Richmond Apande/
Phone#: (510) 681-9692;Email:rapande99@yahoo.com
______________________________________________________________
SUMMARY: Highly-skilled Project Manager/Engineer with over nine years of professional experience in management projects.
Has worked with PG&E Company (2007-2012) directly and has provided engineering support on equipment
commissioning/retro-commissioning and energy efficiency projects; and has worked with the Port of Oakland as an
Electrical/Mechanical Engineer (1999 to 2006) and provided engineering design and construction support. Familiar with
distribution and transmission power lines ( 120V to 12kV to 115kV), and design and construction of water and gas pipeline
projects.
EDUCATION:
MSEM – Master of Sc. Engineering Management-California State University,Eastbay – CA – 2016
B.Sc. Mechanical Engineering/Minor Mathematics, California State University, Fresno- CA
Engineer-In-Training (EIT) Certificate
American Society of Mechanical Engineers (ASME)
SKILLS:
Certificates: Project Management courses; NEC 2005 Certificate; Mechanical Design, Title 24 – Non-Residential Mechanical
Requirements; Building Electrical Design Certifications; Industrial Energy Efficiency Strategy Certification etc.
Computer Skills: Proficient in MS Word, Excel (Spreadsheet), emailing, Project scheduling, and work Project Management,
Budget Monitoring Software; EnergyPro/eQuest Software, pressure, equipment Test Procedures
CONSTRUCTION PROJECT MANAGER (CONSTRUCTION BUILDING) APRIL 2014 – PRESENT
Pacific Real Estates
Provide engineering design and construction support on commercial and residential buildings; Plan, direct and coordinate
project activities to ensure that the projects meet project objectives. Review status reports, update cost and schedule as
required; Responsible for the overall quality of work by supervising all project deliverables, recognize and resolve potential
problems by implementing corrective actions; Inspect and review plans to match what is constructed with building and safety
(ADA, OHSA, ASHRAE) codes, and other regulations; Interpret and explain plans and contract terms to staff, workers, and
clients.
FACILITYENGINEER (DESIGN/CONSTRUCTION PROJECTS) JAN 2014 – APRIL 2014
AEROJET-ROCKETDYNE CORPORATION - RANCHO CORDOVA, CA
Projects – Water/gas , HVAC, pumps and motors, pipelines, valves, backflow devices
Provided construction support for commissioning energy efficiency equipment; prepared specification, and monitored and
oversaw the activities of the contractors, vendors, and interact and update clients on construction activities; prepared daily
reports on project activities; report weekly on project status on submittals, change orders, RFI and other construction issues.
·Provided safety guidelines in construction area to ensure safety in accordance with Construction Work Plans; Ability to obtain
all permits required and familiar with building codes and power distributions.
PROJECT ENGINNEER (SR. ENERGY ENGINEER) NOV 2007 – MAY 2012
PACIFIC GAS & ELECTRIC COMPANY (PG&E), SAN FRANCISCO, CA
PROJECTS: Demand-Response Programs, New Constructions, Commissioned and Retro-Commissioning Projects -
pumps, motors, HVAC, lightings
• Provided engineering support to address energy and other utility conservation and acquisition programs – reviewed
mechanical plans,equipment installation,and maintenanceprocedures
Provided project and program control for facility and utility infrastructure energy conservation projects – equipment
specifications,installation,maintenance,testing and operation costs
Provided engineering support that focused on efficiency upgrades to reduce energy use and utility costs – calculationsof
energy savings and proposed future energy use
• Supported the development, guidance and implementation of distributed and renewable generation projects, and the
design, review, and construction of energy efficient structures (new construction and retrofits)
• Performed or participated in energy audits of the client's facilities. - Identifying and developing energy conservation
measures (ECM's) and initiatives, including calculating expected energy savings, estimating implementation costs and
calculating simple paybacks
• Monitored facility operating practices to identify opportunities to improve or modify practices to reduce energy cost –
safety equipment operation, testing, and regular inspection
• Developed procedures and guidelines for equipment inspection, detailing program energy and cost savings as well as
capital projects implemented.
PROJECT ENGINEER (ELECTRICAL & MECHANICAL WORK) FEB 1999 – DEC 2006
PORT OF OAKLAND, OAKLAND – CA
DESIGN AND CONSTRUCTION OF MARITIME TERMINALS AND OAKLAND AIRPORT TERMINAL EXPANSION
Packing lot lighting, buildings, domestic water systems, gas distribution/transmission projects, power distribution
systems
Managed electrical and mechanical engineering projects from planning/designing to construction; Prepared project objectives,
scope, milestones and project schedules; prepared supporting documentations and monitored and coordinated project activities
to meet time and cost parameters; Prepared and implemented request for proposals for development projects; reviewed
proposal; negotiated with consultants and contractors; and participated in selection process of statements for qualifications, RFQ
from consultants, coordinated the necessary contract administration.
Knowledge of distribution, transmission power lines and substations (120 volts, 12kV to 115kV)
· Provided engineering design support to the 12kV, 115kV power lines projects
· Provided small to large project management ($250K to $100M)
· Ensured projects adhere to standard company practices and expectations through all aspects of project life
· Drove projects through all phases; worked on multiple projects at a time
· Lead vendor management effort by establishing contacts, assured weekly updates are held, assisted with resolutions
and managed vendor support effort on site.

RichmondApande PM

  • 1.
    Richmond Apande/ Phone#: (510)681-9692;Email:rapande99@yahoo.com ______________________________________________________________ SUMMARY: Highly-skilled Project Manager/Engineer with over nine years of professional experience in management projects. Has worked with PG&E Company (2007-2012) directly and has provided engineering support on equipment commissioning/retro-commissioning and energy efficiency projects; and has worked with the Port of Oakland as an Electrical/Mechanical Engineer (1999 to 2006) and provided engineering design and construction support. Familiar with distribution and transmission power lines ( 120V to 12kV to 115kV), and design and construction of water and gas pipeline projects. EDUCATION: MSEM – Master of Sc. Engineering Management-California State University,Eastbay – CA – 2016 B.Sc. Mechanical Engineering/Minor Mathematics, California State University, Fresno- CA Engineer-In-Training (EIT) Certificate American Society of Mechanical Engineers (ASME) SKILLS: Certificates: Project Management courses; NEC 2005 Certificate; Mechanical Design, Title 24 – Non-Residential Mechanical Requirements; Building Electrical Design Certifications; Industrial Energy Efficiency Strategy Certification etc. Computer Skills: Proficient in MS Word, Excel (Spreadsheet), emailing, Project scheduling, and work Project Management, Budget Monitoring Software; EnergyPro/eQuest Software, pressure, equipment Test Procedures CONSTRUCTION PROJECT MANAGER (CONSTRUCTION BUILDING) APRIL 2014 – PRESENT Pacific Real Estates Provide engineering design and construction support on commercial and residential buildings; Plan, direct and coordinate project activities to ensure that the projects meet project objectives. Review status reports, update cost and schedule as required; Responsible for the overall quality of work by supervising all project deliverables, recognize and resolve potential problems by implementing corrective actions; Inspect and review plans to match what is constructed with building and safety (ADA, OHSA, ASHRAE) codes, and other regulations; Interpret and explain plans and contract terms to staff, workers, and clients. FACILITYENGINEER (DESIGN/CONSTRUCTION PROJECTS) JAN 2014 – APRIL 2014 AEROJET-ROCKETDYNE CORPORATION - RANCHO CORDOVA, CA Projects – Water/gas , HVAC, pumps and motors, pipelines, valves, backflow devices Provided construction support for commissioning energy efficiency equipment; prepared specification, and monitored and oversaw the activities of the contractors, vendors, and interact and update clients on construction activities; prepared daily reports on project activities; report weekly on project status on submittals, change orders, RFI and other construction issues. ·Provided safety guidelines in construction area to ensure safety in accordance with Construction Work Plans; Ability to obtain all permits required and familiar with building codes and power distributions. PROJECT ENGINNEER (SR. ENERGY ENGINEER) NOV 2007 – MAY 2012 PACIFIC GAS & ELECTRIC COMPANY (PG&E), SAN FRANCISCO, CA
  • 2.
    PROJECTS: Demand-Response Programs,New Constructions, Commissioned and Retro-Commissioning Projects - pumps, motors, HVAC, lightings • Provided engineering support to address energy and other utility conservation and acquisition programs – reviewed mechanical plans,equipment installation,and maintenanceprocedures Provided project and program control for facility and utility infrastructure energy conservation projects – equipment specifications,installation,maintenance,testing and operation costs Provided engineering support that focused on efficiency upgrades to reduce energy use and utility costs – calculationsof energy savings and proposed future energy use • Supported the development, guidance and implementation of distributed and renewable generation projects, and the design, review, and construction of energy efficient structures (new construction and retrofits) • Performed or participated in energy audits of the client's facilities. - Identifying and developing energy conservation measures (ECM's) and initiatives, including calculating expected energy savings, estimating implementation costs and calculating simple paybacks • Monitored facility operating practices to identify opportunities to improve or modify practices to reduce energy cost – safety equipment operation, testing, and regular inspection • Developed procedures and guidelines for equipment inspection, detailing program energy and cost savings as well as capital projects implemented. PROJECT ENGINEER (ELECTRICAL & MECHANICAL WORK) FEB 1999 – DEC 2006 PORT OF OAKLAND, OAKLAND – CA DESIGN AND CONSTRUCTION OF MARITIME TERMINALS AND OAKLAND AIRPORT TERMINAL EXPANSION Packing lot lighting, buildings, domestic water systems, gas distribution/transmission projects, power distribution systems Managed electrical and mechanical engineering projects from planning/designing to construction; Prepared project objectives, scope, milestones and project schedules; prepared supporting documentations and monitored and coordinated project activities to meet time and cost parameters; Prepared and implemented request for proposals for development projects; reviewed proposal; negotiated with consultants and contractors; and participated in selection process of statements for qualifications, RFQ from consultants, coordinated the necessary contract administration. Knowledge of distribution, transmission power lines and substations (120 volts, 12kV to 115kV) · Provided engineering design support to the 12kV, 115kV power lines projects · Provided small to large project management ($250K to $100M) · Ensured projects adhere to standard company practices and expectations through all aspects of project life · Drove projects through all phases; worked on multiple projects at a time · Lead vendor management effort by establishing contacts, assured weekly updates are held, assisted with resolutions and managed vendor support effort on site.