ac
Aaron Cooper


Mob: 0477425592		 	 E-mail: aaroncooper_9@hotmail.com
Objective
My objective is to gain full time employment as a Rigger continuing within the construction, mining, or oil and
gas industries. I pride my self on my ability to perform the tasks that are given to me in a timely manner with
a high standard of safety and minimum error. I only hope that you consider my offer as becoming a valued
employee.
Qualifications
• Dogman
• Intermediate Rigger
• Elevated Work Platform
• Telescopic Materials Handler
• Forklift
• Working @ Heights
• Confined Space
Completed various training certificates. I.e.: Standard 11, Coal Induction, Defensive Driving, Boat
license.
Experience
Monadelphous - Incitec Pivot Limited
02/16 - 03/16
• Installation and removal of hazardous pipelines, valves, pumps, compressors and rotors.
• Assisting in flange management and pressure testing. Pipe alignment for welding.
• Transferring pipelines via chain block to position.
• Forklift and Tele-handler operations.
• Dogging various lifts on 450t, 110t, 80t and 50t cranes.
Monadelphous – Sino
01/15 – 08/15
• Steel erection, grid mesh and handrail installation from EWP/Dog Box/static lines.
• Installation of gearing and mills.
• Piping Installation small bore and big bore up to 1m.
• Install and removal of blinds and pressure testing on nightshift.
• Chain block work for installation and supporting lines while pressure testing.
• Forklift and Tele-handler operations
• Dogging 400t, 220t, 200t, 75t and 80t cranes as well as some Franna work.
CQField Maintenance – BMA
07/14 – 11/14
• Rope changeover, walking-gear assembly and removal.
• Removal and replacement of all internal gearing, lowering dragline boom.
• Forklift and Tele-handler operations.
• Dogging various lifts on 250t, 150t,80t and 50t cranes as well as some Franna work.
Monadelphous - BMA
01/14 – 06/14
• Major lifts on the shutdown 15t-55t.
• Rope changeover, walking-gear assembly and removal.
• Removal and replacement of all internal gearing, lowering dragline boom.
• Forklift and Tele-handler operations.
• Dogging various lifts on 250t, 150t,80t and 50t cranes as well as some Franna work.
Thiess – Bechtel
04/13 – 12/13
• Construction of the wash plant and filter building on the Caval Ridge mine site.
• Mostly steel erection and pipe and component installation from EWP.
• Forklift and Tele-handler operations.
• Dogging 300t,160t,110,80t and 55t cranes as well as some Franna work.
Monadelphous – BMA
06/11 – 02/13
• Major lifts on the shutdown 15t-55t.
• Rope changeover, walking-gear assembly and removal.
• Removal and replacement of all internal gearing, lowering dragline boom.
• Forklift and Tele-handler operations.
• Dogging various lifts on 250t, 150t,80t and 50t cranes as well as some Franna work.
Transfield Services Ltd. – BMA
11/10 – 03/11
• Major lifts on the shutdown 15t-55t.
• Rope changeover, walking-gear assembly and removal.
• Removal and replacement of all internal gearing, lowering dragline boom.
• Forklift and Tele-handler operations.
• Dogging various lifts on 250t, 150t,80t and 50t cranes as well as some Franna work.
United Group Resources - BMC
04/10 – 10/10
• Major lifts on the shutdown 15t-55t.
• Rope changeover, walking-gear assembly and removal.
• Removal and replacement of all internal gearing, lowering dragline boom.
• Forklift and Tele-handler operations.
• Dogging various lifts on 250t, 150t,80t and 50t cranes as well as some Franna work.
!2
Boom Logistics - General Hire
02/09 – 03/10
• Cranes involved include 18t, 20t, and 25t Franna’s
• 50t and 55t Kato’s,
• 220t,200t, 160t,130t, and 100t hydraulic Tadano and Grove models.
• Tasks include lifting of dragline buckets dual and singular lifts.
• Lifting various plant and items onto mine float ie; Graders, Dozer blades, power plants etc.
• Dogbox work and various lifts involved in swapping out old for new parts
• General lifts in town.
Monadelphous - Rio Tinto
04/08 – 11/08
• Construction of several iron ore transfer stations.
• Leading hand of a crew of 8 completing several transfer stations with very few punch-list items.
• Dogging various cranes on site- 275t Liebherr, various franna’s, 75t Grove roughie etc.
• Assisted in the dogging and pinning of a 75t slide pulley unit.
• Also completed the largest transfer station on site with a crew of 8, ahead of schedule and being
awarded for a high safety standard whilst still having less than 10 items on our punch list at pre
handover assessment, with recommendation from site overseer’s Sinclair Knight Merz (SKM).
Laing O’Rourke - Western Corridor
06/07 – 04/08
• Rigger on an advanced reverse osmosis water treatment plant in the southern hemisphere.
• Construction and cosmetics on all the substations
• Dogging for tower cranes, 100t and 110t Liebherr, 20 & 25t Franna.
• Rigging pipe work in Main Process and Chemical transfer stations.
• Various tasks for civil workers i.e. Redline- laying 700mm pipeline, 60 meters of, dogging excava-
tor.
Albem Operations – Brisbane Port
03/06 - 04/07
• Working as a rigger/dogger on the heavy lift crew and pile driving crew
• Dogging a 100t concrete ecosol unit from the water whilst diving(to unscrew the rigging gear).
• Assembling pile-driving frame, Driving over 400 pylons.
• Installation of a series of concrete storm water units weighing between 20 – 100t.
• General Labouring - included stripping formwork from underneath wharf onto loading barges.
• Operation of forklift and site vehicles, some formwork, concrete pours, onsite fabrication, welding
and oxy cutting.
Referees
Warren Waller Monadelphous Supervisor 0428186115
Mannie Combrinck Monadelphous Supervisor 0408628084
Nathan Fernley Thiess/Bechtel Supervisor 0407639647
Mick Fernley Bechtel Supervisor 0437826244
Dallas Brown Monadelphous Supervisor 0400548432
!3

Resume 2016

  • 1.
    ac Aaron Cooper 
 Mob: 0477425592 E-mail: aaroncooper_9@hotmail.com Objective My objective is to gain full time employment as a Rigger continuing within the construction, mining, or oil and gas industries. I pride my self on my ability to perform the tasks that are given to me in a timely manner with a high standard of safety and minimum error. I only hope that you consider my offer as becoming a valued employee. Qualifications • Dogman • Intermediate Rigger • Elevated Work Platform • Telescopic Materials Handler • Forklift • Working @ Heights • Confined Space Completed various training certificates. I.e.: Standard 11, Coal Induction, Defensive Driving, Boat license. Experience Monadelphous - Incitec Pivot Limited 02/16 - 03/16 • Installation and removal of hazardous pipelines, valves, pumps, compressors and rotors. • Assisting in flange management and pressure testing. Pipe alignment for welding. • Transferring pipelines via chain block to position. • Forklift and Tele-handler operations. • Dogging various lifts on 450t, 110t, 80t and 50t cranes. Monadelphous – Sino 01/15 – 08/15 • Steel erection, grid mesh and handrail installation from EWP/Dog Box/static lines. • Installation of gearing and mills. • Piping Installation small bore and big bore up to 1m. • Install and removal of blinds and pressure testing on nightshift. • Chain block work for installation and supporting lines while pressure testing. • Forklift and Tele-handler operations • Dogging 400t, 220t, 200t, 75t and 80t cranes as well as some Franna work.
  • 2.
    CQField Maintenance –BMA 07/14 – 11/14 • Rope changeover, walking-gear assembly and removal. • Removal and replacement of all internal gearing, lowering dragline boom. • Forklift and Tele-handler operations. • Dogging various lifts on 250t, 150t,80t and 50t cranes as well as some Franna work. Monadelphous - BMA 01/14 – 06/14 • Major lifts on the shutdown 15t-55t. • Rope changeover, walking-gear assembly and removal. • Removal and replacement of all internal gearing, lowering dragline boom. • Forklift and Tele-handler operations. • Dogging various lifts on 250t, 150t,80t and 50t cranes as well as some Franna work. Thiess – Bechtel 04/13 – 12/13 • Construction of the wash plant and filter building on the Caval Ridge mine site. • Mostly steel erection and pipe and component installation from EWP. • Forklift and Tele-handler operations. • Dogging 300t,160t,110,80t and 55t cranes as well as some Franna work. Monadelphous – BMA 06/11 – 02/13 • Major lifts on the shutdown 15t-55t. • Rope changeover, walking-gear assembly and removal. • Removal and replacement of all internal gearing, lowering dragline boom. • Forklift and Tele-handler operations. • Dogging various lifts on 250t, 150t,80t and 50t cranes as well as some Franna work. Transfield Services Ltd. – BMA 11/10 – 03/11 • Major lifts on the shutdown 15t-55t. • Rope changeover, walking-gear assembly and removal. • Removal and replacement of all internal gearing, lowering dragline boom. • Forklift and Tele-handler operations. • Dogging various lifts on 250t, 150t,80t and 50t cranes as well as some Franna work. United Group Resources - BMC 04/10 – 10/10 • Major lifts on the shutdown 15t-55t. • Rope changeover, walking-gear assembly and removal. • Removal and replacement of all internal gearing, lowering dragline boom. • Forklift and Tele-handler operations. • Dogging various lifts on 250t, 150t,80t and 50t cranes as well as some Franna work. !2
  • 3.
    Boom Logistics -General Hire 02/09 – 03/10 • Cranes involved include 18t, 20t, and 25t Franna’s • 50t and 55t Kato’s, • 220t,200t, 160t,130t, and 100t hydraulic Tadano and Grove models. • Tasks include lifting of dragline buckets dual and singular lifts. • Lifting various plant and items onto mine float ie; Graders, Dozer blades, power plants etc. • Dogbox work and various lifts involved in swapping out old for new parts • General lifts in town. Monadelphous - Rio Tinto 04/08 – 11/08 • Construction of several iron ore transfer stations. • Leading hand of a crew of 8 completing several transfer stations with very few punch-list items. • Dogging various cranes on site- 275t Liebherr, various franna’s, 75t Grove roughie etc. • Assisted in the dogging and pinning of a 75t slide pulley unit. • Also completed the largest transfer station on site with a crew of 8, ahead of schedule and being awarded for a high safety standard whilst still having less than 10 items on our punch list at pre handover assessment, with recommendation from site overseer’s Sinclair Knight Merz (SKM). Laing O’Rourke - Western Corridor 06/07 – 04/08 • Rigger on an advanced reverse osmosis water treatment plant in the southern hemisphere. • Construction and cosmetics on all the substations • Dogging for tower cranes, 100t and 110t Liebherr, 20 & 25t Franna. • Rigging pipe work in Main Process and Chemical transfer stations. • Various tasks for civil workers i.e. Redline- laying 700mm pipeline, 60 meters of, dogging excava- tor. Albem Operations – Brisbane Port 03/06 - 04/07 • Working as a rigger/dogger on the heavy lift crew and pile driving crew • Dogging a 100t concrete ecosol unit from the water whilst diving(to unscrew the rigging gear). • Assembling pile-driving frame, Driving over 400 pylons. • Installation of a series of concrete storm water units weighing between 20 – 100t. • General Labouring - included stripping formwork from underneath wharf onto loading barges. • Operation of forklift and site vehicles, some formwork, concrete pours, onsite fabrication, welding and oxy cutting. Referees Warren Waller Monadelphous Supervisor 0428186115 Mannie Combrinck Monadelphous Supervisor 0408628084 Nathan Fernley Thiess/Bechtel Supervisor 0407639647 Mick Fernley Bechtel Supervisor 0437826244 Dallas Brown Monadelphous Supervisor 0400548432 !3