SlideShare a Scribd company logo
Desideria Culanag
Senior Estimator
Education:
B.S., Civil Engineering, Notre Dame
University, 1987
Professional Memberships:
AACE International AZ Section
Board Member – Vice President
Desideria (Daisy) Culanag has 24 years of experience as a
construction estimator and has performed detailed cost estimates
for all 16 CSI divisions of construction. She has prepared estimates
for new construction, renovations, defect remediation and
buildings damaged by earth movement, wind, fire, explosion,
water and civil unrest. She has also performed architectural,
structural, electrical, mechanical, landscaping, civil and Utilities
quantity take-offs, prepared quantity take-off sheets and priced
charts of account. She has performed cost comparisons and cost
analyses. Her specialized computer skills include Publisher,
Estimating Database, On-Screen Take-Off, Estimating Digitizer,
Delta CAD, MS Visual FoxPro, MC2, Timberline, and Success
Estimator. She is fluent in English and Tagalog, with a working
knowledge of Spanish.
For the project, Daisy will contribute to the development and
reconciliation of project estimates. She will apply her knowledge
of contractor, designer-provided and third-party estimates, with
an emphasis on reducing budget risk and improving project
delivery. She will also perform cost comparisons and cost analyses.
Daisy will help establish the baseline budget, define and develop
activity budgets and track, evaluate and verify changes to the
established budget. Daisy will also apply her skills in developing
and maintaining current cost databases indexed to the specific
geographical project area, as well as working with industry cost
databases.
Estimating Experience:
Capital Program Controls System, San Francisco Municipal
Transportation Authority, San Francisco, CA, Estimator
Hill is providing consulting services to assist the SFMTA in
procuring software and implementing a Capital Program Controls
System to track capital project finances, spending, and project
scheduling. Daisy provides estimating and constructability review
services for three stations, one 1.5 mile long tunnel, and a
communications and control package valued at $1.3 billion.
Page | 1
Metro Gold Line Foothill Extension Construction Authority, Gold
Line Foothill Extension, Monrovia, CA, Estimator
The Metro Gold Line Light Rail Transit System will be expanded 24
miles east from the City of Pasadena to the City of Montclair,
California. It will be built in two segments. Hill was commissioned
to provide Phase 2A Program Management Consulting services.
The objective will be a cost-effective program of services along
with a work plan that will provide the Authority with the required
staff to support and integrate with the Authority's personnel.
Daisy serves as an estimator for the project.
Port of Los Angeles (POLA) Wilmington Waterfront Park and
Harry Bridges Boulevard Street Improvements, Los Angeles, CA,
Estimator
As part of the continued POLA area waterfront and community
improvements, enhancements were made to the Wilmington area
north of the Port. The Wilmington Waterfront Park (formerly
known as Harry Bridges Boulevard Improvements) Project creates
a 30-acre environmentally focused community buffer with
significant recreational areas, vistas and development
opportunity. It will also eventually host a trolley line extension
along the north side of the boulevard, creating a multi-use
transportation corridor. Hill is assisting the construction
management consultant for the project with scheduling and
claims consulting services. As estimator, Daisy works on Requests
for Qualification (RFQs) and Requests for Information (RFIs) for the
project.
Arizona Diamondbacks and Colorado Rockies, Spring Training
Facilities, Scottsdale, AZ, Estimator
Hill is providing on-call construction management and project
controls Services for the Arizona Diamondbacks and Colorado
Rockies new spring training facility. The state-of-the-art facility will
be located on the Salt River Pima-Maricopa Indian Community
adjacent to the City of Scottsdale, Arizona. The facility will include
an 11,000-seat ballpark, 12 replica and practice fields and related
buildings that will include Major and Minor League signature
clubhouses, training facilities and offices for each team. Daisy
serves as estimator and is responsible for on-screen quantity
Page | 2
takeoff of floors and ceiling finishes, interior partition walls and
exterior walls of Buildings A, B, C, D, E, F and G to Bldg. R - 18
Bldgs.
Other Projects:
ADOT 303 Expansion - Phoenix AZ – SITE UTILITIES
LA Metro Regional Connector – Los Angeles, CA – MEP & SITE U
LA Metro Westside Extension – Los Angeles, CA – MEP & SITE U
LA Metro I-5 – Los Angeles, CA – MEP & SITE U
LA Metro SR 71 – Los Angeles, CA – MEP & SITE U
LA Metro Measure R LA & Orange County – CA – MEP & SITE U
Gold Line Phase 2b - Irwindale, CA – MEP & SITE U
Phoenix Sky Harbor Airport – T4 Garage Lighting Upgrade – ELEC.
APS Data Center - MEP
Colorado Springs – Scitor - MEP
Freeport McMoran – STRUCTURAL & MEP
Ho-Chunk Gaming – ARCHITECTURAL & MEP
Pascua Yaqui - MEP
Raytheon – Site A & K Fence - MEP
San Francisco Airport - MEP
SRPMIC Justice - MEP
Church of Scientology, Different Locations - MEP
Prior Experience:
Madsen, Kneppers and Associates, Inc., Various Projects,
Construction Estimator
Working for a multidisciplinary construction-consulting firm, Daisy
performed detailed cost estimates for all 16 CSI divisions of
construction. She provided estimates for new construction,
renovations, defect remediation and buildings damaged by
earthquakes, wind, fire, explosion, water or civil unrest. She
conducted property loss site inspections or property claim
inspections for such events as fire, hurricane, wind and flood for
various different insurance companies. She performed
architectural, structural, electrical, mechanical, civil and
landscaping quantity take-off. She then prepared quantity take-off
sheets and priced charts of accounts. Daisy prepared lists of
Page | 3
subcontractors and/or suppliers for quotation; contacted different
suppliers to obtain material prices; and performed cost
comparisons and cost analyses. She has extensive experience
drawing numerous floor plans using Delta CAD. Projects included:
* Wild River Foods, Grandview, WA. Provided site
inspections, drafting and estimates for construction
projects for Wild River Foods. Projects included: AG
Maintenance Shop, Receiving Building, Steiner Building,
Office Building, Processing Plant, Freezer Building, Old
Safeway Building and Old Safeway Freezer Buildings A, B &
C.
* Vernonia School District, Vernonia, OR. Site inspection,
drafting and estimates.
* The Homestead Restaurant–Thomas Lin, Seattle, WA.
Site inspections, drafting and estimates.
* First United Methodist Church, Biloxi and Long Beach,
MS. Site inspections and estimates at multiple locations.
* Sun City MacDonald’s Ranch, Las Vegas, NV. Defect
inspections.
* Svetich Residence, Eugene, OR. Estimates.
* Moulton Properties, Pensacola, FL. Drafting and
estimates, multiple locations.
* Beau Rivage Resort & Casino, Biloxi, MS.
Documentations.
* Mississippi Apartment Buildings, Jackson MS. Drafting.
* Tierra Oaks, Redding, CA. Drafting.
* Smith Residence, Fallbrook, CA. Drafting.
* Benevolent Protective Order of Elks. Drafting and
estimates
* ACWA/JPIA Loss, La Mesa, CA. Drafting and estimates.
* Stemilt Growers, Wenatchee, WA. Drafting and
estimates.
* J.E. Dunn Kroll Map Subsidence. Drafting and estimates.
* Goldener Condominiums, Snoqualmie, WA. Site
inspections.
* Land O'Lakes and Purina Feeds, Caldwell, ID. Drafting and
estimates.
* Port of Gold Beach, Gold Beach, OR. Drafting.
Page | 4
* Biomedical Science Building. Drafting.
* Hamilton Library. Drafting.
* Euro Medical Building, Winter Park, FL. Drafting.
* Ivar's Mukilteo Landing, Mukilteo, WA. Drafting.
* Daytona Beach, Tammack. Drafting.
* 120 Grove, Lake Tahoe, NV. Drafting and estimates.
* Four Seasons Hotel, Sea Wall Plan & Front Elevation.
Drafting.
* Sanborn Building, Astoria, WA. Drafting and estimates.
* Lofts @ Joel LLC, Spokane, WA. Drafting and estimates.
* Fire District #13, Station 1, Boisfort, WA. Drafting.
* Fire District #6, Doty, WA. Drafting and estimates.
* Fire District #13, Station 2, Curtis, WA. Drafting.
* Multnomah Industrial Park, SDAO Port of St. Helens,
Warren, OR. Drafting.
* Calaway Trading – Hay Barn, Ellensburg, WA. Drafting.
* Linda Hargreaves Property, Spokane, WA. Drafting and
estimates.
* Port of Hoodsport, Hoodsport, WA. Dock plan drafting.
* Hoffman Hangar, Sandy, OR. Drafting and estimates.
* SDAO Port of St. Helens, Scappoose, OR. Draw truss
elevation, connection detail and end elevation.
* Mt. Haye's Properties, Delta Junction, AK. Drafting and
estimates.
* Public School District, Beaumont, TX. Site inspections and
estimates.
* Retirement Homes Building, Houston, TX. Site inspections
and estimates.
C3 Management Group, Inc., Various Projects, Cost
Estimator/Quantity Surveyor
As cost estimator/quantity surveyor for a construction cost-
estimating firm, Daisy performed detailed cost estimates for all 16
CSI divisions of construction from conceptual planning and design
through construction bid documents. She performed material
take-off at all phases of design, including structural, architectural,
mechanical, electrical, civil and landscaping. She prepared
estimates that were easily understood by the design team and the
owner, resulting in clear direction regarding the scope and quality
Page | 5
of the project. Projects included:
* Oregon State University Engineering Building, Corvallis,
OR. Architectural, structural and site work estimates, SD,
DD, CD.
* IVT Building, Tacoma Community College, Tacoma, WA.
Architectural estimates, CD.
* WWU Campus Services Facility, WWU, Bellingham, WA.
Architectural and structural estimates.
* Orting Public Safety Building, Orting, WA. Architectural
estimates DD, CD.
Matson Carlson & Associates, Inc., Various Projects, Construction
Estimator. Daisy was a construction estimator for this construction
cost-estimating firm. She performed material take-off for all
phases of design, including structural, architectural, mechanical,
electrical, civil and landscaping.
New City Builders, Inc., Various Projects, Quezon City,
Philippines, Project Engineer/Cost Estimator. For this commercial
construction firm, Daisy estimated the costs for many different
types of high-rise building projects. She also served as project
engineer and supervised all subcontractors, prepared variance
reports and performed site inspections for ongoing projects.
Projects included serving as Project Engineer for the construction
of a 32-story Infinity Tower Building.
Cotabato City Engineers Office, Various Projects, Cotabato City,
Philippines, Field Engineer. As field engineer, Daisy supervised
road pavement projects and performed quality control
inspections.
Masot Construction, Warehouse Project, Cotabato City,
Philippines, Draftswoman. Daisy drafted a revised plan for a
warehouse project and performed the site inspection to verify the
final layout.
Page | 6
of the project. Projects included:
* Oregon State University Engineering Building, Corvallis,
OR. Architectural, structural and site work estimates, SD,
DD, CD.
* IVT Building, Tacoma Community College, Tacoma, WA.
Architectural estimates, CD.
* WWU Campus Services Facility, WWU, Bellingham, WA.
Architectural and structural estimates.
* Orting Public Safety Building, Orting, WA. Architectural
estimates DD, CD.
Matson Carlson & Associates, Inc., Various Projects, Construction
Estimator. Daisy was a construction estimator for this construction
cost-estimating firm. She performed material take-off for all
phases of design, including structural, architectural, mechanical,
electrical, civil and landscaping.
New City Builders, Inc., Various Projects, Quezon City,
Philippines, Project Engineer/Cost Estimator. For this commercial
construction firm, Daisy estimated the costs for many different
types of high-rise building projects. She also served as project
engineer and supervised all subcontractors, prepared variance
reports and performed site inspections for ongoing projects.
Projects included serving as Project Engineer for the construction
of a 32-story Infinity Tower Building.
Cotabato City Engineers Office, Various Projects, Cotabato City,
Philippines, Field Engineer. As field engineer, Daisy supervised
road pavement projects and performed quality control
inspections.
Masot Construction, Warehouse Project, Cotabato City,
Philippines, Draftswoman. Daisy drafted a revised plan for a
warehouse project and performed the site inspection to verify the
final layout.
Page | 6

More Related Content

What's hot

constructionresumeasof02102015long4page
constructionresumeasof02102015long4pageconstructionresumeasof02102015long4page
constructionresumeasof02102015long4pageFred Thompson
 
David Brotchie
David Brotchie David Brotchie
David Brotchie
Brotchie
 
Hollingsworth Resume
Hollingsworth ResumeHollingsworth Resume
Hollingsworth Resume
John Hollingsworth
 
Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16tyeeseeker
 
Resume Mark 061215
Resume Mark 061215Resume Mark 061215
Resume Mark 061215Mark Andrews
 
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...
Daniel X. O'Neil
 
Erik D resume for Project Manager position
Erik D resume for Project Manager positionErik D resume for Project Manager position
Erik D resume for Project Manager positionErik Slaughter
 
Todd Eric Male1.docx RESUME 2015.docx2
Todd Eric Male1.docx RESUME 2015.docx2Todd Eric Male1.docx RESUME 2015.docx2
Todd Eric Male1.docx RESUME 2015.docx2Todd Maley
 
Professional Resume Final, Juano
Professional Resume Final, JuanoProfessional Resume Final, Juano
Professional Resume Final, JuanoJuano Betancourt
 
11600 Us 31 Marketing Package
11600 Us 31 Marketing Package11600 Us 31 Marketing Package
11600 Us 31 Marketing Package
Kevin Endres
 

What's hot (10)

constructionresumeasof02102015long4page
constructionresumeasof02102015long4pageconstructionresumeasof02102015long4page
constructionresumeasof02102015long4page
 
David Brotchie
David Brotchie David Brotchie
David Brotchie
 
Hollingsworth Resume
Hollingsworth ResumeHollingsworth Resume
Hollingsworth Resume
 
Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16
 
Resume Mark 061215
Resume Mark 061215Resume Mark 061215
Resume Mark 061215
 
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...
 
Erik D resume for Project Manager position
Erik D resume for Project Manager positionErik D resume for Project Manager position
Erik D resume for Project Manager position
 
Todd Eric Male1.docx RESUME 2015.docx2
Todd Eric Male1.docx RESUME 2015.docx2Todd Eric Male1.docx RESUME 2015.docx2
Todd Eric Male1.docx RESUME 2015.docx2
 
Professional Resume Final, Juano
Professional Resume Final, JuanoProfessional Resume Final, Juano
Professional Resume Final, Juano
 
11600 Us 31 Marketing Package
11600 Us 31 Marketing Package11600 Us 31 Marketing Package
11600 Us 31 Marketing Package
 

Viewers also liked

Practica 6 gerardo
Practica 6 gerardoPractica 6 gerardo
Practica 6 gerardo
gerardd98
 
Top 15 Adventures Destinations You Should Try Out
 Top 15 Adventures Destinations You Should Try Out Top 15 Adventures Destinations You Should Try Out
Top 15 Adventures Destinations You Should Try Out
Tours In Abu Dhabi.Com
 
ACTIVIDAD 2
ACTIVIDAD 2ACTIVIDAD 2
ACTIVIDAD 2
gerardd98
 
Robot
RobotRobot
Robot
karen405
 
Qué son las bases de datos
Qué son las bases de datosQué son las bases de datos
Qué son las bases de datos
gerardd98
 
Acceso a datos con ado.net en visual basic
Acceso a datos con ado.net en visual basicAcceso a datos con ado.net en visual basic
Acceso a datos con ado.net en visual basic
gerardd98
 
Graficas estadisticas 7
Graficas estadisticas 7Graficas estadisticas 7
Graficas estadisticas 7
valeriajjs2004
 

Viewers also liked (7)

Practica 6 gerardo
Practica 6 gerardoPractica 6 gerardo
Practica 6 gerardo
 
Top 15 Adventures Destinations You Should Try Out
 Top 15 Adventures Destinations You Should Try Out Top 15 Adventures Destinations You Should Try Out
Top 15 Adventures Destinations You Should Try Out
 
ACTIVIDAD 2
ACTIVIDAD 2ACTIVIDAD 2
ACTIVIDAD 2
 
Robot
RobotRobot
Robot
 
Qué son las bases de datos
Qué son las bases de datosQué son las bases de datos
Qué son las bases de datos
 
Acceso a datos con ado.net en visual basic
Acceso a datos con ado.net en visual basicAcceso a datos con ado.net en visual basic
Acceso a datos con ado.net en visual basic
 
Graficas estadisticas 7
Graficas estadisticas 7Graficas estadisticas 7
Graficas estadisticas 7
 

Similar to Culanag, Desideria

Scott resume
Scott resumeScott resume
Scott resume
Scott Williams
 
AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16Amir pia
 
Heyer Professional Profile
Heyer Professional ProfileHeyer Professional Profile
Heyer Professional Profilepheyer351
 
Resume
ResumeResume
Resume
Shiva USA
 
Carlos Yibirin - CAY Group International 2014
Carlos Yibirin - CAY Group International 2014Carlos Yibirin - CAY Group International 2014
Carlos Yibirin - CAY Group International 2014Carlos Yibirin
 
Resume pe civil
Resume pe civilResume pe civil
Resume pe civil
Kim D. Scattarella
 
Lab Photo Resume 2008
Lab Photo  Resume 2008Lab Photo  Resume 2008
Lab Photo Resume 2008
psaledakis
 
Rodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard
 
Gerald Durand Resume
Gerald Durand ResumeGerald Durand Resume
Gerald Durand ResumeJerry Durand
 
PACOTECH Parks SOQ
PACOTECH Parks SOQPACOTECH Parks SOQ
PACOTECH Parks SOQ
Philip Mok
 
Christian Finn - Resume
Christian Finn - ResumeChristian Finn - Resume
Christian Finn - Resume
Christian Finn, AIA, LEED AP
 
Michael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-naMichael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-naMichael Barbera
 

Similar to Culanag, Desideria (20)

Scott resume
Scott resumeScott resume
Scott resume
 
AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16
 
Heyer Professional Profile
Heyer Professional ProfileHeyer Professional Profile
Heyer Professional Profile
 
Resume
ResumeResume
Resume
 
Bokath Resume
Bokath ResumeBokath Resume
Bokath Resume
 
Carlos Yibirin - CAY Group International 2014
Carlos Yibirin - CAY Group International 2014Carlos Yibirin - CAY Group International 2014
Carlos Yibirin - CAY Group International 2014
 
Scott_Molstad 8
Scott_Molstad 8Scott_Molstad 8
Scott_Molstad 8
 
Resume pe civil
Resume pe civilResume pe civil
Resume pe civil
 
Lab Photo Resume 2008
Lab Photo  Resume 2008Lab Photo  Resume 2008
Lab Photo Resume 2008
 
RYAN STODDARD
RYAN STODDARDRYAN STODDARD
RYAN STODDARD
 
Abernathy-CV_2016June
Abernathy-CV_2016JuneAbernathy-CV_2016June
Abernathy-CV_2016June
 
Rodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction Manager
 
Resume
ResumeResume
Resume
 
Gerald Durand Resume
Gerald Durand ResumeGerald Durand Resume
Gerald Durand Resume
 
PACOTECH Parks SOQ
PACOTECH Parks SOQPACOTECH Parks SOQ
PACOTECH Parks SOQ
 
resume 2017
resume 2017resume 2017
resume 2017
 
Christian Finn - Resume
Christian Finn - ResumeChristian Finn - Resume
Christian Finn - Resume
 
Richard Greeley
Richard GreeleyRichard Greeley
Richard Greeley
 
Michael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-naMichael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-na
 
Project list
Project listProject list
Project list
 

Culanag, Desideria

  • 1. Desideria Culanag Senior Estimator Education: B.S., Civil Engineering, Notre Dame University, 1987 Professional Memberships: AACE International AZ Section Board Member – Vice President Desideria (Daisy) Culanag has 24 years of experience as a construction estimator and has performed detailed cost estimates for all 16 CSI divisions of construction. She has prepared estimates for new construction, renovations, defect remediation and buildings damaged by earth movement, wind, fire, explosion, water and civil unrest. She has also performed architectural, structural, electrical, mechanical, landscaping, civil and Utilities quantity take-offs, prepared quantity take-off sheets and priced charts of account. She has performed cost comparisons and cost analyses. Her specialized computer skills include Publisher, Estimating Database, On-Screen Take-Off, Estimating Digitizer, Delta CAD, MS Visual FoxPro, MC2, Timberline, and Success Estimator. She is fluent in English and Tagalog, with a working knowledge of Spanish. For the project, Daisy will contribute to the development and reconciliation of project estimates. She will apply her knowledge of contractor, designer-provided and third-party estimates, with an emphasis on reducing budget risk and improving project delivery. She will also perform cost comparisons and cost analyses. Daisy will help establish the baseline budget, define and develop activity budgets and track, evaluate and verify changes to the established budget. Daisy will also apply her skills in developing and maintaining current cost databases indexed to the specific geographical project area, as well as working with industry cost databases. Estimating Experience: Capital Program Controls System, San Francisco Municipal Transportation Authority, San Francisco, CA, Estimator Hill is providing consulting services to assist the SFMTA in procuring software and implementing a Capital Program Controls System to track capital project finances, spending, and project scheduling. Daisy provides estimating and constructability review services for three stations, one 1.5 mile long tunnel, and a communications and control package valued at $1.3 billion. Page | 1
  • 2. Metro Gold Line Foothill Extension Construction Authority, Gold Line Foothill Extension, Monrovia, CA, Estimator The Metro Gold Line Light Rail Transit System will be expanded 24 miles east from the City of Pasadena to the City of Montclair, California. It will be built in two segments. Hill was commissioned to provide Phase 2A Program Management Consulting services. The objective will be a cost-effective program of services along with a work plan that will provide the Authority with the required staff to support and integrate with the Authority's personnel. Daisy serves as an estimator for the project. Port of Los Angeles (POLA) Wilmington Waterfront Park and Harry Bridges Boulevard Street Improvements, Los Angeles, CA, Estimator As part of the continued POLA area waterfront and community improvements, enhancements were made to the Wilmington area north of the Port. The Wilmington Waterfront Park (formerly known as Harry Bridges Boulevard Improvements) Project creates a 30-acre environmentally focused community buffer with significant recreational areas, vistas and development opportunity. It will also eventually host a trolley line extension along the north side of the boulevard, creating a multi-use transportation corridor. Hill is assisting the construction management consultant for the project with scheduling and claims consulting services. As estimator, Daisy works on Requests for Qualification (RFQs) and Requests for Information (RFIs) for the project. Arizona Diamondbacks and Colorado Rockies, Spring Training Facilities, Scottsdale, AZ, Estimator Hill is providing on-call construction management and project controls Services for the Arizona Diamondbacks and Colorado Rockies new spring training facility. The state-of-the-art facility will be located on the Salt River Pima-Maricopa Indian Community adjacent to the City of Scottsdale, Arizona. The facility will include an 11,000-seat ballpark, 12 replica and practice fields and related buildings that will include Major and Minor League signature clubhouses, training facilities and offices for each team. Daisy serves as estimator and is responsible for on-screen quantity Page | 2
  • 3. takeoff of floors and ceiling finishes, interior partition walls and exterior walls of Buildings A, B, C, D, E, F and G to Bldg. R - 18 Bldgs. Other Projects: ADOT 303 Expansion - Phoenix AZ – SITE UTILITIES LA Metro Regional Connector – Los Angeles, CA – MEP & SITE U LA Metro Westside Extension – Los Angeles, CA – MEP & SITE U LA Metro I-5 – Los Angeles, CA – MEP & SITE U LA Metro SR 71 – Los Angeles, CA – MEP & SITE U LA Metro Measure R LA & Orange County – CA – MEP & SITE U Gold Line Phase 2b - Irwindale, CA – MEP & SITE U Phoenix Sky Harbor Airport – T4 Garage Lighting Upgrade – ELEC. APS Data Center - MEP Colorado Springs – Scitor - MEP Freeport McMoran – STRUCTURAL & MEP Ho-Chunk Gaming – ARCHITECTURAL & MEP Pascua Yaqui - MEP Raytheon – Site A & K Fence - MEP San Francisco Airport - MEP SRPMIC Justice - MEP Church of Scientology, Different Locations - MEP Prior Experience: Madsen, Kneppers and Associates, Inc., Various Projects, Construction Estimator Working for a multidisciplinary construction-consulting firm, Daisy performed detailed cost estimates for all 16 CSI divisions of construction. She provided estimates for new construction, renovations, defect remediation and buildings damaged by earthquakes, wind, fire, explosion, water or civil unrest. She conducted property loss site inspections or property claim inspections for such events as fire, hurricane, wind and flood for various different insurance companies. She performed architectural, structural, electrical, mechanical, civil and landscaping quantity take-off. She then prepared quantity take-off sheets and priced charts of accounts. Daisy prepared lists of Page | 3
  • 4. subcontractors and/or suppliers for quotation; contacted different suppliers to obtain material prices; and performed cost comparisons and cost analyses. She has extensive experience drawing numerous floor plans using Delta CAD. Projects included: * Wild River Foods, Grandview, WA. Provided site inspections, drafting and estimates for construction projects for Wild River Foods. Projects included: AG Maintenance Shop, Receiving Building, Steiner Building, Office Building, Processing Plant, Freezer Building, Old Safeway Building and Old Safeway Freezer Buildings A, B & C. * Vernonia School District, Vernonia, OR. Site inspection, drafting and estimates. * The Homestead Restaurant–Thomas Lin, Seattle, WA. Site inspections, drafting and estimates. * First United Methodist Church, Biloxi and Long Beach, MS. Site inspections and estimates at multiple locations. * Sun City MacDonald’s Ranch, Las Vegas, NV. Defect inspections. * Svetich Residence, Eugene, OR. Estimates. * Moulton Properties, Pensacola, FL. Drafting and estimates, multiple locations. * Beau Rivage Resort & Casino, Biloxi, MS. Documentations. * Mississippi Apartment Buildings, Jackson MS. Drafting. * Tierra Oaks, Redding, CA. Drafting. * Smith Residence, Fallbrook, CA. Drafting. * Benevolent Protective Order of Elks. Drafting and estimates * ACWA/JPIA Loss, La Mesa, CA. Drafting and estimates. * Stemilt Growers, Wenatchee, WA. Drafting and estimates. * J.E. Dunn Kroll Map Subsidence. Drafting and estimates. * Goldener Condominiums, Snoqualmie, WA. Site inspections. * Land O'Lakes and Purina Feeds, Caldwell, ID. Drafting and estimates. * Port of Gold Beach, Gold Beach, OR. Drafting. Page | 4
  • 5. * Biomedical Science Building. Drafting. * Hamilton Library. Drafting. * Euro Medical Building, Winter Park, FL. Drafting. * Ivar's Mukilteo Landing, Mukilteo, WA. Drafting. * Daytona Beach, Tammack. Drafting. * 120 Grove, Lake Tahoe, NV. Drafting and estimates. * Four Seasons Hotel, Sea Wall Plan & Front Elevation. Drafting. * Sanborn Building, Astoria, WA. Drafting and estimates. * Lofts @ Joel LLC, Spokane, WA. Drafting and estimates. * Fire District #13, Station 1, Boisfort, WA. Drafting. * Fire District #6, Doty, WA. Drafting and estimates. * Fire District #13, Station 2, Curtis, WA. Drafting. * Multnomah Industrial Park, SDAO Port of St. Helens, Warren, OR. Drafting. * Calaway Trading – Hay Barn, Ellensburg, WA. Drafting. * Linda Hargreaves Property, Spokane, WA. Drafting and estimates. * Port of Hoodsport, Hoodsport, WA. Dock plan drafting. * Hoffman Hangar, Sandy, OR. Drafting and estimates. * SDAO Port of St. Helens, Scappoose, OR. Draw truss elevation, connection detail and end elevation. * Mt. Haye's Properties, Delta Junction, AK. Drafting and estimates. * Public School District, Beaumont, TX. Site inspections and estimates. * Retirement Homes Building, Houston, TX. Site inspections and estimates. C3 Management Group, Inc., Various Projects, Cost Estimator/Quantity Surveyor As cost estimator/quantity surveyor for a construction cost- estimating firm, Daisy performed detailed cost estimates for all 16 CSI divisions of construction from conceptual planning and design through construction bid documents. She performed material take-off at all phases of design, including structural, architectural, mechanical, electrical, civil and landscaping. She prepared estimates that were easily understood by the design team and the owner, resulting in clear direction regarding the scope and quality Page | 5
  • 6. of the project. Projects included: * Oregon State University Engineering Building, Corvallis, OR. Architectural, structural and site work estimates, SD, DD, CD. * IVT Building, Tacoma Community College, Tacoma, WA. Architectural estimates, CD. * WWU Campus Services Facility, WWU, Bellingham, WA. Architectural and structural estimates. * Orting Public Safety Building, Orting, WA. Architectural estimates DD, CD. Matson Carlson & Associates, Inc., Various Projects, Construction Estimator. Daisy was a construction estimator for this construction cost-estimating firm. She performed material take-off for all phases of design, including structural, architectural, mechanical, electrical, civil and landscaping. New City Builders, Inc., Various Projects, Quezon City, Philippines, Project Engineer/Cost Estimator. For this commercial construction firm, Daisy estimated the costs for many different types of high-rise building projects. She also served as project engineer and supervised all subcontractors, prepared variance reports and performed site inspections for ongoing projects. Projects included serving as Project Engineer for the construction of a 32-story Infinity Tower Building. Cotabato City Engineers Office, Various Projects, Cotabato City, Philippines, Field Engineer. As field engineer, Daisy supervised road pavement projects and performed quality control inspections. Masot Construction, Warehouse Project, Cotabato City, Philippines, Draftswoman. Daisy drafted a revised plan for a warehouse project and performed the site inspection to verify the final layout. Page | 6
  • 7. of the project. Projects included: * Oregon State University Engineering Building, Corvallis, OR. Architectural, structural and site work estimates, SD, DD, CD. * IVT Building, Tacoma Community College, Tacoma, WA. Architectural estimates, CD. * WWU Campus Services Facility, WWU, Bellingham, WA. Architectural and structural estimates. * Orting Public Safety Building, Orting, WA. Architectural estimates DD, CD. Matson Carlson & Associates, Inc., Various Projects, Construction Estimator. Daisy was a construction estimator for this construction cost-estimating firm. She performed material take-off for all phases of design, including structural, architectural, mechanical, electrical, civil and landscaping. New City Builders, Inc., Various Projects, Quezon City, Philippines, Project Engineer/Cost Estimator. For this commercial construction firm, Daisy estimated the costs for many different types of high-rise building projects. She also served as project engineer and supervised all subcontractors, prepared variance reports and performed site inspections for ongoing projects. Projects included serving as Project Engineer for the construction of a 32-story Infinity Tower Building. Cotabato City Engineers Office, Various Projects, Cotabato City, Philippines, Field Engineer. As field engineer, Daisy supervised road pavement projects and performed quality control inspections. Masot Construction, Warehouse Project, Cotabato City, Philippines, Draftswoman. Daisy drafted a revised plan for a warehouse project and performed the site inspection to verify the final layout. Page | 6