My objective is to obtain a job using my 25 years in the construction and maintenance
supervisor roles. I want to continue learning and being part of a team that accomplishes
daily goals that keep the work area safe, productive and on track. I have planning,
problem solving, purchasing and communication skills that can be used in any work
environment. My background is from clerk to supervisor and I have continued to use all
the skills and appreciate every skill set. I am committed to recycling and saving any kind
of usable materials and not waste labor nor equipment. I have lived in Mississippi County
most of my life and have plans to stay in this area. Travel is not an issue for me when
required necessary for the project.
Work Experience
Manager of Special Projects
Pentad Advisory Group
@ BlueOak Arkansas Electronic Waste Recovery Facility
Osceola, Ar.
February 2016-December 2016
Manage and supervise the demolition and reinstallation of industrial equipment
• Document and categorize equipment for insurance claim
• Investigate and evaluate equipment and industrial facility for damages
• Communicate and advise management of priority events
• Organize contractors for bid process, reviews and award expectations
• Create blueprint packages, transmittals and documents
• Procure equipment, materials and manpower
• Evaluate time constraints, operations requirements and logistics
• Supervise and assist on site contractors
• Acquire necessary support for material removal, roads, surveys etc.
• Confer with management and the engineering firm with necessary utility, city and
government contracts or services as required
• Constantly review industrial work areas for safety issues, job safety assessments
and lockout/tag out procedures
• Utilizes on site materials, equipment, labor and time for cost effective work
Construction/Contractor Supervisor
Nucor-Yamato Steel Co.
Blytheville, AR.
February 2007-July 2015
• Confer with supervisory personnel, owners, contractors, or design professionals to
discuss and resolve matters, such as work procedures, complaints, or construction
problems
• Plan, schedule, or coordinate construction project activities to meet deadlines
• Direct supervision over construction or related workers
• Inspect or review projects to monitor compliance with building and safety codes,
or other regulations
• Plan, organize, or direct plant outage activities concerned with the construction or
maintenance of structures, facilities, or systems
• Determine labor requirements for dispatching workers to construction sites
• Investigate damage, accidents, or delays at construction sites to ensure that proper
construction procedures are being followed. Review blueprint requirements.
• Prepare contracts or negotiate revisions to contractual agreements with architects,
consultants, clients, suppliers, or subcontractors
• Requisition supplies or materials to complete construction projects
• Contract or oversee all craft work, such as structural, electrical or piping
• Communicating with Supervisors, Peers, or Subordinates
• Scheduling Work and Activities
• Organizing, Planning, and Prioritizing Work
• Communicating with Persons Outside Organization
• Coordinating the Work and Activities of Others
• Inspecting Equipment, Structures, or Material
• Experience with: Autodesk AutoCAD software, Email software, Internet browser
software, Oracle purchasing, Microsoft office, and project planning software.
Maintenance Planner
Nucor Yamato Steel
Blytheville, AR
February 1995-February 2007
This position was to assist maintenance with planned equipment repairs and parts. I also
bid fabrication packages to shops for upgrades and installations. With upgrades the
responsibility of updating storeroom stock for parts and materials for repairs was a huge
cost requirement. Software usage to create preventative maintenance jobs with the part
numbers or blueprint information was a large scope to this position. Shutdown planning
was a key item and I would purchase an stage refurbished spares and materials and also
oversee or supervise the personnel for the installation. Routine requirements for tools,
contractor personnel, vendor communication, purchasing, accounts payable and
documentation made this a very busy job.
Nucor Construction Clerk
February 1991-February 1995
Construction for the Hickman sheet mill is where I started for Nucor. I was a key
stakeholder in laying the groundwork for all office equipment, layouts and personnel.
I kept records on the vendor and contractor contracts. I ordered the grout and concrete
for the jobsite. With the records I also approved and coded all the invoices. Blueprint
packages were done by USPS not email. I loved the fast pace and commitment to the end
result and being a part of the team. This job gave the groundwork for all of my future
jobs.
IMS
Industrial Mill Service
Office Clerk
Farmers Bank & Trust
Bookkeeper
Proof Operator
Education
Blytheville High School graduate
Blytheville, AR
University of Mississippi, Oxford MS- general course studies
AISC – seminars for Problems in Design, Fabrication & Erection
COVEY-Project Management, planning & scheduling
Miscellaneous other certificates: Mechanical Drives, AC/DC electric motors,
Maintenance welding procedures, Effective planning & scheduling, OSHA 10,
Safe Supervisor training and Management skills for new supervisors.
I have taken community college courses for computer and office technology.
I have attended many refresher classes for supervisor communication skills, ethics,
leadership and construction technology. I was a first responder for 15 yrs.
References:
Dave Stickler-COO
Big River Steel-870-819-3031 Email: dstickler@bigriversteel.com
Norm Maero- Construction Manager retired 2016
Nucor Corporation -704-996-9321
Gary Wren- Maintenance Manager
Nucor Yamato Steel- 870-838-5654 Email: gary.wren@nucor-yamato.com

Resume-Bullard 2017

  • 1.
    STACY BULLARD stacybullard2015@gmail.com Phone Number:870-740-5745 My objective is to obtain a job using my 25 years in the construction and maintenance supervisor roles. I want to continue learning and being part of a team that accomplishes daily goals that keep the work area safe, productive and on track. I have planning, problem solving, purchasing and communication skills that can be used in any work environment. My background is from clerk to supervisor and I have continued to use all the skills and appreciate every skill set. I am committed to recycling and saving any kind of usable materials and not waste labor nor equipment. I have lived in Mississippi County most of my life and have plans to stay in this area. Travel is not an issue for me when required necessary for the project. Work Experience Manager of Special Projects Pentad Advisory Group @ BlueOak Arkansas Electronic Waste Recovery Facility Osceola, Ar. February 2016-December 2016 Manage and supervise the demolition and reinstallation of industrial equipment • Document and categorize equipment for insurance claim • Investigate and evaluate equipment and industrial facility for damages • Communicate and advise management of priority events • Organize contractors for bid process, reviews and award expectations • Create blueprint packages, transmittals and documents • Procure equipment, materials and manpower • Evaluate time constraints, operations requirements and logistics • Supervise and assist on site contractors • Acquire necessary support for material removal, roads, surveys etc. • Confer with management and the engineering firm with necessary utility, city and government contracts or services as required • Constantly review industrial work areas for safety issues, job safety assessments and lockout/tag out procedures • Utilizes on site materials, equipment, labor and time for cost effective work Construction/Contractor Supervisor Nucor-Yamato Steel Co. Blytheville, AR. February 2007-July 2015 • Confer with supervisory personnel, owners, contractors, or design professionals to discuss and resolve matters, such as work procedures, complaints, or construction problems
  • 2.
    • Plan, schedule,or coordinate construction project activities to meet deadlines • Direct supervision over construction or related workers • Inspect or review projects to monitor compliance with building and safety codes, or other regulations • Plan, organize, or direct plant outage activities concerned with the construction or maintenance of structures, facilities, or systems • Determine labor requirements for dispatching workers to construction sites • Investigate damage, accidents, or delays at construction sites to ensure that proper construction procedures are being followed. Review blueprint requirements. • Prepare contracts or negotiate revisions to contractual agreements with architects, consultants, clients, suppliers, or subcontractors • Requisition supplies or materials to complete construction projects • Contract or oversee all craft work, such as structural, electrical or piping • Communicating with Supervisors, Peers, or Subordinates • Scheduling Work and Activities • Organizing, Planning, and Prioritizing Work • Communicating with Persons Outside Organization • Coordinating the Work and Activities of Others • Inspecting Equipment, Structures, or Material • Experience with: Autodesk AutoCAD software, Email software, Internet browser software, Oracle purchasing, Microsoft office, and project planning software. Maintenance Planner Nucor Yamato Steel Blytheville, AR February 1995-February 2007 This position was to assist maintenance with planned equipment repairs and parts. I also bid fabrication packages to shops for upgrades and installations. With upgrades the responsibility of updating storeroom stock for parts and materials for repairs was a huge cost requirement. Software usage to create preventative maintenance jobs with the part numbers or blueprint information was a large scope to this position. Shutdown planning was a key item and I would purchase an stage refurbished spares and materials and also oversee or supervise the personnel for the installation. Routine requirements for tools, contractor personnel, vendor communication, purchasing, accounts payable and documentation made this a very busy job. Nucor Construction Clerk February 1991-February 1995 Construction for the Hickman sheet mill is where I started for Nucor. I was a key stakeholder in laying the groundwork for all office equipment, layouts and personnel. I kept records on the vendor and contractor contracts. I ordered the grout and concrete for the jobsite. With the records I also approved and coded all the invoices. Blueprint packages were done by USPS not email. I loved the fast pace and commitment to the end result and being a part of the team. This job gave the groundwork for all of my future jobs.
  • 3.
    IMS Industrial Mill Service OfficeClerk Farmers Bank & Trust Bookkeeper Proof Operator Education Blytheville High School graduate Blytheville, AR University of Mississippi, Oxford MS- general course studies AISC – seminars for Problems in Design, Fabrication & Erection COVEY-Project Management, planning & scheduling Miscellaneous other certificates: Mechanical Drives, AC/DC electric motors, Maintenance welding procedures, Effective planning & scheduling, OSHA 10, Safe Supervisor training and Management skills for new supervisors. I have taken community college courses for computer and office technology. I have attended many refresher classes for supervisor communication skills, ethics, leadership and construction technology. I was a first responder for 15 yrs. References: Dave Stickler-COO Big River Steel-870-819-3031 Email: dstickler@bigriversteel.com Norm Maero- Construction Manager retired 2016 Nucor Corporation -704-996-9321 Gary Wren- Maintenance Manager Nucor Yamato Steel- 870-838-5654 Email: gary.wren@nucor-yamato.com