SlideShare a Scribd company logo
Mark McCroy
241 Spring Creek Gate Canmore Alberta T1W-2G2
E-mail mmccroy@hotmail.com
403-707-5122 or 780-884-1534
Professional Summary;
I am a professional Millwright with experience spanning SAGD, Mining, Commissioning, Maintenance,
Field Service and shut down work in the oil and gas and forestry industries. I am a team leader and goal orientated
Millwright who pays attention to detail. I've created great customer service relationships with all of my clients.
Professional History;
Commissioning Millwright: FT Services CNRL Horizon Site Open Pit Mine (2016-Present)
Key Responsibilities:
• Commissioned Froth Treatment Slurry Pumps, Vertical Pumps, Sump Pumps and Liquid ring compressors.
• Responsible for writing maintenance procedures for Weir high pressure slurry pumps, Flowserve vertical
pumps, and Toyo slurry pumps.
• Developed start up procedures to eliminate and limit any possible down time upon startup of equipment.
• Worked in Microsoft Word and Excel tracking systems and equipment onto spread sheets.
• Worked in McLaren, Maximo and JDE to log in all systems and associated equipment.
• Performed system walk down checks and sign off duties for pipe strain and alignments.
• Replaced packing and mechanical seals.
• Planned maintenance outages.
(Shut downs) 2014-2016
Millwright: Clear stream Energy ANC Pulp and Paper Mill
• Tore down and rebuilt high speed turbine pumps
• Responsible for General plant maintenance (Installed pressure gauges, ran tube lines, fitted pipe, lubricated
equipment)
Millwright:JV Driver Kearl Lake Open Pit Mine
• Plant maintenance on pumps, conveyors, crushers, shakers, screens and gear box's
Millwright: Bula Millwrights Kearl Lake Open Pit Mine
• Team member involved in a full tear down and rebuild of an Double Roll crusher including bearings
• Removed and replaced head pulley and tension pulley's on conveyor belt
• Replaced conveyor belt rollers
• Installed new shaker box's with screens
• Accomplished full OPP maintenance in timely, safe, incident free manner limiting down time by 40%
Commissioning Millwright: Quinn Contracting Commissioning Husky Sunrise Site (07/2015-10/2015)
Key Responsibilities:
• Start up and commissioning of hydraulic, pneumatic, gas and fluid systems
• Replaced mechanical seals on vertical and horizontal centrifugal pumps
• Preformed rebuilds on liquid ring compressors
• Took vibration base readings on pumps, motors and compressors
• Rebuilt and reinstated Milton Roy diaphragm pumps
• Achieved laser alignments between motors and rotating equipment
Accomplishments:
• Accomplished the full commissioning of a SAGD facility one month ahead of schedule
• Established a safe working relationship with client (Husky Energy)
Construction Millwright: Bula Millwrights Kearl Lake (Imperial Oil) Open Pit Mine: Surmont Phase 2 (Conoco
Phillips) SAGD Facility: Sunrise Site (Husky Energy) SAGD Facility: (2014-2015)
Key Responsibilities:
• Installed and aligned crusher roll gear boxes, cardan shaft and fluid coupling
• Built conveyor trains including gear box and motor installations for head pulleys
• Installed sizer and sizer gear box primary and secondary stages
• Manufactured lube oil skids for pumps
• Preformed pipe strain on slurry pumps and compressors
• Worked with 80/100 ton cranes rigging and hoisting
• Achieved laser alignments on pumps and compressors within .002”
• Installed and leveled pump skids and motors
• Preformed maintenance duties with centrifugal pumps and compressors
• Team leader for multiple sign off duties (Laser alignments and pipe strain within .002”)
• Installed, aligned and tensioned aerial cooling fin fans to API specifications
Accomplishments:
• Achieved a 20% increase in production by implementing new procedures on pump installations
• Completed new construction with over 1000 days incident and injury free
• Completed high pressure tasks ahead of schedule by a 30% margin
• Established a safe working relationship with client and other on-site trades
• Received safety awards for outstanding on job performance
Shop Maintenance Millwright: Blowertech LTD. (2013-2014)
Key Responsibilities:
• Preformed tear down, cleaning and rebuilds on lobe blowers
• Tore down and rebuilt Bird 900 centrifuge including commissioning and vibration readings
• Multistage centrifugal compressor rebuilds
• Vane compressor maintenance
• Gear box repairs and maintenance
• Achieved Dynamic balancing on compressor impellers, blower lobes and pump impellers to API standard
• Preformed welding duties including Arc, Mig and Ox-Acetylene torch cutting
• Rebuilt vertical and horizontal centrifugal pumps
• Removed and installed bearings on rotating equipment
• Set timing gears for pumps and lobe blowers
• Responsible for operating 10 ton overhead crane and forklift
Accomplishments:
• Implemented procedures to cut maintenance rebuilds by 10%
• Increased company profits by 5% by implementing compatibility between machine shop and Millwrights
• Established outstanding customer service relationships with all of our clients
Field Service Millwright Technician: Precision Pump Service (2013-2013)
Key Responsibilities:
• Start up and commissioning of well pad process pumps
• Installed pumps and motors
• Pipe strain on pumps
• Achieved laser alignments between pumps and motors to within .002”
• Leveled pump skids
• Performed live plant maintenance on double screw, multistage, diaphragm and centrifugal pumps
• Installed and maintained seal flush systems
• Installed and maintained screw pumps, diaphragm pumps, and horizontal barrel pumps
• Installed mechanical seals
• Set timing gears
• Installed and removed bearings
• Responsible for driving, cleaning and maintaining service truck
Accomplishments:
• Established customer service relationships with all of our clients
• Preformed call out duties in a timely manner, reducing plant down time by 10-20%
• Operated service vehicle with zero incidents
Construction Millwright: Strike Energy Services Kirby Lake (CNRL) (2012-2013)
Key Responsibilities:
• Pipe strain on pumps and compressors
• Installed and aligned rotating equipment
• Fabricated seal flush and lube systems for pumps and compressors
• Worked with 100 ton cranes rigging and hoisting
• Installed and aligned belt and chain driven equipment
• Preformed multiple sign off duties (Pipe strain and Laser alignments within .002”)
• Worked as a pipe fitter in water treatment building and main pipe rack
Accomplishments:
• Responsible for overseeing work duties in water treatment building
• Completed new construction with 1 million man hours incident free
• Received safety awards for outstanding on the job performance
Certifications;
• Red Seal Millwright, completed 4th
year and Inter-provincial exam at S.A.I.T.
• PST-CSTS, H2S Alive, OSSA, Confined Space Entry, Fall Arrest, First Aid, Fit tested full face and half face
(All Current)
• Class 5 Drivers License
• Small Engine Repair Certificate
• Worked in Maximo, McLaren and JDE maintenance search engines.
• Familiar with Microsoft Word and Excel.
References available upon request.

More Related Content

What's hot

Brand new davy jenkins cv
Brand new davy jenkins cvBrand new davy jenkins cv
Brand new davy jenkins cv
davy jenkins
 
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr DriveStorm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Fairfax County
 
Richie New CV 2016
Richie  New CV 2016Richie  New CV 2016
Richie New CV 2016Richard Ward
 
Kevin Quigley Portfolio Condensed
Kevin Quigley Portfolio CondensedKevin Quigley Portfolio Condensed
Kevin Quigley Portfolio Condensedkevin quigley
 
PROJECT-List_Attach_A_Jim Benge 6-14
PROJECT-List_Attach_A_Jim Benge 6-14PROJECT-List_Attach_A_Jim Benge 6-14
PROJECT-List_Attach_A_Jim Benge 6-14Jim Benge
 
Noble_Esemitodje_Resume_February_2017
Noble_Esemitodje_Resume_February_2017Noble_Esemitodje_Resume_February_2017
Noble_Esemitodje_Resume_February_2017Noble Esemitodje
 
R Lengyel resume for HudBay (1)
R Lengyel resume for HudBay (1)R Lengyel resume for HudBay (1)
R Lengyel resume for HudBay (1)Rob Lengyel
 
Resume KV 2015
Resume KV 2015Resume KV 2015
Resume KV 2015Keith Vary
 
Jeff word resume.doc 4
Jeff word resume.doc 4Jeff word resume.doc 4
Jeff word resume.doc 4Jeff Lyman
 
Jeff word resume.doc 4
Jeff word resume.doc 4Jeff word resume.doc 4
Jeff word resume.doc 4Jeff Lyman
 
Sandher Updated Resume15
Sandher Updated Resume15Sandher Updated Resume15
Sandher Updated Resume15Sandher Subayno
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical EngineerKarthi Keyan
 

What's hot (20)

Brand new davy jenkins cv
Brand new davy jenkins cvBrand new davy jenkins cv
Brand new davy jenkins cv
 
Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117
 
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr DriveStorm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
 
Richie New CV 2016
Richie  New CV 2016Richie  New CV 2016
Richie New CV 2016
 
Kevin Quigley Portfolio Condensed
Kevin Quigley Portfolio CondensedKevin Quigley Portfolio Condensed
Kevin Quigley Portfolio Condensed
 
Newest
NewestNewest
Newest
 
Wiiliam CV update
Wiiliam CV updateWiiliam CV update
Wiiliam CV update
 
SISCO - Presentation SABIC
SISCO - Presentation SABICSISCO - Presentation SABIC
SISCO - Presentation SABIC
 
RESUME_BA
RESUME_BARESUME_BA
RESUME_BA
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 
Resume Bob 6
Resume Bob 6Resume Bob 6
Resume Bob 6
 
PROJECT-List_Attach_A_Jim Benge 6-14
PROJECT-List_Attach_A_Jim Benge 6-14PROJECT-List_Attach_A_Jim Benge 6-14
PROJECT-List_Attach_A_Jim Benge 6-14
 
Noble_Esemitodje_Resume_February_2017
Noble_Esemitodje_Resume_February_2017Noble_Esemitodje_Resume_February_2017
Noble_Esemitodje_Resume_February_2017
 
R Lengyel resume for HudBay (1)
R Lengyel resume for HudBay (1)R Lengyel resume for HudBay (1)
R Lengyel resume for HudBay (1)
 
Resume KV 2015
Resume KV 2015Resume KV 2015
Resume KV 2015
 
Jeff word resume.doc 4
Jeff word resume.doc 4Jeff word resume.doc 4
Jeff word resume.doc 4
 
Jeff word resume.doc 4
Jeff word resume.doc 4Jeff word resume.doc 4
Jeff word resume.doc 4
 
WHETTONMarkResume
WHETTONMarkResumeWHETTONMarkResume
WHETTONMarkResume
 
Sandher Updated Resume15
Sandher Updated Resume15Sandher Updated Resume15
Sandher Updated Resume15
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 

Viewers also liked

My last vacations evidence 3
My last vacations evidence 3My last vacations evidence 3
My last vacations evidence 3
Angie Lopez
 
Presentation on Project of bard
Presentation on Project of bardPresentation on Project of bard
Presentation on Project of bardNittyananda Kumar
 
Secure your Cpanel in 9 advanced tips
Secure your Cpanel in 9 advanced tipsSecure your Cpanel in 9 advanced tips
Secure your Cpanel in 9 advanced tips
Tera Mny
 
My daily routine evidence 2
My daily routine evidence 2My daily routine evidence 2
My daily routine evidence 2
Angie Lopez
 
Apresentação VisionClient
Apresentação VisionClientApresentação VisionClient
Apresentação VisionClient
Isabele Moreira
 
Introduction Ethical hacking by eslam hussein
Introduction Ethical hacking by eslam husseinIntroduction Ethical hacking by eslam hussein
Introduction Ethical hacking by eslam hussein
Eslam Hussein
 
디자인과 문화 1510890 최윤정
디자인과 문화 1510890 최윤정디자인과 문화 1510890 최윤정
디자인과 문화 1510890 최윤정
윤정 최
 
디자인과 문화 1510890 최윤정
디자인과 문화 1510890 최윤정디자인과 문화 1510890 최윤정
디자인과 문화 1510890 최윤정
윤정 최
 
Campaign sherpa 8 16-2011
Campaign sherpa 8 16-2011Campaign sherpa 8 16-2011
Campaign sherpa 8 16-2011
Network Communications
 
Real time web applications with SignalR (BNE .NET UG)
Real time web applications with SignalR (BNE .NET UG)Real time web applications with SignalR (BNE .NET UG)
Real time web applications with SignalR (BNE .NET UG)
brendankowitz
 
Msdn optimizando la performance en la web
Msdn   optimizando la performance en la webMsdn   optimizando la performance en la web
Msdn optimizando la performance en la webAndrés Iturralde
 
Evan Smith -Co-Chair, Avon- Otakaro Network (AvON) and programme Manger, East...
Evan Smith -Co-Chair, Avon- Otakaro Network (AvON) and programme Manger, East...Evan Smith -Co-Chair, Avon- Otakaro Network (AvON) and programme Manger, East...
Evan Smith -Co-Chair, Avon- Otakaro Network (AvON) and programme Manger, East...
SmartNet
 
Dr Colin G. Harrison, IBM Smarter Cities -Seismics and the City 22 March 2012
Dr Colin G. Harrison, IBM Smarter Cities -Seismics and the City 22 March 2012Dr Colin G. Harrison, IBM Smarter Cities -Seismics and the City 22 March 2012
Dr Colin G. Harrison, IBM Smarter Cities -Seismics and the City 22 March 2012
SmartNet
 
ELF14 Cheryl Doig Moving Mindset Keynote presentation
ELF14 Cheryl Doig Moving Mindset Keynote presentationELF14 Cheryl Doig Moving Mindset Keynote presentation
ELF14 Cheryl Doig Moving Mindset Keynote presentation
SmartNet
 
ELF14 Dr Fleur Harris -Consultant, The Learner Education Centre
ELF14 Dr Fleur Harris -Consultant, The Learner Education CentreELF14 Dr Fleur Harris -Consultant, The Learner Education Centre
ELF14 Dr Fleur Harris -Consultant, The Learner Education Centre
SmartNet
 
Going offline with JS (DDD Sydney)
Going offline with JS (DDD Sydney)Going offline with JS (DDD Sydney)
Going offline with JS (DDD Sydney)
brendankowitz
 
The Secret Power of Social Media Success 7-25-2011
The Secret Power of Social Media Success 7-25-2011The Secret Power of Social Media Success 7-25-2011
The Secret Power of Social Media Success 7-25-2011
Network Communications
 
Dr Andrew West Vice Chancellor, Lincoln University - speaking at Seismics and...
Dr Andrew West Vice Chancellor, Lincoln University - speaking at Seismics and...Dr Andrew West Vice Chancellor, Lincoln University - speaking at Seismics and...
Dr Andrew West Vice Chancellor, Lincoln University - speaking at Seismics and...
SmartNet
 

Viewers also liked (20)

Volunteering
VolunteeringVolunteering
Volunteering
 
My last vacations evidence 3
My last vacations evidence 3My last vacations evidence 3
My last vacations evidence 3
 
Presentation on Project of bard
Presentation on Project of bardPresentation on Project of bard
Presentation on Project of bard
 
Secure your Cpanel in 9 advanced tips
Secure your Cpanel in 9 advanced tipsSecure your Cpanel in 9 advanced tips
Secure your Cpanel in 9 advanced tips
 
My daily routine evidence 2
My daily routine evidence 2My daily routine evidence 2
My daily routine evidence 2
 
Apresentação VisionClient
Apresentação VisionClientApresentação VisionClient
Apresentação VisionClient
 
Introduction Ethical hacking by eslam hussein
Introduction Ethical hacking by eslam husseinIntroduction Ethical hacking by eslam hussein
Introduction Ethical hacking by eslam hussein
 
디자인과 문화 1510890 최윤정
디자인과 문화 1510890 최윤정디자인과 문화 1510890 최윤정
디자인과 문화 1510890 최윤정
 
디자인과 문화 1510890 최윤정
디자인과 문화 1510890 최윤정디자인과 문화 1510890 최윤정
디자인과 문화 1510890 최윤정
 
Campaign sherpa 8 16-2011
Campaign sherpa 8 16-2011Campaign sherpa 8 16-2011
Campaign sherpa 8 16-2011
 
Real time web applications with SignalR (BNE .NET UG)
Real time web applications with SignalR (BNE .NET UG)Real time web applications with SignalR (BNE .NET UG)
Real time web applications with SignalR (BNE .NET UG)
 
Mis
MisMis
Mis
 
Msdn optimizando la performance en la web
Msdn   optimizando la performance en la webMsdn   optimizando la performance en la web
Msdn optimizando la performance en la web
 
Evan Smith -Co-Chair, Avon- Otakaro Network (AvON) and programme Manger, East...
Evan Smith -Co-Chair, Avon- Otakaro Network (AvON) and programme Manger, East...Evan Smith -Co-Chair, Avon- Otakaro Network (AvON) and programme Manger, East...
Evan Smith -Co-Chair, Avon- Otakaro Network (AvON) and programme Manger, East...
 
Dr Colin G. Harrison, IBM Smarter Cities -Seismics and the City 22 March 2012
Dr Colin G. Harrison, IBM Smarter Cities -Seismics and the City 22 March 2012Dr Colin G. Harrison, IBM Smarter Cities -Seismics and the City 22 March 2012
Dr Colin G. Harrison, IBM Smarter Cities -Seismics and the City 22 March 2012
 
ELF14 Cheryl Doig Moving Mindset Keynote presentation
ELF14 Cheryl Doig Moving Mindset Keynote presentationELF14 Cheryl Doig Moving Mindset Keynote presentation
ELF14 Cheryl Doig Moving Mindset Keynote presentation
 
ELF14 Dr Fleur Harris -Consultant, The Learner Education Centre
ELF14 Dr Fleur Harris -Consultant, The Learner Education CentreELF14 Dr Fleur Harris -Consultant, The Learner Education Centre
ELF14 Dr Fleur Harris -Consultant, The Learner Education Centre
 
Going offline with JS (DDD Sydney)
Going offline with JS (DDD Sydney)Going offline with JS (DDD Sydney)
Going offline with JS (DDD Sydney)
 
The Secret Power of Social Media Success 7-25-2011
The Secret Power of Social Media Success 7-25-2011The Secret Power of Social Media Success 7-25-2011
The Secret Power of Social Media Success 7-25-2011
 
Dr Andrew West Vice Chancellor, Lincoln University - speaking at Seismics and...
Dr Andrew West Vice Chancellor, Lincoln University - speaking at Seismics and...Dr Andrew West Vice Chancellor, Lincoln University - speaking at Seismics and...
Dr Andrew West Vice Chancellor, Lincoln University - speaking at Seismics and...
 

Similar to Mark McCroy resume

Resume Hanif Shaikh Update (7)
Resume Hanif Shaikh Update (7)Resume Hanif Shaikh Update (7)
Resume Hanif Shaikh Update (7)hanif shaikh
 
Mechanical Technician
Mechanical TechnicianMechanical Technician
Mechanical Technician
subbu manian
 
Resume General qualifications
Resume General qualificationsResume General qualifications
Resume General qualificationsDarin LaCroix
 
20150709 - Americas Industrial Services
20150709 - Americas Industrial Services20150709 - Americas Industrial Services
20150709 - Americas Industrial ServicesMaribel Renteria
 
Resume-Thomas Mathew
Resume-Thomas MathewResume-Thomas Mathew
Resume-Thomas MathewThomas Mathew
 
MUHAMMADF DAUD New CV (1)
MUHAMMADF DAUD New CV (1)MUHAMMADF DAUD New CV (1)
MUHAMMADF DAUD New CV (1)Muhammad Daud
 
Wellington Shumba CV projects
Wellington Shumba CV projectsWellington Shumba CV projects
Wellington Shumba CV projectsweshumba
 
Mechanical cv
Mechanical cvMechanical cv
Mechanical cv
Umar Faruque
 
2015 PT. SEM introduction presentation.pptx
2015 PT. SEM introduction presentation.pptx2015 PT. SEM introduction presentation.pptx
2015 PT. SEM introduction presentation.pptx
DarrenWijaya5
 
Aqeel cv updated
Aqeel cv updatedAqeel cv updated
Aqeel cv updated
aqeel ahmed
 
R mayers_CV 2302
R mayers_CV 2302R mayers_CV 2302
R mayers_CV 2302Rhod Mayers
 
New resume Ivan 2015
New resume Ivan 2015New resume Ivan 2015
New resume Ivan 2015Yvon Gagnon
 

Similar to Mark McCroy resume (20)

Resume Hanif Shaikh Update (7)
Resume Hanif Shaikh Update (7)Resume Hanif Shaikh Update (7)
Resume Hanif Shaikh Update (7)
 
Mechanical Technician
Mechanical TechnicianMechanical Technician
Mechanical Technician
 
MAN CV ud 1.3.16
MAN CV ud 1.3.16MAN CV ud 1.3.16
MAN CV ud 1.3.16
 
Resume General qualifications
Resume General qualificationsResume General qualifications
Resume General qualifications
 
20150709 - Americas Industrial Services
20150709 - Americas Industrial Services20150709 - Americas Industrial Services
20150709 - Americas Industrial Services
 
Resume-Thomas Mathew
Resume-Thomas MathewResume-Thomas Mathew
Resume-Thomas Mathew
 
m.bendris
m.bendrism.bendris
m.bendris
 
MUHAMMADF DAUD New CV (1)
MUHAMMADF DAUD New CV (1)MUHAMMADF DAUD New CV (1)
MUHAMMADF DAUD New CV (1)
 
Wellington Shumba CV projects
Wellington Shumba CV projectsWellington Shumba CV projects
Wellington Shumba CV projects
 
new_cv-2016
new_cv-2016new_cv-2016
new_cv-2016
 
FINAL CV
FINAL CVFINAL CV
FINAL CV
 
Engr,imran cv.cement.
Engr,imran cv.cement.Engr,imran cv.cement.
Engr,imran cv.cement.
 
KONI RESUME
KONI RESUMEKONI RESUME
KONI RESUME
 
dean resume (1)
dean resume (1)dean resume (1)
dean resume (1)
 
Mechanical cv
Mechanical cvMechanical cv
Mechanical cv
 
2015 PT. SEM introduction presentation.pptx
2015 PT. SEM introduction presentation.pptx2015 PT. SEM introduction presentation.pptx
2015 PT. SEM introduction presentation.pptx
 
Aqeel cv updated
Aqeel cv updatedAqeel cv updated
Aqeel cv updated
 
DWresume1215
DWresume1215DWresume1215
DWresume1215
 
R mayers_CV 2302
R mayers_CV 2302R mayers_CV 2302
R mayers_CV 2302
 
New resume Ivan 2015
New resume Ivan 2015New resume Ivan 2015
New resume Ivan 2015
 

Mark McCroy resume

  • 1. Mark McCroy 241 Spring Creek Gate Canmore Alberta T1W-2G2 E-mail mmccroy@hotmail.com 403-707-5122 or 780-884-1534 Professional Summary; I am a professional Millwright with experience spanning SAGD, Mining, Commissioning, Maintenance, Field Service and shut down work in the oil and gas and forestry industries. I am a team leader and goal orientated Millwright who pays attention to detail. I've created great customer service relationships with all of my clients. Professional History; Commissioning Millwright: FT Services CNRL Horizon Site Open Pit Mine (2016-Present) Key Responsibilities: • Commissioned Froth Treatment Slurry Pumps, Vertical Pumps, Sump Pumps and Liquid ring compressors. • Responsible for writing maintenance procedures for Weir high pressure slurry pumps, Flowserve vertical pumps, and Toyo slurry pumps. • Developed start up procedures to eliminate and limit any possible down time upon startup of equipment. • Worked in Microsoft Word and Excel tracking systems and equipment onto spread sheets. • Worked in McLaren, Maximo and JDE to log in all systems and associated equipment. • Performed system walk down checks and sign off duties for pipe strain and alignments. • Replaced packing and mechanical seals. • Planned maintenance outages. (Shut downs) 2014-2016 Millwright: Clear stream Energy ANC Pulp and Paper Mill • Tore down and rebuilt high speed turbine pumps • Responsible for General plant maintenance (Installed pressure gauges, ran tube lines, fitted pipe, lubricated equipment) Millwright:JV Driver Kearl Lake Open Pit Mine • Plant maintenance on pumps, conveyors, crushers, shakers, screens and gear box's Millwright: Bula Millwrights Kearl Lake Open Pit Mine • Team member involved in a full tear down and rebuild of an Double Roll crusher including bearings • Removed and replaced head pulley and tension pulley's on conveyor belt • Replaced conveyor belt rollers • Installed new shaker box's with screens • Accomplished full OPP maintenance in timely, safe, incident free manner limiting down time by 40% Commissioning Millwright: Quinn Contracting Commissioning Husky Sunrise Site (07/2015-10/2015) Key Responsibilities: • Start up and commissioning of hydraulic, pneumatic, gas and fluid systems • Replaced mechanical seals on vertical and horizontal centrifugal pumps • Preformed rebuilds on liquid ring compressors • Took vibration base readings on pumps, motors and compressors • Rebuilt and reinstated Milton Roy diaphragm pumps • Achieved laser alignments between motors and rotating equipment Accomplishments: • Accomplished the full commissioning of a SAGD facility one month ahead of schedule • Established a safe working relationship with client (Husky Energy)
  • 2. Construction Millwright: Bula Millwrights Kearl Lake (Imperial Oil) Open Pit Mine: Surmont Phase 2 (Conoco Phillips) SAGD Facility: Sunrise Site (Husky Energy) SAGD Facility: (2014-2015) Key Responsibilities: • Installed and aligned crusher roll gear boxes, cardan shaft and fluid coupling • Built conveyor trains including gear box and motor installations for head pulleys • Installed sizer and sizer gear box primary and secondary stages • Manufactured lube oil skids for pumps • Preformed pipe strain on slurry pumps and compressors • Worked with 80/100 ton cranes rigging and hoisting • Achieved laser alignments on pumps and compressors within .002” • Installed and leveled pump skids and motors • Preformed maintenance duties with centrifugal pumps and compressors • Team leader for multiple sign off duties (Laser alignments and pipe strain within .002”) • Installed, aligned and tensioned aerial cooling fin fans to API specifications Accomplishments: • Achieved a 20% increase in production by implementing new procedures on pump installations • Completed new construction with over 1000 days incident and injury free • Completed high pressure tasks ahead of schedule by a 30% margin • Established a safe working relationship with client and other on-site trades • Received safety awards for outstanding on job performance Shop Maintenance Millwright: Blowertech LTD. (2013-2014) Key Responsibilities: • Preformed tear down, cleaning and rebuilds on lobe blowers • Tore down and rebuilt Bird 900 centrifuge including commissioning and vibration readings • Multistage centrifugal compressor rebuilds • Vane compressor maintenance • Gear box repairs and maintenance • Achieved Dynamic balancing on compressor impellers, blower lobes and pump impellers to API standard • Preformed welding duties including Arc, Mig and Ox-Acetylene torch cutting • Rebuilt vertical and horizontal centrifugal pumps • Removed and installed bearings on rotating equipment • Set timing gears for pumps and lobe blowers • Responsible for operating 10 ton overhead crane and forklift Accomplishments: • Implemented procedures to cut maintenance rebuilds by 10% • Increased company profits by 5% by implementing compatibility between machine shop and Millwrights • Established outstanding customer service relationships with all of our clients Field Service Millwright Technician: Precision Pump Service (2013-2013) Key Responsibilities: • Start up and commissioning of well pad process pumps • Installed pumps and motors • Pipe strain on pumps • Achieved laser alignments between pumps and motors to within .002” • Leveled pump skids • Performed live plant maintenance on double screw, multistage, diaphragm and centrifugal pumps • Installed and maintained seal flush systems • Installed and maintained screw pumps, diaphragm pumps, and horizontal barrel pumps • Installed mechanical seals • Set timing gears
  • 3. • Installed and removed bearings • Responsible for driving, cleaning and maintaining service truck Accomplishments: • Established customer service relationships with all of our clients • Preformed call out duties in a timely manner, reducing plant down time by 10-20% • Operated service vehicle with zero incidents Construction Millwright: Strike Energy Services Kirby Lake (CNRL) (2012-2013) Key Responsibilities: • Pipe strain on pumps and compressors • Installed and aligned rotating equipment • Fabricated seal flush and lube systems for pumps and compressors • Worked with 100 ton cranes rigging and hoisting • Installed and aligned belt and chain driven equipment • Preformed multiple sign off duties (Pipe strain and Laser alignments within .002”) • Worked as a pipe fitter in water treatment building and main pipe rack Accomplishments: • Responsible for overseeing work duties in water treatment building • Completed new construction with 1 million man hours incident free • Received safety awards for outstanding on the job performance Certifications; • Red Seal Millwright, completed 4th year and Inter-provincial exam at S.A.I.T. • PST-CSTS, H2S Alive, OSSA, Confined Space Entry, Fall Arrest, First Aid, Fit tested full face and half face (All Current) • Class 5 Drivers License • Small Engine Repair Certificate • Worked in Maximo, McLaren and JDE maintenance search engines. • Familiar with Microsoft Word and Excel. References available upon request.