Risk Assessment
Complete the following table rating;
 Each risks severity on scale from Negligable (N), Low risk (L), Moderate risk (M), Severe (S),
Very severe (V)
 Each risks likelihood on scale from Very unlikely (VU), Unlikely (U), Possible (P), Likely (L), Very
likely (VL)
 Determine the risk factor from the table overleaf.
Hazard
Present? Severity Likelihood Risk Factor
1 Alcohol/drugs No L VU 1
2 Animals/insects No N U 1
3 Audiences No N VU 1
4 Camera cable/grip equipment Yes L U 2
5 Confined spaces No N U 1
6 Derelict buildings/dangerous structures No M VU 2
7 Electricity/gas (other than normal supplies) No L U 1
8 Fatigue/long hours No N U 1
9 Fire/flammable materials No M U 2
10 Hazardous substances No L VU 1
11 Heat/Cold/extreme weather No L U 1
12 Laser/strobe effects No L VU 1
13 Machinery/industrial/ crane/hoist No M VU 2
14 Materials - glass, non-fire retardant set materials No L U 2
15 Night operation Yes L L 3
16 Noise – high sound levels No L U 2
17 Non standard manual handling No L VU 1
18 Public/crowds Yes L L 3
19 Radiation No M VU 2
20 Scaffold/Rostra No M VU 2
21 Smoking on set Yes L VL 3
22 Special effects/explosives No L VU 1
23 Special needs (elderly, disabled, inexperienced) Yes S U 3
24 Specialised rescue/first aid No L VU 1
25 Stunts, dangerous activities No M VU 2
26 Tall scenery/suspended ceilings No M VU 2
27 Vehicles/speed Yes L P 2
28 Water/proximity to water No L VU 1
29 Weapons No L U 2
30 Working at heights No L VU 1
31 Working overseas No M VU 2
32 Other risks No L U 2
2
Calculate the Risk Factor:
Very Unlikely Unlikely Possible Likely Very Likely
Very severe 3 4 4 5 5
Severe 2 3 3 3 5
Moderate 2 2 3 3 3
Slight 1 2 2 3 3
Negligible 1 1 2 2 3
Decide the action to take:
5 Very severe Take immediate action
4 Severe High priority
3 Moderate Risk Programme for action
2 Low Risk Action may be required
1 Negligible Probably acceptable
Then list each risk identified
Hazard no: 23 Risk Factor (1-5) 3
Description Type 1 Diabetes, controlled by insulin. Risk of hypoglycaemia from
activity.
Person(s) exposed
(detail if cast/crew (C),
outside company (O) or
public (P) )
Em Leeman – Cast
Action to take If fallen unconscious due to low blood glucose- 999 immediately.
Person/company
responsible for action
Other crew members
To be completed at agreed later date -
Exposed person(s)
informed? (y/n)
Agreed action taken? (y/n) Risk removed?
(y/n)
3
Hazard no: 4 Risk Factor (1-5) 2
Description Camera equipment
Person(s) exposed
(detail if cast/crew (C),
outside company (O) or
public (P) )
Cast/crew
Action to take Keep equipment in bags and turned off when not using
Person/company
responsible for action
Cast/crew
To be completed at agreed later date -
Exposed person(s)
informed? (y/n)
Agreed action taken? (y/n) Risk removed?
(y/n)
Hazard no: 15 Risk Factor (1-5) 3
Description Filming at night
Person(s) exposed
(detail if cast/crew (C),
outside company (O) or
public (P) )
Cast/crew
Action to take Film somewhere with adequate lighting and have ways of contacting
others.
Person/company
responsible for action
Cast/crew
To be completed at agreed later date -
Exposed person(s)
informed? (y/n)
Agreed action taken? (y/n) Risk removed?
(y/n)
Hazard no: 18 Risk Factor (1-5) 3
Description Filming in public places including crowded areas.
Person(s) exposed
(detail if cast/crew (C),
outside company (O) or
public (P) )
Cast/crew, public
Action to take Do not film people if they express discomfort, try to get the most quite
public area to film in, as to not disturb others.
Person/company
responsible for action
Cast/crew
To be completed at agreed later date -
Exposed person(s)
informed? (y/n)
Agreed action taken? (y/n) Risk removed?
(y/n)
4
Hazard no: 21 Risk Factor (1-5) 3
Description Crew members smoking
Person(s) exposed
(detail if cast/crew (C),
outside company (O) or
public (P) )
Cast/crew
Action to take No smoking in public places, also making sure smoking is permitted in
places.
Person/company
responsible for action
Cast/crew
To be completed at agreed later date -
Exposed person(s)
informed? (y/n)
Agreed action taken? (y/n) Risk removed?
(y/n)
Hazard no: 27 Risk Factor (1-5) 2
Description Using vehicles to travel in between locations.
Person(s) exposed
(detail if cast/crew (C),
outside company (O) or
public (P) )
Cast/crew
Action to take Using safe ways of transportation.
Person/company
responsible for action
Cast/crew
To be completed at agreed later date -
Exposed person(s)
informed? (y/n)
Agreed action taken? (y/n) Risk removed?
(y/n)
Completed by:
Signature;
Countersigned by:
Signature; Date:

More Related Content

What's hot

Risk assessment forms
Risk assessment formsRisk assessment forms
Risk assessment formsDan Topham
 
Risk assessment form 1
Risk assessment form 1Risk assessment form 1
Risk assessment form 1Jordan Swan
 
Dox risk assessment_form
Dox risk assessment_formDox risk assessment_form
Dox risk assessment_formTimmy Litondo
 
Risk assessment form pier
Risk assessment form pierRisk assessment form pier
Risk assessment form pierellyyyxxx
 
Risk assessment form
Risk assessment formRisk assessment form
Risk assessment formAmelia Hart
 
The underpass check list
The underpass check listThe underpass check list
The underpass check listSofia Morana
 
Crying - Risk Assessment
Crying - Risk AssessmentCrying - Risk Assessment
Crying - Risk AssessmentIsaacSharpMedia
 
The robert kett check list
The robert kett check listThe robert kett check list
The robert kett check listSofia Morana
 
Risk Assessment - Exam
Risk Assessment  - ExamRisk Assessment  - Exam
Risk Assessment - Exammeganbyrne1223
 
1 events filming risk assessment form-1
1 events   filming risk assessment form-11 events   filming risk assessment form-1
1 events filming risk assessment form-110079613
 
Riskassessmentform1 161205121254
Riskassessmentform1 161205121254Riskassessmentform1 161205121254
Riskassessmentform1 161205121254LydiaMarleyLawson1
 
Filming Risk Assessment Form
Filming Risk Assessment FormFilming Risk Assessment Form
Filming Risk Assessment Formceliapeplow
 

What's hot (20)

Risk Assessment Form
Risk Assessment FormRisk Assessment Form
Risk Assessment Form
 
Abby check list
Abby check listAbby check list
Abby check list
 
Risk assessment 2017
Risk assessment 2017Risk assessment 2017
Risk assessment 2017
 
Risk assessment forms
Risk assessment formsRisk assessment forms
Risk assessment forms
 
Abby check list
Abby check listAbby check list
Abby check list
 
Risk assessment form 1
Risk assessment form 1Risk assessment form 1
Risk assessment form 1
 
Dox risk assessment_form
Dox risk assessment_formDox risk assessment_form
Dox risk assessment_form
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment form pier
Risk assessment form pierRisk assessment form pier
Risk assessment form pier
 
Risk assessment form
Risk assessment formRisk assessment form
Risk assessment form
 
The underpass check list
The underpass check listThe underpass check list
The underpass check list
 
Crying - Risk Assessment
Crying - Risk AssessmentCrying - Risk Assessment
Crying - Risk Assessment
 
The robert kett check list
The robert kett check listThe robert kett check list
The robert kett check list
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessment Risk assessment
Risk assessment
 
Risk Assessment - Exam
Risk Assessment  - ExamRisk Assessment  - Exam
Risk Assessment - Exam
 
Risk assessment (1)
Risk assessment (1)Risk assessment (1)
Risk assessment (1)
 
1 events filming risk assessment form-1
1 events   filming risk assessment form-11 events   filming risk assessment form-1
1 events filming risk assessment form-1
 
Riskassessmentform1 161205121254
Riskassessmentform1 161205121254Riskassessmentform1 161205121254
Riskassessmentform1 161205121254
 
Filming Risk Assessment Form
Filming Risk Assessment FormFilming Risk Assessment Form
Filming Risk Assessment Form
 

Similar to Risk Assessment Form

Similar to Risk Assessment Form (13)

Risk Assesment for Filming
Risk Assesment for FilmingRisk Assesment for Filming
Risk Assesment for Filming
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk assessment form
Risk assessment formRisk assessment form
Risk assessment form
 
Risk assessment form
Risk assessment formRisk assessment form
Risk assessment form
 
Risk assessment form
Risk assessment formRisk assessment form
Risk assessment form
 
Train tracks check list
Train tracks check listTrain tracks check list
Train tracks check list
 
Risk assessment form
Risk assessment formRisk assessment form
Risk assessment form
 
Risk assessment form
Risk assessment formRisk assessment form
Risk assessment form
 
Rsk Assessment
Rsk AssessmentRsk Assessment
Rsk Assessment
 
Risk assessment form - Bus
Risk assessment form - BusRisk assessment form - Bus
Risk assessment form - Bus
 
Risk assessment form-2
Risk assessment form-2Risk assessment form-2
Risk assessment form-2
 
Risk assessment form-2
Risk assessment form-2Risk assessment form-2
Risk assessment form-2
 
Risk assessment form (1)
Risk assessment form (1)Risk assessment form (1)
Risk assessment form (1)
 

More from Em Leeman

Media Studies Evaluation A2
Media Studies Evaluation A2Media Studies Evaluation A2
Media Studies Evaluation A2Em Leeman
 
Final Digipak
Final DigipakFinal Digipak
Final DigipakEm Leeman
 
Digipak and Magazine Advert Draft
Digipak and Magazine Advert DraftDigipak and Magazine Advert Draft
Digipak and Magazine Advert DraftEm Leeman
 
Shooting schedule
Shooting scheduleShooting schedule
Shooting scheduleEm Leeman
 
Survey Analysis
Survey AnalysisSurvey Analysis
Survey AnalysisEm Leeman
 
Fall Out Boy Research
Fall Out Boy ResearchFall Out Boy Research
Fall Out Boy ResearchEm Leeman
 
Analysis of Digipacks and Album Adverts
Analysis of Digipacks and Album AdvertsAnalysis of Digipacks and Album Adverts
Analysis of Digipacks and Album AdvertsEm Leeman
 
Media evaluation
Media evaluationMedia evaluation
Media evaluationEm Leeman
 
Survey analysis
Survey analysisSurvey analysis
Survey analysisEm Leeman
 
Magazine Plan Pitch
Magazine Plan PitchMagazine Plan Pitch
Magazine Plan PitchEm Leeman
 
Survey analysis
Survey analysisSurvey analysis
Survey analysisEm Leeman
 
Market research
Market researchMarket research
Market researchEm Leeman
 

More from Em Leeman (12)

Media Studies Evaluation A2
Media Studies Evaluation A2Media Studies Evaluation A2
Media Studies Evaluation A2
 
Final Digipak
Final DigipakFinal Digipak
Final Digipak
 
Digipak and Magazine Advert Draft
Digipak and Magazine Advert DraftDigipak and Magazine Advert Draft
Digipak and Magazine Advert Draft
 
Shooting schedule
Shooting scheduleShooting schedule
Shooting schedule
 
Survey Analysis
Survey AnalysisSurvey Analysis
Survey Analysis
 
Fall Out Boy Research
Fall Out Boy ResearchFall Out Boy Research
Fall Out Boy Research
 
Analysis of Digipacks and Album Adverts
Analysis of Digipacks and Album AdvertsAnalysis of Digipacks and Album Adverts
Analysis of Digipacks and Album Adverts
 
Media evaluation
Media evaluationMedia evaluation
Media evaluation
 
Survey analysis
Survey analysisSurvey analysis
Survey analysis
 
Magazine Plan Pitch
Magazine Plan PitchMagazine Plan Pitch
Magazine Plan Pitch
 
Survey analysis
Survey analysisSurvey analysis
Survey analysis
 
Market research
Market researchMarket research
Market research
 

Recently uploaded

UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...Sayali Powar
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345beazzy04
 
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...Denish Jangid
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxbennyroshan06
 
Advances in production technology of Grapes.pdf
Advances in production technology of Grapes.pdfAdvances in production technology of Grapes.pdf
Advances in production technology of Grapes.pdfDr. M. Kumaresan Hort.
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxEduSkills OECD
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxPavel ( NSTU)
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfPo-Chuan Chen
 
[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online Presentation[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online PresentationGDSCYCCE
 
2024_Student Session 2_ Set Plan Preparation.pptx
2024_Student Session 2_ Set Plan Preparation.pptx2024_Student Session 2_ Set Plan Preparation.pptx
2024_Student Session 2_ Set Plan Preparation.pptxmansk2
 
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdfDanh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdfQucHHunhnh
 
The Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational ResourcesThe Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational Resourcesaileywriter
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxRaedMohamed3
 
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & EngineeringBasic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & EngineeringDenish Jangid
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxJheel Barad
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaasiemaillard
 
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptxJose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptxricssacare
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfVivekanand Anglo Vedic Academy
 
Benefits and Challenges of Using Open Educational Resources
Benefits and Challenges of Using Open Educational ResourcesBenefits and Challenges of Using Open Educational Resources
Benefits and Challenges of Using Open Educational Resourcesdimpy50
 

Recently uploaded (20)

UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
Advances in production technology of Grapes.pdf
Advances in production technology of Grapes.pdfAdvances in production technology of Grapes.pdf
Advances in production technology of Grapes.pdf
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
 
[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online Presentation[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online Presentation
 
2024_Student Session 2_ Set Plan Preparation.pptx
2024_Student Session 2_ Set Plan Preparation.pptx2024_Student Session 2_ Set Plan Preparation.pptx
2024_Student Session 2_ Set Plan Preparation.pptx
 
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdfDanh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
 
The Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational ResourcesThe Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational Resources
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
 
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & EngineeringBasic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptxJose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
 
Benefits and Challenges of Using Open Educational Resources
Benefits and Challenges of Using Open Educational ResourcesBenefits and Challenges of Using Open Educational Resources
Benefits and Challenges of Using Open Educational Resources
 

Risk Assessment Form

  • 1. 1 Risk Assessment Complete the following table rating;  Each risks severity on scale from Negligable (N), Low risk (L), Moderate risk (M), Severe (S), Very severe (V)  Each risks likelihood on scale from Very unlikely (VU), Unlikely (U), Possible (P), Likely (L), Very likely (VL)  Determine the risk factor from the table overleaf. Hazard Present? Severity Likelihood Risk Factor 1 Alcohol/drugs No L VU 1 2 Animals/insects No N U 1 3 Audiences No N VU 1 4 Camera cable/grip equipment Yes L U 2 5 Confined spaces No N U 1 6 Derelict buildings/dangerous structures No M VU 2 7 Electricity/gas (other than normal supplies) No L U 1 8 Fatigue/long hours No N U 1 9 Fire/flammable materials No M U 2 10 Hazardous substances No L VU 1 11 Heat/Cold/extreme weather No L U 1 12 Laser/strobe effects No L VU 1 13 Machinery/industrial/ crane/hoist No M VU 2 14 Materials - glass, non-fire retardant set materials No L U 2 15 Night operation Yes L L 3 16 Noise – high sound levels No L U 2 17 Non standard manual handling No L VU 1 18 Public/crowds Yes L L 3 19 Radiation No M VU 2 20 Scaffold/Rostra No M VU 2 21 Smoking on set Yes L VL 3 22 Special effects/explosives No L VU 1 23 Special needs (elderly, disabled, inexperienced) Yes S U 3 24 Specialised rescue/first aid No L VU 1 25 Stunts, dangerous activities No M VU 2 26 Tall scenery/suspended ceilings No M VU 2 27 Vehicles/speed Yes L P 2 28 Water/proximity to water No L VU 1 29 Weapons No L U 2 30 Working at heights No L VU 1 31 Working overseas No M VU 2 32 Other risks No L U 2
  • 2. 2 Calculate the Risk Factor: Very Unlikely Unlikely Possible Likely Very Likely Very severe 3 4 4 5 5 Severe 2 3 3 3 5 Moderate 2 2 3 3 3 Slight 1 2 2 3 3 Negligible 1 1 2 2 3 Decide the action to take: 5 Very severe Take immediate action 4 Severe High priority 3 Moderate Risk Programme for action 2 Low Risk Action may be required 1 Negligible Probably acceptable Then list each risk identified Hazard no: 23 Risk Factor (1-5) 3 Description Type 1 Diabetes, controlled by insulin. Risk of hypoglycaemia from activity. Person(s) exposed (detail if cast/crew (C), outside company (O) or public (P) ) Em Leeman – Cast Action to take If fallen unconscious due to low blood glucose- 999 immediately. Person/company responsible for action Other crew members To be completed at agreed later date - Exposed person(s) informed? (y/n) Agreed action taken? (y/n) Risk removed? (y/n)
  • 3. 3 Hazard no: 4 Risk Factor (1-5) 2 Description Camera equipment Person(s) exposed (detail if cast/crew (C), outside company (O) or public (P) ) Cast/crew Action to take Keep equipment in bags and turned off when not using Person/company responsible for action Cast/crew To be completed at agreed later date - Exposed person(s) informed? (y/n) Agreed action taken? (y/n) Risk removed? (y/n) Hazard no: 15 Risk Factor (1-5) 3 Description Filming at night Person(s) exposed (detail if cast/crew (C), outside company (O) or public (P) ) Cast/crew Action to take Film somewhere with adequate lighting and have ways of contacting others. Person/company responsible for action Cast/crew To be completed at agreed later date - Exposed person(s) informed? (y/n) Agreed action taken? (y/n) Risk removed? (y/n) Hazard no: 18 Risk Factor (1-5) 3 Description Filming in public places including crowded areas. Person(s) exposed (detail if cast/crew (C), outside company (O) or public (P) ) Cast/crew, public Action to take Do not film people if they express discomfort, try to get the most quite public area to film in, as to not disturb others. Person/company responsible for action Cast/crew To be completed at agreed later date - Exposed person(s) informed? (y/n) Agreed action taken? (y/n) Risk removed? (y/n)
  • 4. 4 Hazard no: 21 Risk Factor (1-5) 3 Description Crew members smoking Person(s) exposed (detail if cast/crew (C), outside company (O) or public (P) ) Cast/crew Action to take No smoking in public places, also making sure smoking is permitted in places. Person/company responsible for action Cast/crew To be completed at agreed later date - Exposed person(s) informed? (y/n) Agreed action taken? (y/n) Risk removed? (y/n) Hazard no: 27 Risk Factor (1-5) 2 Description Using vehicles to travel in between locations. Person(s) exposed (detail if cast/crew (C), outside company (O) or public (P) ) Cast/crew Action to take Using safe ways of transportation. Person/company responsible for action Cast/crew To be completed at agreed later date - Exposed person(s) informed? (y/n) Agreed action taken? (y/n) Risk removed? (y/n) Completed by: Signature; Countersigned by: Signature; Date: