SlideShare a Scribd company logo
1 of 518
Download to read offline
RULES FOR THE CLASSIFICATION AND
CONSTRUCTION
PART 1. SEAGOING SHIPS
VOLUME II
RULES FOR HULL
2014 EDITION
BIRO KLASIFIKASI INDONESIA
RULES FOR THE CLASSIFICATION AND
CONSTRUCTION
PART 1. SEAGOING SHIPS
VOLUME II
RULES FOR HULL
2014 EDITION
Biro Klasifikasi Indonesia
Jl. Yos Sudarso No. 38-40, Tanjung Priok
Jakarta 14320
www.klasifikasiindonesia.com
rules@klasifikasiindonesia.com
Copyright © 2014
Reproduction in whole or in part by any means, is subject to the permission in writing by Biro Klasifikasi Indonesia Head Office
The following Guidelines come into force on 1st
January 2014
Reproduction in whole or in part by any means, is subject to the permission in writing by Biro Klasifikasi
Indonesia Head Office
Published by: Biro Klasifikasi Indonesia
Foreword iii
Foreword
Rules for Hull Volume II 2014 Edition amends Rules for Hull Volume II Edition 2013. Reference source of the rules are
derived from IACS Unified Requirements and inputs from BKI Branch Offices and Technical Division BKI Head Office.
The general description about this rules in every section describe below:
Section 1 General Definition
Section 2 Material
Section 3 Design Principles
Section 4 Design Load
Section 5 Longitudinal Strength
Section 6-14 Scantling Calculation
Section 15 Strengthening for Navigation in Ice
Section 16 Superstructure and Deckhouse
Section 17 Hatchways
Section 18 Equipment
Section 19 Welded Joints
Section 20 Fatigue Strength
Section 21 Hull Outfit
Section 22 Structural Fire Protection on Board Seagoing Ships
Section 23-34 Special Requirement for Ship Type (Bulk Carriers, Ore Carriers, Heavy Cargo Ships, Oil Tankers, Ships
Carrying Dangerous Chemical in Bulk, Ships Carrying Liquefied Gases in Bulk, Tugs, Fishing Vessels,
Passenger Ships, Ships for Sheltered Shallow Water Services, Barges, Pontoons, Dredgers, Special Rules
Floating Docks, and Supply Vessels)
Section 35 Strengthening Against Collision
Section 36 Subdivision and Stability of Cargo Ships and Passanger Ships
Section 37 Special Requirement for In-Water Surveys
Section 38 Corrosion Protection
BKI - Rules for Hull - 2014
This page intentionally left blank
BKI - Rules for Hull - 2014
Table of Contents v
Table of Contents
Page
Foreword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii
Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v
Rules Amendment Notice . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxv
Section 1 - General, Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1/10
A. Validity, Equivalence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1/10
B. Restricted Service Ranges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2/10
C. Ships for Special Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2/10
D. Accessibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2/10
E. Stability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2/10
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2/10
2. Ships with proven damage stability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2/10
3. Anti-heeling devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3/10
F. Vibrations and Noise . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3/10
1. Mechanical vibrations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3/10
2. Noise . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3/10
G. Documents for Approval . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4/10
H. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-6/10
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-6/10
2. Principal dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-6/10
J. International Conventions and Codes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-7/10
K. Rounding-off Tolerances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-8/10
L. Regulations of National Administrations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-8/10
M. Computer Programs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-8/10
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-8/10
2. General Programs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-8/10
N. Workmanship . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-9/10
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-9/10
1.l Requirements to be complied with by the manufacturer . . . . . . . . . . . . . . . . . . . . . . . . . 1-9/10
1.2 Quality control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-9/10
2. Structural details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-9/10
2.1 Details in manufacturing documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-9/10
2.2 Cut-outs, plate edges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-9/10
2.3 Cold forming . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-10/10
2.4 Assembly, alignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-10/10
3. Corrosion protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-10/10
Section 2 - Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1/10
A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1/10
B. Hull Structural Steel for Plates and Sections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1/10
1. Normal strength hull structural steel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1/10
2. Higher strength hull structural steels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1/10
3. Material selection for the hull . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2/10
4. Structural members which are stressed in direction of their thickness . . . . . . . . . . . . . . . . . . . 2-7/10
C. Forged Steel and Cast Steel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7/10
D. Aluminium Alloys . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7/10
E. Austenitic Steels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-8/10
Section 3 - Design Principles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1/24
A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1/24
1. Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1/24
2. Permissible stresses and required sectional properties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1/24
3. Plate panels subjected to lateral pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1/24
4. Fatigue strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2/24
B. Upper and Lower Hull Flange . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2/24
C. Unsupported Span . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2/24
BKI - Rules for Hull - 2014
Table of Contentsvi
Page
D. End Attachments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3/24
1. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3/24
2. Brackets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3/24
3. Sniped ends of stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4/24
4. Corrugated bulkhead elements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4/24
E. Effective Breadth of Plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4/24
1. Frames and stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4/24
2. Girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4/24
3. Cantilevers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5/24
F. Proof of Buckling Strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5/24
1. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5/24
2. Proof of single plate fields . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7/24
3. Proof of partial and total fields . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-12/24
3.1 Longitudinal and transverse stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-12/24
3.2 Lateral buckling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-12/24
3.3 Torsional buckling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-15/24
G. Rigidity of Transverses and Girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-17/24
H. Structural Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-17/24
1. Longitudinal members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-17/24
2. Transverses and girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-17/24
3. Knuckles (general) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-19/24
J. Evaluation of Notch Stresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-20/24
K. Corrosion Additions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-22/24
L. Additional Stresses in Asymmetric Sections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-23/24
1. Additional stresses for fatique strength analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-23/24
2. Correction of section modulus . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-23/24
Section 4 - Design Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1/10
A. General, Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1/10
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1/10
2. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1/10
2.1 Load centre . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1/10
2.2 Definition of symbols . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1/10
B. External Sea Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2/10
1. Load on weather decks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2/10
2. Load on ship's sides and of bow and stern structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3/10
2.1 Load on ship's sides . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3/10
2.2 Load on bow structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3/10
2.3 Load on stern structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4/10
3. Load on the ship's bottom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4/10
4. Design bottom slamming pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4/10
5. Load on decks of superstructures and deckhouses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-5/10
C. Cargo Loads, Load on Accommodation Decks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6/10
1. Load on cargo decks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6/10
2. Load on inner bottom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6/10
3. Loads on accommodation and machinery decks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7/10
D. Load on Tank Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7/10
1. Design pressure for filled tanks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7/10
2. Design pressure for partially filled tanks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-8/10
E. Design Values of Acceleration Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-8/10
1. Acceleration components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-8/10
2. Combined acceleration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-9/10
Section 5 - Longitudinal Strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1/27
A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1/27
1. Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1/27
2. Calculation Particulars . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1/27
3. Assumptions for calculation, loading conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1/27
4. Loading guidance information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1/27
4.1 General, definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1/27
4.2 Conditions of approval of loading manuals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2/27
BKI - Rules for Hull - 2014
Table of Contents vii
Page
4.3 Conditions of approval of loading instruments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2/27
4.4 Design cargo and ballast loading conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3/27
4.5 Approval procedures of loading instruments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5/27
4.6 Class maintenance of loading guidance information . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5/27
5. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5/27
B. Loads on the Ship’s Hull . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6/27
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6/27
2. Still Water Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7/27
2.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7/27
2.2 Guidance values for containerships with irregular loading . . . . . . . . . . . . . . . . . . . . . . . 5-7/27
3. Wave induced loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8/27
3.1 Vertical wave bending moments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8/27
3.2 Vertical wave shear forces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-9/27
3.3 Horizontal bending moments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10/27
3.4 Horizontal shear forces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10/27
3.5 Torsional moments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10/27
C. Section Moduli, Moments of Inertia, Shear and Buckling Strength . . . . . . . . . . . . . . . . . . . . . . . . . 5-11/27
1. Section moduli as a function of the longitudinal bending moments . . . . . . . . . . . . . . . . . . . . 5-11/27
2. Minimum midship section modulus . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-12/27
3. Midship section moment of inertia . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-12/27
4. Calculation of section moduli . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-12/27
5. Ships with multi-hatchways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-13/27
6. Shear strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-14/27
7. Proof of buckling strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-14/27
8. Ultimate load calculation of the ship's transverse sections . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-14/27
D. Design Stresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-19/27
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-19/27
1.1 Buckling strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-19/27
1.2 Permissible stresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-20/27
1.3 Structural design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-20/27
2. Normal stresses in the ship's longitudinal direction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-21/27
2.1 Normal stresses from vertical bending moments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-21/27
2.2 Normal stresses due to horizontal bending moments . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-21/27
2.3 Normal stresses from torsion of the ship's hull . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-21/27
3. Shear stresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-22/27
3.1 Shear stresses due to vertical shear forces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-22/27
3.2 Shear stresses due to horizontal shear forces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-23/27
3.3 Shear stresses due to torsional moments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-23/27
E. Permissible Still Water Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-23/27
1. Vertical bending moments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-23/27
2. Vertical shear forces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-24/27
3. Static torsional moments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-25/27
F. Guidance Values for Large Deck Openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-25/27
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-25/27
2. Guidance values for the determination of the section modulus . . . . . . . . . . . . . . . . . . . . . . . . 5-25/27
3. Guidance values for the design of transverse box girders of container ships . . . . . . . . . . . . . . 5-26/27
4. Guidance values for the displacements of the upper girder of the ship . . . . . . . . . . . . . . . . . . 5-27/27
G. Bulk Carriers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-27/27
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-27/27
2. Flooding criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-27/27
3. Flooding conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-27/27
Section 6 - Shell Plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1/20
A. General, Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1/20
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1/20
2. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1/20
B. Bottom Plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1/20
1. Plate thickness based on load stress criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1/20
1.1 Ships with lengths L < 90 m . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1/20
1.2 Ships with length L > 90 m . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1/20
BKI - Rules for Hull - 2014
Table of Contentsviii
Page
2. Critical plate thickness, buckling strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2/20
2.1 Guidance values for critical plate thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2/20
2.2 Buckling strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2/20
3. Minimum thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2/20
4. Bilge strake . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2/20
5. Flat plate keel and garboard strake . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-3/20
C. Side Shell Plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4/20
1. Plate thickness based on load stress criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4/20
1.1 Ships with lengths L < 90 m . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4/20
1.2 Ships with lengths L 90 m . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4/20
2. Minimum thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4/20
3. Sheerstrake . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-5/20
4. Buckling strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-5/20
5. Strengthenings for harbour and tug manoeuvres . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-5/20
D. Side Plating of Superstructures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6/20
E. Strengthening of Bottom Forward . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6/20
1. Arrangement of floors and girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6/20
2. Bottom plating forward of = 0,5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6/20
3. Stiffeners forward of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6/20
F. Strengthenings in Way of Propellers and Propeller Shaft Brackets, Bilge Keels . . . . . . . . . . . . . . . 6-7/20
1. Strengthenings in way of propellers and propeller brackets . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7/20
2. Bilge keels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7/20
G. Openings in the Shell Plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7/20
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7/20
2. Pipe connections at the shell plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8/20
H. Bow Doors and Inner Doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8/20
1. General, definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8/20
1.1 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8/20
1.2 Arrangement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9/20
1.3 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9/20
2. Strength criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9/20
3. Design loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10/20
3.1 Bow doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10/20
3.2 Inner doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-12/20
4. Scantlings of bow doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-12/20
4.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-12/20
4.2 Plating and secondary stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-12/20
4.3 Primary structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-12/20
5. Scantlings of inner doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-12/20
6. Securing and supporting of bow doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13/20
6.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13/20
6.2 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13/20
7. Arrangement of securing and locking devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-14/20
7.1 Systems for operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-14/20
7.2 Systems for indication/monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-15/20
8. Operating and maintenance manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-16/20
J. Side Shell Doors and Stern Doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-16/20
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-16/20
2. Arrangement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-16/20
3. Strength criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-17/20
4. Design loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-17/20
5. Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-17/20
5.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-17/20
5.2 Plating and secondary stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18/20
5.3 Primary structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18/20
6. Securing and supporting of side shell and stern doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18/20
6.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18/20
6.2 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18/20
7. Arrangement of securing and locking devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18/20
7.1 Systems for operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18/20
BKI - Rules for Hull - 2014
Table of Contents ix
Page
7.2 Systems for indication/monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18/20
8. Operating and maintenance manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18/20
K. Bulwarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-19/20
Section 7 - Decks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1/9
A. Strength Deck . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1/9
1. General, Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1/9
2. Connection between strength deck and sheerstrake . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1/9
3. Openings in the strength deck . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1/9
4. Scantlings of strength deck of ships up to 65 m in length . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-5/9
5. Scantlings of strength deck of ships of more than 65 m in length . . . . . . . . . . . . . . . . . . . . . . 7-5/9
6. Minimum thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-5/9
7. End thickness, thickness inside line of hatchways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-5/9
B. Lower Decks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-6/9
1. Thickness of decks for cargo loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-6/9
2. Thickness of decks for wheel loading . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-6/9
3. Machinery decks and accommodation decks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-7/9
C. Helicopter Decks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-7/9
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-7/9
2. Design Load . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-8/9
2.1 LC 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-8/9
2.2 LC 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-8/9
2.3 LC 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-8/9
3. Scantlings of structural members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-9/9
Section 8 - Bottom Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1/13
A. Single Bottom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1/13
1. Floor plates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1/13
1.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1/13
1.2 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1/13
2. Longitudinal girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2/13
2.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2/13
2.2 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2/13
B. Double Bottom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2/13
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2/13
2. Centre girder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-3/13
2.1 Lightening holes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-3/13
2.2 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-3/13
3. Side girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4/13
3.1 Arrangement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4/13
3.2 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4/13
4. Inner bottom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4/13
5. Double bottom tanks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-5/13
5.1 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-5/13
5.2 Fuel and lubricating oil tanks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-5/13
5.3 Bilge wells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-5/13
5.4 Sea chests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-5/13
6. Double bottom, transverse framing system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-6/13
6.1 Plate floors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-6/13
6.2 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-6/13
6.3 Watertight floors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-6/13
6.4 Bracket floors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-7/13
6.5 Brackets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-7/13
6.6 Struts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-7/13
7. Double bottom, longitudinal framing system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-7/13
7.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-7/13
7.2 Bottom and inner bottom longitudinals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-7/13
7.3 Plate floors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-8/13
7.4 Brackets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-8/13
7.5 Longitudinal girder system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-8/13
8. Direct calculation of bottom structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-8/13
BKI - Rules for Hull - 2014
Table of Contentsx
Page
8.1 General, Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-8/13
8.2 Design loads, permissible stresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-9/13
8.3 Buckling strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-9/13
9. Testing for tightness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-9/13
C. Bottom Structure in Machinery Spaces in Way of the Main Propulsion Plant . . . . . . . . . . . . . . . . . 8-10/13
1. Single bottom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-10/13
2. Double bottom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-10/13
2.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-10/13
2.2 Plate floors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-10/13
2.3 Side girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-10/13
2.4 Inner bottom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-11/13
3. Engine seating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-11/13
3.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-11/13
3.2 Longitudinal girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-11/13
D. Docking Calculation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-12/13
1. Simplified docking calculation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-12/13
2. Direct docking calculation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-13/13
3. Permissible stresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-13/13
4. Buckling strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-13/13
Section 9 - Framing System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1/12
A. Transverse Framing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1/12
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1/12
1.1 Frame spacing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1/12
1.2 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1/12
2. Main frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2/12
2.1 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2/12
2.2 Frames in tanks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2/12
2.3 End attachment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3/12
3. 'Tween deck and superstructure frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3/12
3.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3/12
3.2 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3/12
3.3 End attachment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3/12
4. Peak frames and frames in way of the stern . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3/12
4.1 Peak frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3/12
4.2 Frames in way of the stern . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-4/12
5. Strengthenings in fore- and aft body . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-4/12
5.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-4/12
5.2 Tiers of beams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-4/12
5.3 Web frames and stringers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-4/12
5.4 Web frames and stringers in 'tween decks and superstructure decks . . . . . . . . . . . . . . . . 9-5/12
5.5 Tripping brackets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-5/12
6. Web frames in machinery spaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-6/12
6.1 Arrangement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-6/12
6.2 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-6/12
B. Bottom, Side- and Deck Longitudinals, Side Transverses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-7/12
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-7/12
2. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-7/12
3. Scantlings of longitudinals and longitudinal beams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-9/12
4. Side transverses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-12/12
5. Strengthenings in the fore and aft body . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-12/12
Section 10 - Deck Beams and Supporting Deck Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1/5
A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1/5
1. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1/5
2. Permissible stresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1/5
3. Buckling strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-2/5
B. Deck Beams and Girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-2/5
1. Transverse deck beams and deck longitudinals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-2/5
2. Deck longitudinals in way of the upper and lower hull flange . . . . . . . . . . . . . . . . . . . . . . . . . 10-2/5
3. Attachment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-2/5
BKI - Rules for Hull - 2014
Table of Contents xi
Page
4. Girders and transverses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-2/5
5. Supporting structure of windlasses and chain stoppers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-3/5
C. Pillars . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-3/5
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-3/5
2. Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-3/5
D. Cantilevers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-4/5
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-4/5
2. Permissible stresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-4/5
E. Hatchway Girders and Girders Forming Part of the Longitudinal Hull Structure . . . . . . . . . . . . . . 10-5/5
Section 11 - Watertight Bulkheads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-1/8
A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-1/8
1. Watertight subdivision . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-1/8
2. Arrangement of watertight bulkheads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-1/8
2.1 Collision bulkhead . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-1/8
2.2 Stern tube and remaining watertight bulkheads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-3/8
3. Openings in watertight bulkheads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-3/8
3.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-3/8
3.2 Hinged doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-3/8
3.3 Sliding doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-3/8
3.4 Penetrations through watertight bulkheads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-4/8
B. Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-4/8
1. General, Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-4/8
2. Bulkhead plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-4/8
3. Stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-5/8
4. Corrugated bulkheads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-5/8
5. Primary Supporting Members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-6/8
5.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-6/8
5.2 Load assumptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-6/8
5.3 Strength criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-6/8
6. Watertight longitudinal structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-8/8
C. Shaft Tunnels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-8/8
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-8/8
2. Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-8/8
Section 12 - Tank Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1/10
A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1/10
1. Subdivision of tanks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1/10
2. Air, overflow and sounding pipes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1/10
3. Forepeak tank . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1/10
4. Cross references . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1/10
5. Separation of fuel oil tanks from tanks for other liquids . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1/10
6. Tanks for heated liquids . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-2/10
7. Minimum thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-2/10
8. Plating and stiffeners in the propeller area and in the engine room . . . . . . . . . . . . . . . . . . . . . 12-3/10
8.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-3/10
8.2 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-3/10
8.3 Shell structures in propeller area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-3/10
8.4 Tank structures in propeller area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-3/10
8.5 Tank structures in main engine area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-4/10
B. Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-4/10
1. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-4/10
2. Plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-5/10
3. Stiffeners and girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-5/10
4. Corrugated bulkheads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-7/10
5. Thickness of clad plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-7/10
C. Tanks with Large Lengths or Breadths . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-7/10
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-7/10
2. Hold spaces for ballast water . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-8/10
D. Vegetable Oil Tanks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-8/10
E. Detached Tanks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-9/10
BKI - Rules for Hull - 2014
Table of Contentsxii
Page
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-9/10
2. Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-9/10
F. Potable Water Tanks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-9/10
G. Swash Bulkheads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-9/10
H. Testing for Tightness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-10/10
Section 13 - Stem and Sternframe Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-1/8
A. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-1/8
B. Stem . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-1/8
1. Bar stem . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-1/8
2. Plate stem and bulbous bows . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-1/8
C. Sternframe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-1/8
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-1/8
2. Propeller post . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-2/8
3. Rudder post and rudder axle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-3/8
4. Sole piece . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-4/8
5. Rudder horn of semi spade rudders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-5/8
D. Propeller Brackets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-7/8
E. Elastic Stern Tube . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-7/8
1. Strength analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-7/8
1.1 Static load . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-8/8
1.2 Dynamic load . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-8/8
Section 14 Rudder and Manoeuvring Arrangement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-1/21
A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-1/21
1. Manoeuvring arrangement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-1/21
2. Structural details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-1/21
3. Size of rudder area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-2/21
4. Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-2/21
5. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-3/21
B. Rudder Force and Torque . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-4/21
1. Rudder force and torque for normal rudders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-4/21
2. Rudder force and torque for rudder blades with cut-outs (semi-spade rudders) . . . . . . . . . . . . 14-5/21
C. Scantlings of the Rudder Stock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-6/21
1. Rudder stock diameter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-6/21
2. Strengthening of rudder stock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-7/21
3. Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-7/21
3.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-7/21
3.2 Data for the analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-7/21
3.3 Moments and forces to be evaluated . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-10/21
4. Rudder trunk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-11/21
D. Rudder Couplings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-12/21
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-12/21
2. Horizontal couplings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-12/21
3. Vertical couplings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-12/21
4. Cone couplings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-13/21
4.1 Cone couplings with key . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-13/21
4.2 Cone couplings with special arrangements for mounting and dismounting the couplings 14-14/21
E. Rudder Body, Rudder Bearings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-16/21
1. Strength of rudder body . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-16/21
2. Rudder plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-17/21
2.1 Double plate rudders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-17/21
2.2 Single plate rudders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-18/21
2.2.1 Main piece diameter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-18/21
2.2.2 Blade thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-18/21
2.2.3 Arms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-18/21
3. Transmitting of the rudder torque . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-18/21
4. Rudder bearings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-18/21
5. Pintles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-19/21
6. Guidance values for bearing clearances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-19/21
F. Design Yield Moment of Rudder Stock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-20/21
BKI - Rules for Hull - 2014
Table of Contents xiii
Page
G. Stopper, Locking Device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-20/21
H. Propeller Nozzles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-20/21
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-20/21
2. Design pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-20/21
3. Plate thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-21/21
4. Section modulus . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-21/21
5. Welding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-21/21
Section 15 - Strengthening for Navigation in Ice . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-1/17
A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-1/17
1. Ice class notations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-1/17
2. Ice class draught for Ships with Notations ES1-ES4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-2/17
3. Propulsion machinery output for ships with Notations ES1-ES4 . . . . . . . . . . . . . . . . . . . . . . . 15-2/17
4. Definitions for ships notations ES1-ES4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-5/17
B. Requirements for the Notations ES1 – ES4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-7/17
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-7/17
2. Ice loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-8/17
3. Thickness of shell plating in the ice belt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-9/17
4. Frames, ice stringers, web frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-10/17
4.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-10/17
4.2 Transverse frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-10/17
4.3 Longitudinal frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-12/17
4.4 Ice stringers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-12/17
4.5 Web frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-13/17
5. Stem . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-15/17
6. Arrangements for towing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-16/17
7. Stern . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-16/17
8. Bilge keels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-16/17
9. Rudder and steering gear . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-16/17
C. Requirements for the Ice Class Notation ES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-17/17
1. Shell plating within the ice belt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-17/17
2. Frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-17/17
3. Stem . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-17/17
Section 16 - Superstructures and Deckhouses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-1/10
A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-1/10
1. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-1/10
2. Arrangement of superstructure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-1/10
3. Strengthenings at the ends of superstructures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-1/10
4. Transverse structure of superstructures and deckhouses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-2/10
5. Openings in closed superstructures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-2/10
6. Recommendations regarding deckhouse vibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-2/10
B. Side Plating and Decks of Non-Effective Superstructures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-2/10
1. Side plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-2/10
2. Deck plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-3/10
3. Deck beams, supporting deck structure, frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-3/10
C. Superstructure End Bulkheads and Deckhouse Walls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-3/10
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-3/10
2. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-3/10
3. Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-5/10
3.1 Stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-5/10
3.2 Plate thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-5/10
D. Decks of Short Deckhouses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-5/10
1. Plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-5/10
2. Deck beams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-5/10
E. Elastic Mounting of Deckhouses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-6/10
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-6/10
2. Design loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-6/10
2.1 Weight . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-6/10
2.2 Water pressure and wind pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-7/10
BKI - Rules for Hull - 2014
Table of Contentsxiv
Page
2.3 Load on the deckhouse bottom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-7/10
2.4 Load on deck beams and girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-7/10
3. Load cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-7/10
4. Scantlings of rails, mounting elements and substructures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-8/10
4.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-8/10
4.2 Permissible stresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-8/10
5. Corrosion Addition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-9/10
F. Breakwater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-9/10
1. Arrangement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-9/10
2. Dimensions of the breakwater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-9/10
3. Cutouts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-10/10
4. Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-10/10
5. Plate thickness and stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-10/10
6. Primary supporting members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-10/10
7. Proof of buckling strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-10/10
Section 17 - Hatchways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-1/20
A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-1/20
1. Hatchways on freeboard and superstructure decks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-1/20
2. Hatchways on lower decks and within superstructures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-1/20
3. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-1/20
B. Hatch Covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-2/20
1. Design loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-2/20
1.1 Load case A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-2/20
1.2 Load case B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-2/20
1.3 Load case C . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-3/20
1.4 Load case D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-4/20
1.5 Load case E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-5/20
1.6 Load case F . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-5/20
1.7 Horizontal mass forces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-5/20
2. Permissible stresses and deflections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-5/20
3. Strength calculation for hatch covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-5/20
3.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-5/20
3.2 Hatch cover supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-6/20
3.3 Strength calculations for beam and girder grillages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-6/20
3.4 FEM calculations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-6/20
4. Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-6/20
4.1 Hatch cover plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-6/20
4.1.1 Top plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-6/20
4.1.2 Lower plating of pontoon hatch covers and box girders . . . . . . . . . . . . . . . . . 17-7/20
4.2 Main girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-7/20
4.3 Edge girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-7/20
4.4 Hatch cover stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-7/20
4.5 Hatch cover supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-8/20
4.6 Locking and securing of hatch covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-9/20
4.7 Hatch cover stoppers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-9/20
4.8 Cantilevers, load transmitting elements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-10/20
4.9 Container seatings on hatch covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-10/20
5. Weathertightness of hatch covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-10/20
5.1 Packing material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-10/20
5.2 Non-weathertightness hatch covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-10/20
5.3 Drainage arrangements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-11/20
5.4 Tightness test, trials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-11/20
6. Wooden hatchway covers & hatchway beams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-12/20
6.1 Hatchway covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-12/20
6.2. Hatchway beams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-12/20
6.2.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-12/20
6.2.2 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-12/20
6.3. Moments of inertia, section moduli, shear areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-13/20
6.4 Arrangement and securing of hatchway beams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-13/20
BKI - Rules for Hull - 2014
Table of Contents xv
Page
7. Sealing and Securing Arrangements of Wooden and Non Self Tightening Pontoon Hatchway
Covering . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-14/20
C. Hatch Cover Coamings and Girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-14/20
1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-14/20
2. Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-15/20
2.1 Plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-15/20
2.2 Coaming stays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-15/20
2.3 Horizontal stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-15/20
D. Smaller Opening and Hatches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-16/20
1. Miscellaneous openings in freeboard and superstructure decks . . . . . . . . . . . . . . . . . . . . . . . 17-16/20
2. Strength and securing of small hatches on the exposed fore deck . . . . . . . . . . . . . . . . . . . . . . 17-16/20
2.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-16/20
2.2 Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-16/20
2.3 Strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-17/20
2.4 Primary securing devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-17/20
2.5 Requirements for primary securing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-17/20
2.6 Secondary securing device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-18/20
E. Engine and Boiler Room Hatchways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-18/20
1. Deck openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-18/20
2. Engine and boiler room casings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-18/20
3. Doors in engine and boiler room casings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-19/20
Section 18 - Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-1/10
A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-1/10
B. Equipment Numeral . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-1/10
C. Anchors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-2/10
D. Chain Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-3/10
E. Chain Locker . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-4/10
F. Mooring Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-5/10
1. Ropes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-5/10
2. Shipboard fittings (mooring bollards and bitts, fairleads, stand rollers, chocks) . . . . . . . . . . . 18-6/10
3. Supporting hull structure for mooring equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-6/10
4. Corrosion addition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-7/10
5. Equipment for mooring at single point moorings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-7/10
G. Towing Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-8/10
H. Towing and Mooring Arrangements Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-9/10
Section 19 - Welded Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-1/20
A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-1/20
1. Information contained in manufacturing documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-1/20
2. Materials, weldability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-1/20
3. Manufacture and testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-1/20
B. Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-2/20
1. General design principles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-2/20
2. Design details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-2/20
2.1 Stress flow, transitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-2/20
2.2 Local clustering of welds, minimum spacing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-3/20
2.3 Welding cut-outs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-3/20
2.4 Local reinforcements, doubling plates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-3/20
2.5 Intersecting members, stress in the thickness direction . . . . . . . . . . . . . . . . . . . . . . . . . . 19-4/20
2.6 Welding of cold formed sections, bending radii . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-4/20
2.7 Build - up welds on rudderstocks and pintles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-5/20
3. Weld shapes and dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-5/20
3.1 Butt joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-5/20
3.2 Corner, T and double-T (cruciform) joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-6/20
3.3 Fillet weld connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-8/20
4. Welded joints of particular components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-10/20
4.1 Welds at the ends of girders and stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-10/20
4.2 Joints between section ends and plates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-11/20
4.3 Welded shaft bracket joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-11/20
4.4 Rudder coupling flanges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-12/20
BKI - Rules for Hull - 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014
Rules for hull 2014

More Related Content

What's hot

Georgia Rainwater Harvesting Manual
Georgia Rainwater Harvesting ManualGeorgia Rainwater Harvesting Manual
Georgia Rainwater Harvesting ManualD6Z
 
דו"ח פשיטת הרגל של סולינדרה
דו"ח פשיטת הרגל של סולינדרהדו"ח פשיטת הרגל של סולינדרה
דו"ח פשיטת הרגל של סולינדרהTashtiot media
 
Prediction of economical recession with the signal approach, and the turkey case
Prediction of economical recession with the signal approach, and the turkey casePrediction of economical recession with the signal approach, and the turkey case
Prediction of economical recession with the signal approach, and the turkey caseDeniz Özgür Tiryaki
 
SAFETEA LU SECTION 157 IS BAD LEGISLATION
SAFETEA LU SECTION 157 IS BAD LEGISLATIONSAFETEA LU SECTION 157 IS BAD LEGISLATION
SAFETEA LU SECTION 157 IS BAD LEGISLATIONsection157
 
Ge turbine fuel specs
Ge turbine fuel specsGe turbine fuel specs
Ge turbine fuel specsHeryanto Syam
 
0510 w13 qp_41
0510 w13 qp_410510 w13 qp_41
0510 w13 qp_41King Ali
 
Future Scenarios for Petroleum Development
Future Scenarios for Petroleum DevelopmentFuture Scenarios for Petroleum Development
Future Scenarios for Petroleum DevelopmentNicholas Varilone
 
Arevalo la calle_cj tesis rcm maquinaria pesada
Arevalo la calle_cj tesis rcm maquinaria pesadaArevalo la calle_cj tesis rcm maquinaria pesada
Arevalo la calle_cj tesis rcm maquinaria pesadaAlexSonccoLabra1
 
5054 s09 qp_2
5054 s09 qp_25054 s09 qp_2
5054 s09 qp_2King Ali
 
Role of Rock Mechanics in Mining Industry : Applications in Underground Mining
Role of Rock Mechanics in Mining Industry : Applications in Underground MiningRole of Rock Mechanics in Mining Industry : Applications in Underground Mining
Role of Rock Mechanics in Mining Industry : Applications in Underground MiningPavan Josyula
 
Methods for Monitoring Pump-and-Treat Performance
Methods for Monitoring Pump-and-Treat PerformanceMethods for Monitoring Pump-and-Treat Performance
Methods for Monitoring Pump-and-Treat PerformanceRenato Kumamoto
 
Helikoptersikkerhetsstudie 3 (Hss 3) Vedleggsrapport
Helikoptersikkerhetsstudie 3 (Hss 3) VedleggsrapportHelikoptersikkerhetsstudie 3 (Hss 3) Vedleggsrapport
Helikoptersikkerhetsstudie 3 (Hss 3) VedleggsrapportE.ON Exploration & Production
 
Leed v4.1 bd_c_guide_1.2020
Leed v4.1 bd_c_guide_1.2020Leed v4.1 bd_c_guide_1.2020
Leed v4.1 bd_c_guide_1.2020MnikaVrtesy
 
Cost Benefit Anaylsis - Hermosa Beach - February 2014 - Draft
Cost Benefit Anaylsis - Hermosa Beach - February 2014 - DraftCost Benefit Anaylsis - Hermosa Beach - February 2014 - Draft
Cost Benefit Anaylsis - Hermosa Beach - February 2014 - DraftStopHermosaBeachOil
 

What's hot (20)

DNV Liquified Gas Terminal
DNV Liquified Gas TerminalDNV Liquified Gas Terminal
DNV Liquified Gas Terminal
 
Georgia Rainwater Harvesting Manual
Georgia Rainwater Harvesting ManualGeorgia Rainwater Harvesting Manual
Georgia Rainwater Harvesting Manual
 
דו"ח פשיטת הרגל של סולינדרה
דו"ח פשיטת הרגל של סולינדרהדו"ח פשיטת הרגל של סולינדרה
דו"ח פשיטת הרגל של סולינדרה
 
Prediction of economical recession with the signal approach, and the turkey case
Prediction of economical recession with the signal approach, and the turkey casePrediction of economical recession with the signal approach, and the turkey case
Prediction of economical recession with the signal approach, and the turkey case
 
SAFETEA LU SECTION 157 IS BAD LEGISLATION
SAFETEA LU SECTION 157 IS BAD LEGISLATIONSAFETEA LU SECTION 157 IS BAD LEGISLATION
SAFETEA LU SECTION 157 IS BAD LEGISLATION
 
Ge turbine fuel specs
Ge turbine fuel specsGe turbine fuel specs
Ge turbine fuel specs
 
0510 w13 qp_41
0510 w13 qp_410510 w13 qp_41
0510 w13 qp_41
 
Future Scenarios for Petroleum Development
Future Scenarios for Petroleum DevelopmentFuture Scenarios for Petroleum Development
Future Scenarios for Petroleum Development
 
Arevalo la calle_cj tesis rcm maquinaria pesada
Arevalo la calle_cj tesis rcm maquinaria pesadaArevalo la calle_cj tesis rcm maquinaria pesada
Arevalo la calle_cj tesis rcm maquinaria pesada
 
5054 s09 qp_2
5054 s09 qp_25054 s09 qp_2
5054 s09 qp_2
 
Abs maneuverability
Abs   maneuverabilityAbs   maneuverability
Abs maneuverability
 
Role of Rock Mechanics in Mining Industry : Applications in Underground Mining
Role of Rock Mechanics in Mining Industry : Applications in Underground MiningRole of Rock Mechanics in Mining Industry : Applications in Underground Mining
Role of Rock Mechanics in Mining Industry : Applications in Underground Mining
 
Qcs manual 2_38
Qcs manual 2_38Qcs manual 2_38
Qcs manual 2_38
 
Methods for Monitoring Pump-and-Treat Performance
Methods for Monitoring Pump-and-Treat PerformanceMethods for Monitoring Pump-and-Treat Performance
Methods for Monitoring Pump-and-Treat Performance
 
Report_FAT1_Final
Report_FAT1_FinalReport_FAT1_Final
Report_FAT1_Final
 
design and analysis of pressure vessel
design and analysis of pressure vesseldesign and analysis of pressure vessel
design and analysis of pressure vessel
 
Helikoptersikkerhetsstudie 3 (Hss 3) Vedleggsrapport
Helikoptersikkerhetsstudie 3 (Hss 3) VedleggsrapportHelikoptersikkerhetsstudie 3 (Hss 3) Vedleggsrapport
Helikoptersikkerhetsstudie 3 (Hss 3) Vedleggsrapport
 
Leed v4.1 bd_c_guide_1.2020
Leed v4.1 bd_c_guide_1.2020Leed v4.1 bd_c_guide_1.2020
Leed v4.1 bd_c_guide_1.2020
 
Mirsal 2 manual BOE
Mirsal 2 manual BOEMirsal 2 manual BOE
Mirsal 2 manual BOE
 
Cost Benefit Anaylsis - Hermosa Beach - February 2014 - Draft
Cost Benefit Anaylsis - Hermosa Beach - February 2014 - DraftCost Benefit Anaylsis - Hermosa Beach - February 2014 - Draft
Cost Benefit Anaylsis - Hermosa Beach - February 2014 - Draft
 

Viewers also liked

Perhitungan Plat Kulit Kapal
Perhitungan Plat Kulit KapalPerhitungan Plat Kulit Kapal
Perhitungan Plat Kulit Kapaltanalialayubi
 
Perhitungan Beban Kapal
Perhitungan Beban KapalPerhitungan Beban Kapal
Perhitungan Beban Kapaltanalialayubi
 
Teknik Konstruksi kapal
Teknik Konstruksi kapalTeknik Konstruksi kapal
Teknik Konstruksi kapaltanalialayubi
 
Gaguk suhardjito desain rencana garis
Gaguk suhardjito   desain rencana garisGaguk suhardjito   desain rencana garis
Gaguk suhardjito desain rencana garisGaguk Suhardjito
 
Tugas Merancang Kapal I (Container 7000 DWT)
Tugas Merancang Kapal I (Container 7000 DWT)Tugas Merancang Kapal I (Container 7000 DWT)
Tugas Merancang Kapal I (Container 7000 DWT)Yogga Haw
 
TBK 1 Satuan-satuan Perkapalan
TBK 1 Satuan-satuan PerkapalanTBK 1 Satuan-satuan Perkapalan
TBK 1 Satuan-satuan Perkapalantanalialayubi
 
Final Project - Design and Implementation EDF Rocket
Final Project - Design and Implementation EDF RocketFinal Project - Design and Implementation EDF Rocket
Final Project - Design and Implementation EDF RocketWandi Wijaya
 
85321 midship section (1) (1)
85321 midship section (1) (1)85321 midship section (1) (1)
85321 midship section (1) (1)Dimas Romansyah
 
4 195-suryo-adji-engine propeller matching
4 195-suryo-adji-engine propeller matching4 195-suryo-adji-engine propeller matching
4 195-suryo-adji-engine propeller matchingYanto adrian
 
Dasar – dasar konstruksi kapal
Dasar – dasar konstruksi kapalDasar – dasar konstruksi kapal
Dasar – dasar konstruksi kapaltanalialayubi
 
Kd 2 bagian bagian kapal
Kd 2 bagian bagian kapalKd 2 bagian bagian kapal
Kd 2 bagian bagian kapalrobert hokoyoku
 
Gaguk suhardjito geometri kapal
Gaguk suhardjito   geometri kapalGaguk suhardjito   geometri kapal
Gaguk suhardjito geometri kapalGaguk Suhardjito
 
Mega Ship Maersk Triple E
Mega Ship  Maersk Triple EMega Ship  Maersk Triple E
Mega Ship Maersk Triple ERoy Chung
 
Sejarah kapal
Sejarah kapalSejarah kapal
Sejarah kapalalmuiz07
 
Modular Construction Advancements
Modular Construction AdvancementsModular Construction Advancements
Modular Construction AdvancementsAkhil Saxena
 

Viewers also liked (20)

Perhitungan Plat Kulit Kapal
Perhitungan Plat Kulit KapalPerhitungan Plat Kulit Kapal
Perhitungan Plat Kulit Kapal
 
Perhitungan Beban Kapal
Perhitungan Beban KapalPerhitungan Beban Kapal
Perhitungan Beban Kapal
 
Perhitungan propulsi kapal
Perhitungan propulsi kapalPerhitungan propulsi kapal
Perhitungan propulsi kapal
 
Teknik Konstruksi kapal
Teknik Konstruksi kapalTeknik Konstruksi kapal
Teknik Konstruksi kapal
 
Gaguk suhardjito desain rencana garis
Gaguk suhardjito   desain rencana garisGaguk suhardjito   desain rencana garis
Gaguk suhardjito desain rencana garis
 
Tugas Merancang Kapal I (Container 7000 DWT)
Tugas Merancang Kapal I (Container 7000 DWT)Tugas Merancang Kapal I (Container 7000 DWT)
Tugas Merancang Kapal I (Container 7000 DWT)
 
Konst haluan Kapal
Konst haluan KapalKonst haluan Kapal
Konst haluan Kapal
 
TBK 1 Satuan-satuan Perkapalan
TBK 1 Satuan-satuan PerkapalanTBK 1 Satuan-satuan Perkapalan
TBK 1 Satuan-satuan Perkapalan
 
Final Project - Design and Implementation EDF Rocket
Final Project - Design and Implementation EDF RocketFinal Project - Design and Implementation EDF Rocket
Final Project - Design and Implementation EDF Rocket
 
85321 midship section (1) (1)
85321 midship section (1) (1)85321 midship section (1) (1)
85321 midship section (1) (1)
 
Ship construction &amp; building
Ship construction &amp; buildingShip construction &amp; building
Ship construction &amp; building
 
4 195-suryo-adji-engine propeller matching
4 195-suryo-adji-engine propeller matching4 195-suryo-adji-engine propeller matching
4 195-suryo-adji-engine propeller matching
 
App1(1)
App1(1)App1(1)
App1(1)
 
Dasar – dasar konstruksi kapal
Dasar – dasar konstruksi kapalDasar – dasar konstruksi kapal
Dasar – dasar konstruksi kapal
 
Kd 2 bagian bagian kapal
Kd 2 bagian bagian kapalKd 2 bagian bagian kapal
Kd 2 bagian bagian kapal
 
Ship construction
Ship constructionShip construction
Ship construction
 
Gaguk suhardjito geometri kapal
Gaguk suhardjito   geometri kapalGaguk suhardjito   geometri kapal
Gaguk suhardjito geometri kapal
 
Mega Ship Maersk Triple E
Mega Ship  Maersk Triple EMega Ship  Maersk Triple E
Mega Ship Maersk Triple E
 
Sejarah kapal
Sejarah kapalSejarah kapal
Sejarah kapal
 
Modular Construction Advancements
Modular Construction AdvancementsModular Construction Advancements
Modular Construction Advancements
 

Similar to Rules for hull 2014

Precast carparks
Precast carparksPrecast carparks
Precast carparksMichal Bors
 
Simplified design of reinforced concrete buildings
Simplified design of reinforced concrete buildings Simplified design of reinforced concrete buildings
Simplified design of reinforced concrete buildings Sarmed Shukur
 
Asme b30 2-2011 ok
Asme b30 2-2011 okAsme b30 2-2011 ok
Asme b30 2-2011 okSIGPROMAP
 
Operations manual for_owners_and_managers_multi-unit_residential_buildings
Operations manual for_owners_and_managers_multi-unit_residential_buildingsOperations manual for_owners_and_managers_multi-unit_residential_buildings
Operations manual for_owners_and_managers_multi-unit_residential_buildingsSherry Schluessel
 
Ip model code of safe practice part 19 2nd ed. jan. 2007 part1
Ip   model code of safe practice part 19 2nd ed. jan. 2007 part1Ip   model code of safe practice part 19 2nd ed. jan. 2007 part1
Ip model code of safe practice part 19 2nd ed. jan. 2007 part1Varadaraj Ck
 
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to presentCaterpillar cat th255 c telehandler service repair manual sn jk200150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to presentudfjjdksekmm
 
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to presentCaterpillar cat th255 c telehandler service repair manual sn jk200150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to presentufusejkksemm
 
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to presentCaterpillar cat th255 c telehandler service repair manual sn jk300150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to presentudfjjdksekmm
 
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to presentCaterpillar cat th255 c telehandler service repair manual sn jk300150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to presentufusejkksemm
 
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to presentCaterpillar cat th255 c telehandler service repair manual sn jk200150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to presentfjjsekksemmx
 
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to presentCaterpillar cat th255 c telehandler service repair manual sn jk300150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to presentjfjskekdhnejd
 
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to presentCaterpillar cat th255 c telehandler service repair manual sn jk300150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to presentfjjskdmnenemm
 
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to presentCaterpillar cat th255 c telehandler service repair manual sn jk200150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to presentfjjskekrtfsmem
 
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to presentCaterpillar cat th255 c telehandler service repair manual sn jk300150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to presentufsjekfksmem
 

Similar to Rules for hull 2014 (20)

Precast carparks
Precast carparksPrecast carparks
Precast carparks
 
PCI parking structures recommended practices
PCI parking structures  recommended practicesPCI parking structures  recommended practices
PCI parking structures recommended practices
 
Simplified design of reinforced concrete buildings
Simplified design of reinforced concrete buildings Simplified design of reinforced concrete buildings
Simplified design of reinforced concrete buildings
 
Nfpa 1140
Nfpa 1140Nfpa 1140
Nfpa 1140
 
Hollow core slabs
Hollow core slabsHollow core slabs
Hollow core slabs
 
Asme b30 2-2011 ok
Asme b30 2-2011 okAsme b30 2-2011 ok
Asme b30 2-2011 ok
 
Operations manual for_owners_and_managers_multi-unit_residential_buildings
Operations manual for_owners_and_managers_multi-unit_residential_buildingsOperations manual for_owners_and_managers_multi-unit_residential_buildings
Operations manual for_owners_and_managers_multi-unit_residential_buildings
 
Ip model code of safe practice part 19 2nd ed. jan. 2007 part1
Ip   model code of safe practice part 19 2nd ed. jan. 2007 part1Ip   model code of safe practice part 19 2nd ed. jan. 2007 part1
Ip model code of safe practice part 19 2nd ed. jan. 2007 part1
 
Asmeb30.2 2001
Asmeb30.2 2001Asmeb30.2 2001
Asmeb30.2 2001
 
Coulter manual de usos
Coulter manual de usosCoulter manual de usos
Coulter manual de usos
 
Modu part 6_e-jan12
Modu part 6_e-jan12Modu part 6_e-jan12
Modu part 6_e-jan12
 
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to presentCaterpillar cat th255 c telehandler service repair manual sn jk200150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to present
 
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to presentCaterpillar cat th255 c telehandler service repair manual sn jk200150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to present
 
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to presentCaterpillar cat th255 c telehandler service repair manual sn jk300150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to present
 
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to presentCaterpillar cat th255 c telehandler service repair manual sn jk300150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to present
 
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to presentCaterpillar cat th255 c telehandler service repair manual sn jk200150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to present
 
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to presentCaterpillar cat th255 c telehandler service repair manual sn jk300150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to present
 
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to presentCaterpillar cat th255 c telehandler service repair manual sn jk300150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to present
 
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to presentCaterpillar cat th255 c telehandler service repair manual sn jk200150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk200150 to present
 
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to presentCaterpillar cat th255 c telehandler service repair manual sn jk300150 to present
Caterpillar cat th255 c telehandler service repair manual sn jk300150 to present
 

More from tanalialayubi

PERENCANAAN WAKTU & JARINGAN KERJA
PERENCANAAN WAKTU & JARINGAN KERJAPERENCANAAN WAKTU & JARINGAN KERJA
PERENCANAAN WAKTU & JARINGAN KERJAtanalialayubi
 
LAPORAN PRAKTEK KELISTRIKAN KAPAL
LAPORAN PRAKTEK KELISTRIKAN KAPAL LAPORAN PRAKTEK KELISTRIKAN KAPAL
LAPORAN PRAKTEK KELISTRIKAN KAPAL tanalialayubi
 
LINES PLAN TANKER SHIP MT ALITAN
LINES PLAN TANKER SHIP MT ALITANLINES PLAN TANKER SHIP MT ALITAN
LINES PLAN TANKER SHIP MT ALITANtanalialayubi
 
JOB DIES DAN PENGEDOKAN KAPAL
JOB DIES DAN PENGEDOKAN KAPALJOB DIES DAN PENGEDOKAN KAPAL
JOB DIES DAN PENGEDOKAN KAPALtanalialayubi
 
Perhitungan daun kemudi
Perhitungan daun kemudiPerhitungan daun kemudi
Perhitungan daun kemuditanalialayubi
 
Perencanaan Kebutuhan Listrik Kapal
Perencanaan Kebutuhan Listrik KapalPerencanaan Kebutuhan Listrik Kapal
Perencanaan Kebutuhan Listrik Kapaltanalialayubi
 
Cacat Las Pada Pelat Lambung Kapal
Cacat Las Pada Pelat Lambung KapalCacat Las Pada Pelat Lambung Kapal
Cacat Las Pada Pelat Lambung Kapaltanalialayubi
 
teknologi pengelasan logam
teknologi pengelasan logamteknologi pengelasan logam
teknologi pengelasan logamtanalialayubi
 
Dimensi Satuan Mekanika Fluida
Dimensi Satuan Mekanika FluidaDimensi Satuan Mekanika Fluida
Dimensi Satuan Mekanika Fluidatanalialayubi
 
Teknik pengelasan kapal jilid 1
Teknik pengelasan kapal jilid 1Teknik pengelasan kapal jilid 1
Teknik pengelasan kapal jilid 1tanalialayubi
 
Proses pembuatan kapal
Proses pembuatan kapalProses pembuatan kapal
Proses pembuatan kapaltanalialayubi
 
Sistem Informasi Manajemen
Sistem Informasi ManajemenSistem Informasi Manajemen
Sistem Informasi Manajementanalialayubi
 
Konstruksi buritan Kapal
Konstruksi buritan KapalKonstruksi buritan Kapal
Konstruksi buritan Kapaltanalialayubi
 
Alas ganda (double bottom)
Alas ganda (double bottom)Alas ganda (double bottom)
Alas ganda (double bottom)tanalialayubi
 

More from tanalialayubi (20)

PERENCANAAN WAKTU & JARINGAN KERJA
PERENCANAAN WAKTU & JARINGAN KERJAPERENCANAAN WAKTU & JARINGAN KERJA
PERENCANAAN WAKTU & JARINGAN KERJA
 
LAPORAN PRAKTEK KELISTRIKAN KAPAL
LAPORAN PRAKTEK KELISTRIKAN KAPAL LAPORAN PRAKTEK KELISTRIKAN KAPAL
LAPORAN PRAKTEK KELISTRIKAN KAPAL
 
LAPORAN KKL 2014
LAPORAN KKL 2014 LAPORAN KKL 2014
LAPORAN KKL 2014
 
LINES PLAN TANKER SHIP MT ALITAN
LINES PLAN TANKER SHIP MT ALITANLINES PLAN TANKER SHIP MT ALITAN
LINES PLAN TANKER SHIP MT ALITAN
 
PROSEDUR LAS
PROSEDUR LASPROSEDUR LAS
PROSEDUR LAS
 
JOB DIES DAN PENGEDOKAN KAPAL
JOB DIES DAN PENGEDOKAN KAPALJOB DIES DAN PENGEDOKAN KAPAL
JOB DIES DAN PENGEDOKAN KAPAL
 
Perhitungan daun kemudi
Perhitungan daun kemudiPerhitungan daun kemudi
Perhitungan daun kemudi
 
Perencanaan Kebutuhan Listrik Kapal
Perencanaan Kebutuhan Listrik KapalPerencanaan Kebutuhan Listrik Kapal
Perencanaan Kebutuhan Listrik Kapal
 
Cacat Las Pada Pelat Lambung Kapal
Cacat Las Pada Pelat Lambung KapalCacat Las Pada Pelat Lambung Kapal
Cacat Las Pada Pelat Lambung Kapal
 
teknologi pengelasan logam
teknologi pengelasan logamteknologi pengelasan logam
teknologi pengelasan logam
 
Dimensi Satuan Mekanika Fluida
Dimensi Satuan Mekanika FluidaDimensi Satuan Mekanika Fluida
Dimensi Satuan Mekanika Fluida
 
Mekanika Fluida
Mekanika FluidaMekanika Fluida
Mekanika Fluida
 
Laporan Uji Bahan
Laporan Uji BahanLaporan Uji Bahan
Laporan Uji Bahan
 
Teknik pengelasan kapal jilid 1
Teknik pengelasan kapal jilid 1Teknik pengelasan kapal jilid 1
Teknik pengelasan kapal jilid 1
 
Proses pembuatan kapal
Proses pembuatan kapalProses pembuatan kapal
Proses pembuatan kapal
 
Alat Potong Gas
Alat Potong GasAlat Potong Gas
Alat Potong Gas
 
Sistem Informasi Manajemen
Sistem Informasi ManajemenSistem Informasi Manajemen
Sistem Informasi Manajemen
 
Konstruksi buritan Kapal
Konstruksi buritan KapalKonstruksi buritan Kapal
Konstruksi buritan Kapal
 
Konstruksi geladak
Konstruksi geladakKonstruksi geladak
Konstruksi geladak
 
Alas ganda (double bottom)
Alas ganda (double bottom)Alas ganda (double bottom)
Alas ganda (double bottom)
 

Recently uploaded

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 

Recently uploaded (20)

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 

Rules for hull 2014

  • 1. RULES FOR THE CLASSIFICATION AND CONSTRUCTION PART 1. SEAGOING SHIPS VOLUME II RULES FOR HULL 2014 EDITION BIRO KLASIFIKASI INDONESIA
  • 2.
  • 3. RULES FOR THE CLASSIFICATION AND CONSTRUCTION PART 1. SEAGOING SHIPS VOLUME II RULES FOR HULL 2014 EDITION Biro Klasifikasi Indonesia Jl. Yos Sudarso No. 38-40, Tanjung Priok Jakarta 14320 www.klasifikasiindonesia.com rules@klasifikasiindonesia.com Copyright © 2014 Reproduction in whole or in part by any means, is subject to the permission in writing by Biro Klasifikasi Indonesia Head Office
  • 4. The following Guidelines come into force on 1st January 2014 Reproduction in whole or in part by any means, is subject to the permission in writing by Biro Klasifikasi Indonesia Head Office Published by: Biro Klasifikasi Indonesia
  • 5. Foreword iii Foreword Rules for Hull Volume II 2014 Edition amends Rules for Hull Volume II Edition 2013. Reference source of the rules are derived from IACS Unified Requirements and inputs from BKI Branch Offices and Technical Division BKI Head Office. The general description about this rules in every section describe below: Section 1 General Definition Section 2 Material Section 3 Design Principles Section 4 Design Load Section 5 Longitudinal Strength Section 6-14 Scantling Calculation Section 15 Strengthening for Navigation in Ice Section 16 Superstructure and Deckhouse Section 17 Hatchways Section 18 Equipment Section 19 Welded Joints Section 20 Fatigue Strength Section 21 Hull Outfit Section 22 Structural Fire Protection on Board Seagoing Ships Section 23-34 Special Requirement for Ship Type (Bulk Carriers, Ore Carriers, Heavy Cargo Ships, Oil Tankers, Ships Carrying Dangerous Chemical in Bulk, Ships Carrying Liquefied Gases in Bulk, Tugs, Fishing Vessels, Passenger Ships, Ships for Sheltered Shallow Water Services, Barges, Pontoons, Dredgers, Special Rules Floating Docks, and Supply Vessels) Section 35 Strengthening Against Collision Section 36 Subdivision and Stability of Cargo Ships and Passanger Ships Section 37 Special Requirement for In-Water Surveys Section 38 Corrosion Protection BKI - Rules for Hull - 2014
  • 6. This page intentionally left blank BKI - Rules for Hull - 2014
  • 7. Table of Contents v Table of Contents Page Foreword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v Rules Amendment Notice . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxv Section 1 - General, Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1/10 A. Validity, Equivalence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1/10 B. Restricted Service Ranges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2/10 C. Ships for Special Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2/10 D. Accessibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2/10 E. Stability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2/10 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2/10 2. Ships with proven damage stability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2/10 3. Anti-heeling devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3/10 F. Vibrations and Noise . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3/10 1. Mechanical vibrations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3/10 2. Noise . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3/10 G. Documents for Approval . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4/10 H. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-6/10 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-6/10 2. Principal dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-6/10 J. International Conventions and Codes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-7/10 K. Rounding-off Tolerances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-8/10 L. Regulations of National Administrations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-8/10 M. Computer Programs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-8/10 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-8/10 2. General Programs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-8/10 N. Workmanship . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-9/10 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-9/10 1.l Requirements to be complied with by the manufacturer . . . . . . . . . . . . . . . . . . . . . . . . . 1-9/10 1.2 Quality control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-9/10 2. Structural details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-9/10 2.1 Details in manufacturing documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-9/10 2.2 Cut-outs, plate edges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-9/10 2.3 Cold forming . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-10/10 2.4 Assembly, alignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-10/10 3. Corrosion protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-10/10 Section 2 - Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1/10 A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1/10 B. Hull Structural Steel for Plates and Sections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1/10 1. Normal strength hull structural steel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1/10 2. Higher strength hull structural steels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1/10 3. Material selection for the hull . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2/10 4. Structural members which are stressed in direction of their thickness . . . . . . . . . . . . . . . . . . . 2-7/10 C. Forged Steel and Cast Steel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7/10 D. Aluminium Alloys . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7/10 E. Austenitic Steels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-8/10 Section 3 - Design Principles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1/24 A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1/24 1. Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1/24 2. Permissible stresses and required sectional properties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1/24 3. Plate panels subjected to lateral pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1/24 4. Fatigue strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2/24 B. Upper and Lower Hull Flange . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2/24 C. Unsupported Span . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2/24 BKI - Rules for Hull - 2014
  • 8. Table of Contentsvi Page D. End Attachments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3/24 1. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3/24 2. Brackets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3/24 3. Sniped ends of stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4/24 4. Corrugated bulkhead elements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4/24 E. Effective Breadth of Plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4/24 1. Frames and stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4/24 2. Girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4/24 3. Cantilevers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5/24 F. Proof of Buckling Strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5/24 1. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5/24 2. Proof of single plate fields . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7/24 3. Proof of partial and total fields . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-12/24 3.1 Longitudinal and transverse stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-12/24 3.2 Lateral buckling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-12/24 3.3 Torsional buckling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-15/24 G. Rigidity of Transverses and Girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-17/24 H. Structural Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-17/24 1. Longitudinal members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-17/24 2. Transverses and girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-17/24 3. Knuckles (general) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-19/24 J. Evaluation of Notch Stresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-20/24 K. Corrosion Additions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-22/24 L. Additional Stresses in Asymmetric Sections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-23/24 1. Additional stresses for fatique strength analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-23/24 2. Correction of section modulus . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-23/24 Section 4 - Design Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1/10 A. General, Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1/10 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1/10 2. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1/10 2.1 Load centre . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1/10 2.2 Definition of symbols . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1/10 B. External Sea Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2/10 1. Load on weather decks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2/10 2. Load on ship's sides and of bow and stern structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3/10 2.1 Load on ship's sides . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3/10 2.2 Load on bow structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3/10 2.3 Load on stern structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4/10 3. Load on the ship's bottom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4/10 4. Design bottom slamming pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4/10 5. Load on decks of superstructures and deckhouses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-5/10 C. Cargo Loads, Load on Accommodation Decks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6/10 1. Load on cargo decks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6/10 2. Load on inner bottom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6/10 3. Loads on accommodation and machinery decks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7/10 D. Load on Tank Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7/10 1. Design pressure for filled tanks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7/10 2. Design pressure for partially filled tanks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-8/10 E. Design Values of Acceleration Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-8/10 1. Acceleration components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-8/10 2. Combined acceleration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-9/10 Section 5 - Longitudinal Strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1/27 A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1/27 1. Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1/27 2. Calculation Particulars . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1/27 3. Assumptions for calculation, loading conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1/27 4. Loading guidance information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1/27 4.1 General, definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1/27 4.2 Conditions of approval of loading manuals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2/27 BKI - Rules for Hull - 2014
  • 9. Table of Contents vii Page 4.3 Conditions of approval of loading instruments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2/27 4.4 Design cargo and ballast loading conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3/27 4.5 Approval procedures of loading instruments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5/27 4.6 Class maintenance of loading guidance information . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5/27 5. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5/27 B. Loads on the Ship’s Hull . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6/27 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6/27 2. Still Water Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7/27 2.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7/27 2.2 Guidance values for containerships with irregular loading . . . . . . . . . . . . . . . . . . . . . . . 5-7/27 3. Wave induced loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8/27 3.1 Vertical wave bending moments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8/27 3.2 Vertical wave shear forces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-9/27 3.3 Horizontal bending moments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10/27 3.4 Horizontal shear forces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10/27 3.5 Torsional moments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10/27 C. Section Moduli, Moments of Inertia, Shear and Buckling Strength . . . . . . . . . . . . . . . . . . . . . . . . . 5-11/27 1. Section moduli as a function of the longitudinal bending moments . . . . . . . . . . . . . . . . . . . . 5-11/27 2. Minimum midship section modulus . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-12/27 3. Midship section moment of inertia . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-12/27 4. Calculation of section moduli . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-12/27 5. Ships with multi-hatchways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-13/27 6. Shear strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-14/27 7. Proof of buckling strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-14/27 8. Ultimate load calculation of the ship's transverse sections . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-14/27 D. Design Stresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-19/27 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-19/27 1.1 Buckling strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-19/27 1.2 Permissible stresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-20/27 1.3 Structural design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-20/27 2. Normal stresses in the ship's longitudinal direction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-21/27 2.1 Normal stresses from vertical bending moments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-21/27 2.2 Normal stresses due to horizontal bending moments . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-21/27 2.3 Normal stresses from torsion of the ship's hull . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-21/27 3. Shear stresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-22/27 3.1 Shear stresses due to vertical shear forces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-22/27 3.2 Shear stresses due to horizontal shear forces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-23/27 3.3 Shear stresses due to torsional moments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-23/27 E. Permissible Still Water Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-23/27 1. Vertical bending moments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-23/27 2. Vertical shear forces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-24/27 3. Static torsional moments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-25/27 F. Guidance Values for Large Deck Openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-25/27 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-25/27 2. Guidance values for the determination of the section modulus . . . . . . . . . . . . . . . . . . . . . . . . 5-25/27 3. Guidance values for the design of transverse box girders of container ships . . . . . . . . . . . . . . 5-26/27 4. Guidance values for the displacements of the upper girder of the ship . . . . . . . . . . . . . . . . . . 5-27/27 G. Bulk Carriers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-27/27 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-27/27 2. Flooding criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-27/27 3. Flooding conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-27/27 Section 6 - Shell Plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1/20 A. General, Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1/20 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1/20 2. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1/20 B. Bottom Plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1/20 1. Plate thickness based on load stress criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1/20 1.1 Ships with lengths L < 90 m . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1/20 1.2 Ships with length L > 90 m . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1/20 BKI - Rules for Hull - 2014
  • 10. Table of Contentsviii Page 2. Critical plate thickness, buckling strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2/20 2.1 Guidance values for critical plate thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2/20 2.2 Buckling strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2/20 3. Minimum thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2/20 4. Bilge strake . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2/20 5. Flat plate keel and garboard strake . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-3/20 C. Side Shell Plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4/20 1. Plate thickness based on load stress criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4/20 1.1 Ships with lengths L < 90 m . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4/20 1.2 Ships with lengths L 90 m . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4/20 2. Minimum thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4/20 3. Sheerstrake . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-5/20 4. Buckling strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-5/20 5. Strengthenings for harbour and tug manoeuvres . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-5/20 D. Side Plating of Superstructures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6/20 E. Strengthening of Bottom Forward . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6/20 1. Arrangement of floors and girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6/20 2. Bottom plating forward of = 0,5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6/20 3. Stiffeners forward of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6/20 F. Strengthenings in Way of Propellers and Propeller Shaft Brackets, Bilge Keels . . . . . . . . . . . . . . . 6-7/20 1. Strengthenings in way of propellers and propeller brackets . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7/20 2. Bilge keels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7/20 G. Openings in the Shell Plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7/20 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7/20 2. Pipe connections at the shell plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8/20 H. Bow Doors and Inner Doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8/20 1. General, definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8/20 1.1 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8/20 1.2 Arrangement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9/20 1.3 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9/20 2. Strength criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9/20 3. Design loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10/20 3.1 Bow doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10/20 3.2 Inner doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-12/20 4. Scantlings of bow doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-12/20 4.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-12/20 4.2 Plating and secondary stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-12/20 4.3 Primary structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-12/20 5. Scantlings of inner doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-12/20 6. Securing and supporting of bow doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13/20 6.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13/20 6.2 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13/20 7. Arrangement of securing and locking devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-14/20 7.1 Systems for operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-14/20 7.2 Systems for indication/monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-15/20 8. Operating and maintenance manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-16/20 J. Side Shell Doors and Stern Doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-16/20 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-16/20 2. Arrangement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-16/20 3. Strength criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-17/20 4. Design loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-17/20 5. Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-17/20 5.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-17/20 5.2 Plating and secondary stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18/20 5.3 Primary structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18/20 6. Securing and supporting of side shell and stern doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18/20 6.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18/20 6.2 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18/20 7. Arrangement of securing and locking devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18/20 7.1 Systems for operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18/20 BKI - Rules for Hull - 2014
  • 11. Table of Contents ix Page 7.2 Systems for indication/monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18/20 8. Operating and maintenance manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18/20 K. Bulwarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-19/20 Section 7 - Decks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1/9 A. Strength Deck . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1/9 1. General, Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1/9 2. Connection between strength deck and sheerstrake . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1/9 3. Openings in the strength deck . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1/9 4. Scantlings of strength deck of ships up to 65 m in length . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-5/9 5. Scantlings of strength deck of ships of more than 65 m in length . . . . . . . . . . . . . . . . . . . . . . 7-5/9 6. Minimum thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-5/9 7. End thickness, thickness inside line of hatchways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-5/9 B. Lower Decks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-6/9 1. Thickness of decks for cargo loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-6/9 2. Thickness of decks for wheel loading . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-6/9 3. Machinery decks and accommodation decks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-7/9 C. Helicopter Decks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-7/9 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-7/9 2. Design Load . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-8/9 2.1 LC 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-8/9 2.2 LC 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-8/9 2.3 LC 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-8/9 3. Scantlings of structural members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-9/9 Section 8 - Bottom Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1/13 A. Single Bottom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1/13 1. Floor plates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1/13 1.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1/13 1.2 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1/13 2. Longitudinal girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2/13 2.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2/13 2.2 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2/13 B. Double Bottom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2/13 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2/13 2. Centre girder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-3/13 2.1 Lightening holes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-3/13 2.2 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-3/13 3. Side girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4/13 3.1 Arrangement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4/13 3.2 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4/13 4. Inner bottom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4/13 5. Double bottom tanks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-5/13 5.1 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-5/13 5.2 Fuel and lubricating oil tanks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-5/13 5.3 Bilge wells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-5/13 5.4 Sea chests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-5/13 6. Double bottom, transverse framing system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-6/13 6.1 Plate floors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-6/13 6.2 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-6/13 6.3 Watertight floors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-6/13 6.4 Bracket floors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-7/13 6.5 Brackets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-7/13 6.6 Struts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-7/13 7. Double bottom, longitudinal framing system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-7/13 7.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-7/13 7.2 Bottom and inner bottom longitudinals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-7/13 7.3 Plate floors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-8/13 7.4 Brackets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-8/13 7.5 Longitudinal girder system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-8/13 8. Direct calculation of bottom structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-8/13 BKI - Rules for Hull - 2014
  • 12. Table of Contentsx Page 8.1 General, Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-8/13 8.2 Design loads, permissible stresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-9/13 8.3 Buckling strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-9/13 9. Testing for tightness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-9/13 C. Bottom Structure in Machinery Spaces in Way of the Main Propulsion Plant . . . . . . . . . . . . . . . . . 8-10/13 1. Single bottom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-10/13 2. Double bottom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-10/13 2.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-10/13 2.2 Plate floors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-10/13 2.3 Side girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-10/13 2.4 Inner bottom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-11/13 3. Engine seating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-11/13 3.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-11/13 3.2 Longitudinal girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-11/13 D. Docking Calculation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-12/13 1. Simplified docking calculation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-12/13 2. Direct docking calculation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-13/13 3. Permissible stresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-13/13 4. Buckling strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-13/13 Section 9 - Framing System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1/12 A. Transverse Framing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1/12 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1/12 1.1 Frame spacing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1/12 1.2 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1/12 2. Main frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2/12 2.1 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2/12 2.2 Frames in tanks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2/12 2.3 End attachment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3/12 3. 'Tween deck and superstructure frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3/12 3.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3/12 3.2 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3/12 3.3 End attachment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3/12 4. Peak frames and frames in way of the stern . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3/12 4.1 Peak frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3/12 4.2 Frames in way of the stern . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-4/12 5. Strengthenings in fore- and aft body . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-4/12 5.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-4/12 5.2 Tiers of beams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-4/12 5.3 Web frames and stringers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-4/12 5.4 Web frames and stringers in 'tween decks and superstructure decks . . . . . . . . . . . . . . . . 9-5/12 5.5 Tripping brackets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-5/12 6. Web frames in machinery spaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-6/12 6.1 Arrangement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-6/12 6.2 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-6/12 B. Bottom, Side- and Deck Longitudinals, Side Transverses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-7/12 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-7/12 2. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-7/12 3. Scantlings of longitudinals and longitudinal beams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-9/12 4. Side transverses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-12/12 5. Strengthenings in the fore and aft body . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-12/12 Section 10 - Deck Beams and Supporting Deck Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1/5 A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1/5 1. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1/5 2. Permissible stresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1/5 3. Buckling strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-2/5 B. Deck Beams and Girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-2/5 1. Transverse deck beams and deck longitudinals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-2/5 2. Deck longitudinals in way of the upper and lower hull flange . . . . . . . . . . . . . . . . . . . . . . . . . 10-2/5 3. Attachment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-2/5 BKI - Rules for Hull - 2014
  • 13. Table of Contents xi Page 4. Girders and transverses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-2/5 5. Supporting structure of windlasses and chain stoppers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-3/5 C. Pillars . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-3/5 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-3/5 2. Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-3/5 D. Cantilevers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-4/5 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-4/5 2. Permissible stresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-4/5 E. Hatchway Girders and Girders Forming Part of the Longitudinal Hull Structure . . . . . . . . . . . . . . 10-5/5 Section 11 - Watertight Bulkheads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-1/8 A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-1/8 1. Watertight subdivision . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-1/8 2. Arrangement of watertight bulkheads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-1/8 2.1 Collision bulkhead . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-1/8 2.2 Stern tube and remaining watertight bulkheads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-3/8 3. Openings in watertight bulkheads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-3/8 3.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-3/8 3.2 Hinged doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-3/8 3.3 Sliding doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-3/8 3.4 Penetrations through watertight bulkheads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-4/8 B. Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-4/8 1. General, Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-4/8 2. Bulkhead plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-4/8 3. Stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-5/8 4. Corrugated bulkheads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-5/8 5. Primary Supporting Members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-6/8 5.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-6/8 5.2 Load assumptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-6/8 5.3 Strength criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-6/8 6. Watertight longitudinal structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-8/8 C. Shaft Tunnels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-8/8 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-8/8 2. Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-8/8 Section 12 - Tank Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1/10 A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1/10 1. Subdivision of tanks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1/10 2. Air, overflow and sounding pipes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1/10 3. Forepeak tank . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1/10 4. Cross references . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1/10 5. Separation of fuel oil tanks from tanks for other liquids . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1/10 6. Tanks for heated liquids . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-2/10 7. Minimum thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-2/10 8. Plating and stiffeners in the propeller area and in the engine room . . . . . . . . . . . . . . . . . . . . . 12-3/10 8.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-3/10 8.2 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-3/10 8.3 Shell structures in propeller area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-3/10 8.4 Tank structures in propeller area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-3/10 8.5 Tank structures in main engine area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-4/10 B. Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-4/10 1. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-4/10 2. Plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-5/10 3. Stiffeners and girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-5/10 4. Corrugated bulkheads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-7/10 5. Thickness of clad plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-7/10 C. Tanks with Large Lengths or Breadths . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-7/10 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-7/10 2. Hold spaces for ballast water . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-8/10 D. Vegetable Oil Tanks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-8/10 E. Detached Tanks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-9/10 BKI - Rules for Hull - 2014
  • 14. Table of Contentsxii Page 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-9/10 2. Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-9/10 F. Potable Water Tanks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-9/10 G. Swash Bulkheads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-9/10 H. Testing for Tightness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-10/10 Section 13 - Stem and Sternframe Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-1/8 A. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-1/8 B. Stem . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-1/8 1. Bar stem . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-1/8 2. Plate stem and bulbous bows . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-1/8 C. Sternframe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-1/8 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-1/8 2. Propeller post . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-2/8 3. Rudder post and rudder axle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-3/8 4. Sole piece . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-4/8 5. Rudder horn of semi spade rudders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-5/8 D. Propeller Brackets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-7/8 E. Elastic Stern Tube . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-7/8 1. Strength analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-7/8 1.1 Static load . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-8/8 1.2 Dynamic load . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-8/8 Section 14 Rudder and Manoeuvring Arrangement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-1/21 A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-1/21 1. Manoeuvring arrangement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-1/21 2. Structural details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-1/21 3. Size of rudder area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-2/21 4. Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-2/21 5. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-3/21 B. Rudder Force and Torque . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-4/21 1. Rudder force and torque for normal rudders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-4/21 2. Rudder force and torque for rudder blades with cut-outs (semi-spade rudders) . . . . . . . . . . . . 14-5/21 C. Scantlings of the Rudder Stock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-6/21 1. Rudder stock diameter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-6/21 2. Strengthening of rudder stock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-7/21 3. Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-7/21 3.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-7/21 3.2 Data for the analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-7/21 3.3 Moments and forces to be evaluated . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-10/21 4. Rudder trunk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-11/21 D. Rudder Couplings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-12/21 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-12/21 2. Horizontal couplings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-12/21 3. Vertical couplings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-12/21 4. Cone couplings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-13/21 4.1 Cone couplings with key . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-13/21 4.2 Cone couplings with special arrangements for mounting and dismounting the couplings 14-14/21 E. Rudder Body, Rudder Bearings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-16/21 1. Strength of rudder body . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-16/21 2. Rudder plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-17/21 2.1 Double plate rudders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-17/21 2.2 Single plate rudders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-18/21 2.2.1 Main piece diameter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-18/21 2.2.2 Blade thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-18/21 2.2.3 Arms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-18/21 3. Transmitting of the rudder torque . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-18/21 4. Rudder bearings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-18/21 5. Pintles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-19/21 6. Guidance values for bearing clearances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-19/21 F. Design Yield Moment of Rudder Stock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-20/21 BKI - Rules for Hull - 2014
  • 15. Table of Contents xiii Page G. Stopper, Locking Device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-20/21 H. Propeller Nozzles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-20/21 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-20/21 2. Design pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-20/21 3. Plate thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-21/21 4. Section modulus . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-21/21 5. Welding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-21/21 Section 15 - Strengthening for Navigation in Ice . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-1/17 A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-1/17 1. Ice class notations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-1/17 2. Ice class draught for Ships with Notations ES1-ES4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-2/17 3. Propulsion machinery output for ships with Notations ES1-ES4 . . . . . . . . . . . . . . . . . . . . . . . 15-2/17 4. Definitions for ships notations ES1-ES4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-5/17 B. Requirements for the Notations ES1 – ES4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-7/17 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-7/17 2. Ice loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-8/17 3. Thickness of shell plating in the ice belt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-9/17 4. Frames, ice stringers, web frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-10/17 4.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-10/17 4.2 Transverse frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-10/17 4.3 Longitudinal frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-12/17 4.4 Ice stringers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-12/17 4.5 Web frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-13/17 5. Stem . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-15/17 6. Arrangements for towing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-16/17 7. Stern . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-16/17 8. Bilge keels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-16/17 9. Rudder and steering gear . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-16/17 C. Requirements for the Ice Class Notation ES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-17/17 1. Shell plating within the ice belt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-17/17 2. Frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-17/17 3. Stem . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15-17/17 Section 16 - Superstructures and Deckhouses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-1/10 A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-1/10 1. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-1/10 2. Arrangement of superstructure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-1/10 3. Strengthenings at the ends of superstructures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-1/10 4. Transverse structure of superstructures and deckhouses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-2/10 5. Openings in closed superstructures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-2/10 6. Recommendations regarding deckhouse vibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-2/10 B. Side Plating and Decks of Non-Effective Superstructures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-2/10 1. Side plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-2/10 2. Deck plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-3/10 3. Deck beams, supporting deck structure, frames . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-3/10 C. Superstructure End Bulkheads and Deckhouse Walls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-3/10 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-3/10 2. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-3/10 3. Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-5/10 3.1 Stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-5/10 3.2 Plate thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-5/10 D. Decks of Short Deckhouses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-5/10 1. Plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-5/10 2. Deck beams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-5/10 E. Elastic Mounting of Deckhouses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-6/10 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-6/10 2. Design loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-6/10 2.1 Weight . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-6/10 2.2 Water pressure and wind pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-7/10 BKI - Rules for Hull - 2014
  • 16. Table of Contentsxiv Page 2.3 Load on the deckhouse bottom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-7/10 2.4 Load on deck beams and girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-7/10 3. Load cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-7/10 4. Scantlings of rails, mounting elements and substructures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-8/10 4.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-8/10 4.2 Permissible stresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-8/10 5. Corrosion Addition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-9/10 F. Breakwater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-9/10 1. Arrangement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-9/10 2. Dimensions of the breakwater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-9/10 3. Cutouts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-10/10 4. Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-10/10 5. Plate thickness and stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-10/10 6. Primary supporting members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-10/10 7. Proof of buckling strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16-10/10 Section 17 - Hatchways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-1/20 A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-1/20 1. Hatchways on freeboard and superstructure decks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-1/20 2. Hatchways on lower decks and within superstructures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-1/20 3. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-1/20 B. Hatch Covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-2/20 1. Design loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-2/20 1.1 Load case A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-2/20 1.2 Load case B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-2/20 1.3 Load case C . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-3/20 1.4 Load case D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-4/20 1.5 Load case E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-5/20 1.6 Load case F . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-5/20 1.7 Horizontal mass forces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-5/20 2. Permissible stresses and deflections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-5/20 3. Strength calculation for hatch covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-5/20 3.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-5/20 3.2 Hatch cover supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-6/20 3.3 Strength calculations for beam and girder grillages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-6/20 3.4 FEM calculations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-6/20 4. Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-6/20 4.1 Hatch cover plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-6/20 4.1.1 Top plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-6/20 4.1.2 Lower plating of pontoon hatch covers and box girders . . . . . . . . . . . . . . . . . 17-7/20 4.2 Main girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-7/20 4.3 Edge girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-7/20 4.4 Hatch cover stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-7/20 4.5 Hatch cover supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-8/20 4.6 Locking and securing of hatch covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-9/20 4.7 Hatch cover stoppers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-9/20 4.8 Cantilevers, load transmitting elements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-10/20 4.9 Container seatings on hatch covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-10/20 5. Weathertightness of hatch covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-10/20 5.1 Packing material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-10/20 5.2 Non-weathertightness hatch covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-10/20 5.3 Drainage arrangements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-11/20 5.4 Tightness test, trials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-11/20 6. Wooden hatchway covers & hatchway beams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-12/20 6.1 Hatchway covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-12/20 6.2. Hatchway beams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-12/20 6.2.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-12/20 6.2.2 Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-12/20 6.3. Moments of inertia, section moduli, shear areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-13/20 6.4 Arrangement and securing of hatchway beams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-13/20 BKI - Rules for Hull - 2014
  • 17. Table of Contents xv Page 7. Sealing and Securing Arrangements of Wooden and Non Self Tightening Pontoon Hatchway Covering . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-14/20 C. Hatch Cover Coamings and Girders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-14/20 1. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-14/20 2. Scantlings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-15/20 2.1 Plating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-15/20 2.2 Coaming stays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-15/20 2.3 Horizontal stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-15/20 D. Smaller Opening and Hatches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-16/20 1. Miscellaneous openings in freeboard and superstructure decks . . . . . . . . . . . . . . . . . . . . . . . 17-16/20 2. Strength and securing of small hatches on the exposed fore deck . . . . . . . . . . . . . . . . . . . . . . 17-16/20 2.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-16/20 2.2 Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-16/20 2.3 Strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-17/20 2.4 Primary securing devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-17/20 2.5 Requirements for primary securing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-17/20 2.6 Secondary securing device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-18/20 E. Engine and Boiler Room Hatchways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-18/20 1. Deck openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-18/20 2. Engine and boiler room casings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-18/20 3. Doors in engine and boiler room casings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17-19/20 Section 18 - Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-1/10 A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-1/10 B. Equipment Numeral . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-1/10 C. Anchors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-2/10 D. Chain Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-3/10 E. Chain Locker . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-4/10 F. Mooring Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-5/10 1. Ropes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-5/10 2. Shipboard fittings (mooring bollards and bitts, fairleads, stand rollers, chocks) . . . . . . . . . . . 18-6/10 3. Supporting hull structure for mooring equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-6/10 4. Corrosion addition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-7/10 5. Equipment for mooring at single point moorings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-7/10 G. Towing Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-8/10 H. Towing and Mooring Arrangements Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-9/10 Section 19 - Welded Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-1/20 A. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-1/20 1. Information contained in manufacturing documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-1/20 2. Materials, weldability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-1/20 3. Manufacture and testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-1/20 B. Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-2/20 1. General design principles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-2/20 2. Design details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-2/20 2.1 Stress flow, transitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-2/20 2.2 Local clustering of welds, minimum spacing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-3/20 2.3 Welding cut-outs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-3/20 2.4 Local reinforcements, doubling plates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-3/20 2.5 Intersecting members, stress in the thickness direction . . . . . . . . . . . . . . . . . . . . . . . . . . 19-4/20 2.6 Welding of cold formed sections, bending radii . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-4/20 2.7 Build - up welds on rudderstocks and pintles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-5/20 3. Weld shapes and dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-5/20 3.1 Butt joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-5/20 3.2 Corner, T and double-T (cruciform) joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-6/20 3.3 Fillet weld connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-8/20 4. Welded joints of particular components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-10/20 4.1 Welds at the ends of girders and stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-10/20 4.2 Joints between section ends and plates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-11/20 4.3 Welded shaft bracket joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-11/20 4.4 Rudder coupling flanges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19-12/20 BKI - Rules for Hull - 2014