Senior Executive Summary
PROFILE
Innovative and results driven leader focused on achieving goals in highly competitive and challenging
environments that demand both hands on involvement and summary oversight. Experienced in building
partnerships while driving production and expediting critical schedule performance. Excels in team building and
communication skills with different companies, industries, or factions required for overall project completion.
Proficient in timely problem solving and solution generation required to deal with constantly changing parameters.
Proficient in negotiating major contracts and purchase orders. Known for building and motivating cross-
functional teams from construction, design, and finance that exceed corporate expectations. Areas of expertise
include:
 Budgeting and Forecasting
 Problem Solving
 Project Management
 Operational and Strategic Planning
 Productivity Improvement
 Client Relations and Representation
 Process Optimization
 Government Contracting
PROFESSIONAL EXPERIENCE:
Director of Design and Construction - B.P. Realty, LLC
Managed the development process including the design, permitting and construction of the Watkins Mill Town
Center in Gaithersburg MD. This included the completion of Paramount East building (112 units, $30 million),
Paramount West Building (113 units, $29 million), The Majestic building (243 units, $90 million), and the
Performers Park infrastructure associated with these buildings. Responsible for oversight and completion of all
facets of the project including oversight of the design, jurisdictional approvals, administration of the general
contractors, and management of all third party consultants. Ultimately responsible for problem solving and
deployment of appropriate solutions to all project challenges.
The town center is designed to spread across Route 270 from the East to the West. The town center will ultimately
encompass both sides of route 270 with the interchange allowing mobility from one side to the other. The above
listed development is on the East side of route 270. The Watkins Mill Road/270 interchange has been delayed
indefinitely. This has put the Western portion urban core development on hold. B.P. Realty has now halted its
future development until the time of the initiation of the interchange construction.
Director of Construction – Veterans Construction Inc.
Provide oversight and review of ongoing design build construction projects and staff on projects on military bases
across the country. Participate in company marketing and procurement of new business opportunities. Provide
extensive oversight of Army Corps of Engineers projects across the country. Have experience in litigation with
the Government on Corps of Engineers projects.
 Litigation Administration
 Financial Review and Analysis
 Risk Analysis
 Company Staffing
 Procurement
 Claims Analysis
 P&L management
 Total and Complete Accountability
 management
Curriculum Vita
Paul R. Smith Email psmithlsa@comcast.net
President – Construction Technologies and Associates, LLC (CTA)
(Previously Paul Smith and Assoc., LLC)
Provide oversight of construction and development of projects for ownership and construction companies from
$1 million to $500 million in size. Provide guidance on jurisdictional issues, construction, development, litigation,
and business issues before, during, and after project procurement, performance, and completion. Possess
extensive experience in Design-Build process on projects up to $500,000,000. Also have extensive P & L and
balance sheet management experience. Responsible for total project and company accountability to achieve stated
goals and success.
Project Executive – Forrester Construction Company
Implemented revised job cost systems, developed electronic management information systems, helped to establish
internal company local area networks to link satellite and main offices, supervise Design Build Management,
provide oversight of multiple project teams on projects in the $3.5 million to $40 million range.
Vice President – Chamberlain Construction Corporation
Established and helped build base building division of the company. Provided project management and
procurement of base building projects. Negotiated bonding and insurance coverage. Scheduled company staffing
requirements. Implemented numerous computer systems required for project management and company
administration.
Senior Project Manager – L.F. Jennings, Inc.
Provide oversight of multiple construction projects ranging in size from $350 thousand to $25 million. Developed
management systems for in-house trades of Masonry, Concrete, Carpentry, and Light Gage Framing divisions.
Linked main frame computer systems to the personal computer environment. Implemented interactive job cost
system. Implemented, setup installed, and taught CPM scheduling system. Linked cost loaded schedules to the
requisition and financial functions within the company.
Developed and configured personal computer management information system environment to aid the
construction and accounting processes.
Project Manager – Charles H. Tompkins Co.
Provided project management on the Hecht Company flagship project in Washington D.C, totaling $41 million in
volume. Implemented personal computer technology in the main office administration systems. Implemented,
setup installed, and taught CPM scheduling system. Provided project procurement and management.
Scheduler and Cost Engineer – Bechtel
Provided Project Management, scheduling and cost administration services on the Turkey Point Nuclear Power
Plant. Aided in the logistical planning of fuel rod replacement, turbine and turbine pedestal replacement, generator
replacement, and other construction and design related tasks.
Education:
B.S. in Building Construction/Engineering Option/Computers option
Virginia Tech
RESUME PORTFOLIO
psmithlsa@comcast.net
Director of Design and Construction – B.P. Realty, LLC
Watkins Mill Town Center
Paramount East Building
112,000 SF
114 units
175 Parking spaces
Paramount West Building
120,000 SF
110 Units
178 Parking spaces
RESUME PORTFOLIO
psmithlsa@comcast.net
Majestic Building
210,000 SF
243 units
465 Parking spaces
Firebirds
Restaurant
Fort Leonard Wood Double
Dinning Facility. The first of its
kind. 52,000 sf, $19,500,000.
Fort Leonard Wood Missouri.
Fort Sill Dining Facility, 26,000
sf, $9,800,000. Fort Sill
Oklahoma.
Fort Leavenworth Dining
Facility, 19,500 sf, $7,900,000.
Fort Leavenworth Kansas.
RESUME PORTFOLIO
psmithlsa@comcast.net
Director of Construction – Veterans Construction Inc.
RESUME PORTFOLIO
psmithlsa@comcast.net
Construction Technologies and Associates, LLC. President
Mr. Smith completed the Park Crest Project in
McLean Virginia for Mr. Jim Donohoe and Mr.
Mark Greg, the senior partners of Penrose/Donohoe
Tysons, LLC.
Mr. Smith reported directly to Mr. Donohoe and
Mr. Greg and provided oversight of all aspects of
the development and construction of the project.
The entire project was originally budgeted at a cost
of approximately one billion dollars.
The first three phases of the project currently under
way are highlighted below.
One Park Crest Tower
Construction Hard Cost $122,000,000
19 Story Residential
Development Director:
Oversight of:
General Contractor
Design Team
Finance
Jurisdictional Coordination
Two Park Crest Tower
Construction Hard Cost
$135,000,000
19 Story Residential
Development Director:
Oversight of:
General Contractor
Design Team
Finance
Jurisdictional Coordination
RESUME PORTFOLIO
psmithlsa@comcast.net
The Loft Building
Construction Hard Cost
$70,000,000
7 Story Residential/Retail
Development Director:
Oversight of:
General Contractor
Design Team
Finance
Jurisdictional Coordination
Nysmith School for the Gifted
Belle Haven Country Club Expansion and Restoration
Forrester Construction Company Project Executive
Chamberlain Construction Corp. Vice President
RESUME PORTFOLIO
psmithlsa@comcast.net



 Oversee construction teams on multiple projects simultaneously
 Implemented revised job cost system
 Developed electronic management information system
 Linked Prolog, Primavera, and windows
 Helped to develop Jobsite and main office LAN systems
 Design Build Management
Assisted Living and skilled Nursing Facility $39,000,000
St Patrick’s School $6,300,000
Washington Navy Yard Bldg 176 $8,900,000
Washington Navy Yard M Street $3,500,000
Trinity College Athletic Center $17,100,000
 Procurement of base building projects
 Project management of base building projects
 Implemented Bid Fax system
 Negotiated bonding coverage
 Scheduled company staffing requirements
 Implemented CPM Scheduling
Deer Park Elementary School $7,300,000
Timber Lane Elementary School $5,100,000
Salvation Army Day Care Addition $370,000
Camelot Elementary School Elevator Addition $190,000
H.B. Woodlawn School Renovation $7,200,000
Garfield Police Station $5,600,000
United States Post Office Renovation $1,400,000
Recreation Center Renovation $4,200,000
RESUME PORTFOLIO
psmithlsa@comcast.net
Army Navy Country Club Maintenance Facility $800,000
WAWA Gas & Food Mart $1,300,000
PWC Police Station Renovation $1,400,000
Avis Renta Car Distribution Center $6,900,000
Leesburg Fire Station $6,500,000
L.F. Jennings Inc. Senior Project Manager
 Oversee construction teams on each project
 Developed management systems for in-house trades, masonry, concrete, carpentry,
light gauge framing
 Linked Mainframe systems to P.C. environment
 Implemented interactive job cost system
 Implemented CPM scheduling
 Linked cost loaded schedules to requisition process
 Configured PC MIS environment
Avion Office Park Site $11,100,000
Avion Service Center, Flextech buildings $8,200,000
Watkins Mill High School $25,200,000
Herndon Corporate Park $9,200,000
Concorde Building $1,700,000
Bailey Bridge High School $18,300,000
Dept. of Corrections Training Facility $9,800,000
Uptons Bullrun Center $2,500,000
DEB Shop Strip Store $350,000
Charles H. Tompkins Co. Project Manager
 Took over Hecht company project as project manager
 Implemented PC technology
 Implemented CPM Scheduling
 Project procurement and management
Hecht Company 1201 G Street $41,200,000
RESUME PORTFOLIO
psmithlsa@comcast.net
Scheduled critical work tasks in
containment structure during
spent fuel rod replacement
outages.
Performed cost management of
work tasks
Turkey Point Nuclear Power Plant $35,000,000/annually
Education:
Virginia Tech
B.S. in Building Construction/Engineering Option
Information Technology:
Primavera P-3 Scheduling DOS Microsoft Project
Micrographix Designer Act Contact Manager Windows
Basic Word Perfect XL
Word Microsoft Suite Desk Top Publishing
Bid Fax Communications Digital Graphics
Internet/Intranet Prolog Access
Timber Line Job Cost Systems Shure Track Scheduling
Outlook Power Point Adobe conversion
Ritefax Primavera Scheduling ACT
Scope of Experience Includes:
Project Management Owner Representation
Estimating Company Staffing
Marketing Financial review and analysis
Procurement Design Build Administration
Scheduling Manage Multiple Project Teams
Claims Analysis Litigation Administration
Responsible for Total Project Accountability Value Engineering
Company Financial Review Team Building
Contract Negotiations Risk Analysis
Development Jurisdictional Management
Bechtel Power Corporation Scheduler/Cost Engineer
11

More Related Content

Similar to Curriculum Vita and Portfolio of Services and Additional Projects

RESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCERESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCEJackie Mims-Rivera
 
RESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCERESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCEJackie Mims-Rivera
 
Michael Harrington - Program Project Management Resume
Michael Harrington - Program Project Management ResumeMichael Harrington - Program Project Management Resume
Michael Harrington - Program Project Management Resumeworldwidebranding
 
Sestak Management Services
Sestak Management ServicesSestak Management Services
Sestak Management Servicestomsestak
 
Construction Experience
Construction ExperienceConstruction Experience
Construction Experiencemdkaucher
 
Peter Weiland_Construction Final ResumeA
Peter Weiland_Construction Final ResumeAPeter Weiland_Construction Final ResumeA
Peter Weiland_Construction Final ResumeApeter weiland
 
Michael Mueller _04.30.15
Michael Mueller _04.30.15Michael Mueller _04.30.15
Michael Mueller _04.30.15Michael Mueller
 
ZETA Design + Build Product Design VP Taeko Takagi: Hack the Housing Crisis s...
ZETA Design + Build Product Design VP Taeko Takagi: Hack the Housing Crisis s...ZETA Design + Build Product Design VP Taeko Takagi: Hack the Housing Crisis s...
ZETA Design + Build Product Design VP Taeko Takagi: Hack the Housing Crisis s...San Francisco Public Press
 
Hackworth steven 1 2012
Hackworth steven 1 2012Hackworth steven 1 2012
Hackworth steven 1 2012shackworth
 
John Day Resume
John Day ResumeJohn Day Resume
John Day ResumeJohn Day
 
Michael Harrington - Corporate Operations Resume
Michael Harrington - Corporate Operations ResumeMichael Harrington - Corporate Operations Resume
Michael Harrington - Corporate Operations Resumeworldwidebranding
 
Composite Resume Latest Version
Composite  Resume Latest VersionComposite  Resume Latest Version
Composite Resume Latest VersionRichard Law
 
Koblinsky BW Resume 12-11 -14
Koblinsky BW Resume 12-11 -14Koblinsky BW Resume 12-11 -14
Koblinsky BW Resume 12-11 -14Bernard Koblinsky
 

Similar to Curriculum Vita and Portfolio of Services and Additional Projects (20)

RESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCERESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCE
 
Resume 4-14-2015
Resume 4-14-2015Resume 4-14-2015
Resume 4-14-2015
 
Michael Harrington R
Michael Harrington RMichael Harrington R
Michael Harrington R
 
RESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCERESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCE
 
Michael Harrington - Program Project Management Resume
Michael Harrington - Program Project Management ResumeMichael Harrington - Program Project Management Resume
Michael Harrington - Program Project Management Resume
 
Sestak Management Services
Sestak Management ServicesSestak Management Services
Sestak Management Services
 
Construction Experience
Construction ExperienceConstruction Experience
Construction Experience
 
Peter Weiland_Construction Final ResumeA
Peter Weiland_Construction Final ResumeAPeter Weiland_Construction Final ResumeA
Peter Weiland_Construction Final ResumeA
 
Michael Mueller _04.30.15
Michael Mueller _04.30.15Michael Mueller _04.30.15
Michael Mueller _04.30.15
 
ZETA Design + Build Product Design VP Taeko Takagi: Hack the Housing Crisis s...
ZETA Design + Build Product Design VP Taeko Takagi: Hack the Housing Crisis s...ZETA Design + Build Product Design VP Taeko Takagi: Hack the Housing Crisis s...
ZETA Design + Build Product Design VP Taeko Takagi: Hack the Housing Crisis s...
 
Hackworth steven 1 2012
Hackworth steven 1 2012Hackworth steven 1 2012
Hackworth steven 1 2012
 
John Day Resume
John Day ResumeJohn Day Resume
John Day Resume
 
Michael Harrington - Corporate Operations Resume
Michael Harrington - Corporate Operations ResumeMichael Harrington - Corporate Operations Resume
Michael Harrington - Corporate Operations Resume
 
Hmkaluza fl
Hmkaluza flHmkaluza fl
Hmkaluza fl
 
Composite Resume Latest Version
Composite  Resume Latest VersionComposite  Resume Latest Version
Composite Resume Latest Version
 
LynResume01-16
LynResume01-16LynResume01-16
LynResume01-16
 
STEVE JESKEWITZ
STEVE JESKEWITZSTEVE JESKEWITZ
STEVE JESKEWITZ
 
E profile
E profileE profile
E profile
 
Koblinsky BW Resume 12-11 -14
Koblinsky BW Resume 12-11 -14Koblinsky BW Resume 12-11 -14
Koblinsky BW Resume 12-11 -14
 
Executive Officer Profile
Executive Officer ProfileExecutive Officer Profile
Executive Officer Profile
 

Curriculum Vita and Portfolio of Services and Additional Projects

  • 1. Curriculum Vita Paul R. Smith Email psmithlsa@comcast.net Senior Executive Summary PROFILE Innovative and results driven leader focused on achieving goals in highly competitive and challenging environments that demand both hands on involvement and summary oversight. Experienced in building partnerships while driving production and expediting critical schedule performance. Excels in team building and communication skills with different companies, industries, or factions required for overall project completion. Proficient in timely problem solving and solution generation required to deal with constantly changing parameters. Proficient in negotiating major contracts and purchase orders. Known for building and motivating cross- functional teams from construction, design, and finance that exceed corporate expectations. Areas of expertise include:  Budgeting and Forecasting  Problem Solving  Project Management  Operational and Strategic Planning  Productivity Improvement  Client Relations and Representation  Process Optimization  Government Contracting PROFESSIONAL EXPERIENCE: Director of Design and Construction - B.P. Realty, LLC Managed the development process including the design, permitting and construction of the Watkins Mill Town Center in Gaithersburg MD. This included the completion of Paramount East building (112 units, $30 million), Paramount West Building (113 units, $29 million), The Majestic building (243 units, $90 million), and the Performers Park infrastructure associated with these buildings. Responsible for oversight and completion of all facets of the project including oversight of the design, jurisdictional approvals, administration of the general contractors, and management of all third party consultants. Ultimately responsible for problem solving and deployment of appropriate solutions to all project challenges. The town center is designed to spread across Route 270 from the East to the West. The town center will ultimately encompass both sides of route 270 with the interchange allowing mobility from one side to the other. The above listed development is on the East side of route 270. The Watkins Mill Road/270 interchange has been delayed indefinitely. This has put the Western portion urban core development on hold. B.P. Realty has now halted its future development until the time of the initiation of the interchange construction. Director of Construction – Veterans Construction Inc. Provide oversight and review of ongoing design build construction projects and staff on projects on military bases across the country. Participate in company marketing and procurement of new business opportunities. Provide extensive oversight of Army Corps of Engineers projects across the country. Have experience in litigation with the Government on Corps of Engineers projects.  Litigation Administration  Financial Review and Analysis  Risk Analysis  Company Staffing  Procurement  Claims Analysis  P&L management  Total and Complete Accountability  management
  • 2. Curriculum Vita Paul R. Smith Email psmithlsa@comcast.net President – Construction Technologies and Associates, LLC (CTA) (Previously Paul Smith and Assoc., LLC) Provide oversight of construction and development of projects for ownership and construction companies from $1 million to $500 million in size. Provide guidance on jurisdictional issues, construction, development, litigation, and business issues before, during, and after project procurement, performance, and completion. Possess extensive experience in Design-Build process on projects up to $500,000,000. Also have extensive P & L and balance sheet management experience. Responsible for total project and company accountability to achieve stated goals and success. Project Executive – Forrester Construction Company Implemented revised job cost systems, developed electronic management information systems, helped to establish internal company local area networks to link satellite and main offices, supervise Design Build Management, provide oversight of multiple project teams on projects in the $3.5 million to $40 million range. Vice President – Chamberlain Construction Corporation Established and helped build base building division of the company. Provided project management and procurement of base building projects. Negotiated bonding and insurance coverage. Scheduled company staffing requirements. Implemented numerous computer systems required for project management and company administration. Senior Project Manager – L.F. Jennings, Inc. Provide oversight of multiple construction projects ranging in size from $350 thousand to $25 million. Developed management systems for in-house trades of Masonry, Concrete, Carpentry, and Light Gage Framing divisions. Linked main frame computer systems to the personal computer environment. Implemented interactive job cost system. Implemented, setup installed, and taught CPM scheduling system. Linked cost loaded schedules to the requisition and financial functions within the company. Developed and configured personal computer management information system environment to aid the construction and accounting processes. Project Manager – Charles H. Tompkins Co. Provided project management on the Hecht Company flagship project in Washington D.C, totaling $41 million in volume. Implemented personal computer technology in the main office administration systems. Implemented, setup installed, and taught CPM scheduling system. Provided project procurement and management. Scheduler and Cost Engineer – Bechtel Provided Project Management, scheduling and cost administration services on the Turkey Point Nuclear Power Plant. Aided in the logistical planning of fuel rod replacement, turbine and turbine pedestal replacement, generator replacement, and other construction and design related tasks. Education: B.S. in Building Construction/Engineering Option/Computers option Virginia Tech
  • 3. RESUME PORTFOLIO psmithlsa@comcast.net Director of Design and Construction – B.P. Realty, LLC Watkins Mill Town Center Paramount East Building 112,000 SF 114 units 175 Parking spaces Paramount West Building 120,000 SF 110 Units 178 Parking spaces
  • 4. RESUME PORTFOLIO psmithlsa@comcast.net Majestic Building 210,000 SF 243 units 465 Parking spaces Firebirds Restaurant
  • 5. Fort Leonard Wood Double Dinning Facility. The first of its kind. 52,000 sf, $19,500,000. Fort Leonard Wood Missouri. Fort Sill Dining Facility, 26,000 sf, $9,800,000. Fort Sill Oklahoma. Fort Leavenworth Dining Facility, 19,500 sf, $7,900,000. Fort Leavenworth Kansas. RESUME PORTFOLIO psmithlsa@comcast.net Director of Construction – Veterans Construction Inc.
  • 6. RESUME PORTFOLIO psmithlsa@comcast.net Construction Technologies and Associates, LLC. President Mr. Smith completed the Park Crest Project in McLean Virginia for Mr. Jim Donohoe and Mr. Mark Greg, the senior partners of Penrose/Donohoe Tysons, LLC. Mr. Smith reported directly to Mr. Donohoe and Mr. Greg and provided oversight of all aspects of the development and construction of the project. The entire project was originally budgeted at a cost of approximately one billion dollars. The first three phases of the project currently under way are highlighted below. One Park Crest Tower Construction Hard Cost $122,000,000 19 Story Residential Development Director: Oversight of: General Contractor Design Team Finance Jurisdictional Coordination Two Park Crest Tower Construction Hard Cost $135,000,000 19 Story Residential Development Director: Oversight of: General Contractor Design Team Finance Jurisdictional Coordination
  • 7. RESUME PORTFOLIO psmithlsa@comcast.net The Loft Building Construction Hard Cost $70,000,000 7 Story Residential/Retail Development Director: Oversight of: General Contractor Design Team Finance Jurisdictional Coordination Nysmith School for the Gifted Belle Haven Country Club Expansion and Restoration
  • 8. Forrester Construction Company Project Executive Chamberlain Construction Corp. Vice President RESUME PORTFOLIO psmithlsa@comcast.net     Oversee construction teams on multiple projects simultaneously  Implemented revised job cost system  Developed electronic management information system  Linked Prolog, Primavera, and windows  Helped to develop Jobsite and main office LAN systems  Design Build Management Assisted Living and skilled Nursing Facility $39,000,000 St Patrick’s School $6,300,000 Washington Navy Yard Bldg 176 $8,900,000 Washington Navy Yard M Street $3,500,000 Trinity College Athletic Center $17,100,000  Procurement of base building projects  Project management of base building projects  Implemented Bid Fax system  Negotiated bonding coverage  Scheduled company staffing requirements  Implemented CPM Scheduling Deer Park Elementary School $7,300,000 Timber Lane Elementary School $5,100,000 Salvation Army Day Care Addition $370,000 Camelot Elementary School Elevator Addition $190,000 H.B. Woodlawn School Renovation $7,200,000 Garfield Police Station $5,600,000 United States Post Office Renovation $1,400,000 Recreation Center Renovation $4,200,000
  • 9. RESUME PORTFOLIO psmithlsa@comcast.net Army Navy Country Club Maintenance Facility $800,000 WAWA Gas & Food Mart $1,300,000 PWC Police Station Renovation $1,400,000 Avis Renta Car Distribution Center $6,900,000 Leesburg Fire Station $6,500,000 L.F. Jennings Inc. Senior Project Manager  Oversee construction teams on each project  Developed management systems for in-house trades, masonry, concrete, carpentry, light gauge framing  Linked Mainframe systems to P.C. environment  Implemented interactive job cost system  Implemented CPM scheduling  Linked cost loaded schedules to requisition process  Configured PC MIS environment Avion Office Park Site $11,100,000 Avion Service Center, Flextech buildings $8,200,000 Watkins Mill High School $25,200,000 Herndon Corporate Park $9,200,000 Concorde Building $1,700,000 Bailey Bridge High School $18,300,000 Dept. of Corrections Training Facility $9,800,000 Uptons Bullrun Center $2,500,000 DEB Shop Strip Store $350,000 Charles H. Tompkins Co. Project Manager  Took over Hecht company project as project manager  Implemented PC technology  Implemented CPM Scheduling  Project procurement and management Hecht Company 1201 G Street $41,200,000
  • 10. RESUME PORTFOLIO psmithlsa@comcast.net Scheduled critical work tasks in containment structure during spent fuel rod replacement outages. Performed cost management of work tasks Turkey Point Nuclear Power Plant $35,000,000/annually Education: Virginia Tech B.S. in Building Construction/Engineering Option Information Technology: Primavera P-3 Scheduling DOS Microsoft Project Micrographix Designer Act Contact Manager Windows Basic Word Perfect XL Word Microsoft Suite Desk Top Publishing Bid Fax Communications Digital Graphics Internet/Intranet Prolog Access Timber Line Job Cost Systems Shure Track Scheduling Outlook Power Point Adobe conversion Ritefax Primavera Scheduling ACT Scope of Experience Includes: Project Management Owner Representation Estimating Company Staffing Marketing Financial review and analysis Procurement Design Build Administration Scheduling Manage Multiple Project Teams Claims Analysis Litigation Administration Responsible for Total Project Accountability Value Engineering Company Financial Review Team Building Contract Negotiations Risk Analysis Development Jurisdictional Management Bechtel Power Corporation Scheduler/Cost Engineer
  • 11. 11