SlideShare a Scribd company logo
1 of 10
Maria Joseph Vimalan Professional Profile
SAP Basis Consultant
Strengths
 Dedication and ,
hardworking
 Understanding and
problem solving
approach, Good team
worker & stick to the
time
 Posses excellent
communication skills
and motivation skills
Skills
 Consultant – SAP
Basis,R3 , ECC ,
Netweaver
 Oracle Administration
 SQL Server
Administration
Certifications
 SAP Certified
Netweaver Consultant
 SAP Certified HANA
consultant
 SAP Certified OS/DB
migration Consultant
Spoken Languages
 English
 Tamil
 Having 9+years of IT experience out of which
5+ yr in SAP Basis with two full cycle
implementation project, 3 support projects , 5
migration projects and 2 upgrade project.
 Working as SAP Basis Consultant in HP Global
Soft India Ltd from Feb 2012 to till date
 Worked as SAP Basis Consultant at Keane
India from Dec 2009 to Jan 2012.
 Worked as WFM (Work Force Management)
office at Sitel India Limited from May 2007 to
Nov 2009)
 Experience in basis administration having
performed activities such as system copies , ,
SAP installations, Kernel Upgrades, Support
Pack upgrades on UNIX (AIX 5.3 ) - databases
(Oracle 10g , SQL Server , HANA, Sybase ) ..etc
 Exposures to varied customer landscapes such
as R/3 4.7, ECC 6, sap Netweaver components
etc.
 Familiar with strong SAP processes.
 Good Exposure in Gathering Requirements,
estimating timelines and resource
requirements as per customer requests.
Education:
 Msc. IT – Master of Science in Information
Technology (First Class with Distinction)
 PGDCA – Post Graduate Diploma in Computer
Applications ( First Class)
Certifications / Achievements
 SAP Certified Net weaver Associate (Certificate ID : 0004894359 )
 SAP Certified Technology Consultant – SAP Net weaver ’04 –OS/DB Migration for
SAP Systems (Certificate ID: 0008654879)
 SAP Certified HANA Associate
 Information Technology Infrastructure Library (ITIL) V3 Certified.
 SCN Top Leading Solution contributor for the year 2012 – 2013 ( Platinum
Member)
Experience Details (Starting from the current Employer)
Sl. No. Name Of The
Organization
Designation Joining Date Relieving
Date
1 HPE Globalsoft Pvt
Ltd
Senior SAP
Support
Migration,
Upgrade &
Implementation
Consultant
20-Feb-2012 Till Date
2 Keane India
International
Senior Software
Engineer
16/12/2009 17-Feb-2012
3 Sitel India Pvt Ltd Systems Engineer 24/05/2007 14/12/2009
QualificationDetails (Highest Degree onTop)
Sl.
No.
Degree Branch Year of
Passing
Name of
the College
/ Institute
Name of
the
University
Percentage
/ cgpa /
Grade
1 M.SC IT 2007 Bishop Heber
College,Trichy
Autonomous 83%
2 B.SC Physics 2003 St. Joseph’s
College,Trichy
Bharathidasan
University
60 %
3 Higher
Secondary
Mathematics
& Computer
Science
1999 Arockimatha
Matriculation
Higher
Secondary
School, Trichy
N/A- 80%
TechnicalProficiency
 SAP : SAP Net Weaver 6. 40, 7.01, 7.11, 7.20 7.30, 731,740 releases (
ABAP+JAVA),SAP CRM, SAP SCM on HANA, SAP EP,
SAP ME/MII, SAP IDM 7.2 and 8.0, SAP GTS 8.0, SAP Solution
Manager 7.1
 Platforms : Windows, UNIX, HP-UX, & Linux
 Database : SAP HANA DB, MS-SQLServer, Sybase & Oracle.
ProjectDetails
Project Name SKF – SAP Support
Client SKF, Germany
Responsilbities Currently working as SAP NetWeaver Lead in UNITE Technical
Operations team. Major responsibilities include provide expert
knowledge, proactive advice and early alerts to the program in
NetWeaver and Basis areas. Ensuring that deliverables within area of
responsibility are met within time. Ensure a consistent end-to-end
technical system integrity and operation in NetWeaver area. Translation
of non-functional requirements to technical solutions. Order and follow-
up of deliveries and SLA’s with hosting and basis partners. Issue and
problem resolution together with solution development, deployment
teams, basis and hosting supplier, application management supplier and
system vendor. Manage documentation of technical solution and
operational documents. Proactively work to improve quality and speed
of operations and system delivery. Provide Advice on application re-use,
buy or build decisions. Contribute to strategy development in alignment
with the system vendor roadmap. Collaborate with and provide expert
knowledge, advice and early alerts to architecture function in
NetWeaver and Basis areas
Duration From Nov/14 To Till Date
Activities
Performed
 Installed Various SAP Products like SAP Net weaver Gateway,
ECC 6.0 EHP7, NW 7.3/7.31/7,41, CRM 7.03, SRM 7.03 ,SCM
7.02, BW , GRC, GTS 10.0 , EP, ME & MII, Mobile Platform 3.0
 System Refreshes on periodic basis or based on customer
requirement
 Upgraded the systems to latest available support pack using
SUM
 Performed Post-Installation activities and specific to the
components installed
 SAP System Health Check and Support, Solution manager
systems, performing Transports for both ABAP & JAVA systems.
 Applying Support package and installing add-on via
SPAM/SAINT.
 Java Add-In installation/configuration and worked on java tools
like JSPM, SDM tools.
 Kernel Upgrades and applying licenses for R/3 systems.
 SAP Solution Manager Installation /configuration and configuring
maintenance Optimizer.
 TMS configuration and maintenance
 Transports between Development, Quality and Production
systems of R/3 using STMS.
 Monitoring Background jobs, re-scheduling, canceling long
running jobs.
 Client administration (creation, deletion, local and remote client
copy).
 Performing OS/DB migrations from classical database to HANA.
 Performing clean checks for the systems setup by the team
members before handover to the customers.
 Setting up systems with suite on HANA. Have worked
exclusively on HANA DB activities like backup/restore, setting
traces & alerts, user authorization activities ,Installation of
HANA Live content tools, HANA SP and revision upgrades,
configuring ODBC and JDBC connections
 Migration of HANA Statistics server to embedded statistics
Server
 Installation and configuration of HANA on MDC setup. Setup of
System replication for the Secondary HANA Systems.
 S
 Worked exclusively on HANA, Sybase and MSSQL DB activities
like installing the database software, instance, license, deleting
an instance, setting up the table spaces and upgrades.
 Have setup and administer MCOS with HANA databases.
 As a part of the OS migration project from successfully migrated
15 SAP systems from Unix/Oracle to Linux/Hana/Oracle
platforms.
 SSO configuration between SAP Systems, SAP BO and SAP
HANA MDC systems.
 Trex system install and configure for pre-prod environment.
Team Size 20
Project Name Red Carpet Migration
Client Red Carpet , Germany
Environment Migration from Windows 2003/SQL Server to Windows 2008/SQL Server
Duration From Aug/14 To Oct/14
Role /
Responsibility
 Performed Datacenter Migration
 Installation of SQL Server on Windows Cluster environment with
patching
 Installation of Fresh system and performing backup/restore
method
 Installation of Solution Manager and post configurations
 Patching of SQL Server 2008/2012 software
Team Size 1
Project Name MIBA Migration
Client MIBA ,Germany
Environment Migration from HP-UX/Oracle to Linux/Sybase/MaxDB
Duration From Mar/14 To Aug/14
Role /
Responsibility
 Performed DB tuning for Import
 Migrated ECC system of 3 TB in less than 6 hours with post
activities
 Content server migration from AIX/MaxDB to Linux/MaxDB.
 Patching of MaxDB software
 Performed Parallel export/import to reduce the downtime.
Team Size 2
Project Name Heidelberg Migration (Phase Out)
Client HDM, Germany
Environment Migration from HP-UX/Oracle to Linux/Sybase
Duration From Mar/14 To July/14
Role /
Responsibility
 Performed DB tuning for Export
 Performed Pre-Migration activities like Live Cache Download,
standard pre-checks on ECC , BW , SCM systems, Enterprise
portal, SAP NetWeaver systems like BW and CRM
 Performed Parallel export/import to reduce the downtime.
Team Size 2
Project Name Alcatel-Lucent Upgrade
Client Alcatel-Lucent Upgrade, US.
Environment Upgrade from SAP NW701 to SAP NW731
Duration From Jan/14 To Jul/2014
Role /
Responsibility
 Connected the system to Solution Manager using SLD
 Generated Stack file using Solution Manager 7.1
 Performed pre-Upgraded activities for the Upgrade
 Used SUM for the upgrade.
 Performed Post- Upgrade activities.
 Manually Upgraded the kernel to the latest available patch
Team Size 2
Project Name SRT Migration
Client SRT, Germany
Environment Migration from HP-UX/Oracle to Linux/Oracle
Duration From Feb/14 To Mar/14
Role /
Responsibility
 Performed DB tuning for Export
 Performed Pre-Migration activities like Live Cache Download,
standard pre-checks on SCM systems, Enterprise portal, SAP
Netweaver systems like BW and CRM
 Performed Parallel export/import to reduce the downtime.
Team Size 2
Project Name Sika Upgrade
Client Sika , Germany
Environment SAP NetWeaver Upgrade From SAP NW 7.01 to SAP NW 7.4
Duration From Jan/14 To May/14
Role /
Responsibility
 Connected the system to Solution Manager using SLD
 Generated Stack file using Solution Manager 7.1
 Upgraded the SQL Server to the latest patch.
 Performed pre-Upgraded activities for the Upgrade
 Used SUM for the upgrade.
 Performed Post- Upgrade activities.
 Manually Upgraded the kernel to the latest available patch
Team Size 1
Project Name Syngenta Upgrade
Client Syngenta , Germany
Environment
Upgraded from Solution Manager 7.0 EHP1 to Solution Manager 7.1,
Oracle
Duration From Nov/13 To Dec/13
Role /
Responsibility
 Generated Stack file for Solution Manager 7.01 to Solution
Manager 7.1
 Installed the latest SMD Agents before the upgrade.
 Patched the Oracle to the latest patch.
 Performed pre-Upgraded activities for the Upgrade
 Used SUM for the upgrade.
 Performed Post- Upgrade activities.
 Manually upgraded the kernel to the latest available patch.
 Applying support packages to keep the system up-to-date &
 Implemented SAPNOTES
Team Size 1
Project Name Sika Migration
Client Sika , Germany
Environment Migration of Linux/Oracle to Windows 2008R2/ SQL Server 2012
Duration From Mar/13 To Nov/13
Role /
Responsibility
 Installation of SQL Server 2012 in windows cluster environment
and applying service packs
 Migration of SAP ECC 6.0 , SAP R/3 4.7 EE , SCM 4.1, SCM 7.0 ,
CRM 7.0 , BW 7.0 , CPS 7.3 ,GTS from Linux to Windows in
cluster environment
 Performed migration using SAPINST, MIGMON.
 Performed Homogenous migrations using plain method &
backup / restore method for both oracle and SQL databases.
 Optimized databases to reduce downtime for Migrations.
 Installed Additional applications servers depending on the load.
 Performed pre & post Migration tasks.
Team Size 3
Project Name Migration from Linux/Oracle to Linux/HANA & HANA Consultant
Client Sara-Lee , Germany
Environment Migration of SAP system from Oracle to HANA
Duration From Mar/13 To Apr/13
Role /
Responsibility
 Migration of SAP BW system from Oracle to HANA DB.
 Performed Pre & Post Migration Activities related to HANA Migration.
 Upgraded the HANA components to higher patch.
 Working on installation and post configuration of HANA database
systems and landscape specific customization.
 Working on OS-DB migration of different SAP databases [Oracle] to
HANA and vice versa.
 Installation of development systems of 640, 700, 720 and 730 release
and post set up for development environment.
 SAP HANA Operation including Installation (pre and post installation
steps)
 Configuring and monitoring SAP HANA Studio.
 Upgrading SAP Hana DB and Clients.
 Configuring and taking of Backup and Recovery aspects.
 Maintaining Users and Authorizations
 Data Provisioning: SLT set up and configuration using HANA database.
 Configuration and monitoring of Replication and other operation
Aspects
 Monitoring of SAP HANA DB with SAP HANA Studio, DBACOCKPIT and
SAP Solution Manager
Team Size 2
Project Name BI Implementation
Client Schott , Germany
Environment Implementation of BI system
Duration From Jan/13 To Feb/13
Role /
Responsibility
 Installation and configuration
o SAP NW 7.3 with EhP1
 System administration
 Database administration
 Backup and Recovery
 SAP SP and Kernel update
Team Size 1
Project Name Migration from HP-UX/Oracle to Linux/Oracle
Client Sara-Lee , Germany
Environment Migration of SAP system from HPUX to LINUX
Duration From Mar/12 To Dec/12
Role /
Responsibility
 Installation of Oracle 11 G and applying Software Bundle Patches.
 Migration of SAP ECC 6.0 , SAP R/3 4.7 EE , SCM 4.1, SCM 7.0 , CRM
7.0 , BW 7.0 , CPS 7.3 from HP UX to Linux
 Performed migration using SAPINST, MIGMON and Distribution
Monitor.
 Performed Homogenous migrations using plain method & backup /
restore method for both oracle and SQL databases.
 Optimized databases to reduce downtime for Migrations.
 Installed Additional applications servers depending on the load.
 Performed pre & post Migration tasks.
 Achieved migrating 12.44 TB Database to different OS with 24 hours
of downtime.
Team Size 2
Project Name ECC implementation / Support
Client Redington, Dubai
Environment SAP NetWeaver 7.3 with BI_CONT 7.35 Add on, SBOP BI 4.1
Duration From Sep/11 To Dec/11
Role /
Responsibility
 Oracle 10G Installation with patch set 4 (10.2.0.4)
 ECC 6.0 Installation
 Applying Support Packs
 Creation of xml file in Solman for target support packs.
 EHP4 Installation on ECC 6.0 through EHPI.
 Performance Monitoring User Creation, Authorization & Role
Administration
 Installation of Business Objects 4.1 and post configuration with
Windows AD authentication
 Performing health checks for R3 4.6c & GTS systems in the three
systems landscape -DEV, QAP and Prod servers.
 Transporting requests between the DEV, QUALITY and PROD systems.
 Creating new users, granting user roles, authorizations and
generating profiles.
 Handling and managing spool requests and spool overflow issues.
 User validity extensions based on the clients requirements.
 Scheduling/monitoring the background jobs and troubleshooting the
same.
 Performed system refresh from Prod to the QAS server with MSSQL
DB.
 Performed the maintenance activities on a monthly basis for the
production server.
Team Size One
Project Name SAP COE Migration
Client Keane India International
Project
Description
Keane COE System Migration
Environment SAP -CRM 7.0,SAP ECC 6.0 with EHP4, SAP BW 7.0 /Windows/Oracle
Duration From Aug/11 To Sep/11
Role /
Responsibility
 Oracle 10G Installation with patch set 4 (10.2.0.4)
 SAP Application Server ABAP Installation.
 SAP Application Server Java Installation.
 Installation of BP Add-on’s
 Activation of VMC Container.
 Post-Installation Activities
Team Size Two
Project Name Flemingo International - Jebel Ali, Dubai
Client Flemingo International – Dubai
Project
Description
SAP BASIS Implementation and Support
Environment SAP ERP 6.0 , SAP BI 7.0 , Windows Server 2008, SQL Server 2008
Duration From 04/11 To 08/11
Role /
Responsibility
 Installation and configuration
o SAP ECC6.0 with EhP4 Ready
o SAP BW 7.0 with EhP1
o Solution Manager 7.0 with EhP1
o SAP Router 7.10
 System administration
 Database administration
 Backup and Recovery
 SAP SP and Kernel update
 Roles and Authorization
Contributions  Installed and configured
o SAP ECC6.0 with EhP4 Ready
o SAP BW 7.0 with EhP1
o Solution Manager 7.0 with EhP1
o SAP Router 7.10
 Configured central SLD
 Updated ECC 6.0 with EhP4
Team Size 2
Project Name SAP Implementation in BMTC, Dubai
Client Bari Mazroei Trading Company, Dubai
Project
Description
SAP BASIS Implementation and Support
Environment SAP ERP, Windows Server 2008, MS-SQL Server 2008
Duration From 02/11 To 05/11
Role /
Responsibility
 Installation and configuration
o SAP ECC6.0 with EhP4 Ready
o Solution Manager 7.0 with EhP1
o SAP Router 7.10
 System administration
 Backup and Recovery
 SAP SP and Kernel update
 Roles and Authorization
Contributions  Installed and configured
o SAP ECC6.0 with EhP4 Ready
o Solution Manager 7.0 with EhP1
o SAP Router 7.10
 Configured central SLD
 Updated ECC 6.0 with EhP4
Team Size 2
Project Name SAP ECC6.0 WITH EHP4
Client SAP ECC6.0 with EHP4
Environment SAP –ECC 6.0 with EHP4 /Windows/Oracle
Duration From Nov/10 To Dec/10
Role /
Responsibility
 Plain vanilla SAP ECC 6 SR3 with oracle 10.2.0.4
 Post Installation & Configuration
 Download new version of Kernel, extracted .xml file using solution
manager and downloaded the latest support packs as per .xml
 Upgraded SAP ECC 6.0 SR3 to EHP4 with EHPI
Team Size One
Project Name SAP ECC6.0 WITH EHP4 Support
Client Redington, Dubai
Environment SAP –ECC 6.0 with EHP4 /Windows/Oracle
Duration From May/10 To Till Date
Nov/10
Role /
Responsibility
 Oracle 10G Installation with patch set 4 (10.2.0.4)
 ECC 6.0 Installation
 Applying Support Packs
 Creation of xml file in Solman for target support packs.
 EHP4 Installation on ECC 6.0 through EHPI.
 Performance Monitoring User Creation, Authorization & Role
Administration
 Basic system setup of R3 and java systems along with handling
incidents on a daily basis using SAP’s internal ticketing tool CSS.
 Client copy and client administration.
 Performance Tuning & Monitoring.
 Transport Management System Administration.
 Language Implementation in R/3 system.
 Kernel upgrade, Support Pack installation & Add-on Installation.
 Start/Stop and troubleshooting problems with Start/Stop R3,J2EE,
 ABAP+J2EE systems & Portal/URL unavailability Issues.
 Handling java administration tools like Visual admin, configtool and
telnet.
 Setting up ADS configurations.
 JSPM Upgrade & Deploying Patches & components through SDM and
JSPM.
 Performing redirection from http to https routing as part of system
setup.
 Have performed homogenous/heterogeneous migrations with Oracle &
MSSQL
 Performed DAA agent installations
Team Size One
Project Name SAP ECC6.0 WITH EHP4
Client KEANE USA
Project
Description
IS-INSURANCE with EHP4 Project for Keane USA (Offshore)
Environment SAP –ECC 6.0 with EHP4 /Windows/Oracle
Duration From Jun/10 To Till Jun/10
Role /
Responsibility
 Oracle 10G Installation with patch set 4 (10.2.0.4)
 ECC 6.0 Installation
 Applying Support Packs
 Creation of xml file in Solman for target support packs.
 EHP4 Installation on ECC 6.0 through EHPI.
 Performance Monitoring User Creation, Authorization & Role
Administration
Team Size Two

More Related Content

What's hot (19)

Rithesh sudhakaran resume
Rithesh sudhakaran resumeRithesh sudhakaran resume
Rithesh sudhakaran resume
 
Lakshmankumar_Resume
Lakshmankumar_ResumeLakshmankumar_Resume
Lakshmankumar_Resume
 
John Plunkett III 2016 - DBA revised
John Plunkett III 2016 - DBA revisedJohn Plunkett III 2016 - DBA revised
John Plunkett III 2016 - DBA revised
 
Performance optimization: A combination of User Experience, Business and IT
Performance optimization: A combination of User Experience, Business and ITPerformance optimization: A combination of User Experience, Business and IT
Performance optimization: A combination of User Experience, Business and IT
 
Ashish_Resume7.1
Ashish_Resume7.1Ashish_Resume7.1
Ashish_Resume7.1
 
Saroj_Mahanta
Saroj_MahantaSaroj_Mahanta
Saroj_Mahanta
 
Ali Nawaz Ahmed - Lead DBA
Ali Nawaz Ahmed - Lead DBAAli Nawaz Ahmed - Lead DBA
Ali Nawaz Ahmed - Lead DBA
 
Sa psolman[1]
Sa psolman[1]Sa psolman[1]
Sa psolman[1]
 
Sanjay Lakhanpal 2015
Sanjay Lakhanpal 2015Sanjay Lakhanpal 2015
Sanjay Lakhanpal 2015
 
PERIASAMY R_SQL_DBA
PERIASAMY R_SQL_DBAPERIASAMY R_SQL_DBA
PERIASAMY R_SQL_DBA
 
AnandhR_Resume_2016
AnandhR_Resume_2016AnandhR_Resume_2016
AnandhR_Resume_2016
 
Pradeepa dharmappa
Pradeepa dharmappaPradeepa dharmappa
Pradeepa dharmappa
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
prasanna250315
prasanna250315prasanna250315
prasanna250315
 
Rakesh_Posimreddy_SAP_BASIS
Rakesh_Posimreddy_SAP_BASISRakesh_Posimreddy_SAP_BASIS
Rakesh_Posimreddy_SAP_BASIS
 
CV_Pranay
CV_PranayCV_Pranay
CV_Pranay
 
Ragavendiran's Resume
Ragavendiran's ResumeRagavendiran's Resume
Ragavendiran's Resume
 
Ruban_SQL DBA Resume
Ruban_SQL DBA ResumeRuban_SQL DBA Resume
Ruban_SQL DBA Resume
 
Raghu-UpdatedCV -2016
Raghu-UpdatedCV -2016Raghu-UpdatedCV -2016
Raghu-UpdatedCV -2016
 

Viewers also liked

Maharshi_Amin_416
Maharshi_Amin_416Maharshi_Amin_416
Maharshi_Amin_416mamin1411
 
Riya Bakshi resume
Riya Bakshi resumeRiya Bakshi resume
Riya Bakshi resumeRiya Bakshi
 
SAP_BASIS & HANA_with_Yrs_Exp-10.7_Aravind_Kumar
SAP_BASIS & HANA_with_Yrs_Exp-10.7_Aravind_KumarSAP_BASIS & HANA_with_Yrs_Exp-10.7_Aravind_Kumar
SAP_BASIS & HANA_with_Yrs_Exp-10.7_Aravind_Kumararavindkvs
 
Aayush_Arora_Resume (1)
Aayush_Arora_Resume (1)Aayush_Arora_Resume (1)
Aayush_Arora_Resume (1)Aayush Arora
 
Monte_Bender_Profile
Monte_Bender_ProfileMonte_Bender_Profile
Monte_Bender_ProfileMonte Bender
 
Kiran reddy_SAP BASIS CONSULTANT
Kiran reddy_SAP BASIS CONSULTANTKiran reddy_SAP BASIS CONSULTANT
Kiran reddy_SAP BASIS CONSULTANTKiran Reddy
 
Resume - Shital Redij
Resume - Shital RedijResume - Shital Redij
Resume - Shital RedijShital Redij
 
Dick Kramer 2016 Resume
Dick Kramer 2016 ResumeDick Kramer 2016 Resume
Dick Kramer 2016 ResumeDick Kramer
 

Viewers also liked (11)

Maharshi_Amin_416
Maharshi_Amin_416Maharshi_Amin_416
Maharshi_Amin_416
 
Riya Bakshi resume
Riya Bakshi resumeRiya Bakshi resume
Riya Bakshi resume
 
SAP_BASIS & HANA_with_Yrs_Exp-10.7_Aravind_Kumar
SAP_BASIS & HANA_with_Yrs_Exp-10.7_Aravind_KumarSAP_BASIS & HANA_with_Yrs_Exp-10.7_Aravind_Kumar
SAP_BASIS & HANA_with_Yrs_Exp-10.7_Aravind_Kumar
 
MohdShafique_SAPHANA_Deloitte
MohdShafique_SAPHANA_DeloitteMohdShafique_SAPHANA_Deloitte
MohdShafique_SAPHANA_Deloitte
 
Aayush_Arora_Resume (1)
Aayush_Arora_Resume (1)Aayush_Arora_Resume (1)
Aayush_Arora_Resume (1)
 
Monte_Bender_Profile
Monte_Bender_ProfileMonte_Bender_Profile
Monte_Bender_Profile
 
Kiran reddy_SAP BASIS CONSULTANT
Kiran reddy_SAP BASIS CONSULTANTKiran reddy_SAP BASIS CONSULTANT
Kiran reddy_SAP BASIS CONSULTANT
 
Jagan
JaganJagan
Jagan
 
Resume - Shital Redij
Resume - Shital RedijResume - Shital Redij
Resume - Shital Redij
 
rushi
rushirushi
rushi
 
Dick Kramer 2016 Resume
Dick Kramer 2016 ResumeDick Kramer 2016 Resume
Dick Kramer 2016 Resume
 

Similar to Maria_Joseph_Vimalan_Resume (20)

Thyagarajan_Rajan_resume
Thyagarajan_Rajan_resumeThyagarajan_Rajan_resume
Thyagarajan_Rajan_resume
 
Mahesh_Resume
Mahesh_ResumeMahesh_Resume
Mahesh_Resume
 
Kaustav_Resume
Kaustav_ResumeKaustav_Resume
Kaustav_Resume
 
SREEDHARAN ARUMUGAM
SREEDHARAN ARUMUGAMSREEDHARAN ARUMUGAM
SREEDHARAN ARUMUGAM
 
Rakesh_CV
Rakesh_CVRakesh_CV
Rakesh_CV
 
Souvik_cv
Souvik_cvSouvik_cv
Souvik_cv
 
Ganesh CV
Ganesh CVGanesh CV
Ganesh CV
 
Thillipan
ThillipanThillipan
Thillipan
 
Ayyalappa_CV
Ayyalappa_CVAyyalappa_CV
Ayyalappa_CV
 
Himanshu Sharma
Himanshu SharmaHimanshu Sharma
Himanshu Sharma
 
Vipul mehta cv
Vipul mehta cvVipul mehta cv
Vipul mehta cv
 
RABI SHANKAR PAL_New
RABI SHANKAR PAL_NewRABI SHANKAR PAL_New
RABI SHANKAR PAL_New
 
Jayachandran_Resume
Jayachandran_ResumeJayachandran_Resume
Jayachandran_Resume
 
Yuvaraj Shanmugam - Application Architect
Yuvaraj Shanmugam - Application ArchitectYuvaraj Shanmugam - Application Architect
Yuvaraj Shanmugam - Application Architect
 
Reume_Dinkar_Updated
Reume_Dinkar_UpdatedReume_Dinkar_Updated
Reume_Dinkar_Updated
 
RESUME2015_Updated
RESUME2015_UpdatedRESUME2015_Updated
RESUME2015_Updated
 
Jitendra_Jadhav
Jitendra_JadhavJitendra_Jadhav
Jitendra_Jadhav
 
Vihari_Pawar_Resume
Vihari_Pawar_ResumeVihari_Pawar_Resume
Vihari_Pawar_Resume
 
Mohamed Mostafa Amer
Mohamed Mostafa AmerMohamed Mostafa Amer
Mohamed Mostafa Amer
 
Sreekanth Resume
Sreekanth  ResumeSreekanth  Resume
Sreekanth Resume
 

Maria_Joseph_Vimalan_Resume

  • 1. Maria Joseph Vimalan Professional Profile SAP Basis Consultant Strengths  Dedication and , hardworking  Understanding and problem solving approach, Good team worker & stick to the time  Posses excellent communication skills and motivation skills Skills  Consultant – SAP Basis,R3 , ECC , Netweaver  Oracle Administration  SQL Server Administration Certifications  SAP Certified Netweaver Consultant  SAP Certified HANA consultant  SAP Certified OS/DB migration Consultant Spoken Languages  English  Tamil  Having 9+years of IT experience out of which 5+ yr in SAP Basis with two full cycle implementation project, 3 support projects , 5 migration projects and 2 upgrade project.  Working as SAP Basis Consultant in HP Global Soft India Ltd from Feb 2012 to till date  Worked as SAP Basis Consultant at Keane India from Dec 2009 to Jan 2012.  Worked as WFM (Work Force Management) office at Sitel India Limited from May 2007 to Nov 2009)  Experience in basis administration having performed activities such as system copies , , SAP installations, Kernel Upgrades, Support Pack upgrades on UNIX (AIX 5.3 ) - databases (Oracle 10g , SQL Server , HANA, Sybase ) ..etc  Exposures to varied customer landscapes such as R/3 4.7, ECC 6, sap Netweaver components etc.  Familiar with strong SAP processes.  Good Exposure in Gathering Requirements, estimating timelines and resource requirements as per customer requests. Education:  Msc. IT – Master of Science in Information Technology (First Class with Distinction)  PGDCA – Post Graduate Diploma in Computer Applications ( First Class)
  • 2. Certifications / Achievements  SAP Certified Net weaver Associate (Certificate ID : 0004894359 )  SAP Certified Technology Consultant – SAP Net weaver ’04 –OS/DB Migration for SAP Systems (Certificate ID: 0008654879)  SAP Certified HANA Associate  Information Technology Infrastructure Library (ITIL) V3 Certified.  SCN Top Leading Solution contributor for the year 2012 – 2013 ( Platinum Member) Experience Details (Starting from the current Employer) Sl. No. Name Of The Organization Designation Joining Date Relieving Date 1 HPE Globalsoft Pvt Ltd Senior SAP Support Migration, Upgrade & Implementation Consultant 20-Feb-2012 Till Date 2 Keane India International Senior Software Engineer 16/12/2009 17-Feb-2012 3 Sitel India Pvt Ltd Systems Engineer 24/05/2007 14/12/2009 QualificationDetails (Highest Degree onTop) Sl. No. Degree Branch Year of Passing Name of the College / Institute Name of the University Percentage / cgpa / Grade 1 M.SC IT 2007 Bishop Heber College,Trichy Autonomous 83% 2 B.SC Physics 2003 St. Joseph’s College,Trichy Bharathidasan University 60 % 3 Higher Secondary Mathematics & Computer Science 1999 Arockimatha Matriculation Higher Secondary School, Trichy N/A- 80% TechnicalProficiency  SAP : SAP Net Weaver 6. 40, 7.01, 7.11, 7.20 7.30, 731,740 releases ( ABAP+JAVA),SAP CRM, SAP SCM on HANA, SAP EP, SAP ME/MII, SAP IDM 7.2 and 8.0, SAP GTS 8.0, SAP Solution Manager 7.1  Platforms : Windows, UNIX, HP-UX, & Linux  Database : SAP HANA DB, MS-SQLServer, Sybase & Oracle.
  • 3. ProjectDetails Project Name SKF – SAP Support Client SKF, Germany Responsilbities Currently working as SAP NetWeaver Lead in UNITE Technical Operations team. Major responsibilities include provide expert knowledge, proactive advice and early alerts to the program in NetWeaver and Basis areas. Ensuring that deliverables within area of responsibility are met within time. Ensure a consistent end-to-end technical system integrity and operation in NetWeaver area. Translation of non-functional requirements to technical solutions. Order and follow- up of deliveries and SLA’s with hosting and basis partners. Issue and problem resolution together with solution development, deployment teams, basis and hosting supplier, application management supplier and system vendor. Manage documentation of technical solution and operational documents. Proactively work to improve quality and speed of operations and system delivery. Provide Advice on application re-use, buy or build decisions. Contribute to strategy development in alignment with the system vendor roadmap. Collaborate with and provide expert knowledge, advice and early alerts to architecture function in NetWeaver and Basis areas Duration From Nov/14 To Till Date Activities Performed  Installed Various SAP Products like SAP Net weaver Gateway, ECC 6.0 EHP7, NW 7.3/7.31/7,41, CRM 7.03, SRM 7.03 ,SCM 7.02, BW , GRC, GTS 10.0 , EP, ME & MII, Mobile Platform 3.0  System Refreshes on periodic basis or based on customer requirement  Upgraded the systems to latest available support pack using SUM  Performed Post-Installation activities and specific to the components installed  SAP System Health Check and Support, Solution manager systems, performing Transports for both ABAP & JAVA systems.  Applying Support package and installing add-on via SPAM/SAINT.  Java Add-In installation/configuration and worked on java tools like JSPM, SDM tools.  Kernel Upgrades and applying licenses for R/3 systems.  SAP Solution Manager Installation /configuration and configuring maintenance Optimizer.  TMS configuration and maintenance  Transports between Development, Quality and Production systems of R/3 using STMS.  Monitoring Background jobs, re-scheduling, canceling long running jobs.  Client administration (creation, deletion, local and remote client copy).  Performing OS/DB migrations from classical database to HANA.  Performing clean checks for the systems setup by the team members before handover to the customers.  Setting up systems with suite on HANA. Have worked exclusively on HANA DB activities like backup/restore, setting traces & alerts, user authorization activities ,Installation of HANA Live content tools, HANA SP and revision upgrades, configuring ODBC and JDBC connections  Migration of HANA Statistics server to embedded statistics Server  Installation and configuration of HANA on MDC setup. Setup of System replication for the Secondary HANA Systems.  S
  • 4.  Worked exclusively on HANA, Sybase and MSSQL DB activities like installing the database software, instance, license, deleting an instance, setting up the table spaces and upgrades.  Have setup and administer MCOS with HANA databases.  As a part of the OS migration project from successfully migrated 15 SAP systems from Unix/Oracle to Linux/Hana/Oracle platforms.  SSO configuration between SAP Systems, SAP BO and SAP HANA MDC systems.  Trex system install and configure for pre-prod environment. Team Size 20 Project Name Red Carpet Migration Client Red Carpet , Germany Environment Migration from Windows 2003/SQL Server to Windows 2008/SQL Server Duration From Aug/14 To Oct/14 Role / Responsibility  Performed Datacenter Migration  Installation of SQL Server on Windows Cluster environment with patching  Installation of Fresh system and performing backup/restore method  Installation of Solution Manager and post configurations  Patching of SQL Server 2008/2012 software Team Size 1 Project Name MIBA Migration Client MIBA ,Germany Environment Migration from HP-UX/Oracle to Linux/Sybase/MaxDB Duration From Mar/14 To Aug/14 Role / Responsibility  Performed DB tuning for Import  Migrated ECC system of 3 TB in less than 6 hours with post activities  Content server migration from AIX/MaxDB to Linux/MaxDB.  Patching of MaxDB software  Performed Parallel export/import to reduce the downtime. Team Size 2 Project Name Heidelberg Migration (Phase Out) Client HDM, Germany Environment Migration from HP-UX/Oracle to Linux/Sybase Duration From Mar/14 To July/14 Role / Responsibility  Performed DB tuning for Export  Performed Pre-Migration activities like Live Cache Download, standard pre-checks on ECC , BW , SCM systems, Enterprise portal, SAP NetWeaver systems like BW and CRM  Performed Parallel export/import to reduce the downtime.
  • 5. Team Size 2 Project Name Alcatel-Lucent Upgrade Client Alcatel-Lucent Upgrade, US. Environment Upgrade from SAP NW701 to SAP NW731 Duration From Jan/14 To Jul/2014 Role / Responsibility  Connected the system to Solution Manager using SLD  Generated Stack file using Solution Manager 7.1  Performed pre-Upgraded activities for the Upgrade  Used SUM for the upgrade.  Performed Post- Upgrade activities.  Manually Upgraded the kernel to the latest available patch Team Size 2 Project Name SRT Migration Client SRT, Germany Environment Migration from HP-UX/Oracle to Linux/Oracle Duration From Feb/14 To Mar/14 Role / Responsibility  Performed DB tuning for Export  Performed Pre-Migration activities like Live Cache Download, standard pre-checks on SCM systems, Enterprise portal, SAP Netweaver systems like BW and CRM  Performed Parallel export/import to reduce the downtime. Team Size 2 Project Name Sika Upgrade Client Sika , Germany Environment SAP NetWeaver Upgrade From SAP NW 7.01 to SAP NW 7.4 Duration From Jan/14 To May/14 Role / Responsibility  Connected the system to Solution Manager using SLD  Generated Stack file using Solution Manager 7.1  Upgraded the SQL Server to the latest patch.  Performed pre-Upgraded activities for the Upgrade  Used SUM for the upgrade.  Performed Post- Upgrade activities.  Manually Upgraded the kernel to the latest available patch Team Size 1 Project Name Syngenta Upgrade Client Syngenta , Germany Environment Upgraded from Solution Manager 7.0 EHP1 to Solution Manager 7.1, Oracle
  • 6. Duration From Nov/13 To Dec/13 Role / Responsibility  Generated Stack file for Solution Manager 7.01 to Solution Manager 7.1  Installed the latest SMD Agents before the upgrade.  Patched the Oracle to the latest patch.  Performed pre-Upgraded activities for the Upgrade  Used SUM for the upgrade.  Performed Post- Upgrade activities.  Manually upgraded the kernel to the latest available patch.  Applying support packages to keep the system up-to-date &  Implemented SAPNOTES Team Size 1 Project Name Sika Migration Client Sika , Germany Environment Migration of Linux/Oracle to Windows 2008R2/ SQL Server 2012 Duration From Mar/13 To Nov/13 Role / Responsibility  Installation of SQL Server 2012 in windows cluster environment and applying service packs  Migration of SAP ECC 6.0 , SAP R/3 4.7 EE , SCM 4.1, SCM 7.0 , CRM 7.0 , BW 7.0 , CPS 7.3 ,GTS from Linux to Windows in cluster environment  Performed migration using SAPINST, MIGMON.  Performed Homogenous migrations using plain method & backup / restore method for both oracle and SQL databases.  Optimized databases to reduce downtime for Migrations.  Installed Additional applications servers depending on the load.  Performed pre & post Migration tasks. Team Size 3 Project Name Migration from Linux/Oracle to Linux/HANA & HANA Consultant Client Sara-Lee , Germany Environment Migration of SAP system from Oracle to HANA Duration From Mar/13 To Apr/13 Role / Responsibility  Migration of SAP BW system from Oracle to HANA DB.  Performed Pre & Post Migration Activities related to HANA Migration.  Upgraded the HANA components to higher patch.  Working on installation and post configuration of HANA database systems and landscape specific customization.  Working on OS-DB migration of different SAP databases [Oracle] to HANA and vice versa.  Installation of development systems of 640, 700, 720 and 730 release and post set up for development environment.  SAP HANA Operation including Installation (pre and post installation steps)  Configuring and monitoring SAP HANA Studio.  Upgrading SAP Hana DB and Clients.  Configuring and taking of Backup and Recovery aspects.  Maintaining Users and Authorizations
  • 7.  Data Provisioning: SLT set up and configuration using HANA database.  Configuration and monitoring of Replication and other operation Aspects  Monitoring of SAP HANA DB with SAP HANA Studio, DBACOCKPIT and SAP Solution Manager Team Size 2 Project Name BI Implementation Client Schott , Germany Environment Implementation of BI system Duration From Jan/13 To Feb/13 Role / Responsibility  Installation and configuration o SAP NW 7.3 with EhP1  System administration  Database administration  Backup and Recovery  SAP SP and Kernel update Team Size 1 Project Name Migration from HP-UX/Oracle to Linux/Oracle Client Sara-Lee , Germany Environment Migration of SAP system from HPUX to LINUX Duration From Mar/12 To Dec/12 Role / Responsibility  Installation of Oracle 11 G and applying Software Bundle Patches.  Migration of SAP ECC 6.0 , SAP R/3 4.7 EE , SCM 4.1, SCM 7.0 , CRM 7.0 , BW 7.0 , CPS 7.3 from HP UX to Linux  Performed migration using SAPINST, MIGMON and Distribution Monitor.  Performed Homogenous migrations using plain method & backup / restore method for both oracle and SQL databases.  Optimized databases to reduce downtime for Migrations.  Installed Additional applications servers depending on the load.  Performed pre & post Migration tasks.  Achieved migrating 12.44 TB Database to different OS with 24 hours of downtime. Team Size 2 Project Name ECC implementation / Support Client Redington, Dubai Environment SAP NetWeaver 7.3 with BI_CONT 7.35 Add on, SBOP BI 4.1
  • 8. Duration From Sep/11 To Dec/11 Role / Responsibility  Oracle 10G Installation with patch set 4 (10.2.0.4)  ECC 6.0 Installation  Applying Support Packs  Creation of xml file in Solman for target support packs.  EHP4 Installation on ECC 6.0 through EHPI.  Performance Monitoring User Creation, Authorization & Role Administration  Installation of Business Objects 4.1 and post configuration with Windows AD authentication  Performing health checks for R3 4.6c & GTS systems in the three systems landscape -DEV, QAP and Prod servers.  Transporting requests between the DEV, QUALITY and PROD systems.  Creating new users, granting user roles, authorizations and generating profiles.  Handling and managing spool requests and spool overflow issues.  User validity extensions based on the clients requirements.  Scheduling/monitoring the background jobs and troubleshooting the same.  Performed system refresh from Prod to the QAS server with MSSQL DB.  Performed the maintenance activities on a monthly basis for the production server. Team Size One Project Name SAP COE Migration Client Keane India International Project Description Keane COE System Migration Environment SAP -CRM 7.0,SAP ECC 6.0 with EHP4, SAP BW 7.0 /Windows/Oracle Duration From Aug/11 To Sep/11 Role / Responsibility  Oracle 10G Installation with patch set 4 (10.2.0.4)  SAP Application Server ABAP Installation.  SAP Application Server Java Installation.  Installation of BP Add-on’s  Activation of VMC Container.  Post-Installation Activities Team Size Two Project Name Flemingo International - Jebel Ali, Dubai Client Flemingo International – Dubai Project Description SAP BASIS Implementation and Support Environment SAP ERP 6.0 , SAP BI 7.0 , Windows Server 2008, SQL Server 2008 Duration From 04/11 To 08/11 Role / Responsibility  Installation and configuration o SAP ECC6.0 with EhP4 Ready o SAP BW 7.0 with EhP1 o Solution Manager 7.0 with EhP1 o SAP Router 7.10  System administration
  • 9.  Database administration  Backup and Recovery  SAP SP and Kernel update  Roles and Authorization Contributions  Installed and configured o SAP ECC6.0 with EhP4 Ready o SAP BW 7.0 with EhP1 o Solution Manager 7.0 with EhP1 o SAP Router 7.10  Configured central SLD  Updated ECC 6.0 with EhP4 Team Size 2 Project Name SAP Implementation in BMTC, Dubai Client Bari Mazroei Trading Company, Dubai Project Description SAP BASIS Implementation and Support Environment SAP ERP, Windows Server 2008, MS-SQL Server 2008 Duration From 02/11 To 05/11 Role / Responsibility  Installation and configuration o SAP ECC6.0 with EhP4 Ready o Solution Manager 7.0 with EhP1 o SAP Router 7.10  System administration  Backup and Recovery  SAP SP and Kernel update  Roles and Authorization Contributions  Installed and configured o SAP ECC6.0 with EhP4 Ready o Solution Manager 7.0 with EhP1 o SAP Router 7.10  Configured central SLD  Updated ECC 6.0 with EhP4 Team Size 2 Project Name SAP ECC6.0 WITH EHP4 Client SAP ECC6.0 with EHP4 Environment SAP –ECC 6.0 with EHP4 /Windows/Oracle Duration From Nov/10 To Dec/10 Role / Responsibility  Plain vanilla SAP ECC 6 SR3 with oracle 10.2.0.4  Post Installation & Configuration  Download new version of Kernel, extracted .xml file using solution manager and downloaded the latest support packs as per .xml  Upgraded SAP ECC 6.0 SR3 to EHP4 with EHPI
  • 10. Team Size One Project Name SAP ECC6.0 WITH EHP4 Support Client Redington, Dubai Environment SAP –ECC 6.0 with EHP4 /Windows/Oracle Duration From May/10 To Till Date Nov/10 Role / Responsibility  Oracle 10G Installation with patch set 4 (10.2.0.4)  ECC 6.0 Installation  Applying Support Packs  Creation of xml file in Solman for target support packs.  EHP4 Installation on ECC 6.0 through EHPI.  Performance Monitoring User Creation, Authorization & Role Administration  Basic system setup of R3 and java systems along with handling incidents on a daily basis using SAP’s internal ticketing tool CSS.  Client copy and client administration.  Performance Tuning & Monitoring.  Transport Management System Administration.  Language Implementation in R/3 system.  Kernel upgrade, Support Pack installation & Add-on Installation.  Start/Stop and troubleshooting problems with Start/Stop R3,J2EE,  ABAP+J2EE systems & Portal/URL unavailability Issues.  Handling java administration tools like Visual admin, configtool and telnet.  Setting up ADS configurations.  JSPM Upgrade & Deploying Patches & components through SDM and JSPM.  Performing redirection from http to https routing as part of system setup.  Have performed homogenous/heterogeneous migrations with Oracle & MSSQL  Performed DAA agent installations Team Size One Project Name SAP ECC6.0 WITH EHP4 Client KEANE USA Project Description IS-INSURANCE with EHP4 Project for Keane USA (Offshore) Environment SAP –ECC 6.0 with EHP4 /Windows/Oracle Duration From Jun/10 To Till Jun/10 Role / Responsibility  Oracle 10G Installation with patch set 4 (10.2.0.4)  ECC 6.0 Installation  Applying Support Packs  Creation of xml file in Solman for target support packs.  EHP4 Installation on ECC 6.0 through EHPI.  Performance Monitoring User Creation, Authorization & Role Administration Team Size Two