Darren Johnson
Lifting Supervisor - Appointed Person (Lifting Operations A61 Blue Card) & Level 4 Rigger
10 Toddington Drive,
Norton, Stockton on Tees,
Cleveland,
TS20 1RQ
Tel: 01642 890937 (eve)
Mobile: 07879991502
Email: darren.johnson210790@gmail.com
• Appointed person (Lifting Operations) A61 Blue Card trained
• Lifting supervisor responsible for the planning and safe execution of all non/complex lifts on a top tier COMAH, gas processing
plant located on Teesside.
• Adopts methodical and robust working practices, ensuring strict adherence to all control of work, procedural and health & safety
requirements.
• Conscientious team player, able to establish good working relationships across all levels of seniority within project organsiations.
• Highly motivated individual wishing to gain further experience in an offshore environment.
• Rigger trained and OPITO Level 4 qualified.
• HITRA Trained
•
Course Date Completed
• CPCS Appointed Person - Lifting Operations - A61 Blue Card 03.03.16
• OPITO Approved (9099) Rigger Competence Stage 3/4 22.05.15
• Mammoet – Slinging Signaler 03.09.14
• Lifting & Slinging & Overhead crane - Towns Lifting & Testing 15.02.08
• MEWPS For Managers – IPAF 17.02.16
• Telescopic Handler – NPC Training 09.01.15
• Stockton Riverside College – Abrasive Wheels Training 15.10.08
17/06/2013 – Present
Appointed Person - Amec Foster Wheeler
(BP CATS Terminal, Teesside)
• Risk assessment and detailed planning of all lifts on site, in line with stringent BP lifting regulations and requirements.
• Lifting supervisor, responsible for the management and co-ordination of all rigging resources and activities on a daily basis.
• BP ISSOW trained. Approved permit acceptor, responsible for all associated control of work requirements including pre-task
briefings with the work party and supervising the safe execution of lifts.
• Rigging loft management responsible for the inspection of lifting accessories / equipment, completing pre and after use checks
and periodic inspections of all equipment.
13/05/2013 – 07/06/2013
Rigger - SBV Construction
(SSI Redcar Blast Furnace)
• Working as part of multi discipline team installing new pipe work and structural plate around the Tuyer Platform.
Profile
Previous Employment
Qualifications
• Adhering to all lift plans, risk assessment, ppe, permit and all regulations.
• Working safely as a team to meet deadlines.
• Pre use checks carried out on all lifting equipment and accessories before and after use.
• Reinstating the work place.
20/09/2012 – 20/04/2013
Rigger - MC Construction
(Various)
• Working alongside MPI OFFSHORE on their fleet of installation ships, turbine support grillages, strengthening and maintenance
campaigns.
• Working both in shop, on site and offshore installations.
• Following all lift plans, risk assessment, ppe, permit and all regulations were adhered too.
• Working safely as a team to meet deadlines.
• Pre use checks carried out on all lifting equipment and accessories before and after use.
• Reinstating the work place.
16/07/2012 – 17/08/2012
Rigger - Vital Resources
(Newcastle)
• Removal of old pipe work and reinstated with new.
• Adhering to all lift plans, risk assessment, ppe, permit and all regulations.
• Pre use checks carried out on all lifting equipment and accessories before and after use.
• Working safely as a team to meet deadlines.
• Reinstating the work place.
13/06/2012 – 14/07/2012
Rigger - EON
(Castleford)
• Pre use checks carried out on all equipment before and after use.
• Removal of large water pumps for renovation purposes.
• Following all procedures and wearing full ppe at all times.
• Working out the weight of the lift and the correct equipment to be used to carry out the lift safely taking into account the angles of
the straps and decreasing strength of the slings on chokes and hitches.
• Reinstating the work place.
20/10/2011 – 12/02/2012
Rigger - SSI
(Redcar Blast Furness)
• Installing staves in the skin of the furness.
• Conducting lifts, to and from, the top of the furness.
• Installing units to the four pot holes of the furness.
• Ensuring pre-used checks on equipment.
• Following all procedures and protocols, wearing PPE at all times.
• Reinstating the work place.
Available on request
Craig Wreglesworth
Onshore Site Manager
BP CATS Terminal
Seal Sands
Tel – 01642 331204
REFERENCES

Darren Johnson CV

  • 1.
    Darren Johnson Lifting Supervisor- Appointed Person (Lifting Operations A61 Blue Card) & Level 4 Rigger 10 Toddington Drive, Norton, Stockton on Tees, Cleveland, TS20 1RQ Tel: 01642 890937 (eve) Mobile: 07879991502 Email: darren.johnson210790@gmail.com • Appointed person (Lifting Operations) A61 Blue Card trained • Lifting supervisor responsible for the planning and safe execution of all non/complex lifts on a top tier COMAH, gas processing plant located on Teesside. • Adopts methodical and robust working practices, ensuring strict adherence to all control of work, procedural and health & safety requirements. • Conscientious team player, able to establish good working relationships across all levels of seniority within project organsiations. • Highly motivated individual wishing to gain further experience in an offshore environment. • Rigger trained and OPITO Level 4 qualified. • HITRA Trained • Course Date Completed • CPCS Appointed Person - Lifting Operations - A61 Blue Card 03.03.16 • OPITO Approved (9099) Rigger Competence Stage 3/4 22.05.15 • Mammoet – Slinging Signaler 03.09.14 • Lifting & Slinging & Overhead crane - Towns Lifting & Testing 15.02.08 • MEWPS For Managers – IPAF 17.02.16 • Telescopic Handler – NPC Training 09.01.15 • Stockton Riverside College – Abrasive Wheels Training 15.10.08 17/06/2013 – Present Appointed Person - Amec Foster Wheeler (BP CATS Terminal, Teesside) • Risk assessment and detailed planning of all lifts on site, in line with stringent BP lifting regulations and requirements. • Lifting supervisor, responsible for the management and co-ordination of all rigging resources and activities on a daily basis. • BP ISSOW trained. Approved permit acceptor, responsible for all associated control of work requirements including pre-task briefings with the work party and supervising the safe execution of lifts. • Rigging loft management responsible for the inspection of lifting accessories / equipment, completing pre and after use checks and periodic inspections of all equipment. 13/05/2013 – 07/06/2013 Rigger - SBV Construction (SSI Redcar Blast Furnace) • Working as part of multi discipline team installing new pipe work and structural plate around the Tuyer Platform. Profile Previous Employment Qualifications
  • 2.
    • Adhering toall lift plans, risk assessment, ppe, permit and all regulations. • Working safely as a team to meet deadlines. • Pre use checks carried out on all lifting equipment and accessories before and after use. • Reinstating the work place. 20/09/2012 – 20/04/2013 Rigger - MC Construction (Various) • Working alongside MPI OFFSHORE on their fleet of installation ships, turbine support grillages, strengthening and maintenance campaigns. • Working both in shop, on site and offshore installations. • Following all lift plans, risk assessment, ppe, permit and all regulations were adhered too. • Working safely as a team to meet deadlines. • Pre use checks carried out on all lifting equipment and accessories before and after use. • Reinstating the work place. 16/07/2012 – 17/08/2012 Rigger - Vital Resources (Newcastle) • Removal of old pipe work and reinstated with new. • Adhering to all lift plans, risk assessment, ppe, permit and all regulations. • Pre use checks carried out on all lifting equipment and accessories before and after use. • Working safely as a team to meet deadlines. • Reinstating the work place. 13/06/2012 – 14/07/2012 Rigger - EON (Castleford) • Pre use checks carried out on all equipment before and after use. • Removal of large water pumps for renovation purposes. • Following all procedures and wearing full ppe at all times. • Working out the weight of the lift and the correct equipment to be used to carry out the lift safely taking into account the angles of the straps and decreasing strength of the slings on chokes and hitches. • Reinstating the work place. 20/10/2011 – 12/02/2012 Rigger - SSI (Redcar Blast Furness) • Installing staves in the skin of the furness. • Conducting lifts, to and from, the top of the furness. • Installing units to the four pot holes of the furness. • Ensuring pre-used checks on equipment. • Following all procedures and protocols, wearing PPE at all times. • Reinstating the work place. Available on request Craig Wreglesworth Onshore Site Manager BP CATS Terminal Seal Sands Tel – 01642 331204 REFERENCES