Risk identification checklists can be helpful when identifying potential risk areas. The
following table from Barry Boehm’s “Software Risk Management: Principles and Practices”
is a listing of the top 10 risks likely to result in a software development project’s failure.
Included with each risk is a collection of questions that may be asked to simulate discussion,
and probe for and identify potential project risks.
1. Personnel shortfalls
a. Are the required staff/skills available for the project time frame?
b. Do the people have the right combination of skills?
c. Are enough people available?
d. Is the staff committed for the entire duration of the project?
e. Will some project staff members be working only part time on this project?
f. Does the staff have the right expectations about the job at hand?
g. Have the staff members received necessary training or is training planned and
scheduled?
h. Will turnover among staff members be low enough to allow continuity?
i. Does the estimated staffing profile seem reasonable given current organization
resource availability?
2. Unrealistic schedules and budgets
a. Were all product components estimated?
b. Were all tasks performed during standard development included in the schedule?
c. Were all supporting tasks for the development effort estimated?
d. Were all affected groups involved in their estimates and have they agreed and
committed to them?
e. Does the work seem doable in the schedule and effort bid?
f. Is the man month (hours per month) bid reasonable and for the organization?
g. Has adequate ramp up time been provided for staffing the effort and for the staff
to come up to speed on the project?
h. Is the budgeted cost schedule possible given current resource availability?
i. Have all dependencies between tasks been identified and included in schedule?
j. Have all dependencies between affected project groups been identified
(horizontal schedule integration) and included in the schedule?
3. Developing the wrong functions and properties
a. Are the requirements for the system documented?
b. Are the requirements for the system clear and understandable?
c. Is there a history of misinterpretation or miscommunication between developers
and those defining product requirements?
d. Are the requirements stable?
e. Is there a history of volatility in product requirements?
f. Do requirements have a history of changing after product release to test?
4. Developing the wrong user interface
a. Has the user interface been prototyped and tested on sample user groups?
b. Have surveys on user needs and expectations been performed?
c. Have user mental models been examined and analyzed in relationship to the user
interface?
d. Are user interface goals defined and documented?
e. Have user work scenarios been defined and analyzed in terms of interface goals?
5. Gold plating
a. Is there a history of unneeded functionality being added during project
development?
6. Continuing stream of requirements changes
a. Are the requirements for the project well defined and baselined?
b. Are there known change requests that are pending?
c. Has past history with customer shown that requirements change often?
d. Are there existing products on the market with similar functionality that can be
used to help baseline or establish firm requirements?
e. Have market surveys defining desired user functionality been performed?
f. Does the team have a good understanding of what the customer/user wants in the
system?
7. Shortfalls in externally furnished components
a. Are there any delivery risks identified with projects to which this one is
dependent?
b. Are there any technology or functionality risks identified with the projects to
which this one is dependent?
8. Shortfalls in externally performed tasks
a. Is this project or any of its tasks dependent upon the completion of external
project development efforts?
b. Are layered products necessary to support functionality readily available?
9. Real-time performance shortfalls
a. Have requirements for system response to user functions been defined?
b. Have requirements for data storage been defined?
c. Have requirements for memory usage been defined
d. Have processing speeds for system performance been defined?
e. Have message processing or data throughput requirements been defined?
f. Have user support (number of) requirements been defined?
10. Straining computer-science capabilities
a. Has the system or type of system been accomplished before by the organization?
b. Can current processing capabilities support performance requirements?
c. Is the computer technology necessary to support required functionality readily
available?
d. Are the programming languages familiar and known to staff?
e. Is the computer architecture (OS, layered products, etc.) familiar and known to
the staff?

More Related Content

What's hot

The role of the project manager
The role of the project managerThe role of the project manager
The role of the project manager
Project Management Solutions
 
Project Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge AreasProject Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge Areas
guestfe6ad
 
10.1 Plan Communication Management
10.1 Plan Communication Management10.1 Plan Communication Management
10.1 Plan Communication Management
DavidMcLachlan1
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
Kateri Manglicmot
 
ITIL V3 Overview
ITIL V3 OverviewITIL V3 Overview
ITIL V3 Overview
Allwyn George
 
Chapter 07 project cost management
Chapter 07 project cost managementChapter 07 project cost management
Chapter 07 project cost management
ghizlanejabri
 
PMBOK® Guide 5th edition Processes Flow in English - Simplified Version
PMBOK® Guide 5th edition Processes Flow in English - Simplified VersionPMBOK® Guide 5th edition Processes Flow in English - Simplified Version
PMBOK® Guide 5th edition Processes Flow in English - Simplified Version
Ricardo Viana Vargas
 
10 project management knowledge areas
10 project management knowledge areas10 project management knowledge areas
10 project management knowledge areas
Insaf Ali Soomro PMP
 
Project management
Project managementProject management
Project management
Al Amin Neaz Ahmed
 
2. Project management body of knowledge
2. Project management body of knowledge2. Project management body of knowledge
2. Project management body of knowledge
BhuWan Khadka
 
Project Management Centre of Excellence
Project Management Centre of ExcellenceProject Management Centre of Excellence
Project Management Centre of Excellence
Project Management CoE
 
Pmbok 4th edition chapter 4 - Project Integration Management
Pmbok 4th edition   chapter 4 - Project Integration Management Pmbok 4th edition   chapter 4 - Project Integration Management
Pmbok 4th edition chapter 4 - Project Integration Management
Ahmad Maharma, PMP,RMP
 
Project Scope Management -
Project Scope Management - Project Scope Management -
Project Scope Management -
dyaksa hanindito
 
Program Management
Program ManagementProgram Management
Program Management
Rajnish Anand
 
Engineering Software Products: 1. software products
Engineering Software Products: 1. software productsEngineering Software Products: 1. software products
Engineering Software Products: 1. software products
software-engineering-book
 
Project Management Process Groups
Project Management Process GroupsProject Management Process Groups
Project Management Process Groups
TechNoleGirl
 
Project management
Project managementProject management
Project management
university of sindh
 
Sample client presentation
Sample client presentationSample client presentation
Sample client presentation
Jakub Malobecki
 
Enterprise Architecture, Project Management & Digital Transformation
Enterprise Architecture, Project Management & Digital TransformationEnterprise Architecture, Project Management & Digital Transformation
Enterprise Architecture, Project Management & Digital Transformation
Riaz A. Khan, OpenCA, TOGAF
 
Project risk management
Project risk managementProject risk management
Project risk management
Karishma Chaudhary
 

What's hot (20)

The role of the project manager
The role of the project managerThe role of the project manager
The role of the project manager
 
Project Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge AreasProject Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge Areas
 
10.1 Plan Communication Management
10.1 Plan Communication Management10.1 Plan Communication Management
10.1 Plan Communication Management
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
ITIL V3 Overview
ITIL V3 OverviewITIL V3 Overview
ITIL V3 Overview
 
Chapter 07 project cost management
Chapter 07 project cost managementChapter 07 project cost management
Chapter 07 project cost management
 
PMBOK® Guide 5th edition Processes Flow in English - Simplified Version
PMBOK® Guide 5th edition Processes Flow in English - Simplified VersionPMBOK® Guide 5th edition Processes Flow in English - Simplified Version
PMBOK® Guide 5th edition Processes Flow in English - Simplified Version
 
10 project management knowledge areas
10 project management knowledge areas10 project management knowledge areas
10 project management knowledge areas
 
Project management
Project managementProject management
Project management
 
2. Project management body of knowledge
2. Project management body of knowledge2. Project management body of knowledge
2. Project management body of knowledge
 
Project Management Centre of Excellence
Project Management Centre of ExcellenceProject Management Centre of Excellence
Project Management Centre of Excellence
 
Pmbok 4th edition chapter 4 - Project Integration Management
Pmbok 4th edition   chapter 4 - Project Integration Management Pmbok 4th edition   chapter 4 - Project Integration Management
Pmbok 4th edition chapter 4 - Project Integration Management
 
Project Scope Management -
Project Scope Management - Project Scope Management -
Project Scope Management -
 
Program Management
Program ManagementProgram Management
Program Management
 
Engineering Software Products: 1. software products
Engineering Software Products: 1. software productsEngineering Software Products: 1. software products
Engineering Software Products: 1. software products
 
Project Management Process Groups
Project Management Process GroupsProject Management Process Groups
Project Management Process Groups
 
Project management
Project managementProject management
Project management
 
Sample client presentation
Sample client presentationSample client presentation
Sample client presentation
 
Enterprise Architecture, Project Management & Digital Transformation
Enterprise Architecture, Project Management & Digital TransformationEnterprise Architecture, Project Management & Digital Transformation
Enterprise Architecture, Project Management & Digital Transformation
 
Project risk management
Project risk managementProject risk management
Project risk management
 

Viewers also liked

Npd presentation file risk management
Npd presentation file   risk managementNpd presentation file   risk management
Npd presentation file risk management
Omid Aminzadeh Gohari
 
Schedule risk identification
Schedule risk identificationSchedule risk identification
Schedule risk identification
vishal kachwah
 
NSTDA Newsletter ปีที่ 2 ฉบับที่ 11 ประจำเดือนกุมภาพันธ์ 2560 (ฉบับที่ 23)
NSTDA Newsletter ปีที่ 2 ฉบับที่ 11 ประจำเดือนกุมภาพันธ์ 2560 (ฉบับที่ 23)NSTDA Newsletter ปีที่ 2 ฉบับที่ 11 ประจำเดือนกุมภาพันธ์ 2560 (ฉบับที่ 23)
NSTDA Newsletter ปีที่ 2 ฉบับที่ 11 ประจำเดือนกุมภาพันธ์ 2560 (ฉบับที่ 23)
National Science and Technology Development Agency (NSTDA) - Thailand
 
Risk Mitigation Checklist
Risk Mitigation ChecklistRisk Mitigation Checklist
Risk Mitigation Checklist
Demand Metric
 
คู่มือบริหารความเสี่ยง สวทช.
คู่มือบริหารความเสี่ยง สวทช.คู่มือบริหารความเสี่ยง สวทช.
คู่มือบริหารความเสี่ยง สวทช.
National Science and Technology Development Agency (NSTDA) - Thailand
 
Effective risk management in healthcare practice-
Effective risk management in healthcare practice-Effective risk management in healthcare practice-
Effective risk management in healthcare practice-
Dr. AbdulQawi Almohamadi
 
Opportunities and Risk Management
Opportunities and Risk ManagementOpportunities and Risk Management
Opportunities and Risk Management
Mayflower GmbH
 
Corruption and Fraud Risk Management using ISO 31000
Corruption and Fraud Risk Management using ISO 31000Corruption and Fraud Risk Management using ISO 31000
Corruption and Fraud Risk Management using ISO 31000
PECB
 
Risk identification
Risk identificationRisk identification
Risk identification
murukkada
 
Spm unit 3
Spm unit 3Spm unit 3
Spm unit 3
sweetyammu
 
Basic Risk Identification Techniques
Basic Risk Identification TechniquesBasic Risk Identification Techniques
Basic Risk Identification Techniques
Ricardo Viana Vargas
 
Enterprise Risk Management
Enterprise Risk ManagementEnterprise Risk Management
Enterprise Risk Management
Croydon Consulting, LLC
 
Enterprise Risk Management Framework
Enterprise Risk Management FrameworkEnterprise Risk Management Framework
Enterprise Risk Management Framework
Nigel Tebbutt
 
ERM-Enterprise Risk Management
ERM-Enterprise Risk ManagementERM-Enterprise Risk Management
ERM-Enterprise Risk Management
Jorge Vaz Girão , CISA, PMP, PMDPro I, ERMCP
 
Risk Management ERM Presentation
Risk Management ERM PresentationRisk Management ERM Presentation
Risk Management ERM Presentation
alygale
 
Enterprise Risk Management Erm
Enterprise Risk Management ErmEnterprise Risk Management Erm
Enterprise Risk Management Erm
Nexus Aid
 
ISO 31000 Risk Management
ISO 31000 Risk ManagementISO 31000 Risk Management
ISO 31000 Risk Management
Ramiro Cid
 
Risk management
Risk managementRisk management
Risk management
Abhi Kalyan
 
Implementing Enterprise Risk Management with ISO 31000:2009
Implementing Enterprise Risk Management with ISO 31000:2009Implementing Enterprise Risk Management with ISO 31000:2009
Implementing Enterprise Risk Management with ISO 31000:2009
Goutama Bachtiar
 
The Purpose And Goals Of Risk Management
The Purpose And Goals Of Risk ManagementThe Purpose And Goals Of Risk Management
The Purpose And Goals Of Risk Management
Lisa Shannon, RN, BSN, JD.
 

Viewers also liked (20)

Npd presentation file risk management
Npd presentation file   risk managementNpd presentation file   risk management
Npd presentation file risk management
 
Schedule risk identification
Schedule risk identificationSchedule risk identification
Schedule risk identification
 
NSTDA Newsletter ปีที่ 2 ฉบับที่ 11 ประจำเดือนกุมภาพันธ์ 2560 (ฉบับที่ 23)
NSTDA Newsletter ปีที่ 2 ฉบับที่ 11 ประจำเดือนกุมภาพันธ์ 2560 (ฉบับที่ 23)NSTDA Newsletter ปีที่ 2 ฉบับที่ 11 ประจำเดือนกุมภาพันธ์ 2560 (ฉบับที่ 23)
NSTDA Newsletter ปีที่ 2 ฉบับที่ 11 ประจำเดือนกุมภาพันธ์ 2560 (ฉบับที่ 23)
 
Risk Mitigation Checklist
Risk Mitigation ChecklistRisk Mitigation Checklist
Risk Mitigation Checklist
 
คู่มือบริหารความเสี่ยง สวทช.
คู่มือบริหารความเสี่ยง สวทช.คู่มือบริหารความเสี่ยง สวทช.
คู่มือบริหารความเสี่ยง สวทช.
 
Effective risk management in healthcare practice-
Effective risk management in healthcare practice-Effective risk management in healthcare practice-
Effective risk management in healthcare practice-
 
Opportunities and Risk Management
Opportunities and Risk ManagementOpportunities and Risk Management
Opportunities and Risk Management
 
Corruption and Fraud Risk Management using ISO 31000
Corruption and Fraud Risk Management using ISO 31000Corruption and Fraud Risk Management using ISO 31000
Corruption and Fraud Risk Management using ISO 31000
 
Risk identification
Risk identificationRisk identification
Risk identification
 
Spm unit 3
Spm unit 3Spm unit 3
Spm unit 3
 
Basic Risk Identification Techniques
Basic Risk Identification TechniquesBasic Risk Identification Techniques
Basic Risk Identification Techniques
 
Enterprise Risk Management
Enterprise Risk ManagementEnterprise Risk Management
Enterprise Risk Management
 
Enterprise Risk Management Framework
Enterprise Risk Management FrameworkEnterprise Risk Management Framework
Enterprise Risk Management Framework
 
ERM-Enterprise Risk Management
ERM-Enterprise Risk ManagementERM-Enterprise Risk Management
ERM-Enterprise Risk Management
 
Risk Management ERM Presentation
Risk Management ERM PresentationRisk Management ERM Presentation
Risk Management ERM Presentation
 
Enterprise Risk Management Erm
Enterprise Risk Management ErmEnterprise Risk Management Erm
Enterprise Risk Management Erm
 
ISO 31000 Risk Management
ISO 31000 Risk ManagementISO 31000 Risk Management
ISO 31000 Risk Management
 
Risk management
Risk managementRisk management
Risk management
 
Implementing Enterprise Risk Management with ISO 31000:2009
Implementing Enterprise Risk Management with ISO 31000:2009Implementing Enterprise Risk Management with ISO 31000:2009
Implementing Enterprise Risk Management with ISO 31000:2009
 
The Purpose And Goals Of Risk Management
The Purpose And Goals Of Risk ManagementThe Purpose And Goals Of Risk Management
The Purpose And Goals Of Risk Management
 

Similar to Risk identification checklist

Project breathalyzer
Project breathalyzerProject breathalyzer
Project breathalyzer
Glen Alleman
 
Software engineering-quiz
Software engineering-quizSoftware engineering-quiz
Software engineering-quiz
Dr. C.V. Suresh Babu
 
Jharna Software
Jharna SoftwareJharna Software
Jharna Software
pgjaiganesh108
 
Project breathalyzer
Project breathalyzerProject breathalyzer
Project breathalyzer
Glen Alleman
 
PMI ACP Classroom Question Paper with Answers
PMI ACP Classroom Question Paper with AnswersPMI ACP Classroom Question Paper with Answers
PMI ACP Classroom Question Paper with Answers
Thanh Nguyen
 
Retake Test (toolstest_intro.phptid=6408)Final Score 3.docx
Retake Test (toolstest_intro.phptid=6408)Final Score 3.docxRetake Test (toolstest_intro.phptid=6408)Final Score 3.docx
Retake Test (toolstest_intro.phptid=6408)Final Score 3.docx
ronak56
 
Lean six sigma deployment success checklist
Lean six sigma deployment success checklistLean six sigma deployment success checklist
Lean six sigma deployment success checklist
Vishy Chandra
 
1.A cumulative effort curve for a project generally has an S-shap.docx
1.A cumulative effort curve for a project generally has an S-shap.docx1.A cumulative effort curve for a project generally has an S-shap.docx
1.A cumulative effort curve for a project generally has an S-shap.docx
jackiewalcutt
 
Project success assessment
Project success assessmentProject success assessment
Project success assessment
Glen Alleman
 
Software project planning and monitoring
Software project planning and monitoringSoftware project planning and monitoring
Software project planning and monitoring
Yb Yar
 
Questions paper BA MCQ.docx
Questions paper BA MCQ.docxQuestions paper BA MCQ.docx
Questions paper BA MCQ.docx
Ramandeep Singh
 
Project Success Assessment
Project Success AssessmentProject Success Assessment
Project Success Assessment
Glen Alleman
 
The Bhopal disaster occurred on December 3, 1984 at a Union Carbid.docx
The Bhopal disaster occurred on December 3, 1984 at a Union Carbid.docxThe Bhopal disaster occurred on December 3, 1984 at a Union Carbid.docx
The Bhopal disaster occurred on December 3, 1984 at a Union Carbid.docx
mattinsonjanel
 
A Questionnaire for Identify Failures in Business Analysis Phase of ERP Projects
A Questionnaire for Identify Failures in Business Analysis Phase of ERP ProjectsA Questionnaire for Identify Failures in Business Analysis Phase of ERP Projects
A Questionnaire for Identify Failures in Business Analysis Phase of ERP Projects
Varuna Harshana
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project Management
KUMKUMOKUSSIA
 
Custom elearning: An Overview
Custom elearning: An OverviewCustom elearning: An Overview
Custom elearning: An Overview
Knowledge Advantage, LLC
 
Hrm 326 final exam guide
Hrm 326 final exam guideHrm 326 final exam guide
Hrm 326 final exam guide
sophialily79
 
Hrm 326 final exam guide
Hrm 326 final exam guideHrm 326 final exam guide
Hrm 326 final exam guide
noahjamessss
 
Improving Application Development Effectiveness
Improving Application Development Effectiveness Improving Application Development Effectiveness
Improving Application Development Effectiveness
Computer Aid, Inc
 
Balanced Scorecard for MBA institute
Balanced Scorecard for MBA instituteBalanced Scorecard for MBA institute
Balanced Scorecard for MBA institute
dr m m bagali, phd in hr
 

Similar to Risk identification checklist (20)

Project breathalyzer
Project breathalyzerProject breathalyzer
Project breathalyzer
 
Software engineering-quiz
Software engineering-quizSoftware engineering-quiz
Software engineering-quiz
 
Jharna Software
Jharna SoftwareJharna Software
Jharna Software
 
Project breathalyzer
Project breathalyzerProject breathalyzer
Project breathalyzer
 
PMI ACP Classroom Question Paper with Answers
PMI ACP Classroom Question Paper with AnswersPMI ACP Classroom Question Paper with Answers
PMI ACP Classroom Question Paper with Answers
 
Retake Test (toolstest_intro.phptid=6408)Final Score 3.docx
Retake Test (toolstest_intro.phptid=6408)Final Score 3.docxRetake Test (toolstest_intro.phptid=6408)Final Score 3.docx
Retake Test (toolstest_intro.phptid=6408)Final Score 3.docx
 
Lean six sigma deployment success checklist
Lean six sigma deployment success checklistLean six sigma deployment success checklist
Lean six sigma deployment success checklist
 
1.A cumulative effort curve for a project generally has an S-shap.docx
1.A cumulative effort curve for a project generally has an S-shap.docx1.A cumulative effort curve for a project generally has an S-shap.docx
1.A cumulative effort curve for a project generally has an S-shap.docx
 
Project success assessment
Project success assessmentProject success assessment
Project success assessment
 
Software project planning and monitoring
Software project planning and monitoringSoftware project planning and monitoring
Software project planning and monitoring
 
Questions paper BA MCQ.docx
Questions paper BA MCQ.docxQuestions paper BA MCQ.docx
Questions paper BA MCQ.docx
 
Project Success Assessment
Project Success AssessmentProject Success Assessment
Project Success Assessment
 
The Bhopal disaster occurred on December 3, 1984 at a Union Carbid.docx
The Bhopal disaster occurred on December 3, 1984 at a Union Carbid.docxThe Bhopal disaster occurred on December 3, 1984 at a Union Carbid.docx
The Bhopal disaster occurred on December 3, 1984 at a Union Carbid.docx
 
A Questionnaire for Identify Failures in Business Analysis Phase of ERP Projects
A Questionnaire for Identify Failures in Business Analysis Phase of ERP ProjectsA Questionnaire for Identify Failures in Business Analysis Phase of ERP Projects
A Questionnaire for Identify Failures in Business Analysis Phase of ERP Projects
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project Management
 
Custom elearning: An Overview
Custom elearning: An OverviewCustom elearning: An Overview
Custom elearning: An Overview
 
Hrm 326 final exam guide
Hrm 326 final exam guideHrm 326 final exam guide
Hrm 326 final exam guide
 
Hrm 326 final exam guide
Hrm 326 final exam guideHrm 326 final exam guide
Hrm 326 final exam guide
 
Improving Application Development Effectiveness
Improving Application Development Effectiveness Improving Application Development Effectiveness
Improving Application Development Effectiveness
 
Balanced Scorecard for MBA institute
Balanced Scorecard for MBA instituteBalanced Scorecard for MBA institute
Balanced Scorecard for MBA institute
 

Recently uploaded

PPTS for Directing Fourth Managerial Function
PPTS for Directing  Fourth Managerial FunctionPPTS for Directing  Fourth Managerial Function
PPTS for Directing Fourth Managerial Function
Sarika Malhotra
 
University of California, San Francisco degree Cert diploma offer
University of California, San Francisco degree Cert diploma offerUniversity of California, San Francisco degree Cert diploma offer
University of California, San Francisco degree Cert diploma offer
bpezeqe
 
Portfolio - Muhammad Ikmal Fahmi Bin Che Mohamood (Ikmal Fahmi)
Portfolio - Muhammad Ikmal Fahmi Bin Che Mohamood (Ikmal Fahmi)Portfolio - Muhammad Ikmal Fahmi Bin Che Mohamood (Ikmal Fahmi)
Portfolio - Muhammad Ikmal Fahmi Bin Che Mohamood (Ikmal Fahmi)
FahmiMohamood
 
The University of Nebraska degree Cert diploma offer
The University of Nebraska degree Cert diploma offerThe University of Nebraska degree Cert diploma offer
The University of Nebraska degree Cert diploma offer
bpezeqe
 
VIP Dehradun Girls Call Dehradun 0X0000000X Doorstep High-Profile Girl Servic...
VIP Dehradun Girls Call Dehradun 0X0000000X Doorstep High-Profile Girl Servic...VIP Dehradun Girls Call Dehradun 0X0000000X Doorstep High-Profile Girl Servic...
VIP Dehradun Girls Call Dehradun 0X0000000X Doorstep High-Profile Girl Servic...
shalvikaprincessparv
 
Leadership development for Bachelor students FEPSAC 2024
Leadership development for Bachelor students FEPSAC 2024Leadership development for Bachelor students FEPSAC 2024
Leadership development for Bachelor students FEPSAC 2024
jdenoord
 
Comparison Between Kingfisher and Indigo Airlines
Comparison Between Kingfisher and Indigo AirlinesComparison Between Kingfisher and Indigo Airlines
Comparison Between Kingfisher and Indigo Airlines
ayushsahoo220044
 
Tool Kit For Ethical campaign celebration
Tool Kit For Ethical campaign celebrationTool Kit For Ethical campaign celebration
Tool Kit For Ethical campaign celebration
uttammishra37
 
VIP Kochi Girls Call Kochi 0X0000000X Doorstep High-Profile Girl Service Call...
VIP Kochi Girls Call Kochi 0X0000000X Doorstep High-Profile Girl Service Call...VIP Kochi Girls Call Kochi 0X0000000X Doorstep High-Profile Girl Service Call...
VIP Kochi Girls Call Kochi 0X0000000X Doorstep High-Profile Girl Service Call...
satpalsheravatmumbai
 
Agile Methodology In-Brief : Created byMohamed Shebl
Agile Methodology In-Brief : Created byMohamed SheblAgile Methodology In-Brief : Created byMohamed Shebl
Agile Methodology In-Brief : Created byMohamed Shebl
Mohamed Shebl, MBA,PRINCE2 ®,ITIL®,PMP
 
ANIn Pune July 2024 | Mastering the Data Paradox by Ashish Agrawal
ANIn Pune July 2024 | Mastering the Data Paradox by Ashish AgrawalANIn Pune July 2024 | Mastering the Data Paradox by Ashish Agrawal
ANIn Pune July 2024 | Mastering the Data Paradox by Ashish Agrawal
AgileNetwork
 
The University of Buckingham diploma
The University of Buckingham diplomaThe University of Buckingham diploma
The University of Buckingham diploma
uoxhom
 
ANIn Pune July 2024 | Bootstrapping Data Mesh for a Complex Enterprise by Bal...
ANIn Pune July 2024 | Bootstrapping Data Mesh for a Complex Enterprise by Bal...ANIn Pune July 2024 | Bootstrapping Data Mesh for a Complex Enterprise by Bal...
ANIn Pune July 2024 | Bootstrapping Data Mesh for a Complex Enterprise by Bal...
AgileNetwork
 
Southern Illinois UniversityCarbondale degree Cert diploma offer
Southern Illinois UniversityCarbondale degree Cert diploma offerSouthern Illinois UniversityCarbondale degree Cert diploma offer
Southern Illinois UniversityCarbondale degree Cert diploma offer
bpezeqe
 
University of Birmingham diploma
University of Birmingham diplomaUniversity of Birmingham diploma
University of Birmingham diploma
uoxhom
 

Recently uploaded (15)

PPTS for Directing Fourth Managerial Function
PPTS for Directing  Fourth Managerial FunctionPPTS for Directing  Fourth Managerial Function
PPTS for Directing Fourth Managerial Function
 
University of California, San Francisco degree Cert diploma offer
University of California, San Francisco degree Cert diploma offerUniversity of California, San Francisco degree Cert diploma offer
University of California, San Francisco degree Cert diploma offer
 
Portfolio - Muhammad Ikmal Fahmi Bin Che Mohamood (Ikmal Fahmi)
Portfolio - Muhammad Ikmal Fahmi Bin Che Mohamood (Ikmal Fahmi)Portfolio - Muhammad Ikmal Fahmi Bin Che Mohamood (Ikmal Fahmi)
Portfolio - Muhammad Ikmal Fahmi Bin Che Mohamood (Ikmal Fahmi)
 
The University of Nebraska degree Cert diploma offer
The University of Nebraska degree Cert diploma offerThe University of Nebraska degree Cert diploma offer
The University of Nebraska degree Cert diploma offer
 
VIP Dehradun Girls Call Dehradun 0X0000000X Doorstep High-Profile Girl Servic...
VIP Dehradun Girls Call Dehradun 0X0000000X Doorstep High-Profile Girl Servic...VIP Dehradun Girls Call Dehradun 0X0000000X Doorstep High-Profile Girl Servic...
VIP Dehradun Girls Call Dehradun 0X0000000X Doorstep High-Profile Girl Servic...
 
Leadership development for Bachelor students FEPSAC 2024
Leadership development for Bachelor students FEPSAC 2024Leadership development for Bachelor students FEPSAC 2024
Leadership development for Bachelor students FEPSAC 2024
 
Comparison Between Kingfisher and Indigo Airlines
Comparison Between Kingfisher and Indigo AirlinesComparison Between Kingfisher and Indigo Airlines
Comparison Between Kingfisher and Indigo Airlines
 
Tool Kit For Ethical campaign celebration
Tool Kit For Ethical campaign celebrationTool Kit For Ethical campaign celebration
Tool Kit For Ethical campaign celebration
 
VIP Kochi Girls Call Kochi 0X0000000X Doorstep High-Profile Girl Service Call...
VIP Kochi Girls Call Kochi 0X0000000X Doorstep High-Profile Girl Service Call...VIP Kochi Girls Call Kochi 0X0000000X Doorstep High-Profile Girl Service Call...
VIP Kochi Girls Call Kochi 0X0000000X Doorstep High-Profile Girl Service Call...
 
Agile Methodology In-Brief : Created byMohamed Shebl
Agile Methodology In-Brief : Created byMohamed SheblAgile Methodology In-Brief : Created byMohamed Shebl
Agile Methodology In-Brief : Created byMohamed Shebl
 
ANIn Pune July 2024 | Mastering the Data Paradox by Ashish Agrawal
ANIn Pune July 2024 | Mastering the Data Paradox by Ashish AgrawalANIn Pune July 2024 | Mastering the Data Paradox by Ashish Agrawal
ANIn Pune July 2024 | Mastering the Data Paradox by Ashish Agrawal
 
The University of Buckingham diploma
The University of Buckingham diplomaThe University of Buckingham diploma
The University of Buckingham diploma
 
ANIn Pune July 2024 | Bootstrapping Data Mesh for a Complex Enterprise by Bal...
ANIn Pune July 2024 | Bootstrapping Data Mesh for a Complex Enterprise by Bal...ANIn Pune July 2024 | Bootstrapping Data Mesh for a Complex Enterprise by Bal...
ANIn Pune July 2024 | Bootstrapping Data Mesh for a Complex Enterprise by Bal...
 
Southern Illinois UniversityCarbondale degree Cert diploma offer
Southern Illinois UniversityCarbondale degree Cert diploma offerSouthern Illinois UniversityCarbondale degree Cert diploma offer
Southern Illinois UniversityCarbondale degree Cert diploma offer
 
University of Birmingham diploma
University of Birmingham diplomaUniversity of Birmingham diploma
University of Birmingham diploma
 

Risk identification checklist

  • 1. Risk Identification Checklist Risk identification checklists can be helpful when identifying potential risk areas. The following table from Barry Boehm’s “Software Risk Management: Principles and Practices” is a listing of the top 10 risks likely to result in a software development project’s failure. Included with each risk is a collection of questions that may be asked to simulate discussion, and probe for and identify potential project risks. 1. Personnel shortfalls a. Are the required staff/skills available for the project time frame? b. Do the people have the right combination of skills? c. Are enough people available? d. Is the staff committed for the entire duration of the project? e. Will some project staff members be working only part time on this project? f. Does the staff have the right expectations about the job at hand? g. Have the staff members received necessary training or is training planned and scheduled? h. Will turnover among staff members be low enough to allow continuity? i. Does the estimated staffing profile seem reasonable given current organization resource availability? 2. Unrealistic schedules and budgets a. Were all product components estimated? b. Were all tasks performed during standard development included in the schedule? c. Were all supporting tasks for the development effort estimated? d. Were all affected groups involved in their estimates and have they agreed and committed to them? e. Does the work seem doable in the schedule and effort bid? f. Is the man month (hours per month) bid reasonable and for the organization? g. Has adequate ramp up time been provided for staffing the effort and for the staff to come up to speed on the project? h. Is the budgeted cost schedule possible given current resource availability? i. Have all dependencies between tasks been identified and included in schedule? j. Have all dependencies between affected project groups been identified (horizontal schedule integration) and included in the schedule? 3. Developing the wrong functions and properties a. Are the requirements for the system documented? b. Are the requirements for the system clear and understandable? c. Is there a history of misinterpretation or miscommunication between developers and those defining product requirements? d. Are the requirements stable? e. Is there a history of volatility in product requirements? f. Do requirements have a history of changing after product release to test?
  • 2. 4. Developing the wrong user interface a. Has the user interface been prototyped and tested on sample user groups? b. Have surveys on user needs and expectations been performed? c. Have user mental models been examined and analyzed in relationship to the user interface? d. Are user interface goals defined and documented? e. Have user work scenarios been defined and analyzed in terms of interface goals? 5. Gold plating a. Is there a history of unneeded functionality being added during project development? 6. Continuing stream of requirements changes a. Are the requirements for the project well defined and baselined? b. Are there known change requests that are pending? c. Has past history with customer shown that requirements change often? d. Are there existing products on the market with similar functionality that can be used to help baseline or establish firm requirements? e. Have market surveys defining desired user functionality been performed? f. Does the team have a good understanding of what the customer/user wants in the system? 7. Shortfalls in externally furnished components a. Are there any delivery risks identified with projects to which this one is dependent? b. Are there any technology or functionality risks identified with the projects to which this one is dependent? 8. Shortfalls in externally performed tasks a. Is this project or any of its tasks dependent upon the completion of external project development efforts? b. Are layered products necessary to support functionality readily available? 9. Real-time performance shortfalls a. Have requirements for system response to user functions been defined? b. Have requirements for data storage been defined? c. Have requirements for memory usage been defined d. Have processing speeds for system performance been defined? e. Have message processing or data throughput requirements been defined? f. Have user support (number of) requirements been defined? 10. Straining computer-science capabilities a. Has the system or type of system been accomplished before by the organization? b. Can current processing capabilities support performance requirements? c. Is the computer technology necessary to support required functionality readily available? d. Are the programming languages familiar and known to staff? e. Is the computer architecture (OS, layered products, etc.) familiar and known to the staff?