SlideShare a Scribd company logo
1 of 4
Download to read offline
RESUME
Jacqueline B. Mims
526 Nottingham Road
Baltimore, MD 21229
443-515-3209-c
jmimsrivera@gmail.com
jmimsriveraJBM@gmail.com
SUMMARY
• Skilled at safeguarding Owner’s financial interests during construction.
• Broad Experience in commercial and residential construction means, methods, and materials.
• Successfully completed projects on time and under budget.
• Effective negotiator, decision maker, and time manager.
• Knowledge of safety, building and fire codes.
• CERTIFIED OSHA 10-hour safety CPR and First Aid.
• Conscientious, professional attitude; committed to getting the job done.
• Utilizes keen foresight to eliminate problems before they occur.
• Meticulous Quality Control, Quality Assurance manager.
CHRONOLOGY OF MAJOR EXPERIENCE
January 2012-Present Training Consultancy and Construction Management -JBM
Construction Development Group,
Washington DC CEO, Business Owner
March 2013- November 2015 University of Maryland, Facilities Management,
Department of Facilities Planning, College Park MD.,
Construction Contract Supervisor, On-Site
Construction Representative
September 2008-January 2012 FEI Construction Company, Washington, DC
Project Manager
March 2005- September 2007 Hill International
Business Development Coordinator, Project Manager
August 1999-February 2005 Balfour Beatty Construction (Formerly Centex Construction
Company) Project Manager, Project Superintendent
September 1994- August 1999 Turner Construction Company
Assistant Project Engineer, Project Engineer, Superintendent
DETAILED PROJECT LIST
SUPERVISOR CONSTRUCTION CONTRACTS, ON-SITE CONSTRUCTION REPRESENTATIVE, Campus Projects Division, Facilities
Management, Department of Facilities Planning, Various Campus Projects, College Park Campus, University of Maryland.
Perform general quality assurance inspection activities to ensure construction projects are in compliance with: the project’s design documents;
safe construction practices; and, properly coordinated with specialty systems (e.g. electrical, mechanical, controls) associated with each project.
Coordinate, as required, with the University’s inspectors for such specialties. Review plans, specifications, and progress schedule, and
coordinate various aspects of multiple construction projects. Prepare and submit daily progress and field reports, identifying work inspected,
interpretation of tests conducted and tests reports, and their results, findings, and recommendations for corrective and follow-up actions.
Process contractor’s submittals for review by Facilities Management’s design teams. Perform acceptance inspections and manage project
punch lists. Perform other duties as required which may include coordination of system shutdown and integration, coordination of mechanical
and plumbing aspects with architect/engineers, contractors, inspection and testing personnel, and technical and professional university project
team members. Participate in, and provides support in the review of project financial status, including negotiation of contract change orders;
propose changes and approval of contractor invoices. Provides input for evaluations of contractors and architectural/engineering firms. Provide
assistance/support to user and Facilities Management’s maintenance departments during project’s warranty period. Perform other duties as
assigned.
CORPORATE TRAINING CONSULTANT (PART-TIME) JBM Construction Development Group, Washington DC
HORIZONS Construction and Trade Business Institute is a for profit arm of JBM Construction Development Group whose charge is to
provide on-going business development training for Certified Business Enterprises (CBE’s), small and minority General Contractors and Trade
Subcontractors, who want to: increase sales, get training on ‘how to do business with major General contractors’, become viable, effective
and efficient competitors, become participants on private, public, federal and local government projects throughout the DC region and
beyond.
The mission is to broaden the pool of construction entities that possess the resources and skills to manage their businesses efficiently, grow
their businesses, obtain contracts, perform effectively, become financially secure, and profitable. We want our graduates to be among a
multitude of businesses that are true participating minority members of construction teams for projects requiring Majority General
Contractors to partner with CBE’s and minority businesses, instead of acting as a “pass-through” entity. We train CBE businesses to qualify
or meet state and local government contract Compliance requirements for participation in publicly funded projects, and teach them how to
avoid defaulting on contracts and debarment.
We are working to achieve our mission through providing very low cost training in, “Success is a Mindset”, Basic Business Development and
Strategic Planning…“Planning our Growth”, and our Construction and Trade Business Operations 101 (How to Run your business), which
leads to certification that will be endorsed by State and local governments, General Construction Contractors, Construction Trade Associations,
and Chambers of Commerce.
PROJECT MANAGER Deanwood Community Center, Washington, DC. FEI Construction Company
$44 million Community Center, Library, and Natatorium. Managed Construction team for the construction of a 63,000 SF steel and
CMU block structure. The facility includes a pool with (6) lap lanes, waterslide and recreational play features, 1600 SF DC Public Library
space, community room, gymnasium, and childcare center. Also responsible for establishing and managing surrounding community outreach
including employment job fairs, overseeing subcontractor adherence to DC employment apprenticeship program requirements, and
educational partnering with a local Junior High School.
PROJECT ENGINEERING MANAGER Eastern Market, Washington, DC. FEI Construction Company
$15 million Restoration of the Historic Eastern Market. Managed completion of critical product Submittal reviews, and met the
procurement challenge of obtaining “Red Saint Bees Stone” to match existing 100+ year old historic Stone harvested from original quarry in
England, in order to meet historic preservation requirements.
BUSINESS DEVELOPMENT COORDINATOR, Washington, DC, Hill International, Identified potential business opportunities,
generated written proposals in response to various Solicitations and RFP’s.
PROJECT ENGINEER U.S. Supreme Court , Renovation of Supreme Court Justices Office Suites, Architect of the Capital,
Washington, DC, Hill International Renovation of private office suites occupied the United States Supreme Court Justices including all
security upgrades, Mechanical , Electrical, Plumbing and Sprinkler upgrades. Managed submittal processing, and change order justifications.
PROJECT MANAGER GSA Nationwide IDIQ, General Services Administration (GSA), Public Building Service, Nationwide, Hill
International Conducted Constructability reviews of various Federal Courthouse Design documents, Border Crossing Stations, GSA Office
Buildings. Prepared detailed reports of design adherence to GSA Building Standards, at all stages of Design Development including: Concept
Development, Design Development, and Construction Documents. Utilized electronic review tool established by GSA to generate report and
managed in-house team of reviewers.
DETAILED PROJECT LIST continued
PROJECT MANAGER Wilbur J. Cohen Building, Life Safety System Retro-fit, General Services Administration (GSA), Hill
International $10 million replacement of existing life safety system including removal and replace of Fire Alarm System, Fire Suppression
System, Fire Pump, Underground Sprinkler system Connections.
AREA SUPERINTENDENT National Institutes of Health, Clinical Research Center, Bethesda MD. Centex Construction
Company $650 million, 1.5 million sq. ft. research hospital. Managed construction of Sectors B&C Patient Care diagnostic labs and
administrative offices. Provided oversight of Rough-in and Build-out of Patient Care Rooms and diagnostic areas, including Pediatric Patient
Care areas (ie. Med Gas distribution, Nurse Call, and coordination of Medical Headwall Systems installations.) Responsible for implementing
quality control procedures, established regular deliveries of steel and concrete. Inspected all concrete formwork prior to concrete pours.
Managed and maintained regular subcontractors schedule updates. Assisted subcontractors in obtaining timely answers to RFIs. Monitored
the disassembly of the tallest tower crane in the Washington Metro Area. Coordinated construction interstitial floors containing mechanical,
electrical, plumbing, telecom and medical gas distribution equipment. Also responsible for the management of the miscellaneous metals
package and the construction of the east and west pedestrian bridges connecting the north and south buildings.
SUPERINTENDENT Dulles Technology Center Herndon, VA. Centex Construction Company 177,000 sq. ft. office building and
450 car parking garage, in a three building office complex on a 13 acre site. Responsible for the construction of Building “B”, a
450 car precast parking garage, and underground site utilities. Supervised a three-man labor crew and an Assistant Superintendent.
Developed regular schedule updates, established new schedules for parking garage schedules, as well as regular master schedule updates.
Tracked delivery of major equipment and materials. Analyzed manpower distribution and work activities required to meet target dates.
Created site logistics plans to eliminate activity conflicts. Coordinated all sitework activities, including stake-out, excavation, grading,
subgrade testing, concrete curb and gutter installation, landscaping and asphalt paving operations. Conducted daily quality control
inspections of substrate prior to, during and after installations were complete.
PROJECT MANAGER/ASSISTANT PROJECT MANAGER Prosperity Medical Office Plaza, Centex Construction Company,
Fairfax, VA. 150,000 sq. ft. medical office building and 400 car precast parking garage.
Managed the project controls database. Reviewed submittals and shop drawings for adherence to contract drawings and specifications for
building “C”. Coordinated the installation of precast panels, iron work, signage, parking controls, lighting, mechanical/ storm water piping,
landscaping and site lighting.
ASSISTANT SUPERINTENDENT/ SAFETY COORDINATOR KPMG, Tyson Tower II, Mc Clean VA. Turner Construction
Company. 13- story office building with (2) parking levels below grade,(3) parking levels above grade, and (10) levels of
office floors. Managed all base building trades for the build-out of the core, the coordination of all interior trades, and coordination of
curtainwall and precast with interior work. Supervised layout of bathroom to ensure compliance with ADA requirements. Scheduled county
inspections, conducted preconstruction and progress meetings. Tracked the status of and submitted RFI’s to the Architect and Owner.
Reviewed and updated project schedules. Responsible for daily project safety inspections. Conducted quality control inspections of all fire
rated partitions, and and firestopping at MEP penetrations and slab edges.
ASSISTANT SUPERINTENDENT/ PROJECT ENGINEER Maryland Center for the Performing Arts, College Park Maryland
Turner Construction Company. Phase One- Lot One Road re-alignment and underground utilities; Phase Two- Stadium
Drive Garage; Phase Three and Four- Performing Arts Center construction. Phase One- Responsible for Project Engineering
associated with the road re-alignment and installation of underground utilities for the Performing Arts Center. Processed submittals, change
orders, and material delivery schedules. Managed cost and project controls via database network. Phase Two- Responsible for the
engineering activities associated with construction of an 800 car CIP, precast and brick parking garage. Client required completion within
nine months, including Certificate of Occupancy. Completed project on exact date scheduled—under budget. Visited manufacturing plants for
production schedule progress, for quality control inspections, and payment requisition review of stored materials. Inspected precast panels
and bullet proof guard booths during the manufacturing process. Initiated and implemented revisions to project landsc aping plans.
Coordinated the re-design of a $300,000 graphics package, leading to an Owner’s savings of $60,000. Initiated the creation of a new
standard color formula to match the Maryland State Flag emblem for the graphics package. Responsible for constructability reviews related
to precast concrete, cast-in-place concrete, mechanical, electrical, and masonry trades. Prepared all warranties and guarantees for
submission to owner. Phase Three and Four- Assisted in the coordination of structural steel shop drawings, managed all change directives
related to steel erection. Tracked steel erection and precast plank installation. Inventoried structural steel deliveries.
PROJECT ENGINEER Thetford Properties, Raleigh, Durham, Burlington, and Rocky Mount NC, Turner Construction Company.
Renovation of 400 low income residential units. Conducted surveys of all units to determine renovation/ repair scope. Created a
matrix to manage and organize the scope of work for each unit. Provided estimates for the scope of work. Wrote all ‘requests for pricing’,
‘subcontract scopes’, and ‘subcontract agreements’.
PROJECT ENGINEER Union Theological Seminary, Richmond, VA, Turner Construction Company.
Conversion of a 100-year old stone church building to a state of the art library. Reviewed shop drawings for compliance with code
requirements and contract documents. Authored subsequent Requests For Information (RFIs) to communicate conflicts and s hortfalls in
construction details. Generated owner and subcontract change orders. Reviewed and negotiated subcontractors change proposals.
EDUCATION
Howard University School of Architecture, Washington DC
Project Management Certificate,
Association of Builders and Contractors
ABC Project Management Training, Fall 2000
American Home Inspectors Training Course, AHIT, American Home Inspection Training, Spring 2012
HOBBIES AND INTERESTS
MARTIAL ARTS- Korean Style Tae Kwon Do
REFERENCES
Andrea Warren- Project Manager, (FEI Construction), 513-885-1237
Lavon Mays- Senior Project Scheduler, (FEI Construction), 301-956-6530
Maria Thompson- Project Executive, Centex (Balfour Beatty Construction), 202-438-1272
Steve Anderson- Owner’s Representative, DC Department of Parks and Recreation, 202-255-2764
Marilyn Goslin- Chief Field Engineer, Centex (Balfour Beatty Construction), 443-845-0049 C.
David Barber- Senior Superintendent, Centex (Balfour Beatty Construction), 301-651-2757
Thunder Lane- Owner’s Representative, University of the District of Columbia, 202-526-4099

More Related Content

What's hot

What's hot (20)

CV-CRLIV-2015-ABB
CV-CRLIV-2015-ABBCV-CRLIV-2015-ABB
CV-CRLIV-2015-ABB
 
CV-CRLIV-2015-ABB
CV-CRLIV-2015-ABBCV-CRLIV-2015-ABB
CV-CRLIV-2015-ABB
 
Hackworth steven 1 2012
Hackworth steven 1 2012Hackworth steven 1 2012
Hackworth steven 1 2012
 
Resume_jcrooks_12-15-2015
Resume_jcrooks_12-15-2015Resume_jcrooks_12-15-2015
Resume_jcrooks_12-15-2015
 
CM Resume
CM Resume CM Resume
CM Resume
 
Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016
 
RW Resume_2014_LinkedIn
RW Resume_2014_LinkedInRW Resume_2014_LinkedIn
RW Resume_2014_LinkedIn
 
Curent Resume - Lucian Gunter IV
Curent Resume - Lucian Gunter IVCurent Resume - Lucian Gunter IV
Curent Resume - Lucian Gunter IV
 
PMR Career Experience 2016
PMR Career Experience 2016PMR Career Experience 2016
PMR Career Experience 2016
 
Brian Schipper resume
Brian Schipper resumeBrian Schipper resume
Brian Schipper resume
 
RobRuhlmanResume_11_16
RobRuhlmanResume_11_16RobRuhlmanResume_11_16
RobRuhlmanResume_11_16
 
Bradley R Johnson Resume
Bradley R Johnson ResumeBradley R Johnson Resume
Bradley R Johnson Resume
 
Darrell Resume2014
Darrell Resume2014Darrell Resume2014
Darrell Resume2014
 
Sunil Resume 2012
Sunil Resume   2012Sunil Resume   2012
Sunil Resume 2012
 
Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015
 
CV (1)
CV (1)CV (1)
CV (1)
 
Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1
 
William Faoro - 4pResumeM1
William Faoro - 4pResumeM1William Faoro - 4pResumeM1
William Faoro - 4pResumeM1
 
20100730 Jordan Cv
20100730 Jordan Cv20100730 Jordan Cv
20100730 Jordan Cv
 
013112 mds resume9
013112 mds resume9013112 mds resume9
013112 mds resume9
 

Viewers also liked

Resume Biju Alex
Resume Biju AlexResume Biju Alex
Resume Biju AlexBiju Alex
 
015 другий закон ньютона
015 другий закон ньютона015 другий закон ньютона
015 другий закон ньютонаNina Beljaewa
 
029 Реактивний рух
029 Реактивний рух029 Реактивний рух
029 Реактивний рухNina Beljaewa
 
Bersinergi berprestasi sit al uswah tuban ii2016
Bersinergi berprestasi sit al uswah tuban ii2016Bersinergi berprestasi sit al uswah tuban ii2016
Bersinergi berprestasi sit al uswah tuban ii2016Atho Illah
 
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project ManagerResume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project ManagerTerence Anderson (BSEE & MBA)
 
Composite Resume Latest Version
Composite  Resume Latest VersionComposite  Resume Latest Version
Composite Resume Latest VersionRichard Law
 
048 Газові закони
048 Газові закони048 Газові закони
048 Газові закониNina Beljaewa
 
RobertBurson resume
RobertBurson resumeRobertBurson resume
RobertBurson resumeRob Burson
 
Mapa conceptual derecho, moral y ética
Mapa conceptual derecho, moral y éticaMapa conceptual derecho, moral y ética
Mapa conceptual derecho, moral y éticayoha meza
 

Viewers also liked (20)

CircleOfLove
CircleOfLoveCircleOfLove
CircleOfLove
 
Resume Biju Alex
Resume Biju AlexResume Biju Alex
Resume Biju Alex
 
Ejemplos integracion tics
Ejemplos integracion ticsEjemplos integracion tics
Ejemplos integracion tics
 
Infografia (4)
Infografia (4)Infografia (4)
Infografia (4)
 
015 другий закон ньютона
015 другий закон ньютона015 другий закон ньютона
015 другий закон ньютона
 
029 Реактивний рух
029 Реактивний рух029 Реактивний рух
029 Реактивний рух
 
Ride In Style
Ride In StyleRide In Style
Ride In Style
 
Bersinergi berprestasi sit al uswah tuban ii2016
Bersinergi berprestasi sit al uswah tuban ii2016Bersinergi berprestasi sit al uswah tuban ii2016
Bersinergi berprestasi sit al uswah tuban ii2016
 
Apec 2016
Apec 2016Apec 2016
Apec 2016
 
informatica
informaticainformatica
informatica
 
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project ManagerResume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
 
Mira Abdelaziz resume
Mira Abdelaziz resumeMira Abdelaziz resume
Mira Abdelaziz resume
 
El Impacto Económico del Seguro en México
El Impacto Económico del Seguro en MéxicoEl Impacto Económico del Seguro en México
El Impacto Económico del Seguro en México
 
Composite Resume Latest Version
Composite  Resume Latest VersionComposite  Resume Latest Version
Composite Resume Latest Version
 
048 Газові закони
048 Газові закони048 Газові закони
048 Газові закони
 
Glycemic Control & CV outcome study by lars bryden
Glycemic Control & CV outcome study by lars brydenGlycemic Control & CV outcome study by lars bryden
Glycemic Control & CV outcome study by lars bryden
 
Pnl resume
Pnl resumePnl resume
Pnl resume
 
RobertBurson resume
RobertBurson resumeRobertBurson resume
RobertBurson resume
 
Planeta Terra: Movimentos e fuso horário
Planeta Terra: Movimentos e fuso horárioPlaneta Terra: Movimentos e fuso horário
Planeta Terra: Movimentos e fuso horário
 
Mapa conceptual derecho, moral y ética
Mapa conceptual derecho, moral y éticaMapa conceptual derecho, moral y ética
Mapa conceptual derecho, moral y ética
 

Similar to Resume Summary for Construction Manager

Mike Okey CV FM1 Linked in
Mike Okey  CV FM1 Linked inMike Okey  CV FM1 Linked in
Mike Okey CV FM1 Linked inMike Okey
 
Rick Stinnett Resume
Rick Stinnett ResumeRick Stinnett Resume
Rick Stinnett Resumerstinnett
 
Phil Staib's Resume 2016
Phil Staib's Resume 2016Phil Staib's Resume 2016
Phil Staib's Resume 2016Phil Staib
 
121207 webb jennifer-portfolio
121207 webb jennifer-portfolio121207 webb jennifer-portfolio
121207 webb jennifer-portfoliojenmelt10
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultantdanieloconnell
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultantdanieloconnell
 
Powerpoint Presentation For Edd Polaski
Powerpoint Presentation For Edd PolaskiPowerpoint Presentation For Edd Polaski
Powerpoint Presentation For Edd Polaskiaiaman
 
Stan Shipley Resume, Projects 11mr18
Stan Shipley   Resume, Projects 11mr18Stan Shipley   Resume, Projects 11mr18
Stan Shipley Resume, Projects 11mr18stan_shipley
 
Sestak Management Services
Sestak Management ServicesSestak Management Services
Sestak Management Servicestomsestak
 
Allman Alexis Resume Copy
Allman Alexis Resume CopyAllman Alexis Resume Copy
Allman Alexis Resume CopyLori Mitchell
 
Curriculum Vita and Portfolio of Services and Additional Projects
Curriculum Vita and Portfolio of Services  and Additional ProjectsCurriculum Vita and Portfolio of Services  and Additional Projects
Curriculum Vita and Portfolio of Services and Additional ProjectsPaul Smith 703-987-3919
 
William keane. 03.25.2016 final
William keane. 03.25.2016 finalWilliam keane. 03.25.2016 final
William keane. 03.25.2016 finalWilliam Keane
 
Chris Smith resume
Chris Smith resumeChris Smith resume
Chris Smith resumeChris Smith
 
Resume of S Burch 11-2015
Resume of S Burch 11-2015Resume of S Burch 11-2015
Resume of S Burch 11-2015Steve Burch MRC
 
Gerald Durand Resume
Gerald Durand ResumeGerald Durand Resume
Gerald Durand ResumeJerry Durand
 
101014 Melton Jennifer Resume
101014 Melton Jennifer Resume101014 Melton Jennifer Resume
101014 Melton Jennifer Resumejenmelt10
 

Similar to Resume Summary for Construction Manager (20)

Mike Okey CV FM1 Linked in
Mike Okey  CV FM1 Linked inMike Okey  CV FM1 Linked in
Mike Okey CV FM1 Linked in
 
Resum erj asecure address
Resum erj asecure addressResum erj asecure address
Resum erj asecure address
 
Rick Stinnett Resume
Rick Stinnett ResumeRick Stinnett Resume
Rick Stinnett Resume
 
Phil Staib's Resume 2016
Phil Staib's Resume 2016Phil Staib's Resume 2016
Phil Staib's Resume 2016
 
121207 webb jennifer-portfolio
121207 webb jennifer-portfolio121207 webb jennifer-portfolio
121207 webb jennifer-portfolio
 
Don Mac Donald CV
Don Mac Donald CVDon Mac Donald CV
Don Mac Donald CV
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultant
 
Daniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction ConsultantDaniel O Connell Professional Construction Consultant
Daniel O Connell Professional Construction Consultant
 
Powerpoint Presentation For Edd Polaski
Powerpoint Presentation For Edd PolaskiPowerpoint Presentation For Edd Polaski
Powerpoint Presentation For Edd Polaski
 
Stan Shipley Resume, Projects 11mr18
Stan Shipley   Resume, Projects 11mr18Stan Shipley   Resume, Projects 11mr18
Stan Shipley Resume, Projects 11mr18
 
Sestak Management Services
Sestak Management ServicesSestak Management Services
Sestak Management Services
 
Maulik_Mistri_1
Maulik_Mistri_1Maulik_Mistri_1
Maulik_Mistri_1
 
Allman Alexis Resume Copy
Allman Alexis Resume CopyAllman Alexis Resume Copy
Allman Alexis Resume Copy
 
Curriculum Vita and Portfolio of Services and Additional Projects
Curriculum Vita and Portfolio of Services  and Additional ProjectsCurriculum Vita and Portfolio of Services  and Additional Projects
Curriculum Vita and Portfolio of Services and Additional Projects
 
William keane. 03.25.2016 final
William keane. 03.25.2016 finalWilliam keane. 03.25.2016 final
William keane. 03.25.2016 final
 
Chris Smith resume
Chris Smith resumeChris Smith resume
Chris Smith resume
 
Resume of S Burch 11-2015
Resume of S Burch 11-2015Resume of S Burch 11-2015
Resume of S Burch 11-2015
 
Gerald Durand Resume
Gerald Durand ResumeGerald Durand Resume
Gerald Durand Resume
 
101014 Melton Jennifer Resume
101014 Melton Jennifer Resume101014 Melton Jennifer Resume
101014 Melton Jennifer Resume
 
C. Lavache Management & Consulting, Inc.
C. Lavache Management & Consulting, Inc.C. Lavache Management & Consulting, Inc.
C. Lavache Management & Consulting, Inc.
 

Recently uploaded

VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...Suhani Kapoor
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 

Recently uploaded (20)

VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 

Resume Summary for Construction Manager

  • 1. RESUME Jacqueline B. Mims 526 Nottingham Road Baltimore, MD 21229 443-515-3209-c jmimsrivera@gmail.com jmimsriveraJBM@gmail.com SUMMARY • Skilled at safeguarding Owner’s financial interests during construction. • Broad Experience in commercial and residential construction means, methods, and materials. • Successfully completed projects on time and under budget. • Effective negotiator, decision maker, and time manager. • Knowledge of safety, building and fire codes. • CERTIFIED OSHA 10-hour safety CPR and First Aid. • Conscientious, professional attitude; committed to getting the job done. • Utilizes keen foresight to eliminate problems before they occur. • Meticulous Quality Control, Quality Assurance manager. CHRONOLOGY OF MAJOR EXPERIENCE January 2012-Present Training Consultancy and Construction Management -JBM Construction Development Group, Washington DC CEO, Business Owner March 2013- November 2015 University of Maryland, Facilities Management, Department of Facilities Planning, College Park MD., Construction Contract Supervisor, On-Site Construction Representative September 2008-January 2012 FEI Construction Company, Washington, DC Project Manager March 2005- September 2007 Hill International Business Development Coordinator, Project Manager August 1999-February 2005 Balfour Beatty Construction (Formerly Centex Construction Company) Project Manager, Project Superintendent September 1994- August 1999 Turner Construction Company Assistant Project Engineer, Project Engineer, Superintendent
  • 2. DETAILED PROJECT LIST SUPERVISOR CONSTRUCTION CONTRACTS, ON-SITE CONSTRUCTION REPRESENTATIVE, Campus Projects Division, Facilities Management, Department of Facilities Planning, Various Campus Projects, College Park Campus, University of Maryland. Perform general quality assurance inspection activities to ensure construction projects are in compliance with: the project’s design documents; safe construction practices; and, properly coordinated with specialty systems (e.g. electrical, mechanical, controls) associated with each project. Coordinate, as required, with the University’s inspectors for such specialties. Review plans, specifications, and progress schedule, and coordinate various aspects of multiple construction projects. Prepare and submit daily progress and field reports, identifying work inspected, interpretation of tests conducted and tests reports, and their results, findings, and recommendations for corrective and follow-up actions. Process contractor’s submittals for review by Facilities Management’s design teams. Perform acceptance inspections and manage project punch lists. Perform other duties as required which may include coordination of system shutdown and integration, coordination of mechanical and plumbing aspects with architect/engineers, contractors, inspection and testing personnel, and technical and professional university project team members. Participate in, and provides support in the review of project financial status, including negotiation of contract change orders; propose changes and approval of contractor invoices. Provides input for evaluations of contractors and architectural/engineering firms. Provide assistance/support to user and Facilities Management’s maintenance departments during project’s warranty period. Perform other duties as assigned. CORPORATE TRAINING CONSULTANT (PART-TIME) JBM Construction Development Group, Washington DC HORIZONS Construction and Trade Business Institute is a for profit arm of JBM Construction Development Group whose charge is to provide on-going business development training for Certified Business Enterprises (CBE’s), small and minority General Contractors and Trade Subcontractors, who want to: increase sales, get training on ‘how to do business with major General contractors’, become viable, effective and efficient competitors, become participants on private, public, federal and local government projects throughout the DC region and beyond. The mission is to broaden the pool of construction entities that possess the resources and skills to manage their businesses efficiently, grow their businesses, obtain contracts, perform effectively, become financially secure, and profitable. We want our graduates to be among a multitude of businesses that are true participating minority members of construction teams for projects requiring Majority General Contractors to partner with CBE’s and minority businesses, instead of acting as a “pass-through” entity. We train CBE businesses to qualify or meet state and local government contract Compliance requirements for participation in publicly funded projects, and teach them how to avoid defaulting on contracts and debarment. We are working to achieve our mission through providing very low cost training in, “Success is a Mindset”, Basic Business Development and Strategic Planning…“Planning our Growth”, and our Construction and Trade Business Operations 101 (How to Run your business), which leads to certification that will be endorsed by State and local governments, General Construction Contractors, Construction Trade Associations, and Chambers of Commerce. PROJECT MANAGER Deanwood Community Center, Washington, DC. FEI Construction Company $44 million Community Center, Library, and Natatorium. Managed Construction team for the construction of a 63,000 SF steel and CMU block structure. The facility includes a pool with (6) lap lanes, waterslide and recreational play features, 1600 SF DC Public Library space, community room, gymnasium, and childcare center. Also responsible for establishing and managing surrounding community outreach including employment job fairs, overseeing subcontractor adherence to DC employment apprenticeship program requirements, and educational partnering with a local Junior High School. PROJECT ENGINEERING MANAGER Eastern Market, Washington, DC. FEI Construction Company $15 million Restoration of the Historic Eastern Market. Managed completion of critical product Submittal reviews, and met the procurement challenge of obtaining “Red Saint Bees Stone” to match existing 100+ year old historic Stone harvested from original quarry in England, in order to meet historic preservation requirements. BUSINESS DEVELOPMENT COORDINATOR, Washington, DC, Hill International, Identified potential business opportunities, generated written proposals in response to various Solicitations and RFP’s. PROJECT ENGINEER U.S. Supreme Court , Renovation of Supreme Court Justices Office Suites, Architect of the Capital, Washington, DC, Hill International Renovation of private office suites occupied the United States Supreme Court Justices including all security upgrades, Mechanical , Electrical, Plumbing and Sprinkler upgrades. Managed submittal processing, and change order justifications. PROJECT MANAGER GSA Nationwide IDIQ, General Services Administration (GSA), Public Building Service, Nationwide, Hill International Conducted Constructability reviews of various Federal Courthouse Design documents, Border Crossing Stations, GSA Office Buildings. Prepared detailed reports of design adherence to GSA Building Standards, at all stages of Design Development including: Concept Development, Design Development, and Construction Documents. Utilized electronic review tool established by GSA to generate report and managed in-house team of reviewers.
  • 3. DETAILED PROJECT LIST continued PROJECT MANAGER Wilbur J. Cohen Building, Life Safety System Retro-fit, General Services Administration (GSA), Hill International $10 million replacement of existing life safety system including removal and replace of Fire Alarm System, Fire Suppression System, Fire Pump, Underground Sprinkler system Connections. AREA SUPERINTENDENT National Institutes of Health, Clinical Research Center, Bethesda MD. Centex Construction Company $650 million, 1.5 million sq. ft. research hospital. Managed construction of Sectors B&C Patient Care diagnostic labs and administrative offices. Provided oversight of Rough-in and Build-out of Patient Care Rooms and diagnostic areas, including Pediatric Patient Care areas (ie. Med Gas distribution, Nurse Call, and coordination of Medical Headwall Systems installations.) Responsible for implementing quality control procedures, established regular deliveries of steel and concrete. Inspected all concrete formwork prior to concrete pours. Managed and maintained regular subcontractors schedule updates. Assisted subcontractors in obtaining timely answers to RFIs. Monitored the disassembly of the tallest tower crane in the Washington Metro Area. Coordinated construction interstitial floors containing mechanical, electrical, plumbing, telecom and medical gas distribution equipment. Also responsible for the management of the miscellaneous metals package and the construction of the east and west pedestrian bridges connecting the north and south buildings. SUPERINTENDENT Dulles Technology Center Herndon, VA. Centex Construction Company 177,000 sq. ft. office building and 450 car parking garage, in a three building office complex on a 13 acre site. Responsible for the construction of Building “B”, a 450 car precast parking garage, and underground site utilities. Supervised a three-man labor crew and an Assistant Superintendent. Developed regular schedule updates, established new schedules for parking garage schedules, as well as regular master schedule updates. Tracked delivery of major equipment and materials. Analyzed manpower distribution and work activities required to meet target dates. Created site logistics plans to eliminate activity conflicts. Coordinated all sitework activities, including stake-out, excavation, grading, subgrade testing, concrete curb and gutter installation, landscaping and asphalt paving operations. Conducted daily quality control inspections of substrate prior to, during and after installations were complete. PROJECT MANAGER/ASSISTANT PROJECT MANAGER Prosperity Medical Office Plaza, Centex Construction Company, Fairfax, VA. 150,000 sq. ft. medical office building and 400 car precast parking garage. Managed the project controls database. Reviewed submittals and shop drawings for adherence to contract drawings and specifications for building “C”. Coordinated the installation of precast panels, iron work, signage, parking controls, lighting, mechanical/ storm water piping, landscaping and site lighting. ASSISTANT SUPERINTENDENT/ SAFETY COORDINATOR KPMG, Tyson Tower II, Mc Clean VA. Turner Construction Company. 13- story office building with (2) parking levels below grade,(3) parking levels above grade, and (10) levels of office floors. Managed all base building trades for the build-out of the core, the coordination of all interior trades, and coordination of curtainwall and precast with interior work. Supervised layout of bathroom to ensure compliance with ADA requirements. Scheduled county inspections, conducted preconstruction and progress meetings. Tracked the status of and submitted RFI’s to the Architect and Owner. Reviewed and updated project schedules. Responsible for daily project safety inspections. Conducted quality control inspections of all fire rated partitions, and and firestopping at MEP penetrations and slab edges. ASSISTANT SUPERINTENDENT/ PROJECT ENGINEER Maryland Center for the Performing Arts, College Park Maryland Turner Construction Company. Phase One- Lot One Road re-alignment and underground utilities; Phase Two- Stadium Drive Garage; Phase Three and Four- Performing Arts Center construction. Phase One- Responsible for Project Engineering associated with the road re-alignment and installation of underground utilities for the Performing Arts Center. Processed submittals, change orders, and material delivery schedules. Managed cost and project controls via database network. Phase Two- Responsible for the engineering activities associated with construction of an 800 car CIP, precast and brick parking garage. Client required completion within nine months, including Certificate of Occupancy. Completed project on exact date scheduled—under budget. Visited manufacturing plants for production schedule progress, for quality control inspections, and payment requisition review of stored materials. Inspected precast panels and bullet proof guard booths during the manufacturing process. Initiated and implemented revisions to project landsc aping plans. Coordinated the re-design of a $300,000 graphics package, leading to an Owner’s savings of $60,000. Initiated the creation of a new standard color formula to match the Maryland State Flag emblem for the graphics package. Responsible for constructability reviews related to precast concrete, cast-in-place concrete, mechanical, electrical, and masonry trades. Prepared all warranties and guarantees for submission to owner. Phase Three and Four- Assisted in the coordination of structural steel shop drawings, managed all change directives related to steel erection. Tracked steel erection and precast plank installation. Inventoried structural steel deliveries. PROJECT ENGINEER Thetford Properties, Raleigh, Durham, Burlington, and Rocky Mount NC, Turner Construction Company. Renovation of 400 low income residential units. Conducted surveys of all units to determine renovation/ repair scope. Created a matrix to manage and organize the scope of work for each unit. Provided estimates for the scope of work. Wrote all ‘requests for pricing’, ‘subcontract scopes’, and ‘subcontract agreements’. PROJECT ENGINEER Union Theological Seminary, Richmond, VA, Turner Construction Company. Conversion of a 100-year old stone church building to a state of the art library. Reviewed shop drawings for compliance with code requirements and contract documents. Authored subsequent Requests For Information (RFIs) to communicate conflicts and s hortfalls in construction details. Generated owner and subcontract change orders. Reviewed and negotiated subcontractors change proposals.
  • 4. EDUCATION Howard University School of Architecture, Washington DC Project Management Certificate, Association of Builders and Contractors ABC Project Management Training, Fall 2000 American Home Inspectors Training Course, AHIT, American Home Inspection Training, Spring 2012 HOBBIES AND INTERESTS MARTIAL ARTS- Korean Style Tae Kwon Do REFERENCES Andrea Warren- Project Manager, (FEI Construction), 513-885-1237 Lavon Mays- Senior Project Scheduler, (FEI Construction), 301-956-6530 Maria Thompson- Project Executive, Centex (Balfour Beatty Construction), 202-438-1272 Steve Anderson- Owner’s Representative, DC Department of Parks and Recreation, 202-255-2764 Marilyn Goslin- Chief Field Engineer, Centex (Balfour Beatty Construction), 443-845-0049 C. David Barber- Senior Superintendent, Centex (Balfour Beatty Construction), 301-651-2757 Thunder Lane- Owner’s Representative, University of the District of Columbia, 202-526-4099