Jeff Wang 562-551-8899 jeffusc@gmail.com
Dear Sir/Madam:
I am looking for the position of BIM Engineer/Project Engineer/Assistant Project
Manager. I am skilled at Project Management, Revit & CAD drafting, Quantity take-off,
Scheduling, and Planning, also with knowledge of PMP (Project Management Professional)
Certification, LEED AP Certification, Master degree of Construction Management (USC),
and Bachelor of Architecture. Bilingual in English and Chinese.
Currently, I service as a BIM Engineer for couple 28-story apartments project,
involved in dealing with integrating drawings (Permit set, Biding set, Construction set,
Structure, MEP and other relative documents) to developed the construction drawing by
Revit and AutoCAD. Developing 3D object models to illustrate design/construction
questions and possible solutions, including structure, finish and MEP phases.
Experienced as Estimating/Project Engineer (General Contractor), involved in Prolog
Manager software, Bidding and Budgeting of projects, such as LAUSD projects (Los
Angeles Unified School District), Federal projects, LA county projects, LAPWD projects
(Los Angeles Public Work Department), and Private projects.
Experienced as Field Project Engineer (General Contractor): few school projects in
HBUSD (Huntington Beach Unified School District), involved in RFI’s, COR’s, Review
shop drawing and submittals, Scheduling update, Construction drawing review/update, and
Subcontractor coordination.
I am eager to develop skills at the BIM knowledge use in Design/Construction. If you
could give me an opportunity to discuss my qualifications with you in person, I would be
really appreciated. Looking forward to hearing from you soon.
Sincerely,
Jeff Wang
PMP (Project Management Professional), PMI
Revit Architecture Certified, Autodesk
LEED AP, USGBC
OSHA 30 Certified
Master of Construction Management, USC
Bachelor of Architecture
Email: jeffusc@gmail.com
Cell Phone: 562-551-8899
Jeff Wang 562-551-8899 jeffusc@gmail.com
JEFF WANG
562-551-8899
jeffusc@gmail.com
EDUCATION / CERTIFICATION
PMP (Project Management Professional), Project Management Institute
Revit Architecture Certified, Autodesk
LEED AP, USGBC
2005 – 2006 Master of Construction Management, University of Southern California
1996 – 2001 Bachelor of Architecture
PROFESSIONAL EXPERIENCE
BIM Engineer
DACIN Construction Co. (Developer, General Contractor) 2011 - 2015
Pre-Construction Planning:
 Revit Model and Family Drafting, including Architecture and MEP.
 Developing 3D object models to illustrate design/construction questions and possible solutions,
including structure, finish and MEP phases.
 Integrating drawings (Permit set, Biding set, Construction set, Structure, MEP and other relative
documents) to developed the construction drawing by Revit and AutoCAD.
 Quantity take-off by using 3D model data.
 Generate RFI’s and track RFI Log.
Design/CAD Drafting/Project Engineer
Sea West Enterprises (Design-Build, General Contractor. San Dimas, CA) 2010 - 2011
Type of project Design/Construction:
 Design-Build: Pearson Sales TI. Tenant Improvement in a warehouse. From project design, plan
check, request permit through construction completed.
 Construction: Tournament of Roses TI (Tenant Improvement for new addition).
Estimator/Project Engineer
Premier West Contractors (Concrete, Paving, General Contractor. Orange, CA) 2009 - 2010
Type of project Estimating/Budgeting:
 LAUSD (Los Angeles Unified School District) school projects: Project engineer & Budgeting.
 Type of Projects Bidding: Federal Projects, Los Angeles County Projects, Los Angeles Public Work
Department Projects, City Projects, Motorola Communication Telecom Projects.
 Quantity take-off and Create bidding scope spreadsheet.
 Request for proposal, Qualify subcontractor’s proposal and verify scope of work and Bidding
package.
Field Project Engineer
Day Construction Co. (GC, Costa Mesa, CA) 2007 - 2009
Projects: Westminster High School, Ocean View High School, Huntington Beach High School.
Project size: 15 – 20 million.
 Coordinate with CM, Inspectors, and subcontractors.
 Generate RFI’s, review Shop drawing and Submittal, and track RFP’s, COR’s.
 Monitor Change order work and perform Quality control.
 Construction drawing review/update (IB’s, CCD’s, RFI’s) and As-Built drawing update.
 Jobsite Daily report, Safety meeting and file Inspection request.
 Delegated and directed all trades to their particular task, substantially reducing the potential for
improper construction or irreparable errors.
Jeff Wang 562-551-8899 jeffusc@gmail.com
Project Manager Assistant
R&Y Corporation (Design-Build company, Pasadena, CA) 2005 – 2006
Projects: 2-units Downtown LA., 12-units mix use. Pasadena., 12-units condominium. Pasadena.
 Quantity take off, budget estimating and overview proposals from subcontractor.
 Negotiate contracts to ensure a detailed, accurate scope of work and an efficient schedule.
 Responsible for payment requests and schedule report for work completed by subcontractors.
 Jobsite daily report, monitor change order items, budgeting and scheduling control.
 Coordinate with architect, professional engineer, subcontractor, and city inspectors.
 Resolved all problematic issues due to lack of detail information and consequential design change.
Design Assistant
Wang Architect Firm 2002 – 2004
Project: Building of Early Childhood Education Department /CHENG SHIU UNIVERSITY
 Coordinated between the architectural and engineering drawings.
 Assisted project manager in planning and arrangement of SD and DD drawing.
 Assisted in applying for building permits from city.
Administration Assistant 2001 – 2002
Development at Bureau of Cultural Affairs, City of Kaohsiung, Taiwan.
 Planned and operated activities for special municipal events.
 Worked as a team leader of the communities’ historical survey and report publication.
 Assisted in urban planning for redeveloping the desolation area.
SKILLS
Computer Proficiency
Familiar with Revit Architecture, Navisworks, AutoCAD, Prolog Management, MS Project, Office suit
Experienced in Tekla, Ecotech Analysis, Photoshop, Primavera Project Planner (P3), and Suretrack.
Engineering take-off and Estimating Software: Revit, AutoCAD, Bluebeam, WinEst, Progen, Goldon.
Others
Strong in blue plan details, scheduling, budgeting, field paper work and bidding documentation.
OSHA Safety & Health training, SWPPP’s Certified (Wal-Mart)
Language: English and Chinese
CLASSES / PROJECTS (USC, Master of CM)
Key courses / MCM Program: (Classes from Deportment of Civil Engineering, Architecture and Real Estate)
 Construction Methods and Equipment, Advanced Building Estimating, Functions of the Constructor,
International Construction and Engineering, Project Cost Estimating, Control, Planning and
Scheduling. Seminar: Building Systems.
 Finance of Real Estate Development, Finance Fundamentals for Real Estate Development, Market
Analysis for Real Estate, Construction Accounting and Finance.
Field Project List
Pearson Sales TI, CA
Tenant Improvement - 2010 - $1M – (Project Engineer)
Tournament of Roses, CA
Tenant Improvement - 2010 - $1M – (Project Engineer)
Huntington Beach High School, CA
School Modernization - 2008 - $17M – (Field Project Engineer)
Ocean View High School, CA
School Modernization – 2007 thru 2008 - $18M – (Field Project Engineer)
Westminster High School, CA
School Modernization – 2006 thru 2008 - $18M – (Field Project Engineer)
Condominium (Pasadena, CA)
New 12 units Multi-Family – 2006 thru 2007 - $6M – (PM Assistant/Superintendent Assistant)
Jeff Wang 562-551-8899 jeffusc@gmail.com
Mix-Use (Pasadena, CA)
New 12 units Mix-Use – 2005 thru 2007 - $6M – (Field Project Engineer/Superintendent Assistant)
Duplex Family (Los Angeles, CA)
New 2 units 3 stories – 2006 thru 2007 - $1.2M – (Field Project Engineer/Superintendent Assistant)
Educational Facility
New Facility Buildings – 2002 thru 2004 - $13M – (Assistant Designer/Field Engineer)

Resume (Jeff)

  • 1.
    Jeff Wang 562-551-8899jeffusc@gmail.com Dear Sir/Madam: I am looking for the position of BIM Engineer/Project Engineer/Assistant Project Manager. I am skilled at Project Management, Revit & CAD drafting, Quantity take-off, Scheduling, and Planning, also with knowledge of PMP (Project Management Professional) Certification, LEED AP Certification, Master degree of Construction Management (USC), and Bachelor of Architecture. Bilingual in English and Chinese. Currently, I service as a BIM Engineer for couple 28-story apartments project, involved in dealing with integrating drawings (Permit set, Biding set, Construction set, Structure, MEP and other relative documents) to developed the construction drawing by Revit and AutoCAD. Developing 3D object models to illustrate design/construction questions and possible solutions, including structure, finish and MEP phases. Experienced as Estimating/Project Engineer (General Contractor), involved in Prolog Manager software, Bidding and Budgeting of projects, such as LAUSD projects (Los Angeles Unified School District), Federal projects, LA county projects, LAPWD projects (Los Angeles Public Work Department), and Private projects. Experienced as Field Project Engineer (General Contractor): few school projects in HBUSD (Huntington Beach Unified School District), involved in RFI’s, COR’s, Review shop drawing and submittals, Scheduling update, Construction drawing review/update, and Subcontractor coordination. I am eager to develop skills at the BIM knowledge use in Design/Construction. If you could give me an opportunity to discuss my qualifications with you in person, I would be really appreciated. Looking forward to hearing from you soon. Sincerely, Jeff Wang PMP (Project Management Professional), PMI Revit Architecture Certified, Autodesk LEED AP, USGBC OSHA 30 Certified Master of Construction Management, USC Bachelor of Architecture Email: jeffusc@gmail.com Cell Phone: 562-551-8899
  • 2.
    Jeff Wang 562-551-8899jeffusc@gmail.com JEFF WANG 562-551-8899 jeffusc@gmail.com EDUCATION / CERTIFICATION PMP (Project Management Professional), Project Management Institute Revit Architecture Certified, Autodesk LEED AP, USGBC 2005 – 2006 Master of Construction Management, University of Southern California 1996 – 2001 Bachelor of Architecture PROFESSIONAL EXPERIENCE BIM Engineer DACIN Construction Co. (Developer, General Contractor) 2011 - 2015 Pre-Construction Planning:  Revit Model and Family Drafting, including Architecture and MEP.  Developing 3D object models to illustrate design/construction questions and possible solutions, including structure, finish and MEP phases.  Integrating drawings (Permit set, Biding set, Construction set, Structure, MEP and other relative documents) to developed the construction drawing by Revit and AutoCAD.  Quantity take-off by using 3D model data.  Generate RFI’s and track RFI Log. Design/CAD Drafting/Project Engineer Sea West Enterprises (Design-Build, General Contractor. San Dimas, CA) 2010 - 2011 Type of project Design/Construction:  Design-Build: Pearson Sales TI. Tenant Improvement in a warehouse. From project design, plan check, request permit through construction completed.  Construction: Tournament of Roses TI (Tenant Improvement for new addition). Estimator/Project Engineer Premier West Contractors (Concrete, Paving, General Contractor. Orange, CA) 2009 - 2010 Type of project Estimating/Budgeting:  LAUSD (Los Angeles Unified School District) school projects: Project engineer & Budgeting.  Type of Projects Bidding: Federal Projects, Los Angeles County Projects, Los Angeles Public Work Department Projects, City Projects, Motorola Communication Telecom Projects.  Quantity take-off and Create bidding scope spreadsheet.  Request for proposal, Qualify subcontractor’s proposal and verify scope of work and Bidding package. Field Project Engineer Day Construction Co. (GC, Costa Mesa, CA) 2007 - 2009 Projects: Westminster High School, Ocean View High School, Huntington Beach High School. Project size: 15 – 20 million.  Coordinate with CM, Inspectors, and subcontractors.  Generate RFI’s, review Shop drawing and Submittal, and track RFP’s, COR’s.  Monitor Change order work and perform Quality control.  Construction drawing review/update (IB’s, CCD’s, RFI’s) and As-Built drawing update.  Jobsite Daily report, Safety meeting and file Inspection request.  Delegated and directed all trades to their particular task, substantially reducing the potential for improper construction or irreparable errors.
  • 3.
    Jeff Wang 562-551-8899jeffusc@gmail.com Project Manager Assistant R&Y Corporation (Design-Build company, Pasadena, CA) 2005 – 2006 Projects: 2-units Downtown LA., 12-units mix use. Pasadena., 12-units condominium. Pasadena.  Quantity take off, budget estimating and overview proposals from subcontractor.  Negotiate contracts to ensure a detailed, accurate scope of work and an efficient schedule.  Responsible for payment requests and schedule report for work completed by subcontractors.  Jobsite daily report, monitor change order items, budgeting and scheduling control.  Coordinate with architect, professional engineer, subcontractor, and city inspectors.  Resolved all problematic issues due to lack of detail information and consequential design change. Design Assistant Wang Architect Firm 2002 – 2004 Project: Building of Early Childhood Education Department /CHENG SHIU UNIVERSITY  Coordinated between the architectural and engineering drawings.  Assisted project manager in planning and arrangement of SD and DD drawing.  Assisted in applying for building permits from city. Administration Assistant 2001 – 2002 Development at Bureau of Cultural Affairs, City of Kaohsiung, Taiwan.  Planned and operated activities for special municipal events.  Worked as a team leader of the communities’ historical survey and report publication.  Assisted in urban planning for redeveloping the desolation area. SKILLS Computer Proficiency Familiar with Revit Architecture, Navisworks, AutoCAD, Prolog Management, MS Project, Office suit Experienced in Tekla, Ecotech Analysis, Photoshop, Primavera Project Planner (P3), and Suretrack. Engineering take-off and Estimating Software: Revit, AutoCAD, Bluebeam, WinEst, Progen, Goldon. Others Strong in blue plan details, scheduling, budgeting, field paper work and bidding documentation. OSHA Safety & Health training, SWPPP’s Certified (Wal-Mart) Language: English and Chinese CLASSES / PROJECTS (USC, Master of CM) Key courses / MCM Program: (Classes from Deportment of Civil Engineering, Architecture and Real Estate)  Construction Methods and Equipment, Advanced Building Estimating, Functions of the Constructor, International Construction and Engineering, Project Cost Estimating, Control, Planning and Scheduling. Seminar: Building Systems.  Finance of Real Estate Development, Finance Fundamentals for Real Estate Development, Market Analysis for Real Estate, Construction Accounting and Finance. Field Project List Pearson Sales TI, CA Tenant Improvement - 2010 - $1M – (Project Engineer) Tournament of Roses, CA Tenant Improvement - 2010 - $1M – (Project Engineer) Huntington Beach High School, CA School Modernization - 2008 - $17M – (Field Project Engineer) Ocean View High School, CA School Modernization – 2007 thru 2008 - $18M – (Field Project Engineer) Westminster High School, CA School Modernization – 2006 thru 2008 - $18M – (Field Project Engineer) Condominium (Pasadena, CA) New 12 units Multi-Family – 2006 thru 2007 - $6M – (PM Assistant/Superintendent Assistant)
  • 4.
    Jeff Wang 562-551-8899jeffusc@gmail.com Mix-Use (Pasadena, CA) New 12 units Mix-Use – 2005 thru 2007 - $6M – (Field Project Engineer/Superintendent Assistant) Duplex Family (Los Angeles, CA) New 2 units 3 stories – 2006 thru 2007 - $1.2M – (Field Project Engineer/Superintendent Assistant) Educational Facility New Facility Buildings – 2002 thru 2004 - $13M – (Assistant Designer/Field Engineer)