1. A cumulative effort curve for a project generally has an S-
shape because of:
Answer :
a. The large financial costs associated with ending a project
b. Various hurdles that prevent progress when beginning a
project
c. Team member burnout
d. Higher resource utilization during the middle of a project
2. A manager getting further into a project and obtaining a
better understanding of what needs to be done to accomplish a
project is an example of:
Answer
a. Hidden interaction costs
b. Things going wrong on a project
c. Normal conditions not applying
d. Changes in project scope
e. None of these are correct
3. A project team has been assigned to research and develop a
new product to compete with its competitor’s latest product
launch. The product is needed quickly because the company is
losing market share. The team consists of 6 members, located
throughout the country. Each one has a role in sales, marketing,
manufacturing, or engineering, and will be performing this
project in addition to his or her full-time position. Which of the
following project team considerations is most likely to pose a
threat to achieving success?
Answer
a. Not enough time available for the team members.
b. Not the correct team size.
c. Poor team member representation that does not include a
diverse set of stakeholders.
d. Inadequate knowledge and technical skills of the team
members.
4. All of the following are usually included in a work package
except
Answer
a. What will be done?
b. The time needed to complete the work.
c. A single person who is responsible for its completion.
d. All the costs for the work package.
e. All of these are included in a work package.
5. An advantage of factor rating for project selection is that it:
Answer
a. Involves no arithmetic calculations
b. Allows for comparisons on several weighted criteria
c. Offers objective measures that eliminate human bias
d. Is focused solely on financial outcomes
6. An organization that allows functions to exist on the vertical
dimension of the organizational chart, with projects running on
the horizontal dimension is described as a:
Answer
a. Matrix organization
b. Projectized organization structure
c. Functional organization
d. Networked organization
7. After a team of software development engineers completed
the requirements phase for a major new system, members
learned the client no longer needed several of the features
initially requested. Which of the following project management
models would help avoid this kind of communication challenge?
Answer
a. Silo approach
b. Economic approach
c. Waterfall approach
d. Concurrent approach
8. Companies like Boeing, Kodak, and IBM are using which of
the following for improving the estimating process?
Answer
a. Adjusting estimates based on individual forecasting abilities
b. Benchmarking using the experience of other companies
c. Using time and motion studies
d. Creating historical databases of previous projects
e. All of these are correct
9.
10.
11. Assuming all activities are scheduled to begin on that early
start times. How much can we delay activity D without
delaying the project.
A. 3
B. 4
C. 5
D. 6
12. Design flaws being revealed after the fact, extreme weather
conditions, and accidents occurring are examples of:
Answer
a. Hidden interaction costs
b. Things going wrong on a project
c. Normal conditions not applying
d. Changes in project scope
e. None of these are correct
13. Fast tracking is defined as:
Answer
a. rescheduling sequential tasks to take place simultaneously
b. eliminating tasks or deliverables from the WBS
c. increasing the efficiency of the employees performing the
task
d. adding resources to reduce the time required for selected
project activities
14. Given the schedule below, what sequence of activities
comprises the critical chain?
15. If a project criterion indicates that the project must meet a
specific date, that criterion is classified as
Answer
a. Constrained
b. Enhanced
c. Accepted
d. Limited
e. Fixed
16. Imagine your boss has assigned you to work on a project
that is of strategic importance. She tells you there will be no
other team members available to help you. What arguments
might you effectively raise in persuading her to allow you to
work with a team?
Answer
a. There will be less need for coordination
b. There will be more breadth of technical expertise
c. There will be less chance of conflict
d. There will be less need to gain buy-in
17. In evaluating time-cost tradeoffs, we start by crashing the
activity on the critical path that:
Answer
a. can be reduced the most.
b. has the lowest total crash cost.
c. has the lowest crash cost per unit time.
d. is the longest.
18. In today's business environment, project managers find it
valuable to have a keen understanding of
Answer
A. Strategic management
B. Technical issues
C. Project selection process
D. Both A and C are correct
E. A, B, and C are all correct
19. NPV is a measure of:
Answer
a. How long it will take to recuperate the cost of a project with
future revenue or cost savings
b. The difference between the estimated costs of a project and
the present value associated with future cash flows
c. The expected rate of return required in order for a company
to pursue a project
d. The return on initial investment of the project
20. Project Thunderbolt will incur $30,000 in cost during year
0 and will produce $10,000 in net cost savings to the company
in years 1 through 6. What would the net present value be for
this project for a 20% required rate of return?
Answer
a. ($4,080)
b. $3,250
c. $6,040
d. $7,850
21. Project X requires an initial investment of $1.5 million and
will result in a payment of $2 million from the client at the end
of three years. If the required rate of return is 8%, what is the
NPV for this project?
Answer
a. $ 88,000
b. $ 500,000
c. $ 1,588,000
d. $ 3,654,000
22. Research has shown that multitasking has been linked with:
Answer
a. Enhanced efficiency
b. Expanded brain function.
c. Reduced stress.
d. None of the above.
23. Select all that apply: A new project manager is taking over
his company’s annual charity event. Several members of the
team have worked on this event project in previous years. In
generating a time estimation for the various tasks, which of the
following is (are) most likely to aid improve estimation
accuracy?
Answer
a. Set tight time goals so the team members are pushed to stay
on schedule
b. Add 25% to each person’s estimate
c. Consult the previous project manager for historical
information on task and project durations
d. Involve the team members who will do the work
24. Select all that apply: Important characteristics of
preparation before a meeting include:
Answer
a. A detailed agenda including subject, facilitator, time, and
deliverables, sent in advance
b. Arranging for refreshments if the meeting will last longer
than 90 minutes
c. Flexibility regarding the purpose because important issues
may arise at the last minute that some team members want to
discuss
d. Ensuring that you have enough material to deliver a
presentation for the full duration of the meeting
25. Select all that apply: Members of a project team have
developed a schedule for an upcoming IT project. They observe
that two activities, A. Hardware Design and B. Software
Design, must be complete before a third activity, C. Testing,
can begin. Hardware and Software Design share the same
predecessor task, and each one is estimated to have a duration
of 4 weeks. Based on historical data, team members estimate
that activity A and activity B each has an 80% chance of
finishing within the estimated time frame. Which of the
following is true?
Answer
a. Conjunctive event bias might cause the team to overestimate
the likelihood that A and B will be completed within 4 weeks.
(i.e., they will think it is more likely than it really is.)
b. The likelihood of A and B both finishing within 4 weeks
would be 90%
c. The likelihood of A and B both finishing within 4 weeks
would be 64%
d. Conjunctive event bias might cause the team to underestimate
the likelihood that A and B will be completed within 4 weeks.
(i.e., they will think it is less likely than it really is.)
26. Select all that apply: To effectively motivate a team, the
project manager should understand the following about
motivation (select all correct items):
Answer
a. Providing team members with clear, specific, challenging
goals is among the most powerful motivators.
b. Determining how to best motivate an individual may involve
asking “What can I do to ensure you get the most out of this
project.”
c. Money is normally the most important motivator for project
team members.
d. People will be motivated if they feel a sense of ownership for
the project.
27. Select all that apply: Which of the following are advantages
to including the team in creating the WBS:
Answer
a. Participation in the creation of the WBS builds team
members’ commitment to the project.
b. Team members will gain a total view of the project through
their involvement in creating the WBS.
c. Participation in the creation of the WBS can bring conflicting
views to the surface before it is too late to address them
d. They are the content experts and best equipped to know what
is involved in generating each deliverable
28. Select all that apply: Which of the following are
characteristics of mind mapping when used as a tool for WBS
development?
Answer
a. Mind mapping engages the team.
b. Mind mapping stimulates creative thinking about the
project’s activities
c. The nonlinear nature of the mind mapping process brings out
fewer ideas than outlining.
d. Mind mapping helps generate enthusiasm and commitment to
the project
29. Select all that apply: Which of the following categories are
considered to be a typical sources of project uncertainty?
Answer
a. Schedule
b. Unknown unknowns
c. Technical
d. Business environment
e. Contingencies
30. Select all that apply: Which of the following is (are) likely
examples of symptoms/consequences of poorly launched
projects?
Answer
a. Members of a team fail to understand the performance
standards on which the project will be measured.
b. The project’s costs quickly escalate beyond the initial
estimates.
c. Needs of specific stakeholders are not understood.
31. The backward pass in project network calculations
determines the
Answer
a. Latest time's activities can begin
b. Earliest time's activities can be finished
c. Critical path
d. Both A and C are correct
e. A, B, and C are all correct
32. The first step of project scope definition is to
Answer
a. Analyze the strategic plan
b. Analyze the current budget plan
c. Meet with team members
d. Select team members
e. Define the overall objective to meet the customer's needs
33. The final step in the creation of a Work Breakdown
Structure is to
Answer
a. Code the WBS for tracking
b. Assign the cost account to a manager
c. Assign the work package to a manager
d. Develop the responsibility matrix
e. All of these are included in the final step
34. The intended outcome of strategy/projects integration is
Answer
a. Clear organization focus
b. Best use of scare organization resources
c. Improved communication across projects and departments
d. Both A and C are correct
e. A, B, and C are all correct
35. The minimum amount of time a dependent activity must be
delayed to begin or end is referred to as:
Answer
a. Hammock
b. Laddering
c. Lag
d. Cushion
e. Buffer
36. The laying pipe example in the text illustrates the concept
of
Answer
a. Laddering
b. Hammock activities
c. Critical path
d. Concurrent engineering
e. Forward pass
37. What is the critical chain in the schedule below?
Answer
a. A-B-D-F-G
b. A-C-E-G
c. A-B-D-E-G
d. A-B-D-E-F-G
38. When is crashing beneficial to a project?
Answer
a. When the task to be crashed is not on the critical path
b. When there are no delay penalties
c. When the cost of crashing by one day is less than the
project’s daily overhead cost
d. When the cost of crashing by one day is more than the
project’s daily overhead cost.
39. Which company utilized concurrent engineering to design a
new line of cars and in the process completed its development
six months ahead of schedule?
Answer
a. General Motors
b. Chrysler
c. Ford
d. Nissan
e. Toyota
40. Which of the following factors can influence the selection
of a project as it moves through the project selection funnel?
Answer
a. Organizational politics
b. Resource constraints
c. Strategic goals
d. All of the above
41. Which of the following financial models are typically
included in project selection?
Answer
a. Payback
b. Net present value
c. Internal rate of return
d. Both A and B are correct
e. A, B, and C are all correct
42. Which of the following is an example of a start-to start
relationship?
a. We cannot start design until five weeks after requirements
definition is complete
b. Editing cannot begin until two weeks after we have started
writing the book
c. We cannot start pouring the concrete until the foundation has
been completely excavated.
d. The paving job cannot finish until we have started to put up
the signs
43. Which of the following is typically NOT included in a
project charter?
Answer
a. A list of project stakeholders.
b. The name of the project sponsor
c. A communication plan
d. Preliminary project deliverables
44. Which of the following is NOT a characteristic of the PERT
method?
Answer
a. It assumes project activities are independent of each other
and not affected by common factors.
b. Total project time (T(E)) is assumed to have a normal
distribution.
c. The distribution of possible times for an individual activity is
described as a beta distribution.
d. Activity estimates are known and certain.
e. All of the above are characteristics of the PERT method.
45. Which of these are characteristics of the best project
managers?
Answer
a. Disciplined, yet flexible
b. Creative, but not too technical
c. Sensitive, yet tyrannical
d. Extrovert
46. Which of the following top-down methods is used when
projects closely follow past projects in features and costs and
result in costs being assigned by percentages to major segments
of the project?
a. Apportion
b. Function point
c. Phase estimating
d. Learning curve
e. Censensus
47. Which of these is the critical path for this project schedule?
A-B-F-G
A-B-D-G
A-C-E-G
A-G
48. Which WBS approach is most likely to leave team members
with individual views of the work packages, but not an entire
view of the project?
Answer
a. Mind mapping
b. Bottom-Up Approach
c. Top Down approach

More Related Content

Similar to S-SHAPED CURVES

PMI ACP Classroom Question Paper
PMI ACP Classroom Question PaperPMI ACP Classroom Question Paper
PMI ACP Classroom Question PaperThanh Nguyen
 
PMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdfPMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdfMoncefMakni1
 
01 pmp introduct to project management exam
01 pmp introduct to project management exam01 pmp introduct to project management exam
01 pmp introduct to project management examJamil Faraj , PMP
 
Workbook answers
Workbook answersWorkbook answers
Workbook answersqtntpam
 
Question 1  Doing procurement functions electronically is termed.docx
Question 1  Doing procurement functions electronically is termed.docxQuestion 1  Doing procurement functions electronically is termed.docx
Question 1  Doing procurement functions electronically is termed.docxIRESH3
 
Pmi acp exa- pmi agile certified practitioner
Pmi acp exa- pmi agile certified practitionerPmi acp exa- pmi agile certified practitioner
Pmi acp exa- pmi agile certified practitionerIsabella789
 
PMP assessment exam 1.1
PMP assessment exam 1.1PMP assessment exam 1.1
PMP assessment exam 1.1Daniel Hucks
 
Pmi acp-q&a-demo-cert magic
Pmi acp-q&a-demo-cert magicPmi acp-q&a-demo-cert magic
Pmi acp-q&a-demo-cert magicEllina Beckman
 
PMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdfPMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdfProject Cubicle
 
PROJ 586 RANK Lessons in Excellence-- proj586rank.com
PROJ 586 RANK Lessons in Excellence-- proj586rank.comPROJ 586 RANK Lessons in Excellence-- proj586rank.com
PROJ 586 RANK Lessons in Excellence-- proj586rank.comRoelofMerwe131
 
PROJ 586 RANK Achievement Education / proj586rank.com
PROJ 586 RANK Achievement Education / proj586rank.comPROJ 586 RANK Achievement Education / proj586rank.com
PROJ 586 RANK Achievement Education / proj586rank.comagathachristie149
 
PROJ 586 RANK Education Counseling--proj586rank.com
PROJ 586 RANK Education Counseling--proj586rank.comPROJ 586 RANK Education Counseling--proj586rank.com
PROJ 586 RANK Education Counseling--proj586rank.comvenkat60045
 
Final Examination925 North Spurg.docx
Final Examination925 North Spurg.docxFinal Examination925 North Spurg.docx
Final Examination925 North Spurg.docxmydrynan
 
Retake Test (toolstest_intro.phptid=6408)Final Score 3.docx
Retake Test (toolstest_intro.phptid=6408)Final Score 3.docxRetake Test (toolstest_intro.phptid=6408)Final Score 3.docx
Retake Test (toolstest_intro.phptid=6408)Final Score 3.docxronak56
 
Pmp sample questions
Pmp sample questionsPmp sample questions
Pmp sample questionsnewway85
 
APMP More MC Questions
APMP More MC QuestionsAPMP More MC Questions
APMP More MC QuestionsMonica Waters
 
ICFAI Projects and Operations Management - Solved assignments and case study ...
ICFAI Projects and Operations Management - Solved assignments and case study ...ICFAI Projects and Operations Management - Solved assignments and case study ...
ICFAI Projects and Operations Management - Solved assignments and case study ...smumbahelp
 

Similar to S-SHAPED CURVES (20)

PMI ACP Classroom Question Paper
PMI ACP Classroom Question PaperPMI ACP Classroom Question Paper
PMI ACP Classroom Question Paper
 
150 PMP Questions
150 PMP Questions 150 PMP Questions
150 PMP Questions
 
PMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdfPMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdf
 
01 pmp introduct to project management exam
01 pmp introduct to project management exam01 pmp introduct to project management exam
01 pmp introduct to project management exam
 
Workbook answers
Workbook answersWorkbook answers
Workbook answers
 
Question 1  Doing procurement functions electronically is termed.docx
Question 1  Doing procurement functions electronically is termed.docxQuestion 1  Doing procurement functions electronically is termed.docx
Question 1  Doing procurement functions electronically is termed.docx
 
Pmi acp exa- pmi agile certified practitioner
Pmi acp exa- pmi agile certified practitionerPmi acp exa- pmi agile certified practitioner
Pmi acp exa- pmi agile certified practitioner
 
PMP assessment exam 1.1
PMP assessment exam 1.1PMP assessment exam 1.1
PMP assessment exam 1.1
 
Pmi acp-q&a-demo-cert magic
Pmi acp-q&a-demo-cert magicPmi acp-q&a-demo-cert magic
Pmi acp-q&a-demo-cert magic
 
PMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdfPMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdf
 
PROJ 586 RANK Lessons in Excellence-- proj586rank.com
PROJ 586 RANK Lessons in Excellence-- proj586rank.comPROJ 586 RANK Lessons in Excellence-- proj586rank.com
PROJ 586 RANK Lessons in Excellence-- proj586rank.com
 
PROJ 586 RANK Achievement Education / proj586rank.com
PROJ 586 RANK Achievement Education / proj586rank.comPROJ 586 RANK Achievement Education / proj586rank.com
PROJ 586 RANK Achievement Education / proj586rank.com
 
PROJ 586 RANK Education Counseling--proj586rank.com
PROJ 586 RANK Education Counseling--proj586rank.comPROJ 586 RANK Education Counseling--proj586rank.com
PROJ 586 RANK Education Counseling--proj586rank.com
 
Final Examination925 North Spurg.docx
Final Examination925 North Spurg.docxFinal Examination925 North Spurg.docx
Final Examination925 North Spurg.docx
 
Retake Test (toolstest_intro.phptid=6408)Final Score 3.docx
Retake Test (toolstest_intro.phptid=6408)Final Score 3.docxRetake Test (toolstest_intro.phptid=6408)Final Score 3.docx
Retake Test (toolstest_intro.phptid=6408)Final Score 3.docx
 
1
11
1
 
Pmp sample questions
Pmp sample questionsPmp sample questions
Pmp sample questions
 
PMP Certificate- introduction
PMP Certificate- introductionPMP Certificate- introduction
PMP Certificate- introduction
 
APMP More MC Questions
APMP More MC QuestionsAPMP More MC Questions
APMP More MC Questions
 
ICFAI Projects and Operations Management - Solved assignments and case study ...
ICFAI Projects and Operations Management - Solved assignments and case study ...ICFAI Projects and Operations Management - Solved assignments and case study ...
ICFAI Projects and Operations Management - Solved assignments and case study ...
 

More from jackiewalcutt

briefly summarize how the Electoral College works. Explain some of t.docx
briefly summarize how the Electoral College works. Explain some of t.docxbriefly summarize how the Electoral College works. Explain some of t.docx
briefly summarize how the Electoral College works. Explain some of t.docxjackiewalcutt
 
Briefly summarize and analyze two primary sources, identifying their.docx
Briefly summarize and analyze two primary sources, identifying their.docxBriefly summarize and analyze two primary sources, identifying their.docx
Briefly summarize and analyze two primary sources, identifying their.docxjackiewalcutt
 
Briefly respond to the following questions. Use facts and examples t.docx
Briefly respond to the following questions. Use facts and examples t.docxBriefly respond to the following questions. Use facts and examples t.docx
Briefly respond to the following questions. Use facts and examples t.docxjackiewalcutt
 
Briefly in your own words describe the distinction between explicit .docx
Briefly in your own words describe the distinction between explicit .docxBriefly in your own words describe the distinction between explicit .docx
Briefly in your own words describe the distinction between explicit .docxjackiewalcutt
 
Briefly explain   Victoria Australia Covid19 update and impact.docx
Briefly explain   Victoria Australia Covid19 update and impact.docxBriefly explain   Victoria Australia Covid19 update and impact.docx
Briefly explain   Victoria Australia Covid19 update and impact.docxjackiewalcutt
 
Briefly introduce the détente policies of the early 1970s, and des.docx
Briefly introduce the détente policies of the early 1970s, and des.docxBriefly introduce the détente policies of the early 1970s, and des.docx
Briefly introduce the détente policies of the early 1970s, and des.docxjackiewalcutt
 
Briefly explain the role of information systems in an organization.docx
Briefly explain the role of information systems in an organization.docxBriefly explain the role of information systems in an organization.docx
Briefly explain the role of information systems in an organization.docxjackiewalcutt
 
briefly describe, in 2-3 pages, the problemissue and the proble.docx
briefly describe, in 2-3 pages, the problemissue and the proble.docxbriefly describe, in 2-3 pages, the problemissue and the proble.docx
briefly describe, in 2-3 pages, the problemissue and the proble.docxjackiewalcutt
 
Briefly explain the mission of the OSH Act. What is the rationale be.docx
Briefly explain the mission of the OSH Act. What is the rationale be.docxBriefly explain the mission of the OSH Act. What is the rationale be.docx
Briefly explain the mission of the OSH Act. What is the rationale be.docxjackiewalcutt
 
Briefly discuss the various organizational approaches to managing .docx
Briefly discuss the various organizational approaches to managing .docxBriefly discuss the various organizational approaches to managing .docx
Briefly discuss the various organizational approaches to managing .docxjackiewalcutt
 
Briefly explain the identified security issues during Risk Assessmen.docx
Briefly explain the identified security issues during Risk Assessmen.docxBriefly explain the identified security issues during Risk Assessmen.docx
Briefly explain the identified security issues during Risk Assessmen.docxjackiewalcutt
 
Briefly discuss some KSAs for Fighting Cybercrime and submit in a wo.docx
Briefly discuss some KSAs for Fighting Cybercrime and submit in a wo.docxBriefly discuss some KSAs for Fighting Cybercrime and submit in a wo.docx
Briefly discuss some KSAs for Fighting Cybercrime and submit in a wo.docxjackiewalcutt
 
Briefly describe what a monopoly is and give an example using the ch.docx
Briefly describe what a monopoly is and give an example using the ch.docxBriefly describe what a monopoly is and give an example using the ch.docx
Briefly describe what a monopoly is and give an example using the ch.docxjackiewalcutt
 
Briefly describe the spread of industry throughout Europe and into.docx
Briefly describe the spread of industry throughout Europe and into.docxBriefly describe the spread of industry throughout Europe and into.docx
Briefly describe the spread of industry throughout Europe and into.docxjackiewalcutt
 
Briefly describe the path of food through the digestive system and e.docx
Briefly describe the path of food through the digestive system and e.docxBriefly describe the path of food through the digestive system and e.docx
Briefly describe the path of food through the digestive system and e.docxjackiewalcutt
 
Briefly describe the different parenting styles discussed in this we.docx
Briefly describe the different parenting styles discussed in this we.docxBriefly describe the different parenting styles discussed in this we.docx
Briefly describe the different parenting styles discussed in this we.docxjackiewalcutt
 
Briefly describe how the BIOS boots or starts the computer and.docx
Briefly describe how the BIOS boots or starts the computer and.docxBriefly describe how the BIOS boots or starts the computer and.docx
Briefly describe how the BIOS boots or starts the computer and.docxjackiewalcutt
 
Briefly describe how to deploy a Continuous Improvement effort.W.docx
Briefly describe how to deploy a Continuous Improvement effort.W.docxBriefly describe how to deploy a Continuous Improvement effort.W.docx
Briefly describe how to deploy a Continuous Improvement effort.W.docxjackiewalcutt
 
briefly define democracy and evaluate in detail THREE of.docx
briefly define democracy and evaluate in detail THREE of.docxbriefly define democracy and evaluate in detail THREE of.docx
briefly define democracy and evaluate in detail THREE of.docxjackiewalcutt
 
Briefly define, listcontrast, identify the significance of, or .docx
Briefly define, listcontrast, identify the significance of, or .docxBriefly define, listcontrast, identify the significance of, or .docx
Briefly define, listcontrast, identify the significance of, or .docxjackiewalcutt
 

More from jackiewalcutt (20)

briefly summarize how the Electoral College works. Explain some of t.docx
briefly summarize how the Electoral College works. Explain some of t.docxbriefly summarize how the Electoral College works. Explain some of t.docx
briefly summarize how the Electoral College works. Explain some of t.docx
 
Briefly summarize and analyze two primary sources, identifying their.docx
Briefly summarize and analyze two primary sources, identifying their.docxBriefly summarize and analyze two primary sources, identifying their.docx
Briefly summarize and analyze two primary sources, identifying their.docx
 
Briefly respond to the following questions. Use facts and examples t.docx
Briefly respond to the following questions. Use facts and examples t.docxBriefly respond to the following questions. Use facts and examples t.docx
Briefly respond to the following questions. Use facts and examples t.docx
 
Briefly in your own words describe the distinction between explicit .docx
Briefly in your own words describe the distinction between explicit .docxBriefly in your own words describe the distinction between explicit .docx
Briefly in your own words describe the distinction between explicit .docx
 
Briefly explain   Victoria Australia Covid19 update and impact.docx
Briefly explain   Victoria Australia Covid19 update and impact.docxBriefly explain   Victoria Australia Covid19 update and impact.docx
Briefly explain   Victoria Australia Covid19 update and impact.docx
 
Briefly introduce the détente policies of the early 1970s, and des.docx
Briefly introduce the détente policies of the early 1970s, and des.docxBriefly introduce the détente policies of the early 1970s, and des.docx
Briefly introduce the détente policies of the early 1970s, and des.docx
 
Briefly explain the role of information systems in an organization.docx
Briefly explain the role of information systems in an organization.docxBriefly explain the role of information systems in an organization.docx
Briefly explain the role of information systems in an organization.docx
 
briefly describe, in 2-3 pages, the problemissue and the proble.docx
briefly describe, in 2-3 pages, the problemissue and the proble.docxbriefly describe, in 2-3 pages, the problemissue and the proble.docx
briefly describe, in 2-3 pages, the problemissue and the proble.docx
 
Briefly explain the mission of the OSH Act. What is the rationale be.docx
Briefly explain the mission of the OSH Act. What is the rationale be.docxBriefly explain the mission of the OSH Act. What is the rationale be.docx
Briefly explain the mission of the OSH Act. What is the rationale be.docx
 
Briefly discuss the various organizational approaches to managing .docx
Briefly discuss the various organizational approaches to managing .docxBriefly discuss the various organizational approaches to managing .docx
Briefly discuss the various organizational approaches to managing .docx
 
Briefly explain the identified security issues during Risk Assessmen.docx
Briefly explain the identified security issues during Risk Assessmen.docxBriefly explain the identified security issues during Risk Assessmen.docx
Briefly explain the identified security issues during Risk Assessmen.docx
 
Briefly discuss some KSAs for Fighting Cybercrime and submit in a wo.docx
Briefly discuss some KSAs for Fighting Cybercrime and submit in a wo.docxBriefly discuss some KSAs for Fighting Cybercrime and submit in a wo.docx
Briefly discuss some KSAs for Fighting Cybercrime and submit in a wo.docx
 
Briefly describe what a monopoly is and give an example using the ch.docx
Briefly describe what a monopoly is and give an example using the ch.docxBriefly describe what a monopoly is and give an example using the ch.docx
Briefly describe what a monopoly is and give an example using the ch.docx
 
Briefly describe the spread of industry throughout Europe and into.docx
Briefly describe the spread of industry throughout Europe and into.docxBriefly describe the spread of industry throughout Europe and into.docx
Briefly describe the spread of industry throughout Europe and into.docx
 
Briefly describe the path of food through the digestive system and e.docx
Briefly describe the path of food through the digestive system and e.docxBriefly describe the path of food through the digestive system and e.docx
Briefly describe the path of food through the digestive system and e.docx
 
Briefly describe the different parenting styles discussed in this we.docx
Briefly describe the different parenting styles discussed in this we.docxBriefly describe the different parenting styles discussed in this we.docx
Briefly describe the different parenting styles discussed in this we.docx
 
Briefly describe how the BIOS boots or starts the computer and.docx
Briefly describe how the BIOS boots or starts the computer and.docxBriefly describe how the BIOS boots or starts the computer and.docx
Briefly describe how the BIOS boots or starts the computer and.docx
 
Briefly describe how to deploy a Continuous Improvement effort.W.docx
Briefly describe how to deploy a Continuous Improvement effort.W.docxBriefly describe how to deploy a Continuous Improvement effort.W.docx
Briefly describe how to deploy a Continuous Improvement effort.W.docx
 
briefly define democracy and evaluate in detail THREE of.docx
briefly define democracy and evaluate in detail THREE of.docxbriefly define democracy and evaluate in detail THREE of.docx
briefly define democracy and evaluate in detail THREE of.docx
 
Briefly define, listcontrast, identify the significance of, or .docx
Briefly define, listcontrast, identify the significance of, or .docxBriefly define, listcontrast, identify the significance of, or .docx
Briefly define, listcontrast, identify the significance of, or .docx
 

Recently uploaded

Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupJonathanParaisoCruz
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 

Recently uploaded (20)

Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized Group
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 

S-SHAPED CURVES

  • 1. 1. A cumulative effort curve for a project generally has an S- shape because of: Answer : a. The large financial costs associated with ending a project b. Various hurdles that prevent progress when beginning a project c. Team member burnout d. Higher resource utilization during the middle of a project 2. A manager getting further into a project and obtaining a better understanding of what needs to be done to accomplish a project is an example of: Answer a. Hidden interaction costs b. Things going wrong on a project c. Normal conditions not applying d. Changes in project scope e. None of these are correct 3. A project team has been assigned to research and develop a new product to compete with its competitor’s latest product launch. The product is needed quickly because the company is losing market share. The team consists of 6 members, located throughout the country. Each one has a role in sales, marketing, manufacturing, or engineering, and will be performing this
  • 2. project in addition to his or her full-time position. Which of the following project team considerations is most likely to pose a threat to achieving success? Answer a. Not enough time available for the team members. b. Not the correct team size. c. Poor team member representation that does not include a diverse set of stakeholders. d. Inadequate knowledge and technical skills of the team members. 4. All of the following are usually included in a work package except Answer a. What will be done? b. The time needed to complete the work. c. A single person who is responsible for its completion. d. All the costs for the work package. e. All of these are included in a work package.
  • 3. 5. An advantage of factor rating for project selection is that it: Answer a. Involves no arithmetic calculations b. Allows for comparisons on several weighted criteria c. Offers objective measures that eliminate human bias d. Is focused solely on financial outcomes 6. An organization that allows functions to exist on the vertical dimension of the organizational chart, with projects running on the horizontal dimension is described as a: Answer a. Matrix organization b. Projectized organization structure c. Functional organization d. Networked organization 7. After a team of software development engineers completed the requirements phase for a major new system, members learned the client no longer needed several of the features initially requested. Which of the following project management models would help avoid this kind of communication challenge? Answer a. Silo approach b. Economic approach
  • 4. c. Waterfall approach d. Concurrent approach 8. Companies like Boeing, Kodak, and IBM are using which of the following for improving the estimating process? Answer a. Adjusting estimates based on individual forecasting abilities b. Benchmarking using the experience of other companies c. Using time and motion studies d. Creating historical databases of previous projects e. All of these are correct 9. 10. 11. Assuming all activities are scheduled to begin on that early start times. How much can we delay activity D without delaying the project. A. 3 B. 4 C. 5 D. 6 12. Design flaws being revealed after the fact, extreme weather conditions, and accidents occurring are examples of: Answer a. Hidden interaction costs
  • 5. b. Things going wrong on a project c. Normal conditions not applying d. Changes in project scope e. None of these are correct 13. Fast tracking is defined as: Answer a. rescheduling sequential tasks to take place simultaneously b. eliminating tasks or deliverables from the WBS c. increasing the efficiency of the employees performing the task d. adding resources to reduce the time required for selected project activities 14. Given the schedule below, what sequence of activities comprises the critical chain? 15. If a project criterion indicates that the project must meet a specific date, that criterion is classified as Answer a. Constrained
  • 6. b. Enhanced c. Accepted d. Limited e. Fixed 16. Imagine your boss has assigned you to work on a project that is of strategic importance. She tells you there will be no other team members available to help you. What arguments might you effectively raise in persuading her to allow you to work with a team? Answer a. There will be less need for coordination b. There will be more breadth of technical expertise c. There will be less chance of conflict d. There will be less need to gain buy-in 17. In evaluating time-cost tradeoffs, we start by crashing the activity on the critical path that: Answer
  • 7. a. can be reduced the most. b. has the lowest total crash cost. c. has the lowest crash cost per unit time. d. is the longest. 18. In today's business environment, project managers find it valuable to have a keen understanding of Answer A. Strategic management B. Technical issues C. Project selection process D. Both A and C are correct E. A, B, and C are all correct 19. NPV is a measure of: Answer a. How long it will take to recuperate the cost of a project with future revenue or cost savings b. The difference between the estimated costs of a project and the present value associated with future cash flows c. The expected rate of return required in order for a company to pursue a project d. The return on initial investment of the project
  • 8. 20. Project Thunderbolt will incur $30,000 in cost during year 0 and will produce $10,000 in net cost savings to the company in years 1 through 6. What would the net present value be for this project for a 20% required rate of return? Answer a. ($4,080) b. $3,250 c. $6,040 d. $7,850 21. Project X requires an initial investment of $1.5 million and will result in a payment of $2 million from the client at the end of three years. If the required rate of return is 8%, what is the NPV for this project? Answer a. $ 88,000 b. $ 500,000 c. $ 1,588,000 d. $ 3,654,000 22. Research has shown that multitasking has been linked with: Answer a. Enhanced efficiency b. Expanded brain function.
  • 9. c. Reduced stress. d. None of the above. 23. Select all that apply: A new project manager is taking over his company’s annual charity event. Several members of the team have worked on this event project in previous years. In generating a time estimation for the various tasks, which of the following is (are) most likely to aid improve estimation accuracy? Answer a. Set tight time goals so the team members are pushed to stay on schedule b. Add 25% to each person’s estimate c. Consult the previous project manager for historical information on task and project durations d. Involve the team members who will do the work 24. Select all that apply: Important characteristics of
  • 10. preparation before a meeting include: Answer a. A detailed agenda including subject, facilitator, time, and deliverables, sent in advance b. Arranging for refreshments if the meeting will last longer than 90 minutes c. Flexibility regarding the purpose because important issues may arise at the last minute that some team members want to discuss d. Ensuring that you have enough material to deliver a presentation for the full duration of the meeting 25. Select all that apply: Members of a project team have developed a schedule for an upcoming IT project. They observe that two activities, A. Hardware Design and B. Software Design, must be complete before a third activity, C. Testing, can begin. Hardware and Software Design share the same predecessor task, and each one is estimated to have a duration of 4 weeks. Based on historical data, team members estimate that activity A and activity B each has an 80% chance of finishing within the estimated time frame. Which of the following is true? Answer a. Conjunctive event bias might cause the team to overestimate the likelihood that A and B will be completed within 4 weeks. (i.e., they will think it is more likely than it really is.) b. The likelihood of A and B both finishing within 4 weeks would be 90% c. The likelihood of A and B both finishing within 4 weeks
  • 11. would be 64% d. Conjunctive event bias might cause the team to underestimate the likelihood that A and B will be completed within 4 weeks. (i.e., they will think it is less likely than it really is.) 26. Select all that apply: To effectively motivate a team, the project manager should understand the following about motivation (select all correct items): Answer a. Providing team members with clear, specific, challenging goals is among the most powerful motivators. b. Determining how to best motivate an individual may involve asking “What can I do to ensure you get the most out of this project.” c. Money is normally the most important motivator for project team members. d. People will be motivated if they feel a sense of ownership for the project. 27. Select all that apply: Which of the following are advantages to including the team in creating the WBS: Answer a. Participation in the creation of the WBS builds team members’ commitment to the project. b. Team members will gain a total view of the project through their involvement in creating the WBS.
  • 12. c. Participation in the creation of the WBS can bring conflicting views to the surface before it is too late to address them d. They are the content experts and best equipped to know what is involved in generating each deliverable 28. Select all that apply: Which of the following are characteristics of mind mapping when used as a tool for WBS development? Answer a. Mind mapping engages the team. b. Mind mapping stimulates creative thinking about the project’s activities c. The nonlinear nature of the mind mapping process brings out fewer ideas than outlining. d. Mind mapping helps generate enthusiasm and commitment to the project 29. Select all that apply: Which of the following categories are considered to be a typical sources of project uncertainty? Answer a. Schedule b. Unknown unknowns
  • 13. c. Technical d. Business environment e. Contingencies 30. Select all that apply: Which of the following is (are) likely examples of symptoms/consequences of poorly launched projects? Answer a. Members of a team fail to understand the performance standards on which the project will be measured. b. The project’s costs quickly escalate beyond the initial estimates. c. Needs of specific stakeholders are not understood. 31. The backward pass in project network calculations determines the Answer a. Latest time's activities can begin b. Earliest time's activities can be finished c. Critical path d. Both A and C are correct e. A, B, and C are all correct 32. The first step of project scope definition is to
  • 14. Answer a. Analyze the strategic plan b. Analyze the current budget plan c. Meet with team members d. Select team members e. Define the overall objective to meet the customer's needs 33. The final step in the creation of a Work Breakdown Structure is to Answer a. Code the WBS for tracking b. Assign the cost account to a manager c. Assign the work package to a manager d. Develop the responsibility matrix e. All of these are included in the final step 34. The intended outcome of strategy/projects integration is Answer a. Clear organization focus b. Best use of scare organization resources c. Improved communication across projects and departments d. Both A and C are correct
  • 15. e. A, B, and C are all correct 35. The minimum amount of time a dependent activity must be delayed to begin or end is referred to as: Answer a. Hammock b. Laddering c. Lag d. Cushion e. Buffer 36. The laying pipe example in the text illustrates the concept of Answer a. Laddering b. Hammock activities c. Critical path d. Concurrent engineering e. Forward pass 37. What is the critical chain in the schedule below? Answer a. A-B-D-F-G
  • 16. b. A-C-E-G c. A-B-D-E-G d. A-B-D-E-F-G 38. When is crashing beneficial to a project? Answer a. When the task to be crashed is not on the critical path b. When there are no delay penalties c. When the cost of crashing by one day is less than the project’s daily overhead cost d. When the cost of crashing by one day is more than the project’s daily overhead cost. 39. Which company utilized concurrent engineering to design a new line of cars and in the process completed its development six months ahead of schedule? Answer a. General Motors
  • 17. b. Chrysler c. Ford d. Nissan e. Toyota 40. Which of the following factors can influence the selection of a project as it moves through the project selection funnel? Answer a. Organizational politics b. Resource constraints c. Strategic goals d. All of the above 41. Which of the following financial models are typically included in project selection? Answer a. Payback b. Net present value c. Internal rate of return d. Both A and B are correct e. A, B, and C are all correct
  • 18. 42. Which of the following is an example of a start-to start relationship? a. We cannot start design until five weeks after requirements definition is complete b. Editing cannot begin until two weeks after we have started writing the book c. We cannot start pouring the concrete until the foundation has been completely excavated. d. The paving job cannot finish until we have started to put up the signs 43. Which of the following is typically NOT included in a project charter? Answer a. A list of project stakeholders. b. The name of the project sponsor c. A communication plan d. Preliminary project deliverables 44. Which of the following is NOT a characteristic of the PERT method? Answer a. It assumes project activities are independent of each other and not affected by common factors. b. Total project time (T(E)) is assumed to have a normal
  • 19. distribution. c. The distribution of possible times for an individual activity is described as a beta distribution. d. Activity estimates are known and certain. e. All of the above are characteristics of the PERT method. 45. Which of these are characteristics of the best project managers? Answer a. Disciplined, yet flexible b. Creative, but not too technical c. Sensitive, yet tyrannical d. Extrovert 46. Which of the following top-down methods is used when projects closely follow past projects in features and costs and result in costs being assigned by percentages to major segments of the project? a. Apportion b. Function point c. Phase estimating d. Learning curve e. Censensus 47. Which of these is the critical path for this project schedule?
  • 20. A-B-F-G A-B-D-G A-C-E-G A-G 48. Which WBS approach is most likely to leave team members with individual views of the work packages, but not an entire view of the project? Answer a. Mind mapping b. Bottom-Up Approach c. Top Down approach