SlideShare a Scribd company logo
1 of 71
Project Team
• Experienced staff – 5 key staff with over 25 years and 2 with
10 years in delineation, permitting, mitigation
• All have DelDOT experience - know current regulatory
climate, jurisdictional and RTE criteria and stream restoration
• Staff serve on industry and stakeholder committees in
forefront of regulatory wetland developments
• Team knows the ramifications of recent court rulings and
federal delineation manual supplements
• Project Manager can offer insights of 17 years of experience
with MDE (DNREC sister agency) working with transportation
agencies as well 10 years on the private sector
Project Team
Project Team
Immediate Extension of DelDOT Staff
• Over 50 Environmental Scientists
• Multiple assignment capability and ability
to meet schedules
• Local staff located within 2 hours of
DelDOT
• Continuity and commitment of staff -
WR&A has a proven track record of staff
commitment
Project Team
Key Staff
Andrew Der – Project Manager, WRA
• Director of Environmental Services, 28 years experience in water resources
• 17 years with MDE culminating as Regional Chief in Wetlands Program
• Expertise in wetland and water quality regulation and permitting
• Serves on regional public and industry advisory committees - keeps current
James McCulley, PWS – Assistant Project Manager,
LandmarkJCM
• Principal and Professional Wetlands Scientist, 26 years experience including
DelDOT work
• National Academy of Sciences Wetland Characterization Committee
• Serves on regional public and industry advisory committees - keeps current
Robert Siegfried – Mitigation and Restoration Manager, WR&A
• Restoration Specialist, 25 years of experience including DelDOT work, 10 years
experience in wetland and stream design and innovative stormwater management
• Stream assessment and restoration
• Designed over 15,000 l. f. of stream restoration, over 100 acres of wetland mitigation
Key Staff
Key Staff
Jason Cosler – Vice President, WR&A
• Senior Engineer, 25 years experience, 5 with DelDOT work
• Stormwater management, hydrology and hydraulics, and erosion and
sediment control
• Stream stability, culvert and bridge design, scour analysis
• Stream assessment and restoration per Rosgen methodologies
Michael McQuade – Senior Environmental Scientist, WR&A
• 10 years of Experience, 5 with Delaware work
• Wetland delineation and permitting, RTE species surveys
• Botany and forestry, Certified Arborist
Susan Smith – Senior Environmental Scientist, WR&A
• 25 years of experience, 5 with DelDOT work
• Wetland delineation and permitting, RTE species surveys
• NEPA specialist
Key Staff
Key Staff
Amy Nazdrowicz – Environmental Scientist, LandmarkJCM
• 9 years of Experience including DelDOT work
• Wetland delineation, impact permitting, mitigation, habitat
assessment, and hydrologic studies
• RTE species surveys, published author on mitigation
DavidSmith, PWS –Senior Environmental Scientist,Coastal
Resources,Inc.
• Committed to DBE goals
• 24 years experience including DelDOT work
• Wetland delineation and mitigation, RTE species surveys, Bog
Turtle qualified surveyor
Key Staff
Services
Services that May Be Required under this Contract
• Wetland, habitat, RTE evaluations and other potential environmental studies
• Permit application preparation and submission; federal, state and local agency
coordination
• Development of mitigation proposals, design plans for wetland creation, restoration or
enhancement, site selection pre-construction monitoring
• Design plans for stream restoration and stabilization and evaluation of bioengineering
techniques
• Development of monitoring plans, site monitoring and preparation of monitoring reports
• Development of invasive plant species eradication plans
• Construction consultation and preparation of construction contracts including
specifications and cost estimates suitable for competitive public bidding
• Survey
• Coordination with other DelDOT Divisions
• Public Involvement
Services
Delaware Projects
• Project team familiar with all
regions and characteristics of
Delaware
• Worked on small to major projects
• Expertise in simple to complex
environmental permitting
Delaware Projects
Experience
• Rt. 113 – DEISs and EAs, agency coordination, wetlands and RTE species
(Swamp Pink) investigations, highway design, GIS mapping to identify NEPA and
Section 404 issues regarding highway location.
• I-95 Toll Plaza Improvements – CE, evaluate impacts to wetlands and
subaqueous lands, mitigation, permits, environmental compliance plans per
DelDOT and DNREC standards.
• SR 7, Newtown Road to SR 273 – wetland delineation, evaluate impacts to
wetlands and subaqueous lands, permits, mitigation, environmental compliance
plans per DelDOT and DNREC standards.
• City of Dover Garrison Oak Force Main & Pump Station - wetland delineation
within 4,200 linear foot study area, evaluate impacts to wetlands and subaqueous
lands, mitigation, permits.
• SR 41 Lancaster Pike, Hockessin Road Safety Project – wetland delineation
for 1-mile roadway widening project study area, permitting, mitigation,
environmental compliance plans per DelDOT and DNREC standards, stream
bank stabilization.
Experience
Experience
LJCM
• DelDOT Rt 1, Scott Run to Smyrna, New Castle & Kent County
• Wetland delineations, impact permitting, creation, restoration
• Rare species and habitat studies
• Agency coordination
CRI
• DelDOT Agreement 1414 highway projects, New Castle County
• Phase 1 bog turtle habitat assessment
• Wetlands assessments
• Agency coordination
Experience
Site Assessment Process
DelDOT Environmental
Studies Findings Meeting
Coordinate Jurisdictional
Determination
Project Initiation
Field Investigations
Prepare Work Products
Potential
Related Studies
Site Assessment Process
Project Initiation
• Meet with Environmental Studies Project
Manager
• Review project history
• GIS level assessment
• Site visit
• Develop scope and price proposal with schedule
DelDOT Environmental
Studies Findings Meeting
Coordinate Jurisdictional
Determination
Project Initiation
Field Investigations
Prepare Work Products
Potential
Related Studies
Project Initiation
Field Investigations
• Identify wetland and other habitat areas
• Flag jurisdictional waters, including wetland,
areas per 1987 Corps manual, regional
supplements, court rulings, and other guidance
and additional data
• Record all wetland flag locations using sub-foot
GPS and identify potential ephemeral,
intermittent and perennial streams, and isolated
wetlands
DelDOT Environmental
Studies Findings Meeting
Coordinate Jurisdictional
Determination
Project Initiation
Field Investigations
Prepare Work Products
Potential
Related Studies
Field Investigations
Prepare Work Products
• Download GPS data and convert into plan sheet
format per DelDOT standards
• Prepare applicable digital GIS maps
• Prepare report of findings
Prepare Work Products
DelDOT Environmental
Studies Findings Meeting
Coordinate Jurisdictional
Determination
Project Initiation
Field Investigations
Prepare Work Products
Potential
Related Studies
DelDOT Environmental Studies Meeting
• Present findings
• Discuss sensitive areas
• Discuss jurisdictional status of on-site wetlands
and potential “red flags”
• Determining agencies’ authority (DNREC and
Corps)
• Discuss agency coordination
DelDOT Environmental Studies Meeting
DelDOT Environmental
Studies Findings Meeting
Coordinate Jurisdictional
Determination
Project Initiation
Field Investigations
Prepare Work Products
Potential
Related Studies
Coordinate Jurisdictional Determination
• Submit jurisdictional determination request
• Set up meeting with agencies or attend JPPM
• On-site meeting to achieve concurrence on
delineations
• Obtain jurisdictional determination from Corps of
Engineers and/or DNREC
Coordinate Jurisdictional Determination
DelDOT Environmental
Studies Findings Meeting
Coordinate Jurisdictional
Determination
Project Initiation
Field Investigations
Prepare Work Products
Potential
Related Studies
Potential Related Studies
• RTE habitat coordination and assessment
– Delmarva fox squirrel
– Bog turtle
– Numerous plants & others
• Hydrology studies for atypical areas and nexus
test
• Forest investigation
• Others (NEPA, Phase I, etc.)
Potential Related Studies
DelDOT Environmental
Studies Findings Meeting
Coordinate Jurisdictional
Determination
Project Initiation
Field Investigations
Prepare Work Products
Potential
Related Studies
Permitting Process
Prepare and Submit
Applications
Receive Permit/Approvals
Acquire Design
Plans/Project Description
Assess, Avoid,
Minimize Impacts
Meet with DNREC and/or
USACE on Impacts
Assess Other Type
Of Potential
Environmental Impacts
Permitting Process
Environmental Compliance Plan(fromEnvironmental Section)
Survey Prelim Semi Final
General
Scale Bar N/A
North arrow N/A
DetailedInformation
Generalnotes N/A
Naturalresource notes N/A
Culturalresource notes N/A
Legend N/A
Sheet prepared by (WR&A and date) N/A
Wetlands delineated by (WR&A and date) N/A
Table ofimpacts (permanent and temporary)and mitigation summary N/A
Project plan with specific environmentalcompliance indicated with border
sheets and environmentalcompliance sheet number N/A
Environmental Compliance Plan
Legend including only impacts, pattern/shading, and descriptions that
pertain to the area shown on individualplan
N/A
Construction baseline not screened N/A
Proposed workscreened N/A
Topography screened N/A
Environmentalfeatures not screened N/A
Impact areas shaded/patterned and called out with hexagon N/A
Ordinary high water, Waters ofthe US, and wetlands labeled N/A
Limits ofconstruction consistent with construction plans and erosion
and sediment controlplans N/A
Acquire Design Plans/Project Description
• Meet with designer
– Determine design phase of project
– Important features of the project
– Acquire existing plans
• Coordinate with designer on changes as design
proceeds
Prepare and Submit
Applications
Receive Permit/Approval
Acquire Design
Plans/Project Description
Assess, Avoid,
Minimize Impacts
Meet with DNREC and/or
USACE on Impacts
Assess Other
Potential
Environmental Impacts
Acquire Design Plans/Project Description
Assess, Avoid, Minimize Impacts
• Overlay the project on the environmental
features and assess potential impacts
• Look closely at critical impacts
• Work with the designer to avoid or minimize
impacts without jeopardizing the project’s
purpose
• Document process for meeting with agencies
Prepare and Submit
Applications
Receive Permit/Approval
Acquire Design
Plans/Project Description
Assess, Avoid,
Minimize Impacts
Meet with DNREC and/or
USACE on Impacts
Assess Other
Potential
Environmental Impacts
Assess, Avoid, Minimize Impacts
Meet with DNREC and/or USACE on Impacts
• Prepare displays for JPPM
• Determine the level of meeting(s) required
(office/field)
• Meet with agencies & present information
• Potential coordination with counties
Prepare and Submit
Applications
Receive Permit/Approval
Acquire Design
Plans/Project Description
Assess, Avoid,
Minimize Impacts
Meet with DNREC and/or
USACE on Impacts
Assess Other
Potential
Environmental Impacts
Meet with DNREC and/or USACE on Impacts
Prepare and Submit Applications
• Submit PCN for Nationwide Permit
• Prepare Application Packages for USACE and/or
DNREC
• Prepare environmental compliance sheets
– Clear environmental features
– Close coordination with design to assure compatible EC sheets
– Develop accurate tabulation of impacts
– Conform with DelDOT CADD standards
– Account for temporary access & staging impacts
• Submit application and impact plans
– Provide alternatives analysis
– Document avoidance and minimization
– Develop conceptual mitigation plan
Prepare and Submit Applications
Prepare and Submit
Applications
Receive Permit/Approval
Acquire Design
Plans/Project Description
Assess, Avoid,
Minimize Impacts
Meet with DNREC and/or
USACE on Impacts
Assess Other
Potential
Environmental Impacts
Receive Permits/Approval
• Continuous follow-up with agencies to assure
information is complete and for timely issuance
• Notify agencies of project commencement
• Engage agencies in appropriate compliance
processes
Receive Permits/Approval
Prepare and Submit
Applications
Receive Permit/Approval
Acquire Design
Plans/Project Description
Assess, Avoid,
Minimize Impacts
Meet with DNREC and/or
USACE on Impacts
Assess Other
Potential
Environmental Impacts
Assess Other Potential Environmental Impacts
• Solicit direction from USFWS and DNHP
• Additional RTE screening and species inventory
• Survey and record presence of critical species
populations and habitat
• Address project impacts and offsets
• SHPO coordination and screen for need of
cultural resource assessment
Prepare and Submit
Applications
Receive Permit/Approval
Acquire Design
Plans/Project Description
Assess, Avoid,
Minimize Impacts
Meet with DNREC and/or
USACE on Impacts
Assess Other
Potential
Environmental
Impacts
Assess Other Potential Environmental Impacts
Opportunities for Streamlining
Each project’s degree of impact and resource
sensitivity can vary, offering opportunities for
efficiency
• Combine concurrent field assessment and project impact
comment processes
• Utilize and re-purpose previous assessment studies or permitting
work products in project area by others
• Evaluate project design for refinements to avoid impacts and
maximize use of Nationwide Permits
• Maximize other contemporary on-site mitigation and offset
strategies: enhancement of degraded areas, vegetative
restoration, re-establishing fish passage, and urban stormwater
retrofit opportunities to reduce customary mitigation and permitting
burdens
Opportunities for Streamlining
Rare, Threatened, and Endangered Species
• All team scientists thoroughly experienced in
species identification
• Plants and animals
• Upland/wetland
• Insects, mammals, reptiles
• Timing of assessments
Rare, Threatened, and Endangered Species
Rare, Threatened, and Endangered Species
• Pre-application coordination with wildlife
agencies
• Waters and wetlands evaluation suited to
potential species habitat
• Findings documented and presence located
• Potential issues coordinated with agencies
Rare, Threatened, and Endangered Species
Wetland Mitigation
• Select sites based on landscape position to
maximize success and minimize costs
– Target historically drained or modified wetlands
– Minimize excavation
– Proximity to multiple sources of hydrology
• Example projects
– Restored agriculturally drained Delmarva Bay
– Created 5 acre tidal wetland with minimal excavation
Ridgely
Rt 33 Tidal Wetlands
Wetland Mitigation
Wetland Mitigation
• Use reference wetlands to optimize site design
– Selecting plant community and species
– Identify appropriate hydrology
– Prepare appropriate soil conditions
• Leading cause of wetland failure is soil compaction
– Use low ground pressure equipment
– Minimize use of equipment on final grade
– Rip and disk soils post-final grade
– Add organic matter to decrease bulk density, increase moisture
retention, and increase hydric soil development
Nottoway Bank
Nottoway Bank
Wetland Mitigation
Stream Mitigation
• Use reference systems to identify appropriate
habitat and geomorphic structures
– Use constructed riffles for most coastal and piedmont streams
– Large woody debris for habitat enhancement in pools
• Restore geomorphic and ecological processes to
maximize success
– Fish passage
– Nutrient retention & reduction
– Reconnect floodplain & wetlands to stream
MD 237 Fish Passage
Stream Mitigation
Neabsco Creek
After
Neabsco Creek
Before
Mitigation Construction
Keys to successful mitigation/restoration
construction
• Experienced restoration contractors
• Specialized construction equipment
• Designer on-site during construction
• Anticipate changes to the design
• Expect weather related issues
Specialized Equipment
Difficult Field Conditions
Mitigation Construction
Ecosystem and Watershed Restoration
• Move toward ecosystem and watershed
restoration
– Focus on system scale instead of reach scale
– Combine wetlands, streams, buffers, stormwater
management, and other requirements into
comprehensive solutions
– Contribute to NPDES water quality, TMDL, and
watershed restoration goals
Ecosystem and Watershed Restoration
U. S. 113 North South Study
Swan Creek Mitigation Plan
• Restore, enhance and preserve Swan Creek
Stream Valley
– Remove fish barriers
– Restore 14 acres of tidal wetlands
– Enhance 58 acres of tidal wetlands
– Create 7 acres of tidal wetlands
– Create 8 acres Atlantic White Cedar Wetlands
– Preserve 157 acres of forested wetlands, including
23 acres of AWC wetlands
– Preserve 79 acres of upland buffers
U. S. 113 North South Study
Swan Creek Mitigation Plan
Construction Documents and Constructability
• Focus on permitable, biddable and constructible
mitigation and restoration plans
• Conformance with DelDOT standards for:
– CADD
– Specifications
– Bid Items
• Specialized work requires specialized
construction documents and support staff
Construction Documents and Constructability
Quality
WR&A’s DelDOT Quality Control program for DelDOT
projects
• Independent discipline-specific peer reviews
• Design computations checked by a Professional
Engineer
• Project Manager reviews all submittals
• Design checklists
– DelDOT Plan Submission Checklist
– WR&A addendum to DelDOT Plan Submission and
Permit Preparation Checklist
– Review Comment Form
EnvironmentalCompliance Plan(fromEnvironmentalSection)
Survey Prelim Semi Final
General
ScaleBar N/A
Northarrow N/A
DetailedInformation
Generalnotes N/A
Naturalresourcenotes N/A
Culturalresourcenotes N/A
Legend N/A
Sheetpreparedby(WR&Aanddate) N/A
Wetlands delineatedby(WR&Aanddate) N/A
Tableofimpacts (permanentandtemporary)andmitigationsummary N/A
Projectplanwithspecificenvironmentalcomplianceindicatedwithborder
sheets andenvironmentalcompliancesheetnumber N/A
EnvironmentalCompliance Plan
Legendincludingonlyimpacts,pattern/shading,anddescriptions that
pertaintotheareashownonindividualplan
N/A
Constructionbaselinenotscreened N/A
Proposedworkscreened N/A
Topographyscreened N/A
Environmentalfeatures notscreened N/A
Impactareas shaded/patternedandcalledoutwithhexagon N/A
Ordinaryhighwater,Waters oftheUS,andwetlands labeled N/A
Limits ofconstructionconsistentwithconstructionplans anderosion
andsedimentcontrolplans N/A
Project Title: Airport/Churchmans Road Intersection Improvements
Project Location: Intersection of Route 37 (Airport Road) and Route 58 (Churchmans Road)
State Contract No.: 99-002-01
Federal Aid No.: N/A
ADVERSE IMPACTS/EFFECTS None Possible Probable Comment
Right-of-Way Requirements
A. Private X Partial property acquisitions.
B. Public X Small strip acquisition of New Castle County property.
C. 4(f) X
Phase I Historic and Archeological studies are complete. Impacts
to archeological resources are possible.
D. 6(f) X
Relocations
A. Homes X
B. Businesses X The relocation of tw o businesses is identified.
C. Non-Profit X
Social Impacts
A. Local X
B. Regional X
Environmental Justice
A. Minority X
B. Low-Income X
Economic Impacts
A. Local X
B. Regional X
C. Statewide X
Cultural Resources
(Listed, nominated, eligible)
A. National Register X
B. State Listing X
C. Other X
Air Quality
A. Local X
B. Statewide X
Noise
A. Residential X
B. Commercial X
C. Sensitive Receptors X
D. Other X
Hazardous Waste X
Phase I ESA identified concerns at Airport Exxon and Auto
Collision Center properties
Water Quality
A. Surface Water X Several culvert extensions are anticipated
B. Ground Water X
Hydrological Impacts
A. Stream relocation X
B. Stream channelization X
C. Stream stabilization X Associated w ith culvert extensions
D. Flood Plain X
Fish & Wildlife
A. Endangered Species X
B. Habitat X Fringe forest and minor w etland impacts
Wetlands
A. Project Area X Potential impacts range from 0.1 to 0.3 acres
B. Up or Down Stream X
Land Use
A. Direct X
Minor conversions of land uses adjacent to roadw ay due to road
w idening
B. Secondary X
Natural Resources
A. Farm Lands X Minor encroachments into farm lands
B. Woodlands X Minor encroachments into w ooded fringe areas
C. Conservation Areas X
D. Coastal Zone X
Modal Choice
CATEGORICAL EXCLUSION EVALUATION
PROJECT CHECKLIST AND PROJECT LEVEL DETERMINATION FORM
No identified minority or low income communities identified
Phase I historic structures and archeological studies are
complete. No National Register Eligible or State Listed property
impacts. Impacts to archeological resources are possible.
Roadw ay w ill be extended closer to residential and commercial
properties. Impacts w ill be assessed later in design.
To Provide Check
1 Photo log of impact areas
2 Aerial w/ DNREC SWMP mapping
3 USGS Map
4 Location Map
5
Half-size relevant plan sheets (listed
below)
6 Full-size EC sheets
7 USFWS Correspondence
8 Natural Heritage Correspondence
9 SHPO Correspondence
10
Signed Categorical Exclusion (if Federal
Project)
11 Wetland Delination Report
12 CZM Letter
13 SB 186 exemption letter (if applies)
14 COE Cover letter
15 Construction Plan Title Sheet
16 Construction Plan Sheet Index
17 Construction Plan notes and Legend
18 Construction Plan Project Notes Sheet
19 Construction Plans
20 Construction Details
21 Stream Diversion Plans
22
Stromwater Managagement Plans and
Details
23
Phasing, MOT and E&S Contorl (as
appropriate)
24 Landscaping Plans
DELDOT PERMIT CHECKLIST
Quality
Questions
and
Answers
WRA DelDOT WL Presentation

More Related Content

What's hot

Aaron zambo - Civil Engineer
Aaron  zambo - Civil EngineerAaron  zambo - Civil Engineer
Aaron zambo - Civil Engineeraaronzambo
 
Esi Extractive Industry Brochure
Esi Extractive Industry BrochureEsi Extractive Industry Brochure
Esi Extractive Industry Brochurechrisberryman
 
Esi Water Resources Brochure
Esi Water Resources BrochureEsi Water Resources Brochure
Esi Water Resources Brochurechrisberryman
 
Kate Barnhart Resume
Kate Barnhart ResumeKate Barnhart Resume
Kate Barnhart Resumekatebarnhart
 
Mark_Schumacher_Resume2016
Mark_Schumacher_Resume2016Mark_Schumacher_Resume2016
Mark_Schumacher_Resume2016Mark Schumacher
 
Environmental Issues Related to Construction Projects
Environmental Issues Related to Construction ProjectsEnvironmental Issues Related to Construction Projects
Environmental Issues Related to Construction Projectsbuckje123
 
Dealing with Environmental Issues on the Construction Project, November 16, 2011
Dealing with Environmental Issues on the Construction Project, November 16, 2011Dealing with Environmental Issues on the Construction Project, November 16, 2011
Dealing with Environmental Issues on the Construction Project, November 16, 2011Blake, Cassels & Graydon LLP
 
Staff Presentation 080311 Gtg
Staff Presentation 080311 GtgStaff Presentation 080311 Gtg
Staff Presentation 080311 GtgGreg Gearheart
 
Mofidi Alex (Full 6 09)
Mofidi Alex (Full 6 09)Mofidi Alex (Full 6 09)
Mofidi Alex (Full 6 09)AlexMofidi
 
Resume_Adrienne Sims_ 071615_wo contact info
Resume_Adrienne Sims_ 071615_wo contact infoResume_Adrienne Sims_ 071615_wo contact info
Resume_Adrienne Sims_ 071615_wo contact infoAdrienne Sims
 
Resume for Stephen R. Henshaw, R.G.
Resume for Stephen R. Henshaw, R.G.Resume for Stephen R. Henshaw, R.G.
Resume for Stephen R. Henshaw, R.G.shenshaw
 
Michael_Wehr Work Bio 3 (3)
Michael_Wehr Work Bio 3 (3)Michael_Wehr Work Bio 3 (3)
Michael_Wehr Work Bio 3 (3)Michael Wehr
 
Sept 2015 LRA Lori_Robison
Sept 2015 LRA Lori_Robison Sept 2015 LRA Lori_Robison
Sept 2015 LRA Lori_Robison Lori Robison
 
BBarton resume
BBarton resumeBBarton resume
BBarton resumeBen Barton
 

What's hot (20)

Project Summary Mochizuki
Project Summary MochizukiProject Summary Mochizuki
Project Summary Mochizuki
 
Aaron zambo - Civil Engineer
Aaron  zambo - Civil EngineerAaron  zambo - Civil Engineer
Aaron zambo - Civil Engineer
 
Esi Extractive Industry Brochure
Esi Extractive Industry BrochureEsi Extractive Industry Brochure
Esi Extractive Industry Brochure
 
Esi Water Resources Brochure
Esi Water Resources BrochureEsi Water Resources Brochure
Esi Water Resources Brochure
 
Kate Barnhart Resume
Kate Barnhart ResumeKate Barnhart Resume
Kate Barnhart Resume
 
Mark_Schumacher_Resume2016
Mark_Schumacher_Resume2016Mark_Schumacher_Resume2016
Mark_Schumacher_Resume2016
 
Environmental Issues Related to Construction Projects
Environmental Issues Related to Construction ProjectsEnvironmental Issues Related to Construction Projects
Environmental Issues Related to Construction Projects
 
Stormwater and Wetland Issues in Maryland
Stormwater and Wetland Issues in MarylandStormwater and Wetland Issues in Maryland
Stormwater and Wetland Issues in Maryland
 
Dealing with Environmental Issues on the Construction Project, November 16, 2011
Dealing with Environmental Issues on the Construction Project, November 16, 2011Dealing with Environmental Issues on the Construction Project, November 16, 2011
Dealing with Environmental Issues on the Construction Project, November 16, 2011
 
Staff Presentation 080311 Gtg
Staff Presentation 080311 GtgStaff Presentation 080311 Gtg
Staff Presentation 080311 Gtg
 
Mofidi Alex (Full 6 09)
Mofidi Alex (Full 6 09)Mofidi Alex (Full 6 09)
Mofidi Alex (Full 6 09)
 
Resume_Adrienne Sims_ 071615_wo contact info
Resume_Adrienne Sims_ 071615_wo contact infoResume_Adrienne Sims_ 071615_wo contact info
Resume_Adrienne Sims_ 071615_wo contact info
 
Resume for Stephen R. Henshaw, R.G.
Resume for Stephen R. Henshaw, R.G.Resume for Stephen R. Henshaw, R.G.
Resume for Stephen R. Henshaw, R.G.
 
Michael_Wehr Work Bio 3 (3)
Michael_Wehr Work Bio 3 (3)Michael_Wehr Work Bio 3 (3)
Michael_Wehr Work Bio 3 (3)
 
Gonzalez Resume
Gonzalez ResumeGonzalez Resume
Gonzalez Resume
 
Sept 2015 LRA Lori_Robison
Sept 2015 LRA Lori_Robison Sept 2015 LRA Lori_Robison
Sept 2015 LRA Lori_Robison
 
BBarton resume
BBarton resumeBBarton resume
BBarton resume
 
Sequoia Utility SOQ
Sequoia Utility SOQSequoia Utility SOQ
Sequoia Utility SOQ
 
Current Issues in Stormwater Management
Current Issues in Stormwater ManagementCurrent Issues in Stormwater Management
Current Issues in Stormwater Management
 
DarlingR
DarlingRDarlingR
DarlingR
 

Viewers also liked

LA GUARDIA FLATS (Economic Condo) - Lahug, Cebu City
LA GUARDIA FLATS (Economic Condo) - Lahug, Cebu CityLA GUARDIA FLATS (Economic Condo) - Lahug, Cebu City
LA GUARDIA FLATS (Economic Condo) - Lahug, Cebu Cityguest4cfe3b
 
marshall & llsley corp annual reports 2005
marshall  & llsley corp annual reports 2005marshall  & llsley corp annual reports 2005
marshall & llsley corp annual reports 2005finance36
 
The complete-outdoorsman-s-handbook-
The complete-outdoorsman-s-handbook-The complete-outdoorsman-s-handbook-
The complete-outdoorsman-s-handbook-Bernardo Magalhães
 
Reading floor plans
Reading floor plansReading floor plans
Reading floor plansjayneross
 

Viewers also liked (7)

LA GUARDIA FLATS (Economic Condo) - Lahug, Cebu City
LA GUARDIA FLATS (Economic Condo) - Lahug, Cebu CityLA GUARDIA FLATS (Economic Condo) - Lahug, Cebu City
LA GUARDIA FLATS (Economic Condo) - Lahug, Cebu City
 
Cebu Condominium investment
Cebu Condominium investmentCebu Condominium investment
Cebu Condominium investment
 
marshall & llsley corp annual reports 2005
marshall  & llsley corp annual reports 2005marshall  & llsley corp annual reports 2005
marshall & llsley corp annual reports 2005
 
test
testtest
test
 
The complete-outdoorsman-s-handbook-
The complete-outdoorsman-s-handbook-The complete-outdoorsman-s-handbook-
The complete-outdoorsman-s-handbook-
 
Purchasing a link to sc - sc next
Purchasing a link to sc - sc nextPurchasing a link to sc - sc next
Purchasing a link to sc - sc next
 
Reading floor plans
Reading floor plansReading floor plans
Reading floor plans
 

Similar to WRA DelDOT WL Presentation

Introduction to Mitigation Banking and Functional Assessment in CO/WY and oth...
Introduction to Mitigation Banking and Functional Assessment in CO/WY and oth...Introduction to Mitigation Banking and Functional Assessment in CO/WY and oth...
Introduction to Mitigation Banking and Functional Assessment in CO/WY and oth...RiverSHARED
 
AlabamaEnvironmental_3A_Broch-lo
AlabamaEnvironmental_3A_Broch-loAlabamaEnvironmental_3A_Broch-lo
AlabamaEnvironmental_3A_Broch-loCathy Barnette
 
Using natural processes to reduce flood risk; experiences from Trent Rivers T...
Using natural processes to reduce flood risk; experiences from Trent Rivers T...Using natural processes to reduce flood risk; experiences from Trent Rivers T...
Using natural processes to reduce flood risk; experiences from Trent Rivers T...CaBASupport
 
Habitat Restoration Design-Build
Habitat Restoration Design-BuildHabitat Restoration Design-Build
Habitat Restoration Design-BuildMforster21
 
The-EIS-System-in-Phillipine.ppt
The-EIS-System-in-Phillipine.pptThe-EIS-System-in-Phillipine.ppt
The-EIS-System-in-Phillipine.pptsheenamaedadodave
 
Rick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther
 
Philadelphia Water Department, Green City Clean Waters Program
Philadelphia Water Department, Green City Clean Waters ProgramPhiladelphia Water Department, Green City Clean Waters Program
Philadelphia Water Department, Green City Clean Waters ProgramNew Jersey Future
 
Microsoft Word - Georgie Scott
Microsoft Word - Georgie ScottMicrosoft Word - Georgie Scott
Microsoft Word - Georgie ScottGeorgia Scott
 
Climate Smart Resiliency Planning tool
Climate Smart Resiliency Planning toolClimate Smart Resiliency Planning tool
Climate Smart Resiliency Planning toolLibby Zemaitis
 
Ben Adams resume final
Ben Adams resume finalBen Adams resume final
Ben Adams resume finalBen Adams
 
Greater Baltimore Wilderness Coalition 9/15 update
Greater Baltimore Wilderness Coalition 9/15 updateGreater Baltimore Wilderness Coalition 9/15 update
Greater Baltimore Wilderness Coalition 9/15 updateMichael Galvin
 
Lewis, L-CONDENSED RESUME
Lewis, L-CONDENSED RESUMELewis, L-CONDENSED RESUME
Lewis, L-CONDENSED RESUMELisa Lewis, PG
 
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion UpdateMoffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion UpdateSteve Williams
 
Planning Renewable Energy In Cornwall - Adrian Lea (Cornwall Council)
Planning Renewable Energy In Cornwall - Adrian Lea (Cornwall Council)Planning Renewable Energy In Cornwall - Adrian Lea (Cornwall Council)
Planning Renewable Energy In Cornwall - Adrian Lea (Cornwall Council)Farming Futures
 
TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016Travis Both
 

Similar to WRA DelDOT WL Presentation (20)

Introduction to Mitigation Banking and Functional Assessment in CO/WY and oth...
Introduction to Mitigation Banking and Functional Assessment in CO/WY and oth...Introduction to Mitigation Banking and Functional Assessment in CO/WY and oth...
Introduction to Mitigation Banking and Functional Assessment in CO/WY and oth...
 
AlabamaEnvironmental_3A_Broch-lo
AlabamaEnvironmental_3A_Broch-loAlabamaEnvironmental_3A_Broch-lo
AlabamaEnvironmental_3A_Broch-lo
 
Using natural processes to reduce flood risk; experiences from Trent Rivers T...
Using natural processes to reduce flood risk; experiences from Trent Rivers T...Using natural processes to reduce flood risk; experiences from Trent Rivers T...
Using natural processes to reduce flood risk; experiences from Trent Rivers T...
 
The permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructureThe permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructure
 
Habitat Restoration Design-Build
Habitat Restoration Design-BuildHabitat Restoration Design-Build
Habitat Restoration Design-Build
 
The-EIS-System-in-Phillipine.ppt
The-EIS-System-in-Phillipine.pptThe-EIS-System-in-Phillipine.ppt
The-EIS-System-in-Phillipine.ppt
 
Rick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther Jr Resume
Rick Guenther Jr Resume
 
EA Internship 2014
EA Internship 2014EA Internship 2014
EA Internship 2014
 
Valard Environment Services
Valard Environment ServicesValard Environment Services
Valard Environment Services
 
SOQ
SOQSOQ
SOQ
 
Philadelphia Water Department, Green City Clean Waters Program
Philadelphia Water Department, Green City Clean Waters ProgramPhiladelphia Water Department, Green City Clean Waters Program
Philadelphia Water Department, Green City Clean Waters Program
 
Microsoft Word - Georgie Scott
Microsoft Word - Georgie ScottMicrosoft Word - Georgie Scott
Microsoft Word - Georgie Scott
 
Climate Smart Resiliency Planning tool
Climate Smart Resiliency Planning toolClimate Smart Resiliency Planning tool
Climate Smart Resiliency Planning tool
 
Ben Adams resume final
Ben Adams resume finalBen Adams resume final
Ben Adams resume final
 
Greater Baltimore Wilderness Coalition 9/15 update
Greater Baltimore Wilderness Coalition 9/15 updateGreater Baltimore Wilderness Coalition 9/15 update
Greater Baltimore Wilderness Coalition 9/15 update
 
Lewis, L-CONDENSED RESUME
Lewis, L-CONDENSED RESUMELewis, L-CONDENSED RESUME
Lewis, L-CONDENSED RESUME
 
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion UpdateMoffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
 
Planning Renewable Energy In Cornwall - Adrian Lea (Cornwall Council)
Planning Renewable Energy In Cornwall - Adrian Lea (Cornwall Council)Planning Renewable Energy In Cornwall - Adrian Lea (Cornwall Council)
Planning Renewable Energy In Cornwall - Adrian Lea (Cornwall Council)
 
TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016
 
2016 CBresume
2016 CBresume2016 CBresume
2016 CBresume
 

More from Andrew T. Der & Associates, LLC

International Water Resources and Wetlands Conference, Tulcea, Romania
International Water Resources and Wetlands Conference, Tulcea, RomaniaInternational Water Resources and Wetlands Conference, Tulcea, Romania
International Water Resources and Wetlands Conference, Tulcea, RomaniaAndrew T. Der & Associates, LLC
 
Balancing Nonpoint Source Water Quality Management with Wetland and Stream Pr...
Balancing Nonpoint Source Water Quality Management with Wetland and Stream Pr...Balancing Nonpoint Source Water Quality Management with Wetland and Stream Pr...
Balancing Nonpoint Source Water Quality Management with Wetland and Stream Pr...Andrew T. Der & Associates, LLC
 
Regulation and Permitting of Resource Restoration Activities
Regulation and Permitting of Resource Restoration ActivitiesRegulation and Permitting of Resource Restoration Activities
Regulation and Permitting of Resource Restoration ActivitiesAndrew T. Der & Associates, LLC
 
How Changing Federal and State Water Regulations Continue to Affect Your Proj...
How Changing Federal and State Water Regulations Continue to Affect Your Proj...How Changing Federal and State Water Regulations Continue to Affect Your Proj...
How Changing Federal and State Water Regulations Continue to Affect Your Proj...Andrew T. Der & Associates, LLC
 
Key Clean Water Act Criteria Affecting Stormwater Management at the Site Level
Key Clean Water Act Criteria Affecting Stormwater Management at the Site LevelKey Clean Water Act Criteria Affecting Stormwater Management at the Site Level
Key Clean Water Act Criteria Affecting Stormwater Management at the Site LevelAndrew T. Der & Associates, LLC
 

More from Andrew T. Der & Associates, LLC (20)

Regulatory Overview of Stormwater Management
Regulatory Overview of Stormwater ManagementRegulatory Overview of Stormwater Management
Regulatory Overview of Stormwater Management
 
International Water Resources and Wetlands Conference, Tulcea, Romania
International Water Resources and Wetlands Conference, Tulcea, RomaniaInternational Water Resources and Wetlands Conference, Tulcea, Romania
International Water Resources and Wetlands Conference, Tulcea, Romania
 
Balancing Nonpoint Source Water Quality Management with Wetland and Stream Pr...
Balancing Nonpoint Source Water Quality Management with Wetland and Stream Pr...Balancing Nonpoint Source Water Quality Management with Wetland and Stream Pr...
Balancing Nonpoint Source Water Quality Management with Wetland and Stream Pr...
 
Regulation and Permitting of Resource Restoration Activities
Regulation and Permitting of Resource Restoration ActivitiesRegulation and Permitting of Resource Restoration Activities
Regulation and Permitting of Resource Restoration Activities
 
Environmental Compliance Overview for Architects
Environmental Compliance Overview for ArchitectsEnvironmental Compliance Overview for Architects
Environmental Compliance Overview for Architects
 
How Changing Federal and State Water Regulations Continue to Affect Your Proj...
How Changing Federal and State Water Regulations Continue to Affect Your Proj...How Changing Federal and State Water Regulations Continue to Affect Your Proj...
How Changing Federal and State Water Regulations Continue to Affect Your Proj...
 
An Overview of Stormwater Management
An Overview of Stormwater ManagementAn Overview of Stormwater Management
An Overview of Stormwater Management
 
Nonpoint Source Management and Wetland Preservation
Nonpoint Source Management and Wetland PreservationNonpoint Source Management and Wetland Preservation
Nonpoint Source Management and Wetland Preservation
 
Water Quality and Wetlands: Historic Lessons Learned
Water Quality and Wetlands: Historic Lessons LearnedWater Quality and Wetlands: Historic Lessons Learned
Water Quality and Wetlands: Historic Lessons Learned
 
Maryland Wetland Law and Compliance
Maryland Wetland Law and ComplianceMaryland Wetland Law and Compliance
Maryland Wetland Law and Compliance
 
Key Clean Water Act Criteria Affecting Stormwater Management at the Site Level
Key Clean Water Act Criteria Affecting Stormwater Management at the Site LevelKey Clean Water Act Criteria Affecting Stormwater Management at the Site Level
Key Clean Water Act Criteria Affecting Stormwater Management at the Site Level
 
Waters, waters everywhere
Waters, waters everywhereWaters, waters everywhere
Waters, waters everywhere
 
Wetlands and Stormwater Management
Wetlands and Stormwater ManagementWetlands and Stormwater Management
Wetlands and Stormwater Management
 
Wetlands and Stormwater Management
Wetlands and Stormwater ManagementWetlands and Stormwater Management
Wetlands and Stormwater Management
 
Wetlands and Stormwater Management
Wetlands and Stormwater ManagementWetlands and Stormwater Management
Wetlands and Stormwater Management
 
Bat Blog
Bat BlogBat Blog
Bat Blog
 
Wetland Law and Compliance
Wetland Law and ComplianceWetland Law and Compliance
Wetland Law and Compliance
 
NTU is Not a University
NTU is Not a UniversityNTU is Not a University
NTU is Not a University
 
Stormwater Regulation
Stormwater RegulationStormwater Regulation
Stormwater Regulation
 
Stream Buffers
Stream BuffersStream Buffers
Stream Buffers
 

WRA DelDOT WL Presentation

  • 1.
  • 2. Project Team • Experienced staff – 5 key staff with over 25 years and 2 with 10 years in delineation, permitting, mitigation • All have DelDOT experience - know current regulatory climate, jurisdictional and RTE criteria and stream restoration • Staff serve on industry and stakeholder committees in forefront of regulatory wetland developments • Team knows the ramifications of recent court rulings and federal delineation manual supplements • Project Manager can offer insights of 17 years of experience with MDE (DNREC sister agency) working with transportation agencies as well 10 years on the private sector
  • 4. Project Team Immediate Extension of DelDOT Staff • Over 50 Environmental Scientists • Multiple assignment capability and ability to meet schedules • Local staff located within 2 hours of DelDOT • Continuity and commitment of staff - WR&A has a proven track record of staff commitment
  • 6. Key Staff Andrew Der – Project Manager, WRA • Director of Environmental Services, 28 years experience in water resources • 17 years with MDE culminating as Regional Chief in Wetlands Program • Expertise in wetland and water quality regulation and permitting • Serves on regional public and industry advisory committees - keeps current James McCulley, PWS – Assistant Project Manager, LandmarkJCM • Principal and Professional Wetlands Scientist, 26 years experience including DelDOT work • National Academy of Sciences Wetland Characterization Committee • Serves on regional public and industry advisory committees - keeps current Robert Siegfried – Mitigation and Restoration Manager, WR&A • Restoration Specialist, 25 years of experience including DelDOT work, 10 years experience in wetland and stream design and innovative stormwater management • Stream assessment and restoration • Designed over 15,000 l. f. of stream restoration, over 100 acres of wetland mitigation
  • 8. Key Staff Jason Cosler – Vice President, WR&A • Senior Engineer, 25 years experience, 5 with DelDOT work • Stormwater management, hydrology and hydraulics, and erosion and sediment control • Stream stability, culvert and bridge design, scour analysis • Stream assessment and restoration per Rosgen methodologies Michael McQuade – Senior Environmental Scientist, WR&A • 10 years of Experience, 5 with Delaware work • Wetland delineation and permitting, RTE species surveys • Botany and forestry, Certified Arborist Susan Smith – Senior Environmental Scientist, WR&A • 25 years of experience, 5 with DelDOT work • Wetland delineation and permitting, RTE species surveys • NEPA specialist
  • 10. Key Staff Amy Nazdrowicz – Environmental Scientist, LandmarkJCM • 9 years of Experience including DelDOT work • Wetland delineation, impact permitting, mitigation, habitat assessment, and hydrologic studies • RTE species surveys, published author on mitigation DavidSmith, PWS –Senior Environmental Scientist,Coastal Resources,Inc. • Committed to DBE goals • 24 years experience including DelDOT work • Wetland delineation and mitigation, RTE species surveys, Bog Turtle qualified surveyor
  • 12. Services Services that May Be Required under this Contract • Wetland, habitat, RTE evaluations and other potential environmental studies • Permit application preparation and submission; federal, state and local agency coordination • Development of mitigation proposals, design plans for wetland creation, restoration or enhancement, site selection pre-construction monitoring • Design plans for stream restoration and stabilization and evaluation of bioengineering techniques • Development of monitoring plans, site monitoring and preparation of monitoring reports • Development of invasive plant species eradication plans • Construction consultation and preparation of construction contracts including specifications and cost estimates suitable for competitive public bidding • Survey • Coordination with other DelDOT Divisions • Public Involvement
  • 14. Delaware Projects • Project team familiar with all regions and characteristics of Delaware • Worked on small to major projects • Expertise in simple to complex environmental permitting
  • 16. Experience • Rt. 113 – DEISs and EAs, agency coordination, wetlands and RTE species (Swamp Pink) investigations, highway design, GIS mapping to identify NEPA and Section 404 issues regarding highway location. • I-95 Toll Plaza Improvements – CE, evaluate impacts to wetlands and subaqueous lands, mitigation, permits, environmental compliance plans per DelDOT and DNREC standards. • SR 7, Newtown Road to SR 273 – wetland delineation, evaluate impacts to wetlands and subaqueous lands, permits, mitigation, environmental compliance plans per DelDOT and DNREC standards. • City of Dover Garrison Oak Force Main & Pump Station - wetland delineation within 4,200 linear foot study area, evaluate impacts to wetlands and subaqueous lands, mitigation, permits. • SR 41 Lancaster Pike, Hockessin Road Safety Project – wetland delineation for 1-mile roadway widening project study area, permitting, mitigation, environmental compliance plans per DelDOT and DNREC standards, stream bank stabilization.
  • 18. Experience LJCM • DelDOT Rt 1, Scott Run to Smyrna, New Castle & Kent County • Wetland delineations, impact permitting, creation, restoration • Rare species and habitat studies • Agency coordination CRI • DelDOT Agreement 1414 highway projects, New Castle County • Phase 1 bog turtle habitat assessment • Wetlands assessments • Agency coordination
  • 20. Site Assessment Process DelDOT Environmental Studies Findings Meeting Coordinate Jurisdictional Determination Project Initiation Field Investigations Prepare Work Products Potential Related Studies
  • 22. Project Initiation • Meet with Environmental Studies Project Manager • Review project history • GIS level assessment • Site visit • Develop scope and price proposal with schedule
  • 23. DelDOT Environmental Studies Findings Meeting Coordinate Jurisdictional Determination Project Initiation Field Investigations Prepare Work Products Potential Related Studies Project Initiation
  • 24. Field Investigations • Identify wetland and other habitat areas • Flag jurisdictional waters, including wetland, areas per 1987 Corps manual, regional supplements, court rulings, and other guidance and additional data • Record all wetland flag locations using sub-foot GPS and identify potential ephemeral, intermittent and perennial streams, and isolated wetlands
  • 25. DelDOT Environmental Studies Findings Meeting Coordinate Jurisdictional Determination Project Initiation Field Investigations Prepare Work Products Potential Related Studies Field Investigations
  • 26. Prepare Work Products • Download GPS data and convert into plan sheet format per DelDOT standards • Prepare applicable digital GIS maps • Prepare report of findings
  • 27. Prepare Work Products DelDOT Environmental Studies Findings Meeting Coordinate Jurisdictional Determination Project Initiation Field Investigations Prepare Work Products Potential Related Studies
  • 28. DelDOT Environmental Studies Meeting • Present findings • Discuss sensitive areas • Discuss jurisdictional status of on-site wetlands and potential “red flags” • Determining agencies’ authority (DNREC and Corps) • Discuss agency coordination
  • 29. DelDOT Environmental Studies Meeting DelDOT Environmental Studies Findings Meeting Coordinate Jurisdictional Determination Project Initiation Field Investigations Prepare Work Products Potential Related Studies
  • 30. Coordinate Jurisdictional Determination • Submit jurisdictional determination request • Set up meeting with agencies or attend JPPM • On-site meeting to achieve concurrence on delineations • Obtain jurisdictional determination from Corps of Engineers and/or DNREC
  • 31. Coordinate Jurisdictional Determination DelDOT Environmental Studies Findings Meeting Coordinate Jurisdictional Determination Project Initiation Field Investigations Prepare Work Products Potential Related Studies
  • 32. Potential Related Studies • RTE habitat coordination and assessment – Delmarva fox squirrel – Bog turtle – Numerous plants & others • Hydrology studies for atypical areas and nexus test • Forest investigation • Others (NEPA, Phase I, etc.)
  • 33. Potential Related Studies DelDOT Environmental Studies Findings Meeting Coordinate Jurisdictional Determination Project Initiation Field Investigations Prepare Work Products Potential Related Studies
  • 34. Permitting Process Prepare and Submit Applications Receive Permit/Approvals Acquire Design Plans/Project Description Assess, Avoid, Minimize Impacts Meet with DNREC and/or USACE on Impacts Assess Other Type Of Potential Environmental Impacts
  • 35. Permitting Process Environmental Compliance Plan(fromEnvironmental Section) Survey Prelim Semi Final General Scale Bar N/A North arrow N/A DetailedInformation Generalnotes N/A Naturalresource notes N/A Culturalresource notes N/A Legend N/A Sheet prepared by (WR&A and date) N/A Wetlands delineated by (WR&A and date) N/A Table ofimpacts (permanent and temporary)and mitigation summary N/A Project plan with specific environmentalcompliance indicated with border sheets and environmentalcompliance sheet number N/A Environmental Compliance Plan Legend including only impacts, pattern/shading, and descriptions that pertain to the area shown on individualplan N/A Construction baseline not screened N/A Proposed workscreened N/A Topography screened N/A Environmentalfeatures not screened N/A Impact areas shaded/patterned and called out with hexagon N/A Ordinary high water, Waters ofthe US, and wetlands labeled N/A Limits ofconstruction consistent with construction plans and erosion and sediment controlplans N/A
  • 36. Acquire Design Plans/Project Description • Meet with designer – Determine design phase of project – Important features of the project – Acquire existing plans • Coordinate with designer on changes as design proceeds
  • 37. Prepare and Submit Applications Receive Permit/Approval Acquire Design Plans/Project Description Assess, Avoid, Minimize Impacts Meet with DNREC and/or USACE on Impacts Assess Other Potential Environmental Impacts Acquire Design Plans/Project Description
  • 38. Assess, Avoid, Minimize Impacts • Overlay the project on the environmental features and assess potential impacts • Look closely at critical impacts • Work with the designer to avoid or minimize impacts without jeopardizing the project’s purpose • Document process for meeting with agencies
  • 39. Prepare and Submit Applications Receive Permit/Approval Acquire Design Plans/Project Description Assess, Avoid, Minimize Impacts Meet with DNREC and/or USACE on Impacts Assess Other Potential Environmental Impacts Assess, Avoid, Minimize Impacts
  • 40. Meet with DNREC and/or USACE on Impacts • Prepare displays for JPPM • Determine the level of meeting(s) required (office/field) • Meet with agencies & present information • Potential coordination with counties
  • 41. Prepare and Submit Applications Receive Permit/Approval Acquire Design Plans/Project Description Assess, Avoid, Minimize Impacts Meet with DNREC and/or USACE on Impacts Assess Other Potential Environmental Impacts Meet with DNREC and/or USACE on Impacts
  • 42. Prepare and Submit Applications • Submit PCN for Nationwide Permit • Prepare Application Packages for USACE and/or DNREC • Prepare environmental compliance sheets – Clear environmental features – Close coordination with design to assure compatible EC sheets – Develop accurate tabulation of impacts – Conform with DelDOT CADD standards – Account for temporary access & staging impacts • Submit application and impact plans – Provide alternatives analysis – Document avoidance and minimization – Develop conceptual mitigation plan
  • 43. Prepare and Submit Applications Prepare and Submit Applications Receive Permit/Approval Acquire Design Plans/Project Description Assess, Avoid, Minimize Impacts Meet with DNREC and/or USACE on Impacts Assess Other Potential Environmental Impacts
  • 44. Receive Permits/Approval • Continuous follow-up with agencies to assure information is complete and for timely issuance • Notify agencies of project commencement • Engage agencies in appropriate compliance processes
  • 45. Receive Permits/Approval Prepare and Submit Applications Receive Permit/Approval Acquire Design Plans/Project Description Assess, Avoid, Minimize Impacts Meet with DNREC and/or USACE on Impacts Assess Other Potential Environmental Impacts
  • 46. Assess Other Potential Environmental Impacts • Solicit direction from USFWS and DNHP • Additional RTE screening and species inventory • Survey and record presence of critical species populations and habitat • Address project impacts and offsets • SHPO coordination and screen for need of cultural resource assessment
  • 47. Prepare and Submit Applications Receive Permit/Approval Acquire Design Plans/Project Description Assess, Avoid, Minimize Impacts Meet with DNREC and/or USACE on Impacts Assess Other Potential Environmental Impacts Assess Other Potential Environmental Impacts
  • 48. Opportunities for Streamlining Each project’s degree of impact and resource sensitivity can vary, offering opportunities for efficiency • Combine concurrent field assessment and project impact comment processes • Utilize and re-purpose previous assessment studies or permitting work products in project area by others • Evaluate project design for refinements to avoid impacts and maximize use of Nationwide Permits • Maximize other contemporary on-site mitigation and offset strategies: enhancement of degraded areas, vegetative restoration, re-establishing fish passage, and urban stormwater retrofit opportunities to reduce customary mitigation and permitting burdens
  • 50. Rare, Threatened, and Endangered Species • All team scientists thoroughly experienced in species identification • Plants and animals • Upland/wetland • Insects, mammals, reptiles • Timing of assessments
  • 51. Rare, Threatened, and Endangered Species
  • 52. Rare, Threatened, and Endangered Species • Pre-application coordination with wildlife agencies • Waters and wetlands evaluation suited to potential species habitat • Findings documented and presence located • Potential issues coordinated with agencies
  • 53. Rare, Threatened, and Endangered Species
  • 54. Wetland Mitigation • Select sites based on landscape position to maximize success and minimize costs – Target historically drained or modified wetlands – Minimize excavation – Proximity to multiple sources of hydrology • Example projects – Restored agriculturally drained Delmarva Bay – Created 5 acre tidal wetland with minimal excavation
  • 55. Ridgely Rt 33 Tidal Wetlands Wetland Mitigation
  • 56. Wetland Mitigation • Use reference wetlands to optimize site design – Selecting plant community and species – Identify appropriate hydrology – Prepare appropriate soil conditions • Leading cause of wetland failure is soil compaction – Use low ground pressure equipment – Minimize use of equipment on final grade – Rip and disk soils post-final grade – Add organic matter to decrease bulk density, increase moisture retention, and increase hydric soil development
  • 58. Stream Mitigation • Use reference systems to identify appropriate habitat and geomorphic structures – Use constructed riffles for most coastal and piedmont streams – Large woody debris for habitat enhancement in pools • Restore geomorphic and ecological processes to maximize success – Fish passage – Nutrient retention & reduction – Reconnect floodplain & wetlands to stream
  • 59. MD 237 Fish Passage Stream Mitigation Neabsco Creek After Neabsco Creek Before
  • 60. Mitigation Construction Keys to successful mitigation/restoration construction • Experienced restoration contractors • Specialized construction equipment • Designer on-site during construction • Anticipate changes to the design • Expect weather related issues
  • 61. Specialized Equipment Difficult Field Conditions Mitigation Construction
  • 62. Ecosystem and Watershed Restoration • Move toward ecosystem and watershed restoration – Focus on system scale instead of reach scale – Combine wetlands, streams, buffers, stormwater management, and other requirements into comprehensive solutions – Contribute to NPDES water quality, TMDL, and watershed restoration goals
  • 63. Ecosystem and Watershed Restoration
  • 64. U. S. 113 North South Study Swan Creek Mitigation Plan • Restore, enhance and preserve Swan Creek Stream Valley – Remove fish barriers – Restore 14 acres of tidal wetlands – Enhance 58 acres of tidal wetlands – Create 7 acres of tidal wetlands – Create 8 acres Atlantic White Cedar Wetlands – Preserve 157 acres of forested wetlands, including 23 acres of AWC wetlands – Preserve 79 acres of upland buffers
  • 65. U. S. 113 North South Study Swan Creek Mitigation Plan
  • 66. Construction Documents and Constructability • Focus on permitable, biddable and constructible mitigation and restoration plans • Conformance with DelDOT standards for: – CADD – Specifications – Bid Items • Specialized work requires specialized construction documents and support staff
  • 67. Construction Documents and Constructability
  • 68. Quality WR&A’s DelDOT Quality Control program for DelDOT projects • Independent discipline-specific peer reviews • Design computations checked by a Professional Engineer • Project Manager reviews all submittals • Design checklists – DelDOT Plan Submission Checklist – WR&A addendum to DelDOT Plan Submission and Permit Preparation Checklist – Review Comment Form
  • 69. EnvironmentalCompliance Plan(fromEnvironmentalSection) Survey Prelim Semi Final General ScaleBar N/A Northarrow N/A DetailedInformation Generalnotes N/A Naturalresourcenotes N/A Culturalresourcenotes N/A Legend N/A Sheetpreparedby(WR&Aanddate) N/A Wetlands delineatedby(WR&Aanddate) N/A Tableofimpacts (permanentandtemporary)andmitigationsummary N/A Projectplanwithspecificenvironmentalcomplianceindicatedwithborder sheets andenvironmentalcompliancesheetnumber N/A EnvironmentalCompliance Plan Legendincludingonlyimpacts,pattern/shading,anddescriptions that pertaintotheareashownonindividualplan N/A Constructionbaselinenotscreened N/A Proposedworkscreened N/A Topographyscreened N/A Environmentalfeatures notscreened N/A Impactareas shaded/patternedandcalledoutwithhexagon N/A Ordinaryhighwater,Waters oftheUS,andwetlands labeled N/A Limits ofconstructionconsistentwithconstructionplans anderosion andsedimentcontrolplans N/A Project Title: Airport/Churchmans Road Intersection Improvements Project Location: Intersection of Route 37 (Airport Road) and Route 58 (Churchmans Road) State Contract No.: 99-002-01 Federal Aid No.: N/A ADVERSE IMPACTS/EFFECTS None Possible Probable Comment Right-of-Way Requirements A. Private X Partial property acquisitions. B. Public X Small strip acquisition of New Castle County property. C. 4(f) X Phase I Historic and Archeological studies are complete. Impacts to archeological resources are possible. D. 6(f) X Relocations A. Homes X B. Businesses X The relocation of tw o businesses is identified. C. Non-Profit X Social Impacts A. Local X B. Regional X Environmental Justice A. Minority X B. Low-Income X Economic Impacts A. Local X B. Regional X C. Statewide X Cultural Resources (Listed, nominated, eligible) A. National Register X B. State Listing X C. Other X Air Quality A. Local X B. Statewide X Noise A. Residential X B. Commercial X C. Sensitive Receptors X D. Other X Hazardous Waste X Phase I ESA identified concerns at Airport Exxon and Auto Collision Center properties Water Quality A. Surface Water X Several culvert extensions are anticipated B. Ground Water X Hydrological Impacts A. Stream relocation X B. Stream channelization X C. Stream stabilization X Associated w ith culvert extensions D. Flood Plain X Fish & Wildlife A. Endangered Species X B. Habitat X Fringe forest and minor w etland impacts Wetlands A. Project Area X Potential impacts range from 0.1 to 0.3 acres B. Up or Down Stream X Land Use A. Direct X Minor conversions of land uses adjacent to roadw ay due to road w idening B. Secondary X Natural Resources A. Farm Lands X Minor encroachments into farm lands B. Woodlands X Minor encroachments into w ooded fringe areas C. Conservation Areas X D. Coastal Zone X Modal Choice CATEGORICAL EXCLUSION EVALUATION PROJECT CHECKLIST AND PROJECT LEVEL DETERMINATION FORM No identified minority or low income communities identified Phase I historic structures and archeological studies are complete. No National Register Eligible or State Listed property impacts. Impacts to archeological resources are possible. Roadw ay w ill be extended closer to residential and commercial properties. Impacts w ill be assessed later in design. To Provide Check 1 Photo log of impact areas 2 Aerial w/ DNREC SWMP mapping 3 USGS Map 4 Location Map 5 Half-size relevant plan sheets (listed below) 6 Full-size EC sheets 7 USFWS Correspondence 8 Natural Heritage Correspondence 9 SHPO Correspondence 10 Signed Categorical Exclusion (if Federal Project) 11 Wetland Delination Report 12 CZM Letter 13 SB 186 exemption letter (if applies) 14 COE Cover letter 15 Construction Plan Title Sheet 16 Construction Plan Sheet Index 17 Construction Plan notes and Legend 18 Construction Plan Project Notes Sheet 19 Construction Plans 20 Construction Details 21 Stream Diversion Plans 22 Stromwater Managagement Plans and Details 23 Phasing, MOT and E&S Contorl (as appropriate) 24 Landscaping Plans DELDOT PERMIT CHECKLIST Quality