVM Administration • ESS/MSS/E-Recruitment/Nakisa • Enterprise Portal • Live Cache (High Availability Setup) • Knowledge on Oracle/MS SQL Server 2005/DB2 10.5 • Tape Backups • Windows, AIX, Solaris, HP Unix Exposure • New dimensional products CRM, BI, SRM, SCM, MDM, GRC, GTS. • Hana Administration • SLD, TREX, GRC, ADS,NWDI, SMD, Wily Introscope, Apache, SAPWebDispatcher, Siteminder, XIPay, Vertex, Approva, BIZRights • Best Practices Maintenance • Oracle, MS SQL Server, DB2 • JSPM (Java Support Package Manager) • Hardware Sizing • Handling KT Sessions Domain Experience • Net weaver Administration • Hana Administration • System Administration • Network Administration • Database Administration Educational Qualifications Bachelor Of Engineering St. Peters Engineering College/Anna University. 2005 73% Related Experience s SAP Technical Consultant Wipro Technologies Ltd, Chennai Oct’ 11 – Till date Sr. Software Engineer Hexaware Technologies Ltd, Chennai Feb’ 10 – Oct’11 SAP BASIS Consultant WDC Ltd, Chennai Apr ‘ 09 – Feb’ 10 SAP Technical Consultant, Quintegra Solutions Ltd, Chennai Jul ‘ 08 – Apr’ 09 Consultant SAP Practice, CMC Limited (TATA Enterprise), Mumbai Sep ‘ 06 – Jul ‘ 08 Certification Done Cisco Certified Network Associate – [CCNA - CSCO11210429] Microsoft Certified Professional [MCP - 3813520] Career Profile Project Associated with Wipro Technologies, India ( http://wipro.com) Project # 1 SAP – Support Project (Cardinal Health) Client (http://www.cardinal.com) About the Client Cardinal Health is a Fortune 22 company that improves the cost-effectiveness of healthcare. As the business behind healthcare, Cardinal Health helps pharmacies, hospitals and ambulatory
  • 3. surgery centers, clinical laboratories and physician offices focus on patient care while reducing costs, enhancing efficiency and improving quality. Cardinal Health employs more than 34,000 people worldwide. Position SAP Technical Consultant Location Chennai, Tamilnadu Duration Dec 2013 to Till Date Platform/OS / Database used ECC 6.0 EHP7/SRM/CRM/PI/BI/SCM/SNC/EP/ Linux, AIX, Windows / DB2/Oracle Description Support Project Responsibilities  Experience in Implementations, Migrations, Upgrades, Maintenance, Operations and Performance Tuning of various SAP technical environments.  Performed Enhancement Pack 7 (Ehp7) upgrade on all ECC 6.0 Landscapes and Ehp3 upgrade on NetWeaver Landscapes.  Handled system refresh activities using LVM Tool & TDMS.  Installation of Solution Manager and Performed Post –Installation activities.  Experience in handling the solutions System monitoring, Change Management System, Root cause analysis, Technical Monitoring, BPIM in Solution manager 7.1  Installed Libelle tool & configured High availability for Live cache.  Installed & configured SAP Test Acceleration and Optimization tool (SAP TAO)  Worked as SAP HANA Administrator with responsibilities of Setup of HANA Landscape, SIDECAR scenario, Upgrade, Troubleshooting and Performance Tuning. HALM Configuration for HANA transports, Delivery Units (DU) creation  Performed Hana sizing for ECC using /SDF/HDB_SIZING ABAP report.  Installed SAP HANA system using unified LCM in Wipro COE and also done revision upgrade from 60 to 96.  Installed SAP HANA studio and SAP HANA clients.  Performed SLT initial configuration, Mail Alert setup for Replication Issues.  Configured SSO between windows AD and Hana server using Kerberos.  Configured SSO between SAP HANA and SAP BO 4.1 using SAML.  Configured alerts in HANA for memory consumption, disk usage etc.  Worked in Sap Hana Studio(adding systems, Exporting and Importing Systems, Changing Configurations, Installed License Keys, Configuring and Monitoring with Alerts ) Client ( http://ab-Inbev.com) About the Client InBev generated revenues of 39 billion USD. With a dream to become The Best Beer Company in a Better World, the company has a strong, balanced portfolio. the collective strength of approximately 116,000 people based in operations in 23 countries across the world. The company works through six operational Zones; North America, Latin America North, Latin America South, Western Europe, Central & Eastern Europe, and Asia Pacific Position SAP Technical Consultant Location Chennai, Tamilnadu Duration April 2013 to Till Date
  • 4. Platform/OS / Database used ECC 6.0 / AIX UNIX / Oracle Description Support Project Responsibilities  Extensively worked on EHP6 upgrade for E-recruit systems.  Experience in Design, Developing, Testing and Implementing SAP Security Roles, Profiles and Authorizations for various landscapes using Profile Generator.  Worked on CATT / eCATT Scripts for creating and maintaining Mass Users.  Handled system refresh activities.  Implemented Nakisa Org Chart in HR systems.  Extensively worked on data center migration Project # 2 SAP – Support Project (AKZO Nobel) Client ( http://akzonobel.com ) About the Client Akzonobel is leading global paints and coatings company and a major producer of specialty chemicals. Headquartered in Amsterdam, the Netherlands, around 50,000 Employees in operations in 80 countries across the world. Position SAP Technical Consultant Location Chennai, Tamil nadu Duration FEB 2012 to April 2013 Platform/OS / Database used ECC 6.0 /SRM/SCM/CRM/BI/PI/Solman 7.1 MS Windows 2003/2008 / Oracle/SQL Server 2005/2008 Description Support Project Responsibilities  Extensively worked on EHP5 upgrade for ECC & BI systems.  Implemented SAP JVM Switch, Experience in Integration of third party interfaces.  Extensively worked on hardware migration, Database Migration from Oracle 10g to 11, SQL Server 2005 to SQL Server 2008.  Monitoring of SAP Systems in Clustered Environment. Cluster Administration of SAP Systems running on MSSQL, Managing cluster groups from bringing online/offline, stop/start, swapping between groups. Knowledge of Quorum resources, Virtual Servers, Heartbeats, files structure, Upgrade of Windows O/S and MSSQL Patches and Hotfix  Proactively Involved in Blend by merging multiple Instances into a single landscape.  Handled system refresh activities for different platforms (SRM, CRM, ECC, BI, SCM)  Implemented DVM (Data Volume Management), using the report we have archived the files & stabilized the growth of the database.  Successfully installed 30+ SAP technical systems for Global SAP Landscape roll-out. SAP applications include ECC 6.0, PI 7.1, BI7.0, Portal 7.0, TREX 7.0, SLD, OLMAN 7.0(EhP1) on AIX 6.1/Oracle 10g. Created IQs, WI and other technical documents. Performed client copies, SPs upgrades, post-installation, post-configurations, go-live verification and analysis check. Provided supported for UAT, on-site, off-site during pre and post go-live implementation.  Implemented BPIM (Business Process Interface Monitoring) through solution manager.
  • 5.  To check Database, Operating System and SAP (daily) which includes operating system file system space monitoring, check all Application servers, alerts & system logs, background jobs, System locks, Update failures & ABAP Dump monitoring.  Complete responsibility of Performance/Load Analysis of the system, which includes Memory Management, Workload Analysis of the system, Profile Maintenance for Central Instance and Application Servers, setting OP modes and Instances, defining, and distribution of Work Processes. Project # 3 SAP – Support Project (ADNH - COMPASS) Client ( http://adnhcompassme.com) About the Client ADNH Compass is a Joint Venture (JV) established between Abu Dhabi National Hotels and Compass Group PLC in Abu Dhabi with responsibility for managing business across the Middle East. Position SAP Technical Consultant Location Chennai, Tamilnadu Duration Oct 2011 to Feb 2012 Platform/OS / Database used ECC 6.0 / AIX UNIX / Oracle Description Support Project Responsibilities  Extensively worked on EHP6 upgrade for E-recruit systems.  Handled system refresh activities.  To check Database, Operating System and SAP (daily) which includes operating system file system space monitoring, check all Application servers, alerts & system logs, background jobs, System locks, Update failures & ABAP Dump monitoring.  Complete responsibility of Performance/Load Analysis of the system, which includes Memory Management, Workload Analysis of the system, Profile Maintenance for Central Instance and Application Servers, setting OP modes and Instances, defining, and distribution of Work Processes. Project Associated with Hexaware Technologies, India ( http://hexaware.com) Project # 1 SAP – Support Project (INBEV) Client ( http://ab-Inbev.com) About the Client InBev generated revenues of 39 billion USD. With a dream to become The Best Beer Company in a Better World, the company has a strong, balanced portfolio. the collective strength of approximately 116,000 people based in operations in 23 countries across the world. The company works through six operational Zones; North America, Latin America North, Latin America South, Western Europe, Central & Eastern Europe, and Asia Pacific Position Seniour Software Engineer Location Chennai, Tamilnadu Duration FEB 2010 to OCT 2011 Platform/OS / Database used ECC 6.0 / AIX UNIX / Oracle Description Support Project Responsibilities  Extensively worked on EHP4 upgrade for E-recruit systems.  Handled system refresh activities.
  • 6. Project Associated with WDC Ltd, India ( http://WDC.com) Worked as Contract employee in IBM Project # 1 SAP – Support Project (AMAT) Client Applied Material, Santa Clara ( http://appliedmaterials.com) About the Client Applied Materials, Inc. (Nasdaq: AMAT) is the global leader in Nanomanufacturing Technology solutions with a broad portfolio of innovative equipment, service and software products for the fabrication of semiconductor chips, flat panel displays, solar photovoltaic cells, flexible electronics and energy efficient glass. To support our customers, Applied Materials employs approximately 12,800* people throughout the world. In fiscal year 2008, Applied Materials recorded revenues of approximately U.S. $8.1 billion. Position SAP BASIS Consultant Location Bangalore, Karnataka Duration April 2009 – FEB 2010 Platform/OS / Database used ECC 6.0 / HP UNIX / Oracle Description Implementation Project Responsibilities   Complete responsibility of following business process based on SOX control.  Handling more than 1500 users working in this project.  Handling transport management system  Closely monitoring critical background jobs cancelled & rescheduling as per the customer requirement.  Complete responsibility of CUA Administration.  Spool Administration: Spool configuration, Monitoring Spool requests generated by background jobs and informing the users.  To check Database, Operating System and SAP (daily) which includes operating system file system space monitoring, check all Application servers, alerts & system logs, background jobs, System locks, Update failures & ABAP Dump monitoring.  Complete responsibility of Performance/Load Analysis of the system, which includes Memory Management, Workload Analysis of the system, Profile Maintenance for Central Instance and Application Servers, setting OP modes and Instances, defining, and distribution of Work Processes.  Expertise in analyzing and translating business requirements into technical specifications in collaboration with application developers  Monitoring and collecting Key performance indicators like dialog average response time, Hit-Ratio, swaps, Logs, Dumps, Cancelled Jobs etc and reporting the same  Applied SAP OSS notes as per the SAP recommendations in Early watch Alert Report and also with reference to the requests of developers. Project Associated with Quintegra Solutions Ltd, India ( http://quintegrasolutions.com)
  • 7. Project # 1 SAP – Implementation for Leading Construction & Infrastructure Development Company. Client MARG Limted, Chennai ( http://www.marggroup.com) About the Client Established in 1994, MARG Limited is listed on the Bombay Stock Exchange, Madras Stock Exchange and the Luxembourg Stock Exchange (FCCB), Headquartered in Chennai. The company pioneered the infrastructure development on the Chennai IT Corridor. The company’s business roadmap encompasses development of Power Projects, SEZ's, Ports, Townships, IT Parks, Malls, Airports, Hotels, Apartments, Resorts, and Roads. Position SAP Technical Consultant Location Chennai, Tamilnadu Duration Jul 2008 – April 2009 Platform/OS / Database used ECC 6.0 / Windows Server 2003 R2 / Microsoft SQL 2005 Description Implementation Project Responsibilities  Installed Solution Manager 7.0 and define System Landscape.  Collaboratively worked with CRM team to configure CRM Middleware setup.  Configure ESS, MSS to work in SAP Enterprise Portal.  Deployed Webdynpro and created Jco Destinations in the Content Administration.  Configured two ways of Backup – SAP Backup and HP Data Loader Backups.  Complete responsibility of system security. Created 120 SAP End users and assign them authorizations and profiles.  Handled transport management system  Handled system refresh activities.  To check Database, Operating System and SAP (daily) which includes operating system file system space monitoring, check all Application servers, alerts & system logs, background jobs, System locks, Update failures & ABAP Dump monitoring.  Complete responsibility of Performance/Load Analysis of the system, which includes Memory Management, Workload Analysis of the system, Profile Maintenance for Central Instance and Application Servers, setting OP modes and Instances, defining, and distribution of Work Processes. Project # 3 SAP – Implementation for Leading Food Product Company. Client Manjilas Agro Food Products Limted, Kerala ( http://www.manjilas.com) About the Client Manjilas is the first ISO 9002 company in the rice industry in kerala and presently the company has been awarded with ISO 9001:2000 certificates. Manjilas has 6 manufacturing units, employing 450 people. The units use the state of the art imported technology. A strong R & D department and special development kitchen has helped to launch many innovative products, giving novelty to the customer's taste and appetite. Position SAP Technical Consultant Location Thrissur, Kerala Duration Jul 2008 – Oct 2008 Platform/OS / Database used ECC 6.0 / Solaris 10 / Oracle 10g Description Implementation Project Role Team member Responsibilities  Define Transport Landscape Development to Production  Support Package & Kernel Upgrade.  To check Database, Operating System and SAP (daily) which includes operating system file system space monitoring, check all Application servers, alerts & system
  • 8. logs, background jobs, System locks, Update failures & ABAP Dump monitoring. Project # 4 SAP – Implementation for Leading Construction & Infrastructure Development Company. Client PSN Srivari Automobiles Private Ltd, Kerala( http://www.psnsrivari.com) About the Client It’s a part of PSN group of companies. Presently the company has been awarded with ISO 9001- 2000 QMS Certified by DNV & NABCB certificate. The name has proved inimitable and value added epic service victory in various automotive fields for the past 84 years. We foster creativity, value added advantages and integrity for our teamwork to attain this milestone. Position SAP Technical Consultant Location Thrissur, Kerala Duration Jul 2008 – April 2009 Platform/OS / Database used ECC 6.0 / Solaris 10 / Oracle 10g Description Implementation Project Role Team member Highlights Configured Adobe Document Services, Installed EP 6.0, and Updated JSPM in Stacks. Responsibilities  Installed Solution Manager 4.0 and define System Landscape.  Installed SAP router, Setup SNC remote connection to SAP.  Installation of SAP, Oracle 10g in Solaris 10.  Configured Adobe Document Services for the Interactive Forms.  Configured backups using BRTOOLS.  To check Database, Operating System and SAP (daily) which includes operating system file system space monitoring, check all Application servers, alerts & system logs, background jobs, System locks, Update failures & ABAP Dump monitoring. Project Associated with CMC Ltd (TATA Enterprise), India ( http://cmcltd.com) Project # 5 SAP – Implementation for one of the best University in Maharastra Client NMU (North Maharastra University), Kerala ( http://www.nmu.ac.in ) About the Client North Maharashtra University is one of the most promising upcoming universities in India. It was established on 15th August 1989. The faculty members of the schools and the departments are experienced and have come from reputed Institutes and Industries. Position SAP Consultant Practice Location Jalgaon, Maharastra. Duration May 2008-Jun 2008 Platform/OS / Database used ECC 6.0 /Windows Server 2003 R2/ Microsoft SQL 2005 Description Of the Project Implementation Project Responsibilities  Client Administration: Client Creation, Deletion and Copy (Local, Export/Import).  Define Transport Landscape Development to Production  Complete responsibility of system security. Created 25 SAP End users and assign them authorizations and profiles.  Configured SAP systems according to recommendations in Early watch report  Complete responsibility of Performance/Load Analysis of the system, which includes Memory Management, Workload Analysis of the system, Profile Maintenance for Central Instance and Application Servers, setting OP modes and Instances, defining, and distribution of Work Processes. Project # 6 SAP – Implementation for leading manufacturing operation Company Client Sanghvi Forging & Engineering Ltd ( http://www.sanghviforge.com ) About the Client Sanghvi Forging & Engineering Limited (SFEL), is an ISO 9001:2000 Certified Indian company, is
  • 9. engaged in the manufacture and marketing of Stainless Steel Forged and Machined Subtends, Forged Flanges, Forged Fittings and CNC Machined Forged Parts & Automobile Components in India, since 1990. Position SAP Consultant Practice Location Vadodara, Baroda Duration Sep 2007 – May 2008 Team size 15 Platform/OS / Database used ECC 6.0 / Windows Server 2003 / Oracle 10g Description Implementation Project Role Team member Responsibilities  As part of Implementation, Installed IDES & Production servers configured  Installed and Configured SAP Solution Manager 7.0 for MOPZ, EWA and CCMS Alert Configuration for Background job cancellation and ABAP Dumps.  Configured WebGUI for Internal access  To check Database, Operating System and SAP (daily) which includes operating system file system space monitoring, check all Application servers, alerts & system logs, background jobs, System locks, Update failures & ABAP Dump monitoring.  Complete responsibility of Performance/Load Analysis of the system, which includes Memory Management, Workload Analysis of the system, Profile Maintenance for Central Instance and Application Servers, setting OP modes and Instances, defining, and distribution of Work Processes. Project # 7 SAP – Implementation for leading manufacturing operation Company Client GHATGE PATIL Industries Ltd ( http://www.gplind.com ) About the Client GHATGE PATIL Industries Ltd (GPIL), is an ISO 9001:2000 Certified company, is engaged in the manufacture of Grey/Ductile Iron castings, Industrial Valves, xmas tree aggregates & well head components, Power Transmission Products. Location Kolhapur, Maharastra. Duration Sep 2006-Aug 2007 Team size 12 Platform/OS / Database used ECC 5.0 / AIX 5.0, IBM P-series server / Oracle 9i Description Of the Project Support Project Responsibilities  Proficient in troubleshooting and problem resolution, root cause analysis, bottlenecks elimination.  Performed the workload analysis, monitored the operating system and the CPU utilization.  Backup strategy for the entire landscape Responsibilities in Vertex Systems Role Network Engineer Duration 6 Months Solution Environment Server 2003 Enterprise Edition, Server 2000, Cisco Routers & Switches Highlights V-SAT configuration for wireless Internet, Router & Switch Installation, Server Installation & configuring with LAN & WAN Network Responsibility Designed and Implemented the LAN/WAN Networks, Backup/Restoration of User data’s and AD
  • 10. database using Windows backup Utility. Installation and Administration of Mcafee antivirus/ Symantec Antivirus server and Client rollout Responsibilities in CM Software Technologies Role System Administration Duration 5 Months Solution Environment Server 2000 Enterprise Edition, WinNT, Dlink Switches and Hubs. Highlights Server Support, Installed Active Directory & configured User permissions & added client Machines into Domain Network, RAID-5, Implemented & Maintained Network Infrastructure (LAN/WAN). Responsibility Installation and Configuring RAID- 1 and RAID-5, Managing users and groups, profiles, and rights, Remote Administration, Backup/Restoration of User data’s and AD database using Windows backup Utility. Monitored & Maintained Server Performance consistency. Achievements • Provided Extensive support during Roll out project recognized my efforts & been awarded as a “Best Performer Award” In Hexaware Technologies. • Rewarded for having solved the performance problem in Premier Foods Project. • Ably solved major performance problem in SAP server, was appreciated by the customer. • Achieved “SAP Hi Fliers Award “in 2015 in Wipro Technologies Personal Details Date Of Birth 10th June 1984 Marital Status Single Languages Known English, Tamil, Telugu, & Kannada Nationality Indian Passport Details F2626128 Personal Interests Playing Football & Watching English Premier League, Passion of Bike Riding.