SlideShare a Scribd company logo
David Lewis Perrings,PE, QSD/P
Project Civil Engineer
110 StarlightPlace▪ Danville▪ California▪ 94526 ▪ 925 858 7253 ▪ dperrings@outlook.com
1
Current Project Experience (partial list)
Wilder Development, Orinda, California
250 Lot Residential Development (currently in
construction) with Community Ball Fields, Swim Center
and Art & Garden Center. Total Land Area with open
space, 1000+ acres
Storm Water Management Plan, Offsite Drainage Study,
OnsiteDrainageStudy,Storm DrainageCalculations,Basin
Routing Calculations, Multiple Detention Basins and
Water Quality Basins, BMP studies and design for grassy
swales, bio-retention areas and mechanical treatment
units, FEMA CLOMR for Brookside Creek. A water quality
permit was obtained from the State Regional Water
Quality Control Board.
Schaefer Ranch, Dublin, California
250 Lot Residential Development
Drainage Study, Phase I, Caltrans; Drainage Study, Phase
II, storm drainage design and calculations, Basin routing
and design (3 detention Basins), water quality Basin
design (2 Basins). A water quality permit was obtained
from the State Regional Water Quality Control Board
Stonecreek Development, Los Banos, California
Residential, mixed use and commercial development
Approximately 2000 + acres
Master utility plan study for water, sewer and storm
drainage;sewer and stormdrain pump station studies and
design; storm drainage & sewer studies and calculations
for eight neighborhoods;detention basin design;design of
three miles of sanitary sewer force main
Alhambra Valley Oaks, Contra Costa County, California
27 Lot Residential Development
Drainage Study, Storm drainage calculations, detention
basin studies,FEMA CLOMR, Creek Outfall Design,Water
Quality Study, Obtain water quality permitfrom the State
Regional Water Quality Control Board
Creekside Cemetery Project
Contra Costa County, California
Prepared Contra Costa County C.3. Storm Water Control
Plan.
Expert Witness for Plaintiff is Drainage Lawsuit
Client: Archer Norris Law Firm, Walnut Creek; Drainage
Lawsuitfor sitein Richmond California.
Other Drainage, Water Quality and Flood Control
Projects
Prepared drainage studies for projects in Wendover,
Nevada; Fairfield, Concord; Moraga, Lafayette, Antioch,
Orinda,Clayton,Dublin,Danville,San Ramon, and Walnut
Creek Ca
Previous Project Experience (partial list)
Utility Studies, City of Foster City, California
Assessment of development impact on existing utility
systems and lift stations within the city of Foster City.
Utilities included storm, water and sanitary sewer
systems.Flow monitoringof liftstations wasperformed in
conjunction with capacity analysisof utilities.
Education ▪ B.S.C.E. Civil Engineering,Rose-Hulman Institute of Technology, 1978
Professional Registration ▪ R.C.E #39157, State of California ▪ QSD/QSP # 01188,CASQA
Professional Associations ▪ American Society of Civil Engineers, M.ASCE ▪ Member of ASCE
Committee on American Infrastructure (CAI), 3rd Year, responsible for the Report Card for
American Infrastructure,next release date March,2017.
Current Position ▪ ProjectCivil Engineer, P/A Design Resources, Inc,Walnut Creek, CA, 2002
to Current, 15 years.
Skills ▪ Report writing, computer analysis, CAD, engineering design and analysis. Computer
programs utilized included:Hec l and ll,Hec Ras and HMS; Bentley’s Pond Pack, Graphic Hec
l, StormCAD, SewerCAD and Flowmaster; AutoCAD, MAP, LAND and Civil , and BAHM, Bay
Area Hydrology Model. Water Quality Studies included selection and design of BMP
measures, hydromodification,vector control plans,Operations and MaintenancePlans.
Prior Experience ▪ Mr. Perrings has over 25 years of professional engineering
experience in civil engineering design, project management, and construction
management. As a Civil Engineer he has managed the design of numerousprivate
and public works projects. Key responsibilities include project management of
design team, client contact, and project administration. Municipal projects have
included street, highways, grade crossings, quality control/quality assurance and
utility designs. These projects included preparation of plans, specifications, bid
documentsandcostestimates. Site developmentprojectshave includedresidential
subdivisions,commercial developments, business parks, hotel and hospitals. His
responsibilities have included each phase of the design process: regulatory
environmental review, tentative map, improvement plans and construction
support.
Key Areas of
Expertise
 Stormwater
 Hydraulics
 Hydrology
 Water Quality
 Flood Control
 Basin Routing
 FEMA Flood
Mapping
 Water/Wastewater
Engineering
 Civil/Site
Engineering
 Municipal
Engineering
 Environmental
 Permitting
David Lewis Perrings,PE, QSD/P
Project Civil Engineer
110 StarlightPlace▪ Danville▪ California▪ 94526 ▪ 925 858 7253 ▪ dperrings@outlook.com
2
Truckee Meadows Floodwall and Levee Project, Reno,
NV
Feasibility level design and cost estimates for thirty miles
of levels and floodwalls alongthe Truckee River between
Reno and Sparks,Nevada for the Army Corps of Engineers,
Sacramento District.Intergraph Inroadswas used to aid in
the civil design of the project. Features of the design
included digital terrain modeling, ortho-photos, plan and
profile drawings and aerial mosaic. Construction cost
estimate for the project is 150 million dollars.
Vista Grande Canal Flow Monitoring Study, Daly City, CA
A study was conducted for the City of Daly City on theVista
Grande Canal adjacentto Lake Merced in San Francisco to
determine the annual expected flow volume in the Canal
for possible diversion into Lake Merced. The purpose of
the diversion is to aid in the current trend reversal of
decreasinglakelevels.Flows weremeasured and analyzed
during the 1998-99-winter season. The study
demonstrated to the City of Daly City and to the San
Francisco Public Utilities Commission thatsufficientflows
occurred in the canal thatcould be diverted into the lake
to increasethe water surfaceelevation in the lake.
National Flood Insurance Program, Community Rating
System Application, Mountain View, CA
Prepared application for submittal to FEMA for the
Community Rating System for the City of Mountain View.
The application identified measures taken by the City that
will reduce the probability of negative impacts from
floodingwithin the City. The benefit to the Community is
lower flood insurancepremiums.
National Flood Insurance Program, Substantial
Improvement Procedure
Developed application and procedure for the City of
Mountain View for the determination of substantial
improvements in accordancewith FEMA’s National Flood
Insurance Program. A relational database was developed
in conjunction with GIS mappingto test the impact of the
procedure on the Community and the City’s workload.
Three thousand buildingpermitapplicationsweretested.
Northridge Earthquake Recovery, Pasadena, CA
Worked at the Northridge Earthquake Recovery Office of
the Federal Emergency Management Agency in Pasadena,
California as a Technical Assistance Contractor. Primary
function was to review requests for federal monetary
assistanceby thepublic agencies thatsuffered earthquake
damage and prepareconstruction DamageSurvey Reports
(DSR’s), which established a construction scope of work
and construction funding criteria. Elements of the DSR
include: building damage repair scope of work, code
compliance, access compliance, environmental review,
historic review and hazard mitigation. During the project
design and construction phase responsibilities also
included design eligibility reviewand construction project
monitoring.

More Related Content

What's hot

Max KroschelResume061715
Max KroschelResume061715Max KroschelResume061715
Max KroschelResume061715Max Kroschel
 
Dennis Lambert Diversions
Dennis Lambert DiversionsDennis Lambert Diversions
Dennis Lambert Diversions
Dennis Lambert
 
Resume_Adrienne Sims_ 071615_wo contact info
Resume_Adrienne Sims_ 071615_wo contact infoResume_Adrienne Sims_ 071615_wo contact info
Resume_Adrienne Sims_ 071615_wo contact infoAdrienne Sims
 
Sept 2015 LRA Lori_Robison
Sept 2015 LRA Lori_Robison Sept 2015 LRA Lori_Robison
Sept 2015 LRA Lori_Robison Lori Robison
 
Celys Irizarry Sepúlveda_CV_09_2016
Celys  Irizarry Sepúlveda_CV_09_2016Celys  Irizarry Sepúlveda_CV_09_2016
Celys Irizarry Sepúlveda_CV_09_2016celys.irizarry
 
Contino Stephen Resume LinkedIn
Contino Stephen Resume LinkedInContino Stephen Resume LinkedIn
Contino Stephen Resume LinkedInStephen Contino
 
150508gkResume
150508gkResume150508gkResume
150508gkResumeGlenn King
 
2016_amalone_resume
2016_amalone_resume2016_amalone_resume
2016_amalone_resumeAndy Malone
 
Compliance With MPCA Industrial Stormwater Permit Requirements
Compliance With MPCA Industrial Stormwater Permit RequirementsCompliance With MPCA Industrial Stormwater Permit Requirements
Compliance With MPCA Industrial Stormwater Permit Requirements
Loren Larson, CHMM, CPEA
 
Civic Exchange 2009 The Air We Breathe Conference - U.S. Politics and Laws as...
Civic Exchange 2009 The Air We Breathe Conference - U.S. Politics and Laws as...Civic Exchange 2009 The Air We Breathe Conference - U.S. Politics and Laws as...
Civic Exchange 2009 The Air We Breathe Conference - U.S. Politics and Laws as...
Civic Exchange
 
Stephanie Romano - Professional Profile
Stephanie Romano - Professional ProfileStephanie Romano - Professional Profile
Stephanie Romano - Professional ProfileStephanie Romano
 

What's hot (19)

Max KroschelResume061715
Max KroschelResume061715Max KroschelResume061715
Max KroschelResume061715
 
D Lincicome resume
D Lincicome resumeD Lincicome resume
D Lincicome resume
 
Dennis Lambert Diversions
Dennis Lambert DiversionsDennis Lambert Diversions
Dennis Lambert Diversions
 
Resume_Adrienne Sims_ 071615_wo contact info
Resume_Adrienne Sims_ 071615_wo contact infoResume_Adrienne Sims_ 071615_wo contact info
Resume_Adrienne Sims_ 071615_wo contact info
 
Sept 2015 LRA Lori_Robison
Sept 2015 LRA Lori_Robison Sept 2015 LRA Lori_Robison
Sept 2015 LRA Lori_Robison
 
Celys Irizarry Sepúlveda_CV_09_2016
Celys  Irizarry Sepúlveda_CV_09_2016Celys  Irizarry Sepúlveda_CV_09_2016
Celys Irizarry Sepúlveda_CV_09_2016
 
WRA DelDOT WL Presentation
WRA DelDOT WL PresentationWRA DelDOT WL Presentation
WRA DelDOT WL Presentation
 
LP Linked In Resume
LP Linked In ResumeLP Linked In Resume
LP Linked In Resume
 
Zemitis_Resume
Zemitis_ResumeZemitis_Resume
Zemitis_Resume
 
Contino Stephen Resume LinkedIn
Contino Stephen Resume LinkedInContino Stephen Resume LinkedIn
Contino Stephen Resume LinkedIn
 
150508gkResume
150508gkResume150508gkResume
150508gkResume
 
BSantelik_resume
BSantelik_resumeBSantelik_resume
BSantelik_resume
 
Stormwater Magazine
Stormwater MagazineStormwater Magazine
Stormwater Magazine
 
2016_amalone_resume
2016_amalone_resume2016_amalone_resume
2016_amalone_resume
 
Compliance With MPCA Industrial Stormwater Permit Requirements
Compliance With MPCA Industrial Stormwater Permit RequirementsCompliance With MPCA Industrial Stormwater Permit Requirements
Compliance With MPCA Industrial Stormwater Permit Requirements
 
Youngman Randy 2014
Youngman Randy 2014Youngman Randy 2014
Youngman Randy 2014
 
Repa_Resume 2015
Repa_Resume 2015Repa_Resume 2015
Repa_Resume 2015
 
Civic Exchange 2009 The Air We Breathe Conference - U.S. Politics and Laws as...
Civic Exchange 2009 The Air We Breathe Conference - U.S. Politics and Laws as...Civic Exchange 2009 The Air We Breathe Conference - U.S. Politics and Laws as...
Civic Exchange 2009 The Air We Breathe Conference - U.S. Politics and Laws as...
 
Stephanie Romano - Professional Profile
Stephanie Romano - Professional ProfileStephanie Romano - Professional Profile
Stephanie Romano - Professional Profile
 

Viewers also liked

Eric Girod Project Resume
Eric Girod Project ResumeEric Girod Project Resume
Eric Girod Project ResumeEric Girod
 
MarkSFong_Resume-Nov2016
MarkSFong_Resume-Nov2016MarkSFong_Resume-Nov2016
MarkSFong_Resume-Nov2016Mark Steve Fong
 
Greenwich Peninsula – Where riverside living starts
Greenwich Peninsula – Where riverside living startsGreenwich Peninsula – Where riverside living starts
Greenwich Peninsula – Where riverside living starts
Newsworks
 
Teferi_Seyoum_Resume
Teferi_Seyoum_ResumeTeferi_Seyoum_Resume
Teferi_Seyoum_ResumeTeferi Seyoum
 
Alex Imholz Resume (July 5, 2015)
Alex Imholz Resume (July 5, 2015)Alex Imholz Resume (July 5, 2015)
Alex Imholz Resume (July 5, 2015)alex imholz
 
Senior Voice engineer
Senior Voice engineerSenior Voice engineer
Senior Voice engineer
Justin Cho
 
External evaluation of the peer evaluation process final1
External evaluation of the peer evaluation process final1External evaluation of the peer evaluation process final1
External evaluation of the peer evaluation process final1Association of Colleges
 
Resume-Master Educator
Resume-Master EducatorResume-Master Educator
Resume-Master EducatorRoger McLain
 
Online student management system
Online student management systemOnline student management system
Online student management systemMumbai Academisc
 
2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume
2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume
2014-11-28b BAT_TAFOYA_Bruce_Updated_ResumeBruce Tafoya
 
English syllabus 2011
English syllabus 2011English syllabus 2011
English syllabus 2011
Nila Shah
 
Oracle R12 SCM Functional Interview Questions - Order Management,
Oracle R12 SCM Functional Interview Questions - Order Management, Oracle R12 SCM Functional Interview Questions - Order Management,
Oracle R12 SCM Functional Interview Questions - Order Management,
Boopathy CS
 

Viewers also liked (19)

Eric Girod Project Resume
Eric Girod Project ResumeEric Girod Project Resume
Eric Girod Project Resume
 
Slide Share 1
Slide Share 1Slide Share 1
Slide Share 1
 
YOLANDA AGUILAR
YOLANDA AGUILARYOLANDA AGUILAR
YOLANDA AGUILAR
 
MarkSFong_Resume-Nov2016
MarkSFong_Resume-Nov2016MarkSFong_Resume-Nov2016
MarkSFong_Resume-Nov2016
 
Greenwich Peninsula – Where riverside living starts
Greenwich Peninsula – Where riverside living startsGreenwich Peninsula – Where riverside living starts
Greenwich Peninsula – Where riverside living starts
 
Objective
ObjectiveObjective
Objective
 
Teferi_Seyoum_Resume
Teferi_Seyoum_ResumeTeferi_Seyoum_Resume
Teferi_Seyoum_Resume
 
Alex Imholz Resume (July 5, 2015)
Alex Imholz Resume (July 5, 2015)Alex Imholz Resume (July 5, 2015)
Alex Imholz Resume (July 5, 2015)
 
Senior Voice engineer
Senior Voice engineerSenior Voice engineer
Senior Voice engineer
 
cvADJmay2015
cvADJmay2015cvADJmay2015
cvADJmay2015
 
External evaluation of the peer evaluation process final1
External evaluation of the peer evaluation process final1External evaluation of the peer evaluation process final1
External evaluation of the peer evaluation process final1
 
Resume-Master Educator
Resume-Master EducatorResume-Master Educator
Resume-Master Educator
 
CV(new) site-civil engineer
CV(new) site-civil engineerCV(new) site-civil engineer
CV(new) site-civil engineer
 
CV_ADJeng2015may_prof2page
CV_ADJeng2015may_prof2pageCV_ADJeng2015may_prof2page
CV_ADJeng2015may_prof2page
 
Online student management system
Online student management systemOnline student management system
Online student management system
 
Harpreet Singh Resume
Harpreet Singh ResumeHarpreet Singh Resume
Harpreet Singh Resume
 
2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume
2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume
2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume
 
English syllabus 2011
English syllabus 2011English syllabus 2011
English syllabus 2011
 
Oracle R12 SCM Functional Interview Questions - Order Management,
Oracle R12 SCM Functional Interview Questions - Order Management, Oracle R12 SCM Functional Interview Questions - Order Management,
Oracle R12 SCM Functional Interview Questions - Order Management,
 

Similar to resume 2017

SOQ (Sample)
SOQ (Sample)SOQ (Sample)
SOQ (Sample)jcirone
 
DW & WW Experience 10142015
DW & WW Experience 10142015DW & WW Experience 10142015
DW & WW Experience 10142015Waseem Khan, PG
 
Tyler Hall - Project Experience
Tyler Hall - Project ExperienceTyler Hall - Project Experience
Tyler Hall - Project ExperienceTyler Hall
 
Jason Abendroth Project experience_10_2015
Jason Abendroth Project experience_10_2015Jason Abendroth Project experience_10_2015
Jason Abendroth Project experience_10_2015Jason Abendroth, PE
 
Introduction to Biohabitats presentation public meeting number one 02 11-21
Introduction to Biohabitats presentation public meeting number one 02 11-21Introduction to Biohabitats presentation public meeting number one 02 11-21
Introduction to Biohabitats presentation public meeting number one 02 11-21
Fairfax County
 
Ed Baquerizo CV (Updated April 2015)
Ed Baquerizo CV (Updated April 2015)Ed Baquerizo CV (Updated April 2015)
Ed Baquerizo CV (Updated April 2015)
Ed A. Baquerizo
 
Quander Road Outfall and Stream Restoration
Quander Road Outfall and Stream RestorationQuander Road Outfall and Stream Restoration
Quander Road Outfall and Stream Restoration
Fairfax County
 
Aaron zambo - Civil Engineer
Aaron  zambo - Civil EngineerAaron  zambo - Civil Engineer
Aaron zambo - Civil Engineer
aaronzambo
 
U.S. Army Corps of Engineers Update, Mark Mazzanti SES
U.S. Army Corps of Engineers Update, Mark Mazzanti SESU.S. Army Corps of Engineers Update, Mark Mazzanti SES
U.S. Army Corps of Engineers Update, Mark Mazzanti SES
TWCA
 
Resume JW ENG City 01-12
Resume JW ENG City 01-12Resume JW ENG City 01-12
Resume JW ENG City 01-12Jerry Williams
 
Ahmad mousa project list
Ahmad mousa   project listAhmad mousa   project list
Ahmad mousa project list
Ahmad Mousa
 
LIDDLE - Project-Related Work Experience
LIDDLE - Project-Related Work ExperienceLIDDLE - Project-Related Work Experience
LIDDLE - Project-Related Work ExperienceGeorge Liddle
 
Storm Water Utility Dev. and Master Plans
Storm Water Utility Dev. and Master PlansStorm Water Utility Dev. and Master Plans
Storm Water Utility Dev. and Master Plans
South Shore Clean Cities
 
ENR MOUNTAIN STATES 2013 BEST PROJECTS AWARD
ENR MOUNTAIN STATES 2013 BEST PROJECTS AWARDENR MOUNTAIN STATES 2013 BEST PROJECTS AWARD
ENR MOUNTAIN STATES 2013 BEST PROJECTS AWARDPhilip Tunnah
 

Similar to resume 2017 (20)

SOQ (Sample)
SOQ (Sample)SOQ (Sample)
SOQ (Sample)
 
DW & WW Experience 10142015
DW & WW Experience 10142015DW & WW Experience 10142015
DW & WW Experience 10142015
 
Tyler Hall - Project Experience
Tyler Hall - Project ExperienceTyler Hall - Project Experience
Tyler Hall - Project Experience
 
Bokath Resume
Bokath ResumeBokath Resume
Bokath Resume
 
Jason Abendroth Project experience_10_2015
Jason Abendroth Project experience_10_2015Jason Abendroth Project experience_10_2015
Jason Abendroth Project experience_10_2015
 
Introduction to Biohabitats presentation public meeting number one 02 11-21
Introduction to Biohabitats presentation public meeting number one 02 11-21Introduction to Biohabitats presentation public meeting number one 02 11-21
Introduction to Biohabitats presentation public meeting number one 02 11-21
 
Buchanan_Resume_2015
Buchanan_Resume_2015Buchanan_Resume_2015
Buchanan_Resume_2015
 
Ed Baquerizo CV (Updated April 2015)
Ed Baquerizo CV (Updated April 2015)Ed Baquerizo CV (Updated April 2015)
Ed Baquerizo CV (Updated April 2015)
 
Quander Road Outfall and Stream Restoration
Quander Road Outfall and Stream RestorationQuander Road Outfall and Stream Restoration
Quander Road Outfall and Stream Restoration
 
Aaron zambo - Civil Engineer
Aaron  zambo - Civil EngineerAaron  zambo - Civil Engineer
Aaron zambo - Civil Engineer
 
U.S. Army Corps of Engineers Update, Mark Mazzanti SES
U.S. Army Corps of Engineers Update, Mark Mazzanti SESU.S. Army Corps of Engineers Update, Mark Mazzanti SES
U.S. Army Corps of Engineers Update, Mark Mazzanti SES
 
Resume JW ENG City 01-12
Resume JW ENG City 01-12Resume JW ENG City 01-12
Resume JW ENG City 01-12
 
Culanag, Desideria
Culanag, DesideriaCulanag, Desideria
Culanag, Desideria
 
Ahmad mousa project list
Ahmad mousa   project listAhmad mousa   project list
Ahmad mousa project list
 
LIDDLE - Project-Related Work Experience
LIDDLE - Project-Related Work ExperienceLIDDLE - Project-Related Work Experience
LIDDLE - Project-Related Work Experience
 
Storm Water Utility Dev. and Master Plans
Storm Water Utility Dev. and Master PlansStorm Water Utility Dev. and Master Plans
Storm Water Utility Dev. and Master Plans
 
Resume-Vrsalovich 2015
Resume-Vrsalovich 2015Resume-Vrsalovich 2015
Resume-Vrsalovich 2015
 
PM Resume 9_30_15
PM Resume 9_30_15PM Resume 9_30_15
PM Resume 9_30_15
 
JM Portfolio 04-2016
JM Portfolio 04-2016JM Portfolio 04-2016
JM Portfolio 04-2016
 
ENR MOUNTAIN STATES 2013 BEST PROJECTS AWARD
ENR MOUNTAIN STATES 2013 BEST PROJECTS AWARDENR MOUNTAIN STATES 2013 BEST PROJECTS AWARD
ENR MOUNTAIN STATES 2013 BEST PROJECTS AWARD
 

resume 2017

  • 1. David Lewis Perrings,PE, QSD/P Project Civil Engineer 110 StarlightPlace▪ Danville▪ California▪ 94526 ▪ 925 858 7253 ▪ dperrings@outlook.com 1 Current Project Experience (partial list) Wilder Development, Orinda, California 250 Lot Residential Development (currently in construction) with Community Ball Fields, Swim Center and Art & Garden Center. Total Land Area with open space, 1000+ acres Storm Water Management Plan, Offsite Drainage Study, OnsiteDrainageStudy,Storm DrainageCalculations,Basin Routing Calculations, Multiple Detention Basins and Water Quality Basins, BMP studies and design for grassy swales, bio-retention areas and mechanical treatment units, FEMA CLOMR for Brookside Creek. A water quality permit was obtained from the State Regional Water Quality Control Board. Schaefer Ranch, Dublin, California 250 Lot Residential Development Drainage Study, Phase I, Caltrans; Drainage Study, Phase II, storm drainage design and calculations, Basin routing and design (3 detention Basins), water quality Basin design (2 Basins). A water quality permit was obtained from the State Regional Water Quality Control Board Stonecreek Development, Los Banos, California Residential, mixed use and commercial development Approximately 2000 + acres Master utility plan study for water, sewer and storm drainage;sewer and stormdrain pump station studies and design; storm drainage & sewer studies and calculations for eight neighborhoods;detention basin design;design of three miles of sanitary sewer force main Alhambra Valley Oaks, Contra Costa County, California 27 Lot Residential Development Drainage Study, Storm drainage calculations, detention basin studies,FEMA CLOMR, Creek Outfall Design,Water Quality Study, Obtain water quality permitfrom the State Regional Water Quality Control Board Creekside Cemetery Project Contra Costa County, California Prepared Contra Costa County C.3. Storm Water Control Plan. Expert Witness for Plaintiff is Drainage Lawsuit Client: Archer Norris Law Firm, Walnut Creek; Drainage Lawsuitfor sitein Richmond California. Other Drainage, Water Quality and Flood Control Projects Prepared drainage studies for projects in Wendover, Nevada; Fairfield, Concord; Moraga, Lafayette, Antioch, Orinda,Clayton,Dublin,Danville,San Ramon, and Walnut Creek Ca Previous Project Experience (partial list) Utility Studies, City of Foster City, California Assessment of development impact on existing utility systems and lift stations within the city of Foster City. Utilities included storm, water and sanitary sewer systems.Flow monitoringof liftstations wasperformed in conjunction with capacity analysisof utilities. Education ▪ B.S.C.E. Civil Engineering,Rose-Hulman Institute of Technology, 1978 Professional Registration ▪ R.C.E #39157, State of California ▪ QSD/QSP # 01188,CASQA Professional Associations ▪ American Society of Civil Engineers, M.ASCE ▪ Member of ASCE Committee on American Infrastructure (CAI), 3rd Year, responsible for the Report Card for American Infrastructure,next release date March,2017. Current Position ▪ ProjectCivil Engineer, P/A Design Resources, Inc,Walnut Creek, CA, 2002 to Current, 15 years. Skills ▪ Report writing, computer analysis, CAD, engineering design and analysis. Computer programs utilized included:Hec l and ll,Hec Ras and HMS; Bentley’s Pond Pack, Graphic Hec l, StormCAD, SewerCAD and Flowmaster; AutoCAD, MAP, LAND and Civil , and BAHM, Bay Area Hydrology Model. Water Quality Studies included selection and design of BMP measures, hydromodification,vector control plans,Operations and MaintenancePlans. Prior Experience ▪ Mr. Perrings has over 25 years of professional engineering experience in civil engineering design, project management, and construction management. As a Civil Engineer he has managed the design of numerousprivate and public works projects. Key responsibilities include project management of design team, client contact, and project administration. Municipal projects have included street, highways, grade crossings, quality control/quality assurance and utility designs. These projects included preparation of plans, specifications, bid documentsandcostestimates. Site developmentprojectshave includedresidential subdivisions,commercial developments, business parks, hotel and hospitals. His responsibilities have included each phase of the design process: regulatory environmental review, tentative map, improvement plans and construction support. Key Areas of Expertise  Stormwater  Hydraulics  Hydrology  Water Quality  Flood Control  Basin Routing  FEMA Flood Mapping  Water/Wastewater Engineering  Civil/Site Engineering  Municipal Engineering  Environmental  Permitting
  • 2. David Lewis Perrings,PE, QSD/P Project Civil Engineer 110 StarlightPlace▪ Danville▪ California▪ 94526 ▪ 925 858 7253 ▪ dperrings@outlook.com 2 Truckee Meadows Floodwall and Levee Project, Reno, NV Feasibility level design and cost estimates for thirty miles of levels and floodwalls alongthe Truckee River between Reno and Sparks,Nevada for the Army Corps of Engineers, Sacramento District.Intergraph Inroadswas used to aid in the civil design of the project. Features of the design included digital terrain modeling, ortho-photos, plan and profile drawings and aerial mosaic. Construction cost estimate for the project is 150 million dollars. Vista Grande Canal Flow Monitoring Study, Daly City, CA A study was conducted for the City of Daly City on theVista Grande Canal adjacentto Lake Merced in San Francisco to determine the annual expected flow volume in the Canal for possible diversion into Lake Merced. The purpose of the diversion is to aid in the current trend reversal of decreasinglakelevels.Flows weremeasured and analyzed during the 1998-99-winter season. The study demonstrated to the City of Daly City and to the San Francisco Public Utilities Commission thatsufficientflows occurred in the canal thatcould be diverted into the lake to increasethe water surfaceelevation in the lake. National Flood Insurance Program, Community Rating System Application, Mountain View, CA Prepared application for submittal to FEMA for the Community Rating System for the City of Mountain View. The application identified measures taken by the City that will reduce the probability of negative impacts from floodingwithin the City. The benefit to the Community is lower flood insurancepremiums. National Flood Insurance Program, Substantial Improvement Procedure Developed application and procedure for the City of Mountain View for the determination of substantial improvements in accordancewith FEMA’s National Flood Insurance Program. A relational database was developed in conjunction with GIS mappingto test the impact of the procedure on the Community and the City’s workload. Three thousand buildingpermitapplicationsweretested. Northridge Earthquake Recovery, Pasadena, CA Worked at the Northridge Earthquake Recovery Office of the Federal Emergency Management Agency in Pasadena, California as a Technical Assistance Contractor. Primary function was to review requests for federal monetary assistanceby thepublic agencies thatsuffered earthquake damage and prepareconstruction DamageSurvey Reports (DSR’s), which established a construction scope of work and construction funding criteria. Elements of the DSR include: building damage repair scope of work, code compliance, access compliance, environmental review, historic review and hazard mitigation. During the project design and construction phase responsibilities also included design eligibility reviewand construction project monitoring.