1.ABOUT BHEL
2.BUSDUCT
Introduction to bus duct.
Types of bus duct.
1.Isolated phase bus duct.
2.Segregated phase bus duct.
3.non segregated bus duct.
Design and selection criteria.
3.COMPUTER NETWORKING
Need for computer networking
Advantage of computer networking
Basic component of networking in BHEL, RUDRAPUR
Sharing services
Active directory
Firewall sever
Other features of networking in BHEL,RUDRAPUR
ABOUT BHEL
•Bharat Heavy Electrical Limited is power plant equipment
manufacturer based in New Delhi, India
• It was established in 1964
• It has 17 manufacturing units
• It manufactures gas turbines, steam turbines, generators and
boilers
• It is 7th largest power plant equipment manufacturer in the
world
1.BUSDUCTS
Almost all coal , nuclear , geothermal , solar thermal electric , as well
as many natural gas power plants are thermal.
Commercial electric utility power stations are usually constructed on a
large scale and designed for continuous operation.
Electrical power typically uses three-phase electrical generators to
produce alternating current(AC) electric power at a frequency of 50Hz or
60Hz.
High power generation requires special equipment's to transfer from
source to the sink.
INTRODUCTION
INTRODUCTION (CONTD.)
To transfer the power through grids into various sub
stations the power needs to reach the generator
transformer(GT) which steps down the high voltage and
current.
This transit occurs with the help of bus duct / bus bar
which is capable of carrying current up to 21000A and
can be subjected to various weather conditions without
substantial losses incurred.
BUS DUCTS
INTRODUCTION
Bus ducts or bus bars are used to carry very high current between the
generator and associated transformers, in the power stations.
In the power stations the generator voltages vary from 12 KV to 24
KV whereas auxiliary supply voltages are 3.3 KV, 6.6 KV, or 12 KV.
Bus duct forms an electrical link between generator , transformers
and associated equipment's. It is an assembly of bus bars with
associated joints ,connections and supporting insulators within a
grounded metal enclosure.
Bus bars are thick metal connectors, usually of aluminium , which
carry large current up to 10 KA. The conductors are metal enclosed,
Aluminium has been used for the enclosure, as well
as it reduces the magnetic losses.
Aluminium is being used increasingly as bus bar
material, in power stations, distribution boards,
switchgear, etc. one of the main reasons for this is that
it is cheaper to use than copper and making allowance
for the light metal’s.
There are three types of bus ducts
Isolated phase
bus duct.
(21kv)
segregated phase
bus duct.
(12kv)
Non segregated
phase bus duct.
(6.6kv)
An IPBD most commonly used for large power generating unit and popularly
known as generator bus duct , serves as an interconnection between generator
and it’s associated auxiliary equipment .
Conductors are air insulated and supported in the centre of an enclosure by
strategically arranging the insulators . phase to phase circuits are eliminated
and no current is induced in the steel work.
In Isolated Phase Bus duct each phase conductor is enclosed by an individual
metal housing and separated from adjacent phase conductor housing by an air
space.
Each phase conductor is mounted in an individual enclosure and is carrying
a much higher current for a given permissible temperature hence it has a large
heat dissipation as compared to segregated and non-segregated phase bus duct.
INTRODUCTION
SEGREGATED PHASE BUSDUCT
Metal enclosed bus duct in which all the phase conductors
housed in common metal enclosure and segregated by
metallic barrier between phases.
Segregated phase bus duct is generally employed in
medium voltage systems and serves as interconnection
between the switchgear and transformer.
The segregated phase bus duct comprises of three phase
conductors running along with barrier made of aluminium
alloy.
The non-magnetic barrier provided between phase
conductor reduces forces during phase to phase faults and
also helps in reducing temperature rise.
NON SEGRAGATED PHASE BUSDUCTS
Metal enclosed bus duct in which all phase conductors are in
common metal enclosure with only air barrier and physical
separation between the phases.
NSPBD serves as an interconnection between 1.1KV
switchgear/indoor power control centre (PCC)/motor control
centre(MCC) and its auxiliary transformer. It is also used for
trunking connection between two separate
switchgear/PCC/MCC, wherever applicable
DIAGRAM SHOWING DIFFERENT
TYPES OF BUS DUCT
Isolated Phase Bus-Duct Segregated Phase Bus-Duct
Non-Segregated Phase Bus-Duct
DESIGN AND SELECTION
CRITERIA
The bus duct provide a means for carrying high
current. It provides high system reliability. The type and
rating of bus duct shall be as per system requirement.
The design of bus duct is based on following factors.
The continuous current rating.
Maximum system voltage.
Maximum dynamic and transient forces it may be
subjected to during its life span.
The dielectric requirement of the system.
Climatic conditions.
SELECTION CRITERIA
The shape and size of bus duct of bus bar/enclosure is
selected considering the following aspects.
1)The current carrying capability.
2)The resistivity required for permissible thermal limits.
3)Force between the different conductor in short circuit
condition.
4)Skin effect.
5)Proximity effect.
6)Effect of solar radiation on temperature rise
2.COMPUTER NETWORKING IN
BHEL,RUDRAPUR
WHAT IS COMPUTER
NETWORKING???
•Information and communication are two of the most
important strategic issues for the success of every
enterprise. While today nearly every organization uses a
substantial number of computers and communication
tools (telephone , fax , personal hand held devices) , they
are often still isolated , many departments still do not
communicate and much needed information cannot be
readily accessed.
•To overcome these difficulties there is a need for
effective computer networking.
NEED OF COMPUTER NETWORKING
Computer networks allows the user to access remote
program and remote database either from the same
organization or from other enterprises or public source.
Computer networks provides communication faster then
other facility. Because of these optimal information and
communication possibilities , it may increase the
organizational learning rate
ADVANTAGES OF COMPUTER
NETWORKING
FILE SHARING : computer networking makes easy for everyone to
access the same file and prevents people from accidentally creating
different version.
PRINTER SHARING: with the computer networking several
computers are inter-connected with the same printer.
COMMUNICATION AND CALLABORATION : it’s hard for
people to work together if no one knows what others are doing. A network
allows employees to share , view other people’s work , and exchange ideas
more efficiently. In a large office , one can use e-mail and instant
messaging tools to communicate quickly and to store for future reference.
ORGANIGATION AND DATA PROTECTION.
BASIC COMPONENTS OF COMPUTER
NETWORKING IN BHEL , RUDRAPUR
INTERANET
(MPLS)
INTERNET
(2 MBPS)
FIREWALL
SERVER
SWITCH
( to coordinate b/w
services and users)
ACTIVE
DIRECTORY
SHARING
SERVICE
WEBSITE SERVER
VARIOUS PC
CONNECTIONS

More Related Content

What's hot

Design of substation (with Transformer Design)
Design of substation (with Transformer Design) Design of substation (with Transformer Design)
Design of substation (with Transformer Design)
SayanSarkar55
 
Electric substation
Electric substation Electric substation
Electric substation
ANNU KUMAR
 
Bus duct fabrication
Bus duct fabricationBus duct fabrication
Bus duct fabricationSTUPIDPANDEY
 
BHEL MECHANICAL ( 4TH YEAR ) INTERNSHIP -BLOCK-3(TURBINE SHOP)
BHEL MECHANICAL ( 4TH YEAR ) INTERNSHIP -BLOCK-3(TURBINE SHOP)BHEL MECHANICAL ( 4TH YEAR ) INTERNSHIP -BLOCK-3(TURBINE SHOP)
BHEL MECHANICAL ( 4TH YEAR ) INTERNSHIP -BLOCK-3(TURBINE SHOP)
Abhishek Chaudhary
 
Substation
SubstationSubstation
Underground cables
Underground cablesUnderground cables
Underground cables
Anu71
 
DLW Electrical Engineering industrial training Report
DLW Electrical Engineering industrial training Report DLW Electrical Engineering industrial training Report
DLW Electrical Engineering industrial training Report
Indian Institute of Technology Guwahati
 
HVDC TRANSMISSION LINE PPT
HVDC TRANSMISSION LINE  PPTHVDC TRANSMISSION LINE  PPT
HVDC TRANSMISSION LINE PPT
Ashutosh kumar
 
Vocational training report (SIRTE, BHOPAL)
Vocational training  report (SIRTE, BHOPAL)Vocational training  report (SIRTE, BHOPAL)
Vocational training report (SIRTE, BHOPAL)
Akshay Suryawanshi
 
Presentation on Power Transformer
Presentation on Power TransformerPresentation on Power Transformer
Presentation on Power Transformer
Ajay Maurya
 
220KV Substation Training Report
220KV Substation Training Report220KV Substation Training Report
220KV Substation Training Report
SWAPNILKUMARGUPTA
 
DLW vocational training report
DLW vocational training reportDLW vocational training report
DLW vocational training report
PrashantSharma897
 
BHEL Final Report
BHEL Final ReportBHEL Final Report
BHEL Final Report
Bharti Airtel Ltd.
 
Switchgear Installation Precomissioning Inspection.PPT
Switchgear Installation  Precomissioning Inspection.PPTSwitchgear Installation  Precomissioning Inspection.PPT
Switchgear Installation Precomissioning Inspection.PPTAbdullah Al Dushaishi
 
Sub station training ppt
Sub station training pptSub station training ppt
Sub station training ppt
sitesh95074
 
High Voltage Direct Current Transmission System
High Voltage Direct Current Transmission SystemHigh Voltage Direct Current Transmission System
High Voltage Direct Current Transmission System
Nadeem Khilji
 
Cable joint n end connector
Cable joint n end connectorCable joint n end connector
Cable joint n end connector
BHAGWAN PRASAD
 
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
Power System Operation
 
Summer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSummer Training Report, DLW Varanasi
Summer Training Report, DLW Varanasi
SHAILESH SHUKLA
 

What's hot (20)

Design of substation (with Transformer Design)
Design of substation (with Transformer Design) Design of substation (with Transformer Design)
Design of substation (with Transformer Design)
 
Electric substation
Electric substation Electric substation
Electric substation
 
Bus duct fabrication
Bus duct fabricationBus duct fabrication
Bus duct fabrication
 
BHEL MECHANICAL ( 4TH YEAR ) INTERNSHIP -BLOCK-3(TURBINE SHOP)
BHEL MECHANICAL ( 4TH YEAR ) INTERNSHIP -BLOCK-3(TURBINE SHOP)BHEL MECHANICAL ( 4TH YEAR ) INTERNSHIP -BLOCK-3(TURBINE SHOP)
BHEL MECHANICAL ( 4TH YEAR ) INTERNSHIP -BLOCK-3(TURBINE SHOP)
 
Substation
SubstationSubstation
Substation
 
Underground cables
Underground cablesUnderground cables
Underground cables
 
DLW Electrical Engineering industrial training Report
DLW Electrical Engineering industrial training Report DLW Electrical Engineering industrial training Report
DLW Electrical Engineering industrial training Report
 
HVDC TRANSMISSION LINE PPT
HVDC TRANSMISSION LINE  PPTHVDC TRANSMISSION LINE  PPT
HVDC TRANSMISSION LINE PPT
 
Vocational training report (SIRTE, BHOPAL)
Vocational training  report (SIRTE, BHOPAL)Vocational training  report (SIRTE, BHOPAL)
Vocational training report (SIRTE, BHOPAL)
 
Presentation on Power Transformer
Presentation on Power TransformerPresentation on Power Transformer
Presentation on Power Transformer
 
220KV Substation Training Report
220KV Substation Training Report220KV Substation Training Report
220KV Substation Training Report
 
DLW vocational training report
DLW vocational training reportDLW vocational training report
DLW vocational training report
 
BHEL Final Report
BHEL Final ReportBHEL Final Report
BHEL Final Report
 
Dog Conductor
Dog ConductorDog Conductor
Dog Conductor
 
Switchgear Installation Precomissioning Inspection.PPT
Switchgear Installation  Precomissioning Inspection.PPTSwitchgear Installation  Precomissioning Inspection.PPT
Switchgear Installation Precomissioning Inspection.PPT
 
Sub station training ppt
Sub station training pptSub station training ppt
Sub station training ppt
 
High Voltage Direct Current Transmission System
High Voltage Direct Current Transmission SystemHigh Voltage Direct Current Transmission System
High Voltage Direct Current Transmission System
 
Cable joint n end connector
Cable joint n end connectorCable joint n end connector
Cable joint n end connector
 
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
 
Summer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSummer Training Report, DLW Varanasi
Summer Training Report, DLW Varanasi
 

Similar to Sanjeev bhel ppt.

AMAN LONARE SUMMER INTERNSHIP REPORT
AMAN LONARE SUMMER INTERNSHIP REPORTAMAN LONARE SUMMER INTERNSHIP REPORT
AMAN LONARE SUMMER INTERNSHIP REPORTAMAN LONARE
 
Busduct___Busbar.pptx
Busduct___Busbar.pptxBusduct___Busbar.pptx
Busduct___Busbar.pptx
pramod719257
 
Investigation into possible electrical fire outbreaks at welders’ worksho...
Investigation into possible electrical fire outbreaks at welders’     worksho...Investigation into possible electrical fire outbreaks at welders’     worksho...
Investigation into possible electrical fire outbreaks at welders’ worksho...
Alexander Decker
 
Electrical services WITH WIRING FUSES DISTRIBUTION SYSTEMS
Electrical services WITH WIRING FUSES DISTRIBUTION SYSTEMSElectrical services WITH WIRING FUSES DISTRIBUTION SYSTEMS
Electrical services WITH WIRING FUSES DISTRIBUTION SYSTEMS
MADHUMITHA355894
 
Electronics Supplying Services.pptx
Electronics Supplying Services.pptxElectronics Supplying Services.pptx
Electronics Supplying Services.pptx
Acme Circuits
 
Unit I.pdf
Unit I.pdfUnit I.pdf
Unit I.pdf
SharumathiR1
 
Assessment of Energy Efficiency of a Large Interconnected Distribution System...
Assessment of Energy Efficiency of a Large Interconnected Distribution System...Assessment of Energy Efficiency of a Large Interconnected Distribution System...
Assessment of Energy Efficiency of a Large Interconnected Distribution System...
paperpublications3
 
Assessment of Energy Efficiency of a Large Interconnected Distribution System...
Assessment of Energy Efficiency of a Large Interconnected Distribution System...Assessment of Energy Efficiency of a Large Interconnected Distribution System...
Assessment of Energy Efficiency of a Large Interconnected Distribution System...
paperpublications3
 
Wiring devices for illumination
Wiring devices for illuminationWiring devices for illumination
Wiring devices for illumination
Surendra Tamang
 
Domestic wiring
Domestic wiringDomestic wiring
Domestic wiring
Vima Mali
 
Vaccum Circuit Breaker
Vaccum Circuit BreakerVaccum Circuit Breaker
Vaccum Circuit BreakerRAHUL-GOPU
 
Minimization of Overall Losses of a Distribution System under Contingency Con...
Minimization of Overall Losses of a Distribution System under Contingency Con...Minimization of Overall Losses of a Distribution System under Contingency Con...
Minimization of Overall Losses of a Distribution System under Contingency Con...
paperpublications3
 
Minimization of Overall Losses of a Distribution System under Contingency Con...
Minimization of Overall Losses of a Distribution System under Contingency Con...Minimization of Overall Losses of a Distribution System under Contingency Con...
Minimization of Overall Losses of a Distribution System under Contingency Con...
paperpublications3
 
Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...
Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...
Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...
Leonardo ENERGY
 
Comparative study of power cables and testing as per indian standards
Comparative study of power cables and testing as per indian standardsComparative study of power cables and testing as per indian standards
Comparative study of power cables and testing as per indian standardsIAEME Publication
 
Bs bab 1
Bs bab 1Bs bab 1
Bs bab 1
Natalie Ulza
 
Undergrounding high voltage_electricity_transmission_lines_the_technical_issu...
Undergrounding high voltage_electricity_transmission_lines_the_technical_issu...Undergrounding high voltage_electricity_transmission_lines_the_technical_issu...
Undergrounding high voltage_electricity_transmission_lines_the_technical_issu...
Ivan Rojas Soliz
 
Paper Electron Tube Afs Epri R5
Paper   Electron Tube   Afs Epri R5Paper   Electron Tube   Afs Epri R5
Paper Electron Tube Afs Epri R5
John Kappenman
 
Basic electrical comp upload1
Basic electrical comp upload1Basic electrical comp upload1
Basic electrical comp upload1
Ganesh Kumar
 
e449content.pdf
e449content.pdfe449content.pdf
e449content.pdf
roldangastardo1
 

Similar to Sanjeev bhel ppt. (20)

AMAN LONARE SUMMER INTERNSHIP REPORT
AMAN LONARE SUMMER INTERNSHIP REPORTAMAN LONARE SUMMER INTERNSHIP REPORT
AMAN LONARE SUMMER INTERNSHIP REPORT
 
Busduct___Busbar.pptx
Busduct___Busbar.pptxBusduct___Busbar.pptx
Busduct___Busbar.pptx
 
Investigation into possible electrical fire outbreaks at welders’ worksho...
Investigation into possible electrical fire outbreaks at welders’     worksho...Investigation into possible electrical fire outbreaks at welders’     worksho...
Investigation into possible electrical fire outbreaks at welders’ worksho...
 
Electrical services WITH WIRING FUSES DISTRIBUTION SYSTEMS
Electrical services WITH WIRING FUSES DISTRIBUTION SYSTEMSElectrical services WITH WIRING FUSES DISTRIBUTION SYSTEMS
Electrical services WITH WIRING FUSES DISTRIBUTION SYSTEMS
 
Electronics Supplying Services.pptx
Electronics Supplying Services.pptxElectronics Supplying Services.pptx
Electronics Supplying Services.pptx
 
Unit I.pdf
Unit I.pdfUnit I.pdf
Unit I.pdf
 
Assessment of Energy Efficiency of a Large Interconnected Distribution System...
Assessment of Energy Efficiency of a Large Interconnected Distribution System...Assessment of Energy Efficiency of a Large Interconnected Distribution System...
Assessment of Energy Efficiency of a Large Interconnected Distribution System...
 
Assessment of Energy Efficiency of a Large Interconnected Distribution System...
Assessment of Energy Efficiency of a Large Interconnected Distribution System...Assessment of Energy Efficiency of a Large Interconnected Distribution System...
Assessment of Energy Efficiency of a Large Interconnected Distribution System...
 
Wiring devices for illumination
Wiring devices for illuminationWiring devices for illumination
Wiring devices for illumination
 
Domestic wiring
Domestic wiringDomestic wiring
Domestic wiring
 
Vaccum Circuit Breaker
Vaccum Circuit BreakerVaccum Circuit Breaker
Vaccum Circuit Breaker
 
Minimization of Overall Losses of a Distribution System under Contingency Con...
Minimization of Overall Losses of a Distribution System under Contingency Con...Minimization of Overall Losses of a Distribution System under Contingency Con...
Minimization of Overall Losses of a Distribution System under Contingency Con...
 
Minimization of Overall Losses of a Distribution System under Contingency Con...
Minimization of Overall Losses of a Distribution System under Contingency Con...Minimization of Overall Losses of a Distribution System under Contingency Con...
Minimization of Overall Losses of a Distribution System under Contingency Con...
 
Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...
Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...
Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...
 
Comparative study of power cables and testing as per indian standards
Comparative study of power cables and testing as per indian standardsComparative study of power cables and testing as per indian standards
Comparative study of power cables and testing as per indian standards
 
Bs bab 1
Bs bab 1Bs bab 1
Bs bab 1
 
Undergrounding high voltage_electricity_transmission_lines_the_technical_issu...
Undergrounding high voltage_electricity_transmission_lines_the_technical_issu...Undergrounding high voltage_electricity_transmission_lines_the_technical_issu...
Undergrounding high voltage_electricity_transmission_lines_the_technical_issu...
 
Paper Electron Tube Afs Epri R5
Paper   Electron Tube   Afs Epri R5Paper   Electron Tube   Afs Epri R5
Paper Electron Tube Afs Epri R5
 
Basic electrical comp upload1
Basic electrical comp upload1Basic electrical comp upload1
Basic electrical comp upload1
 
e449content.pdf
e449content.pdfe449content.pdf
e449content.pdf
 

Recently uploaded

The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 

Recently uploaded (20)

The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 

Sanjeev bhel ppt.

  • 1. SUBMITTED TO:- SUBMITTED BY:- MR. AMIT SAXENA SANJEEV KR. SINGH ASST. PROFESSOR(E.C) 4TH YEAR- (E.C) 1108231148
  • 2. TABLE OF CONTENT 1.ABOUT BHEL 2.BUSDUCT Introduction to bus duct. Types of bus duct. 1.Isolated phase bus duct. 2.Segregated phase bus duct. 3.non segregated bus duct. Design and selection criteria. 3.COMPUTER NETWORKING Need for computer networking Advantage of computer networking Basic component of networking in BHEL, RUDRAPUR Sharing services Active directory Firewall sever Other features of networking in BHEL,RUDRAPUR
  • 3. ABOUT BHEL •Bharat Heavy Electrical Limited is power plant equipment manufacturer based in New Delhi, India • It was established in 1964 • It has 17 manufacturing units • It manufactures gas turbines, steam turbines, generators and boilers • It is 7th largest power plant equipment manufacturer in the world
  • 5. Almost all coal , nuclear , geothermal , solar thermal electric , as well as many natural gas power plants are thermal. Commercial electric utility power stations are usually constructed on a large scale and designed for continuous operation. Electrical power typically uses three-phase electrical generators to produce alternating current(AC) electric power at a frequency of 50Hz or 60Hz. High power generation requires special equipment's to transfer from source to the sink. INTRODUCTION
  • 6. INTRODUCTION (CONTD.) To transfer the power through grids into various sub stations the power needs to reach the generator transformer(GT) which steps down the high voltage and current. This transit occurs with the help of bus duct / bus bar which is capable of carrying current up to 21000A and can be subjected to various weather conditions without substantial losses incurred.
  • 7. BUS DUCTS INTRODUCTION Bus ducts or bus bars are used to carry very high current between the generator and associated transformers, in the power stations. In the power stations the generator voltages vary from 12 KV to 24 KV whereas auxiliary supply voltages are 3.3 KV, 6.6 KV, or 12 KV. Bus duct forms an electrical link between generator , transformers and associated equipment's. It is an assembly of bus bars with associated joints ,connections and supporting insulators within a grounded metal enclosure. Bus bars are thick metal connectors, usually of aluminium , which carry large current up to 10 KA. The conductors are metal enclosed,
  • 8. Aluminium has been used for the enclosure, as well as it reduces the magnetic losses. Aluminium is being used increasingly as bus bar material, in power stations, distribution boards, switchgear, etc. one of the main reasons for this is that it is cheaper to use than copper and making allowance for the light metal’s.
  • 9. There are three types of bus ducts Isolated phase bus duct. (21kv) segregated phase bus duct. (12kv) Non segregated phase bus duct. (6.6kv)
  • 10. An IPBD most commonly used for large power generating unit and popularly known as generator bus duct , serves as an interconnection between generator and it’s associated auxiliary equipment . Conductors are air insulated and supported in the centre of an enclosure by strategically arranging the insulators . phase to phase circuits are eliminated and no current is induced in the steel work. In Isolated Phase Bus duct each phase conductor is enclosed by an individual metal housing and separated from adjacent phase conductor housing by an air space. Each phase conductor is mounted in an individual enclosure and is carrying a much higher current for a given permissible temperature hence it has a large heat dissipation as compared to segregated and non-segregated phase bus duct. INTRODUCTION
  • 11. SEGREGATED PHASE BUSDUCT Metal enclosed bus duct in which all the phase conductors housed in common metal enclosure and segregated by metallic barrier between phases. Segregated phase bus duct is generally employed in medium voltage systems and serves as interconnection between the switchgear and transformer. The segregated phase bus duct comprises of three phase conductors running along with barrier made of aluminium alloy. The non-magnetic barrier provided between phase conductor reduces forces during phase to phase faults and also helps in reducing temperature rise.
  • 12. NON SEGRAGATED PHASE BUSDUCTS Metal enclosed bus duct in which all phase conductors are in common metal enclosure with only air barrier and physical separation between the phases. NSPBD serves as an interconnection between 1.1KV switchgear/indoor power control centre (PCC)/motor control centre(MCC) and its auxiliary transformer. It is also used for trunking connection between two separate switchgear/PCC/MCC, wherever applicable
  • 13. DIAGRAM SHOWING DIFFERENT TYPES OF BUS DUCT Isolated Phase Bus-Duct Segregated Phase Bus-Duct
  • 15. DESIGN AND SELECTION CRITERIA The bus duct provide a means for carrying high current. It provides high system reliability. The type and rating of bus duct shall be as per system requirement. The design of bus duct is based on following factors. The continuous current rating. Maximum system voltage. Maximum dynamic and transient forces it may be subjected to during its life span. The dielectric requirement of the system. Climatic conditions.
  • 16. SELECTION CRITERIA The shape and size of bus duct of bus bar/enclosure is selected considering the following aspects. 1)The current carrying capability. 2)The resistivity required for permissible thermal limits. 3)Force between the different conductor in short circuit condition. 4)Skin effect. 5)Proximity effect. 6)Effect of solar radiation on temperature rise
  • 18. WHAT IS COMPUTER NETWORKING??? •Information and communication are two of the most important strategic issues for the success of every enterprise. While today nearly every organization uses a substantial number of computers and communication tools (telephone , fax , personal hand held devices) , they are often still isolated , many departments still do not communicate and much needed information cannot be readily accessed. •To overcome these difficulties there is a need for effective computer networking.
  • 19. NEED OF COMPUTER NETWORKING Computer networks allows the user to access remote program and remote database either from the same organization or from other enterprises or public source. Computer networks provides communication faster then other facility. Because of these optimal information and communication possibilities , it may increase the organizational learning rate
  • 20. ADVANTAGES OF COMPUTER NETWORKING FILE SHARING : computer networking makes easy for everyone to access the same file and prevents people from accidentally creating different version. PRINTER SHARING: with the computer networking several computers are inter-connected with the same printer. COMMUNICATION AND CALLABORATION : it’s hard for people to work together if no one knows what others are doing. A network allows employees to share , view other people’s work , and exchange ideas more efficiently. In a large office , one can use e-mail and instant messaging tools to communicate quickly and to store for future reference. ORGANIGATION AND DATA PROTECTION.
  • 21. BASIC COMPONENTS OF COMPUTER NETWORKING IN BHEL , RUDRAPUR INTERANET (MPLS) INTERNET (2 MBPS) FIREWALL SERVER SWITCH ( to coordinate b/w services and users) ACTIVE DIRECTORY SHARING SERVICE WEBSITE SERVER VARIOUS PC CONNECTIONS