PRAFUL KUMAR
Tel: +8884067183(M), E-Mail: praful.mail18.pk@gmail.com
praful.mail18@gmail.com
Seeking an opportunity to utilize my Technical skills in an Organization best of my
knowledge and hoping to play an interview and active role in the organization growth.
PROFESSIONAL SNAPSHOT
Over 4+ Year of experience in the area of Engineering, Design & Project deliveries. Currently associated with
Vacon Drives & Control Pvt Ltd India from 18.11.2013 to till date. I have rich accomplishment in Project
Planning & Scheduling.
Pervious Employee:
M/s Anupam Industries Ltd as a Design Engineer (Electrical) from 10th
June 2013 to 30th
October
2013.
McChem Anlagen Energies & Infratech Pvt Ltd Bhilai As a Project Engineer (From 1st
April 2011 to
2nd
june 2013).
PROFESSIONAL CREDENTIALS
B-TECH Electronics Engineering - Pass percentage: 72%, Year: 2007-2011, Biju Patnaik University of
Technology Odisha.
HSC Marwari Collage Ranchi-pass percentage: 65%, Year -2004-2006, Jharkhand board, SSLC Rose
Public School (CBSE) – pass percentage: 61 % year -2004, Darbhanga Bihar
COMPETENCY OVERVIEW
ENGINEER (ENGINEERING):
VACON DRIVES BANGALORE (2 year 5 Months)
Vacon is an AC drives manufacturing company.
Roles & Responsibilities:
1) Project Planning & Scheduling.
2) Preparation, evaluation and annotation of specifications
3) interface to customer, order handling, factory and sub-suppliers or partners
4) Preparation of project calculation and - in cooperation with the sales engineers - the quotation
for our customer
5) Documentation and technical description, depending on customer demands and hand over to the
customer
6) Responsibility for time schedule and milestones
7) Organize any kind of FAT, start up- and commissioning support in close cooperation with the
competent service department
8) Preparing of inquiries for our sub suppliers and partners, including technical specifications
and interfaces
9) Making of Electrical Drawing In E Plan Software.
10) Making of General Arrangement Drawing In AutoCAD.
11) Ac Drive selection & Calculation.
Engineering & Project handling activities:
Involved in designing of AC drives engineered panels as per customer requirement as well project
execution activities like drawing approval with customer, technical support with Procurement, Inspection on
quality of material purchased, support for panel assembly with Production Team, Providing panel for
Inspection to customer & Coordinating with Quality & Testing team, project closure and documentation. And
also extended the support to Post sale team for commissioning as well servicing the system.
Product support activities –
Sales Support activities include AC Drive selection & Full cost Module for VFD Cabinet, product technical
support training to both internal and customers, critical site supports.
Key Projects executed
1. EOT Cranes NMDC Nagarnar projects common DC bus system which includes 90T & 300T crane
including PLC operation.
2. HAL 90KW & 75KW drive for Fan application 20 nos each.
3. E.O.T. Cranes of 33.5 MTR New Universal Rail mill package 30 Bhilai steel Plant. Maximum capacity of
50 T X 33.5m SpanAnrak – 1.4 MMTPA Alumina Refinery, Executed Common AC bus for the 415 Volt
(Range from 2.2kw to 280kw) and 690 Volt (Range from 315kw to 1150kw )
Marine - 2MW MOTOR – GENERATOR set for KEC (Kirloskar)
Sarbottam Cement 1200 TPD CLINKERISATION PLANT – 145kW Kiln and other application.
4. Siemens VAI 65T crane 33 mtr span with PLC operation.
5. Skip hoist application with 460A drive for Durgapur steel plant.
6. 690V & 415V line up drive panels including AFE & NFE for Danieli india Ltd.
DESIGN AND ENGINEERING
Anupam Industries Limited.
One of the largest Crane manufacturing company of India. (4 months)
ROLES & RESPONSIBILITY:
8) Making of Electrical Drawing In E Plan Software.
9) Making of General Arrangement Drawing In autocad.
10) Single line diagram of all electrical & control panel.
11) Preparation of Electrical Scheme as per customer requirement.
12) Motor Calculation/Selection,
13) Drive calculation/Selection.
14) Voltage drop calculation
15) DSL calculation,
16) Cable Calculation
17) DBR Calculation,
18) Short circuit calculation as per (ISO,IEC,FEM ) Standards.
19) Bill of Material Finalization.
20) Enquiry generation.
21) Technical discussion with customer/clients.
PROJECT ENGINEER IN McChem ANLAGEN ENERGIES & INFRATECH PVT LTD (MARCH
2011 TO JUNE 2013)
ELCTRICAL AND INSTRUMENTATION AUTOMATION
Experienced in EMERSON MAKE UPS UP TO 20kva, ABB DRIVES,PLC panel MCC , DRIVE,
Design Engineering and commissioning, All
Electrical and Control Panels.
1) Engineering and design, Programming, field instrumentation, drive,UPS,MCC panel erection,
Commissioning experience of commissioning of ABB drives ACS 850,550MCC,PCC in Ankit Metal &
Power Bankura West Bengal.
2) Engineering and designing & commissioning of AC Drives Make ABB in Sarda Energy & Minerals
Raipur Chhatisgarh.
3) Engineering design & Commissioning of ACS 850 drives make ABB 30TON crane panel in JINDAL
POWER LIMITED Tamnar Raigarh Chhatisgarh.
4) Engineering & Design commissioning of ABB drives,MCC,PCC, panel erection and commissioning
for Jindal steel & Power Angul Odisha.
5) Engineering Design ,Erection,Commissioning Of ABB Drives For 200 ton Transfer Car for Nalwa steel
& Power Raigarh Chhatisgarh.
6) Installation & Commissioning of Emerson make UPS 1 kva to 20 kva.
7) Design and Engineering of CCR(central control room) in Ankit Metal & Power (0.6Mtpa Pallet
& Benifivation) Bankura West Bengal.
8) Analysing of P & I diagram,Preparation of project schedule & documentation, Project site
survey.
9)
Soft skills
1) MS office/Excel
2) E-Plan
3) AutoCAD
4) Drives Software(Drive Studio of ABB)
5) C
6) C++
PERSONAL DETAILS
Date of Birth : 31th
july 1989
Present Address : House No-130 BTM 1st
stage 4th
main KEB layout opposite to
Jaydeva Hospital.
Language known : English,Hindi
MOB No : 8884067183
DECLARATION
I hereby declare that the information furnished above is true to the best of my knowledge & consciousness.
With Regards
Praful Kumar

My resume updated

  • 1.
    PRAFUL KUMAR Tel: +8884067183(M),E-Mail: praful.mail18.pk@gmail.com praful.mail18@gmail.com Seeking an opportunity to utilize my Technical skills in an Organization best of my knowledge and hoping to play an interview and active role in the organization growth. PROFESSIONAL SNAPSHOT Over 4+ Year of experience in the area of Engineering, Design & Project deliveries. Currently associated with Vacon Drives & Control Pvt Ltd India from 18.11.2013 to till date. I have rich accomplishment in Project Planning & Scheduling. Pervious Employee: M/s Anupam Industries Ltd as a Design Engineer (Electrical) from 10th June 2013 to 30th October 2013. McChem Anlagen Energies & Infratech Pvt Ltd Bhilai As a Project Engineer (From 1st April 2011 to 2nd june 2013). PROFESSIONAL CREDENTIALS B-TECH Electronics Engineering - Pass percentage: 72%, Year: 2007-2011, Biju Patnaik University of Technology Odisha. HSC Marwari Collage Ranchi-pass percentage: 65%, Year -2004-2006, Jharkhand board, SSLC Rose Public School (CBSE) – pass percentage: 61 % year -2004, Darbhanga Bihar COMPETENCY OVERVIEW ENGINEER (ENGINEERING): VACON DRIVES BANGALORE (2 year 5 Months) Vacon is an AC drives manufacturing company. Roles & Responsibilities: 1) Project Planning & Scheduling. 2) Preparation, evaluation and annotation of specifications 3) interface to customer, order handling, factory and sub-suppliers or partners 4) Preparation of project calculation and - in cooperation with the sales engineers - the quotation for our customer 5) Documentation and technical description, depending on customer demands and hand over to the customer 6) Responsibility for time schedule and milestones 7) Organize any kind of FAT, start up- and commissioning support in close cooperation with the competent service department 8) Preparing of inquiries for our sub suppliers and partners, including technical specifications and interfaces 9) Making of Electrical Drawing In E Plan Software. 10) Making of General Arrangement Drawing In AutoCAD. 11) Ac Drive selection & Calculation. Engineering & Project handling activities: Involved in designing of AC drives engineered panels as per customer requirement as well project execution activities like drawing approval with customer, technical support with Procurement, Inspection on quality of material purchased, support for panel assembly with Production Team, Providing panel for Inspection to customer & Coordinating with Quality & Testing team, project closure and documentation. And also extended the support to Post sale team for commissioning as well servicing the system. Product support activities – Sales Support activities include AC Drive selection & Full cost Module for VFD Cabinet, product technical support training to both internal and customers, critical site supports.
  • 2.
    Key Projects executed 1.EOT Cranes NMDC Nagarnar projects common DC bus system which includes 90T & 300T crane including PLC operation. 2. HAL 90KW & 75KW drive for Fan application 20 nos each. 3. E.O.T. Cranes of 33.5 MTR New Universal Rail mill package 30 Bhilai steel Plant. Maximum capacity of 50 T X 33.5m SpanAnrak – 1.4 MMTPA Alumina Refinery, Executed Common AC bus for the 415 Volt (Range from 2.2kw to 280kw) and 690 Volt (Range from 315kw to 1150kw ) Marine - 2MW MOTOR – GENERATOR set for KEC (Kirloskar) Sarbottam Cement 1200 TPD CLINKERISATION PLANT – 145kW Kiln and other application. 4. Siemens VAI 65T crane 33 mtr span with PLC operation. 5. Skip hoist application with 460A drive for Durgapur steel plant. 6. 690V & 415V line up drive panels including AFE & NFE for Danieli india Ltd. DESIGN AND ENGINEERING Anupam Industries Limited. One of the largest Crane manufacturing company of India. (4 months) ROLES & RESPONSIBILITY: 8) Making of Electrical Drawing In E Plan Software. 9) Making of General Arrangement Drawing In autocad. 10) Single line diagram of all electrical & control panel. 11) Preparation of Electrical Scheme as per customer requirement. 12) Motor Calculation/Selection, 13) Drive calculation/Selection. 14) Voltage drop calculation 15) DSL calculation, 16) Cable Calculation 17) DBR Calculation, 18) Short circuit calculation as per (ISO,IEC,FEM ) Standards. 19) Bill of Material Finalization. 20) Enquiry generation. 21) Technical discussion with customer/clients.
  • 3.
    PROJECT ENGINEER INMcChem ANLAGEN ENERGIES & INFRATECH PVT LTD (MARCH 2011 TO JUNE 2013) ELCTRICAL AND INSTRUMENTATION AUTOMATION Experienced in EMERSON MAKE UPS UP TO 20kva, ABB DRIVES,PLC panel MCC , DRIVE, Design Engineering and commissioning, All Electrical and Control Panels. 1) Engineering and design, Programming, field instrumentation, drive,UPS,MCC panel erection, Commissioning experience of commissioning of ABB drives ACS 850,550MCC,PCC in Ankit Metal & Power Bankura West Bengal. 2) Engineering and designing & commissioning of AC Drives Make ABB in Sarda Energy & Minerals Raipur Chhatisgarh. 3) Engineering design & Commissioning of ACS 850 drives make ABB 30TON crane panel in JINDAL POWER LIMITED Tamnar Raigarh Chhatisgarh. 4) Engineering & Design commissioning of ABB drives,MCC,PCC, panel erection and commissioning for Jindal steel & Power Angul Odisha. 5) Engineering Design ,Erection,Commissioning Of ABB Drives For 200 ton Transfer Car for Nalwa steel & Power Raigarh Chhatisgarh. 6) Installation & Commissioning of Emerson make UPS 1 kva to 20 kva. 7) Design and Engineering of CCR(central control room) in Ankit Metal & Power (0.6Mtpa Pallet & Benifivation) Bankura West Bengal. 8) Analysing of P & I diagram,Preparation of project schedule & documentation, Project site survey. 9) Soft skills 1) MS office/Excel 2) E-Plan 3) AutoCAD 4) Drives Software(Drive Studio of ABB) 5) C 6) C++ PERSONAL DETAILS Date of Birth : 31th july 1989 Present Address : House No-130 BTM 1st stage 4th main KEB layout opposite to Jaydeva Hospital. Language known : English,Hindi MOB No : 8884067183 DECLARATION I hereby declare that the information furnished above is true to the best of my knowledge & consciousness. With Regards Praful Kumar