SlideShare a Scribd company logo
S.MURALI
MOBILE: + 968 9423 6414, E-Mail: jayamurli@gmail.com
______________________________________________________________________________________________________
 MBA – Operations Management ♣♣ B.Sc., - Mathematics
 PG Diploma in Systems Development ♣♣ Diploma in Materials Management
 25+ Yrs (10+ yrs in Middle East & 15+ yrs in India) – experienced in Oil & Gas, Manufacturing sectors in
the field of Supply Chain (SCM), Procurements, Logistics, Sub-Contracts Management, Project Executions,
P&M & Asset leasing, Scrap Disposal Management, ERP/SAP Modules.
Result Areas
Asset & Project Procurements Local & International Logistics ICV/LCC/SME Contributions
Supply Chain Sub-Contracts Management ERP/SAP System
Career Summary
 Larsen & Toubro Group, Muscat – Head Logistics – June, 2013 to till date
 Attila Dogan & Seeh Al Sarya LLC, Muscat – Head Logistics – April, 2012 to April, 2013.
 Petrofac International, Sharjah – Logistics & Expedite Coordinator – Jan, 2012 to April, 2012
 Attila Dogan & Seeh Al Sarya LLC, Muscat – Head Logistics – Feb, 2011 to Dec, 2011.
 Galfar Eng & Contg SAOG, Mct – Sr. Materials & Logistics Coordinator – Sep, 2006 to Feb, 2011.
 INCOPAK, Hodeidah, Yemen – Materials Manager – March, 2005 to Aug, 2006
 NPT Offset Private Ltd., Chennai – Manager – Material & Logistics – Oct, 2001 to Feb, 2005.
 J.K. Engineers, Chennai – Manager – Materials & Admin – March, 1999 to Sep 2001.
 C.P. Intertrade Co. Ltd, Chennai – Trading Executive – Aug, 1996 to Feb, 1999.
 Hindustan Power Plus Limited, Hosur – Executive Secretary – April, 1990 to July, 1996.
 Achievements at Larsen & Toubro Group
 Equipment Leasing & sub-contract orders – achieved project’s ICV value – exceeded by US$.1.25
Million.
 Asset Procurements for PDO Sites like SRDC-2, Y3DC – negotiated with vendors, brought with
minimum 7% less than the previous year order prices and saved US$.160,000/-
 Equipment Leasing for all the PDO & Non-PDO projects – compare to previous years, during 2013-
14 prices are negotiated 9% less than the previous prices and saved US$.390,000 and 2014-15 as
such saved US$.285,000 – projects are in completion stage and de-mobilization of assets are
successfully completed by shifting to our centralized stores in 300 Trips in 28 Days without LTI.
 In-bound logistics – Continual negotiations with 4PL/3PL transport sub-contractors for various
project transportations and reducing the Logistics cost to between10% to 17.5%.
 Portacabins Imports – From LNT (ADNOC Site, UAE) to Y3DC Yibal Site (Oman) – transportation
cost saving US$.104,625/-
 Negotiated with vendor to provide Statistical Declarations to get duty exemption and saved
US$.143,000/- for the import of used Portacabins from our L&T Abu Dhabi.
 Scrap Disposals – during 2014 – US$.857,150/- & during 2015 – US$. 363,750/- against the book
value of US$.1,037,765/-.
 Project Assets & Camp Disposal – Sold & saved a sum of US$.390,000/-
 Achievements at Attila Dogan & Seeh Al Sarya LLC.
 P&M Asset Procurements & Portacabins Procurements saved around US$.200,000/-
 Project Imports both Air & Road Transports& inbound logistics – saved around US$.225,000/-
 Achievements at Petrofac International
 Contributed performance based logistics solutions & Preservatives of ODC equipment starting from
50 Tons to 850 Tons for the world class Turkmenistan Yolanta Gas Project site worth of US$.3.5
Billion Saved around 5 million US$ by the proper strategic planning of Sea/Air/Road/Rail
Transports.
 Achievements at Galfar Eng & Contracting SAOG
 Contributed logistics provisions, Bulk Procurements, expediting with vendors, movements,
erections and Preservatives of ODC equipment starting from 45 Tons to 370 Tons for the world
class Harweel Cluster Phase 2 Facilities.
 Received appreciation letters from Harweel PDO CSR, Petrofac’s logistics manager and Galfar’s
EVP for the achievement of logistics activities and delivered the construction materials, project
equipment and accessories of more than 258,000 tons within the time schedule & without any LTI.
 For Harweel Cluster Phase-2 facility projects, negotiated with local & international transporters,
Liners, Air Cargo agents and saved a sum of US$.1.8 million.
 PROFESSIONAL EXPERIENCES
Company : Larsen & Toubro Electromech LLC, Muscat
Position Holding : Logistics & Procurement Manager - SCM Dept. – Key Position
Reporting to : DGM – Projects & DGM – Operations.
Job Profile : Purchase of Capital Assets, Leasing of P&M Equipments, Import of
Project Materials from various parts of Globe, SCM involving
Bulk Procurements & Logistics, Contracts & Sub-contracts Management.
Projects Handling : PDO Oil & Gas - LGFD Projects, Lekhwair, SRDC-2, Y3DC Projects.
Airport Proj – Salalah Airport Fuel Farm & Hydrant system, Jindal Steel
Project, Mussandam Gas Power Project, Daleel Petroleum Projects.
Company : Attila Dogan & See Al Sarya LLC, Muscat, Oman
Position Held : HEAD – LOGISTICS – ODC Contracts (Oil&Gas) (Key position)
Reporting to : Contracts Head & Supply Chain & Technical Service Head
Job Profile : Logistics Related: Totally responsible for the sub-contractors
management, provision of Logistics Services, which includes Import &
Export, Transportation including Plant & Equipment Management and
Warehouse Management Services for the ODC Contract with Petroleum
Development Oman with the man power of 30 staffs and 45 workers.
Procurement & Sub-Contracts Related: During the absence of
Procurement & Sub-Contract Head, I will lead the sourcing team to enable
the department’s task should complete within the stipulated time with the
assistance of Sourcing Specialists.
Company : Petrofac International, Sharjah
Position Held : Logistics & Expedite Coordinator – O&G Projects – Key Position
Reporting to : Logistics Head & Project Director.
Job Profile : Totally responsible for the provision of SCM Services, which includes
Import & Export, Transportation and Warehouse Management Services for
the Turkmenistan Gas project worth 3.5 Billion US$. Handling & expediting
of ODC cargo, preservatives, movements etc.
Company : Galfar Engineering & Contracting SAOG, Muscat, Oman
Position Held : Sr. Manager – Materials & Logistics – O&G – (PDO-App key post)
Reporting to : Executive Vice President – Oil & Gas Constructions
Job Profile : Coordinating & taking care of project procurements & expediting for the
World Class Projects – Harweel Cluster Phase 2 Facilities & Al-Burj Full
Field Water Injection Project for PDO (Petroleum Development Oman)
worth around US$2.5 BILLION, ISO, HSE & HEMP system procedures,
Planning and controlling of P&M at site, Liaison & expedite with Liners,
Vendors, Clients and integrating procurement contractually into the project
management process and the project business teams at the initial stage to
final stage. Organizing, controlling and monitoring all procurement activities
in a project, introducing procurement strategies, targeting maximum
contribution to the operative result as well as ensuring the observance of
the procurement processes and an optimized deployment of resources.
Achievements : As for this project, procured around 485 Heavy equipments
weighing around 8,500 MT & sixty thousand tons of materials &
moved site as per the contractual terms with fullest safety by
following HSE norms. Saved around 1.85 million Rial Omani in
various transports, erection contracts and paid towards customs duty
in Oman – 5.45 Million for the Import of Project Materials. Due to
proper & direct control in P&M saved around 350K OMR during this
project tenure of 5 years.
Company : International Co. for Industry and Printing & Packaging S.Y.C
A Thabet Brothers Group of Companies in Yemen [2
nd
largest]
Position Held : Manager – Materials & Contracts [International Procurements]
Reporting to : Managing Directors
Job Profile : Heading Materials Department for 3 Divisions.
Responsibilities : Procurement based on contractual agreements, managing inventories,
introducing new vendors, all types of analyzing & evaluating vendors,
materials, quality compliances, liaison with Govt. officials regarding
Customs clearances etc. Budgeting, Analyzing market trend, forecasting,
MIS, E-sourcing, implementing JIT concepts, providing training to local
nationals etc.
Company : NPT Offset Private Limited, channai-14 (ISO 9001-2000 Co.)
Position Held : Manager – Materials & Logistics
Reported to : Director & AGM
Job Profile : Entire Materials Management, Budgeting, Imports & Export Logistics.
Company : J.K. Engineers, Chennai.
Position Held : Manager – Materials & Administration
Reported to : Director.
Job Profile : Entire Procurement & Warehouse activities, Liaison with Government
officials, generating MIS, Logistics, Budgets, were coordinating with
Management, General Administration including house keeping, arranging
itinerary, recruiting etc.
Company : C.P. Intertrade Co. Ltd., Thailand (Chennai Branch)
Position Held : Trading Executive – Procurements [Aqua & Cattle Feeds]
Reported to : Vice President in Bangkok & GM in Chennai Office.
Job Responsibility : All sorts of Material Department work including procurements of raw
Materials (both Imports & Local), logistics involving Planning & controlling
of raw materials with handling capacity of 4000 MT per month & 50 MT of
Cold storage etc, vendor developments, Import & Export dealings, liaison
with concern officials, assisting Vice President in Bangkok regarding
International trading involving various activities like market trend, ocean
freights etc, providing training to Trading coordinators etc.
Company : Hindustan Power Plus Limited, Hosur.
Position Held : Executive Secretary - Imports
Reported to : General Manager – Imports.
Job Profile & Responsibilities : HPL a multinational collaborating with Caterpillar, USA manufacturing
Domestic & Industrial Gensets.
All sorts of Imports/Stores/Logistic activities including coordinating with
Management executives, self correspondence, arranging itinerary, are
coordinating with collaborators, preparing minutes of meeting, planning &
controlling of imports, vendor development, evaluating vendors etc.
 EDUCATIONAL QUALIFICATIONS : MBA – Operations Management @ TNOU.
: B.Sc., - Mathematics @ Madras University.
: PG Diploma in Systems Development @ Brilliants.
: Diploma in Materials Management @ Annamalai University.
 Professional Development : 1. Negotiation Management, 2. Personality Development
3. Leadership qualities, 4. Strategic Management
5. Finance for Non-Finance Managers,
6. Heavy Lift Movements, Erections & Preservatives.
 EXTRACURRICULAR ACTIVITIES : ISC events, Networking, Social Services.
 HOBBIES : Listening Music, Travelling
 PERSONAL DETAILS:
Date of Birth : 24
th
June, 1968
Father’s Name : J. Subramanian
Marital Status : Married
Wife Name : P.K. Jayalakshmi
Passport Number : Z1752508 / 21-05-08 VALID TILL MAY, 2018
Driving License : Sultanate of Oman - Light Driving License valid till year 2019.
Nationality : Indian
Languages Known : To Read: English, Hindi & Tamil
: To Speak: English & Tamil.
 Note:
 Certificates of PDO approval attached
 Educational certificates attached
 Appreciation certificates attached

More Related Content

What's hot

naeemZada (CV)
naeemZada (CV)naeemZada (CV)
naeemZada (CV)Naeem Zada
 
MPH Global Services
MPH Global ServicesMPH Global Services
MPH Global ServicesPrasad Uchil
 
Madhusudhan
MadhusudhanMadhusudhan
Madhusudhan
R Madhusudhan
 
MOAYAD Awad CV Dec 2014-signed
MOAYAD Awad CV Dec 2014-signedMOAYAD Awad CV Dec 2014-signed
MOAYAD Awad CV Dec 2014-signedMoayad Awad
 
DavidReid Revised Resume 2
DavidReid Revised Resume 2DavidReid Revised Resume 2
DavidReid Revised Resume 2DAVID REID
 
Wayne J Dwyer Resume1
Wayne J Dwyer Resume1Wayne J Dwyer Resume1
Wayne J Dwyer Resume1Wayne Dwyer
 
Cv ajay
Cv   ajayCv   ajay
Cv ajay
Ajay Shah
 
Rp kane cv jun11
Rp kane cv jun11Rp kane cv jun11
Rp kane cv jun11Rick Kane
 
CV Abd. Hadi Ahmad
CV Abd. Hadi AhmadCV Abd. Hadi Ahmad
CV Abd. Hadi AhmadAhmad Hadi
 
IvanOrellanosResume_2015
IvanOrellanosResume_2015IvanOrellanosResume_2015
IvanOrellanosResume_2015Ivan Orellanos
 
Calabro Enzo_Resume
Calabro Enzo_Resume Calabro Enzo_Resume
Calabro Enzo_Resume Enzo Calabro
 
Tom Paterson-resume
Tom Paterson-resumeTom Paterson-resume
Tom Paterson-resume
Thomas Paterson
 

What's hot (19)

naeemZada (CV)
naeemZada (CV)naeemZada (CV)
naeemZada (CV)
 
MPH Global Services
MPH Global ServicesMPH Global Services
MPH Global Services
 
Madhusudhan
MadhusudhanMadhusudhan
Madhusudhan
 
Samih.CV docx
Samih.CV docxSamih.CV docx
Samih.CV docx
 
SUNIL-RESUME
SUNIL-RESUMESUNIL-RESUME
SUNIL-RESUME
 
MOAYAD Awad CV Dec 2014-signed
MOAYAD Awad CV Dec 2014-signedMOAYAD Awad CV Dec 2014-signed
MOAYAD Awad CV Dec 2014-signed
 
DavidReid Revised Resume 2
DavidReid Revised Resume 2DavidReid Revised Resume 2
DavidReid Revised Resume 2
 
Wayne J Dwyer Resume1
Wayne J Dwyer Resume1Wayne J Dwyer Resume1
Wayne J Dwyer Resume1
 
Yaqoob Resume.docx 15-4-2015
Yaqoob Resume.docx 15-4-2015Yaqoob Resume.docx 15-4-2015
Yaqoob Resume.docx 15-4-2015
 
Austin_CV.... 2016
Austin_CV.... 2016Austin_CV.... 2016
Austin_CV.... 2016
 
Cv ajay
Cv   ajayCv   ajay
Cv ajay
 
Rp kane cv jun11
Rp kane cv jun11Rp kane cv jun11
Rp kane cv jun11
 
CV Abd. Hadi Ahmad
CV Abd. Hadi AhmadCV Abd. Hadi Ahmad
CV Abd. Hadi Ahmad
 
SHAHZAD PARCO
SHAHZAD PARCOSHAHZAD PARCO
SHAHZAD PARCO
 
WaiFong-Resume
WaiFong-ResumeWaiFong-Resume
WaiFong-Resume
 
CV-Aziz FEB-16
CV-Aziz FEB-16CV-Aziz FEB-16
CV-Aziz FEB-16
 
IvanOrellanosResume_2015
IvanOrellanosResume_2015IvanOrellanosResume_2015
IvanOrellanosResume_2015
 
Calabro Enzo_Resume
Calabro Enzo_Resume Calabro Enzo_Resume
Calabro Enzo_Resume
 
Tom Paterson-resume
Tom Paterson-resumeTom Paterson-resume
Tom Paterson-resume
 

Viewers also liked

Tema 1
Tema  1Tema  1
The 4 Deadly Sins of ITSM
The 4 Deadly Sins of ITSM The 4 Deadly Sins of ITSM
The 4 Deadly Sins of ITSM
InvGate
 
Class design
Class designClass design
Class design
pataclos6
 
우주공강
우주공강우주공강
우주공강
lee chihun
 
MT99Dell OCIO: How we're integrating IT for the largest merger in tech history
MT99Dell OCIO:  How we're integrating IT for the largest merger in tech historyMT99Dell OCIO:  How we're integrating IT for the largest merger in tech history
MT99Dell OCIO: How we're integrating IT for the largest merger in tech history
Dell EMC World
 
IOT Success depends on Integration
IOT Success depends on Integration IOT Success depends on Integration
IOT Success depends on Integration
John Mathon
 
BDD - Collaboration & Hands-on practices
BDD - Collaboration & Hands-on practicesBDD - Collaboration & Hands-on practices
BDD - Collaboration & Hands-on practices
MagenTys
 
2016-09-eclipse-iot-cf-summit
2016-09-eclipse-iot-cf-summit2016-09-eclipse-iot-cf-summit
2016-09-eclipse-iot-cf-summit
Mike Milinkovich
 
Chuong 1
Chuong 1Chuong 1
Chuong 1
Nhat Nguyen
 
le guide d'installation de system mechanic
le guide d'installation de system mechanicle guide d'installation de system mechanic
le guide d'installation de system mechanic
aabdo2841
 

Viewers also liked (10)

Tema 1
Tema  1Tema  1
Tema 1
 
The 4 Deadly Sins of ITSM
The 4 Deadly Sins of ITSM The 4 Deadly Sins of ITSM
The 4 Deadly Sins of ITSM
 
Class design
Class designClass design
Class design
 
우주공강
우주공강우주공강
우주공강
 
MT99Dell OCIO: How we're integrating IT for the largest merger in tech history
MT99Dell OCIO:  How we're integrating IT for the largest merger in tech historyMT99Dell OCIO:  How we're integrating IT for the largest merger in tech history
MT99Dell OCIO: How we're integrating IT for the largest merger in tech history
 
IOT Success depends on Integration
IOT Success depends on Integration IOT Success depends on Integration
IOT Success depends on Integration
 
BDD - Collaboration & Hands-on practices
BDD - Collaboration & Hands-on practicesBDD - Collaboration & Hands-on practices
BDD - Collaboration & Hands-on practices
 
2016-09-eclipse-iot-cf-summit
2016-09-eclipse-iot-cf-summit2016-09-eclipse-iot-cf-summit
2016-09-eclipse-iot-cf-summit
 
Chuong 1
Chuong 1Chuong 1
Chuong 1
 
le guide d'installation de system mechanic
le guide d'installation de system mechanicle guide d'installation de system mechanic
le guide d'installation de system mechanic
 

Similar to MuraliCV

John Hare CV R1 2015
John Hare CV R1 2015John Hare CV R1 2015
John Hare CV R1 2015John Hare
 
CV_JIrattipan_2016_Revision_20160622
CV_JIrattipan_2016_Revision_20160622CV_JIrattipan_2016_Revision_20160622
CV_JIrattipan_2016_Revision_20160622Jirattipan Pongsuwan
 
Curriculam Vitae - R. Kumaran -
Curriculam Vitae - R. Kumaran -Curriculam Vitae - R. Kumaran -
Curriculam Vitae - R. Kumaran -kumaran ramalingam
 
Planning Engineer - Nayan Baraiya
Planning Engineer - Nayan Baraiya Planning Engineer - Nayan Baraiya
Planning Engineer - Nayan Baraiya Nayan Baraiya
 
Vineet Sharma-CV.DOCX
Vineet Sharma-CV.DOCXVineet Sharma-CV.DOCX
Vineet Sharma-CV.DOCXVineet Sharma
 
Resume
ResumeResume
CV_Chatchawal_Yodpol_16-03-2016
CV_Chatchawal_Yodpol_16-03-2016CV_Chatchawal_Yodpol_16-03-2016
CV_Chatchawal_Yodpol_16-03-2016Chatchawal Yodpol
 
CV_Javed_For_Commercial_,_Stores_&_Material_Controller.
CV_Javed_For_Commercial_,_Stores_&_Material_Controller.CV_Javed_For_Commercial_,_Stores_&_Material_Controller.
CV_Javed_For_Commercial_,_Stores_&_Material_Controller.Javed Iqbal
 
Revamp of gas development project
Revamp of gas development projectRevamp of gas development project
Revamp of gas development project
fcreaven
 
My Updated CV
My Updated CVMy Updated CV
My Updated CV
Ahmed Mosalam
 

Similar to MuraliCV (20)

AmitCV
AmitCVAmitCV
AmitCV
 
John Hare CV R1 2015
John Hare CV R1 2015John Hare CV R1 2015
John Hare CV R1 2015
 
CURRICULUM_VITAE
CURRICULUM_VITAECURRICULUM_VITAE
CURRICULUM_VITAE
 
CV_JIrattipan_2016_Revision_20160622
CV_JIrattipan_2016_Revision_20160622CV_JIrattipan_2016_Revision_20160622
CV_JIrattipan_2016_Revision_20160622
 
cv (3)
cv (3)cv (3)
cv (3)
 
Satish Gangadhar - Resume
Satish Gangadhar - ResumeSatish Gangadhar - Resume
Satish Gangadhar - Resume
 
Curriculam Vitae - R. Kumaran -
Curriculam Vitae - R. Kumaran -Curriculam Vitae - R. Kumaran -
Curriculam Vitae - R. Kumaran -
 
Planning Engineer - Nayan Baraiya
Planning Engineer - Nayan Baraiya Planning Engineer - Nayan Baraiya
Planning Engineer - Nayan Baraiya
 
Rohit Resume
Rohit ResumeRohit Resume
Rohit Resume
 
Vineet Sharma-CV.DOCX
Vineet Sharma-CV.DOCXVineet Sharma-CV.DOCX
Vineet Sharma-CV.DOCX
 
M.I.KHAN RESUME.
M.I.KHAN RESUME.M.I.KHAN RESUME.
M.I.KHAN RESUME.
 
Resume
ResumeResume
Resume
 
CV_Chatchawal_Yodpol_16-03-2016
CV_Chatchawal_Yodpol_16-03-2016CV_Chatchawal_Yodpol_16-03-2016
CV_Chatchawal_Yodpol_16-03-2016
 
CV_Javed_For_Commercial_,_Stores_&_Material_Controller.
CV_Javed_For_Commercial_,_Stores_&_Material_Controller.CV_Javed_For_Commercial_,_Stores_&_Material_Controller.
CV_Javed_For_Commercial_,_Stores_&_Material_Controller.
 
Revamp of gas development project
Revamp of gas development projectRevamp of gas development project
Revamp of gas development project
 
R3 CV_GLG-doc
R3 CV_GLG-docR3 CV_GLG-doc
R3 CV_GLG-doc
 
Resume-1
Resume-1Resume-1
Resume-1
 
SA CV Updated
SA CV UpdatedSA CV Updated
SA CV Updated
 
My Updated CV
My Updated CVMy Updated CV
My Updated CV
 
Resume1
Resume1 Resume1
Resume1
 

MuraliCV

  • 1. S.MURALI MOBILE: + 968 9423 6414, E-Mail: jayamurli@gmail.com ______________________________________________________________________________________________________  MBA – Operations Management ♣♣ B.Sc., - Mathematics  PG Diploma in Systems Development ♣♣ Diploma in Materials Management  25+ Yrs (10+ yrs in Middle East & 15+ yrs in India) – experienced in Oil & Gas, Manufacturing sectors in the field of Supply Chain (SCM), Procurements, Logistics, Sub-Contracts Management, Project Executions, P&M & Asset leasing, Scrap Disposal Management, ERP/SAP Modules. Result Areas Asset & Project Procurements Local & International Logistics ICV/LCC/SME Contributions Supply Chain Sub-Contracts Management ERP/SAP System Career Summary  Larsen & Toubro Group, Muscat – Head Logistics – June, 2013 to till date  Attila Dogan & Seeh Al Sarya LLC, Muscat – Head Logistics – April, 2012 to April, 2013.  Petrofac International, Sharjah – Logistics & Expedite Coordinator – Jan, 2012 to April, 2012  Attila Dogan & Seeh Al Sarya LLC, Muscat – Head Logistics – Feb, 2011 to Dec, 2011.  Galfar Eng & Contg SAOG, Mct – Sr. Materials & Logistics Coordinator – Sep, 2006 to Feb, 2011.  INCOPAK, Hodeidah, Yemen – Materials Manager – March, 2005 to Aug, 2006  NPT Offset Private Ltd., Chennai – Manager – Material & Logistics – Oct, 2001 to Feb, 2005.  J.K. Engineers, Chennai – Manager – Materials & Admin – March, 1999 to Sep 2001.  C.P. Intertrade Co. Ltd, Chennai – Trading Executive – Aug, 1996 to Feb, 1999.  Hindustan Power Plus Limited, Hosur – Executive Secretary – April, 1990 to July, 1996.  Achievements at Larsen & Toubro Group  Equipment Leasing & sub-contract orders – achieved project’s ICV value – exceeded by US$.1.25 Million.  Asset Procurements for PDO Sites like SRDC-2, Y3DC – negotiated with vendors, brought with minimum 7% less than the previous year order prices and saved US$.160,000/-  Equipment Leasing for all the PDO & Non-PDO projects – compare to previous years, during 2013- 14 prices are negotiated 9% less than the previous prices and saved US$.390,000 and 2014-15 as such saved US$.285,000 – projects are in completion stage and de-mobilization of assets are successfully completed by shifting to our centralized stores in 300 Trips in 28 Days without LTI.  In-bound logistics – Continual negotiations with 4PL/3PL transport sub-contractors for various project transportations and reducing the Logistics cost to between10% to 17.5%.  Portacabins Imports – From LNT (ADNOC Site, UAE) to Y3DC Yibal Site (Oman) – transportation cost saving US$.104,625/-  Negotiated with vendor to provide Statistical Declarations to get duty exemption and saved US$.143,000/- for the import of used Portacabins from our L&T Abu Dhabi.  Scrap Disposals – during 2014 – US$.857,150/- & during 2015 – US$. 363,750/- against the book value of US$.1,037,765/-.  Project Assets & Camp Disposal – Sold & saved a sum of US$.390,000/-  Achievements at Attila Dogan & Seeh Al Sarya LLC.  P&M Asset Procurements & Portacabins Procurements saved around US$.200,000/-  Project Imports both Air & Road Transports& inbound logistics – saved around US$.225,000/-  Achievements at Petrofac International  Contributed performance based logistics solutions & Preservatives of ODC equipment starting from 50 Tons to 850 Tons for the world class Turkmenistan Yolanta Gas Project site worth of US$.3.5 Billion Saved around 5 million US$ by the proper strategic planning of Sea/Air/Road/Rail Transports.
  • 2.  Achievements at Galfar Eng & Contracting SAOG  Contributed logistics provisions, Bulk Procurements, expediting with vendors, movements, erections and Preservatives of ODC equipment starting from 45 Tons to 370 Tons for the world class Harweel Cluster Phase 2 Facilities.  Received appreciation letters from Harweel PDO CSR, Petrofac’s logistics manager and Galfar’s EVP for the achievement of logistics activities and delivered the construction materials, project equipment and accessories of more than 258,000 tons within the time schedule & without any LTI.  For Harweel Cluster Phase-2 facility projects, negotiated with local & international transporters, Liners, Air Cargo agents and saved a sum of US$.1.8 million.  PROFESSIONAL EXPERIENCES Company : Larsen & Toubro Electromech LLC, Muscat Position Holding : Logistics & Procurement Manager - SCM Dept. – Key Position Reporting to : DGM – Projects & DGM – Operations. Job Profile : Purchase of Capital Assets, Leasing of P&M Equipments, Import of Project Materials from various parts of Globe, SCM involving Bulk Procurements & Logistics, Contracts & Sub-contracts Management. Projects Handling : PDO Oil & Gas - LGFD Projects, Lekhwair, SRDC-2, Y3DC Projects. Airport Proj – Salalah Airport Fuel Farm & Hydrant system, Jindal Steel Project, Mussandam Gas Power Project, Daleel Petroleum Projects. Company : Attila Dogan & See Al Sarya LLC, Muscat, Oman Position Held : HEAD – LOGISTICS – ODC Contracts (Oil&Gas) (Key position) Reporting to : Contracts Head & Supply Chain & Technical Service Head Job Profile : Logistics Related: Totally responsible for the sub-contractors management, provision of Logistics Services, which includes Import & Export, Transportation including Plant & Equipment Management and Warehouse Management Services for the ODC Contract with Petroleum Development Oman with the man power of 30 staffs and 45 workers. Procurement & Sub-Contracts Related: During the absence of Procurement & Sub-Contract Head, I will lead the sourcing team to enable the department’s task should complete within the stipulated time with the assistance of Sourcing Specialists. Company : Petrofac International, Sharjah Position Held : Logistics & Expedite Coordinator – O&G Projects – Key Position Reporting to : Logistics Head & Project Director. Job Profile : Totally responsible for the provision of SCM Services, which includes Import & Export, Transportation and Warehouse Management Services for the Turkmenistan Gas project worth 3.5 Billion US$. Handling & expediting of ODC cargo, preservatives, movements etc. Company : Galfar Engineering & Contracting SAOG, Muscat, Oman Position Held : Sr. Manager – Materials & Logistics – O&G – (PDO-App key post) Reporting to : Executive Vice President – Oil & Gas Constructions
  • 3. Job Profile : Coordinating & taking care of project procurements & expediting for the World Class Projects – Harweel Cluster Phase 2 Facilities & Al-Burj Full Field Water Injection Project for PDO (Petroleum Development Oman) worth around US$2.5 BILLION, ISO, HSE & HEMP system procedures, Planning and controlling of P&M at site, Liaison & expedite with Liners, Vendors, Clients and integrating procurement contractually into the project management process and the project business teams at the initial stage to final stage. Organizing, controlling and monitoring all procurement activities in a project, introducing procurement strategies, targeting maximum contribution to the operative result as well as ensuring the observance of the procurement processes and an optimized deployment of resources. Achievements : As for this project, procured around 485 Heavy equipments weighing around 8,500 MT & sixty thousand tons of materials & moved site as per the contractual terms with fullest safety by following HSE norms. Saved around 1.85 million Rial Omani in various transports, erection contracts and paid towards customs duty in Oman – 5.45 Million for the Import of Project Materials. Due to proper & direct control in P&M saved around 350K OMR during this project tenure of 5 years. Company : International Co. for Industry and Printing & Packaging S.Y.C A Thabet Brothers Group of Companies in Yemen [2 nd largest] Position Held : Manager – Materials & Contracts [International Procurements] Reporting to : Managing Directors Job Profile : Heading Materials Department for 3 Divisions. Responsibilities : Procurement based on contractual agreements, managing inventories, introducing new vendors, all types of analyzing & evaluating vendors, materials, quality compliances, liaison with Govt. officials regarding Customs clearances etc. Budgeting, Analyzing market trend, forecasting, MIS, E-sourcing, implementing JIT concepts, providing training to local nationals etc. Company : NPT Offset Private Limited, channai-14 (ISO 9001-2000 Co.) Position Held : Manager – Materials & Logistics Reported to : Director & AGM Job Profile : Entire Materials Management, Budgeting, Imports & Export Logistics. Company : J.K. Engineers, Chennai. Position Held : Manager – Materials & Administration Reported to : Director. Job Profile : Entire Procurement & Warehouse activities, Liaison with Government officials, generating MIS, Logistics, Budgets, were coordinating with Management, General Administration including house keeping, arranging itinerary, recruiting etc.
  • 4. Company : C.P. Intertrade Co. Ltd., Thailand (Chennai Branch) Position Held : Trading Executive – Procurements [Aqua & Cattle Feeds] Reported to : Vice President in Bangkok & GM in Chennai Office. Job Responsibility : All sorts of Material Department work including procurements of raw Materials (both Imports & Local), logistics involving Planning & controlling of raw materials with handling capacity of 4000 MT per month & 50 MT of Cold storage etc, vendor developments, Import & Export dealings, liaison with concern officials, assisting Vice President in Bangkok regarding International trading involving various activities like market trend, ocean freights etc, providing training to Trading coordinators etc. Company : Hindustan Power Plus Limited, Hosur. Position Held : Executive Secretary - Imports Reported to : General Manager – Imports. Job Profile & Responsibilities : HPL a multinational collaborating with Caterpillar, USA manufacturing Domestic & Industrial Gensets. All sorts of Imports/Stores/Logistic activities including coordinating with Management executives, self correspondence, arranging itinerary, are coordinating with collaborators, preparing minutes of meeting, planning & controlling of imports, vendor development, evaluating vendors etc.  EDUCATIONAL QUALIFICATIONS : MBA – Operations Management @ TNOU. : B.Sc., - Mathematics @ Madras University. : PG Diploma in Systems Development @ Brilliants. : Diploma in Materials Management @ Annamalai University.  Professional Development : 1. Negotiation Management, 2. Personality Development 3. Leadership qualities, 4. Strategic Management 5. Finance for Non-Finance Managers, 6. Heavy Lift Movements, Erections & Preservatives.  EXTRACURRICULAR ACTIVITIES : ISC events, Networking, Social Services.  HOBBIES : Listening Music, Travelling  PERSONAL DETAILS: Date of Birth : 24 th June, 1968 Father’s Name : J. Subramanian Marital Status : Married Wife Name : P.K. Jayalakshmi Passport Number : Z1752508 / 21-05-08 VALID TILL MAY, 2018 Driving License : Sultanate of Oman - Light Driving License valid till year 2019. Nationality : Indian Languages Known : To Read: English, Hindi & Tamil : To Speak: English & Tamil.  Note:  Certificates of PDO approval attached  Educational certificates attached  Appreciation certificates attached