Sea Port Construction, Project Execution PlanDavid H Moloney
Details of how a Sea Port is constructed, and how the progress, safety and quality will be monitored and controlled. Also the measures to ensure that the site is environmentally friendly.
Sea Port Construction, Project Execution PlanDavid H Moloney
Details of how a Sea Port is constructed, and how the progress, safety and quality will be monitored and controlled. Also the measures to ensure that the site is environmentally friendly.
ModularityCheck - A Tool for Assessing Modularity using Co-Change ClustersMarco Tulio Valente
ModularityCheck is an Eclipse plug-in that supports an alternative form to understand and assess package modularity based on co-change clusters, which are collections of highly interrelated classes considering co-change relations
Oplæg om sociale medier i grønland og tips til at komme igang på Twitter. Oplægget blev holdt på et medlemsmøde i Arctic business network forud for Future greenland konferencen.
Take in the UNESCO World Heritage Site of Angkor Wat, ancient capital of Angkor Thom and other famous Siem Reap’s temples
Embark on a boat trip to visit the fascinating stilted village on Tonle Sap Lake
Visit the lesser known Sambor Prei Kuk pre-Angkorian ruins
Glittering Royal Palace & The National Museum which contains many Angkorian artifacts by Cyclo, an original Phnom Penh mean of transportation
Enjoy 1 hour evening boat cruise along Mekong River to view the spectacular sunset
Eco-tourism adventures amongst the waterfalls and trails at Kirirom National Park is a fun way to lean of the authentic Cambodian country life
Relax amongst the rivers and mangroves of the unique 4 Rivers Floating Lodge
Relax at the end of a Cambodian journey with a 3 night stay in Sihanoukville
I have been working as an Experienced Rigger since 1993 at many locations within Nigeria and around African countries. As a Rigger Foreman and Coating Application Technician, with a dynamically positioned derrick/lay barges, the barge is the ideal barge for pipe lay and construction activities in deep water fields. Equipped with both “S” and “J” configuration & pipe lay capabilities, in excess of 1000 tons and also perform tie – in and support functions. In West Africa, the Gulf of Mexico and Brazil.
The work has ranged from ships and barges. Installation of pipeline in Oil/Gas fields, platforms, decks, jackets, risers. Etc.
1. MICHAEL MOUNT
ONSHORE & OFFSHORE: L 4 RIGGER / L 1 ROPE ACCESS TECHNICIAN
AVAILABILITY: TO BE ARRANGED
14, Westbourne Grove, Chesterfield, Derbyshire, UK. S40 3QD.
► Tel Mobile: +44 (0) 7969 888 344
► Tel Home: +44 (0) 1246 201267
► Email: mickmount@gmail.com
► Nationality: British
► Vantage No: 1422301
Personal Profile:
A highly motivated, confident and experienced Rigger, capable of working as part of a busy team and alone
when required. Diversely trained and multi-skilled in varying operations and projects, I am currently seeking
to gain new responsibilities within a progressive organisation, in a role which will utilise the adaptability and
operational skills personally gained through a proactive and challenging career. All my tasks are approached
with a tenacious work attitude, drawing on a wide ranging technical expertise. Willing to work in any
location, having no issues in being away from home for long periods of time. I keep my skills updated as an
aid to both my personal and professional development.
Key Skills:
► Team working/building and excellent communication skills
► Excellent awareness of HSE gained through experience in construction and heavy lifting
► The ability to ensure quality and safety are maintained throughout all projects
► Working in conjunction with Site Management teams
► Reliable, flexible and adaptable
► Maintaining work logs and diaries
► Full Health & Safety awareness
► Computer and IT skills
Occupational Certificates:
► OPITO: Rigger – Level 4
► NVQ: Diploma in Moving Engineering Loads – Level 3
► IRATA: Rope Access Technician – Level 1
► ECITB NVQ: Slinger & Signaller
► ECITB: Safety Passport
► CPCS: Competent Operator
► Work at Heights Unit 2
► IPAF: Power Assisted Licence ( 3a & 3b )
► Confined Spaces Certificate
► B.O.S.I.E.T & M.I.S.T ( 9 modules )
CA-EBS
SBM 52.2 cm
Face Fits
Work at Heights
► Offshore Medical Approval Certificate
► Norwegian Offshore Medical Certificate
► Norwegian Escape Chute
Employment History:
2. Present: Aker Solutions Ltd _ Rigger
Currently employed as a Rigger on the Solan Project
Ad-Hoc 2/2
Sept 2015: Whittaker Engineering Ltd – Rigger
Employed as a rigger on FPSO – EnQuest Producer.
Ad-Hoc 2/2
The removal and replacement of valves and spools.
Working as a member of a team following lift plans, using chain blocks and pull lifts.
Complying with LOLER and PUWER regulations.
May 2015 – Aug 2015: Unit Birwelco Ltd – Rigger
Conoco 66 Oil Refinery Immingham
Working on Alkylation plant in 2.5 PPE and Mask
Removal and replacement of spools, bundles, exchangers etc, using blocks or cranes.
Jan 2015 – May 2015: Fairport Engineering Ltd – Rigger
► The removal and replacement of latticework and steel beams
► Organisation and implementing lifts
► Manual handling
Jul 2014 – Dec 2014: Whittaker Engineering – Rigger & Chargehand
► Ad hoc 3/1
► Working on EnQuest Producer ( FPSO )
► Lifting heavy loads
► Replacing and removing spools and pipe supports
► Rigging and de-rigging installation of steel work
► Working in tanks, fitting valves alongside pipe fitters and platers
► Manual handling
Feb 2014 – Jul 2014: Bi – Fab NRL Ltd – Rigger & Erector
► Worked for land and sea resources building the Solan Jacket and Topside for Premier Oil
► Installation of cans, risers, platforms and the Jacket Spreader beams which weigh in the region
of 300 tonnes in preparation for lifting
► Strand jacks, bottles and grillage prepared and installed
► Working from the man baskets at heights as a Banksman to the crane driver, giving directions
via radio communications
► Ground level Banksman, communications to crane drivers and on occasions when tandem lifts
are being performed
► Slinging and rigging using chain blocks, pull lifts and tirfors
► Working as part of a team and at an individual level, when required by the rigging Supervisor
Feb 2014: Sub-Contracted to TRAC – Rope Access Technician
► Various geotechnical work, including rigging, drilling and applications of large steel wires into
rock bed
► Installation of safety netting using Rope Access techniques to prevent rock fall and ensure the
3. safety to the public
► Rigging and installation of netting on 100m rock face
► Drilling and preparing holes in rocks for explosive work
Sep 2013 – Feb 2014: S P ( Fabrications ) 2007 Ltd – Rigger & Slinger Signaller
► Sub-contracted to National Grid
► The Installation and dismantling of Hack Conveyors
Aug 2013 – Sep 2013: Doosan Babcock – Erector & Rigger Technician
► I was employed at Grangemouth Oil Refinery
► Following all Method Statements and Risk Assessments as per company policy
► Implementation and operation of safe system of work
► Removal and replacement of valves of various size and weights
► Supervising Crane activities
Jun 2013 – Aug 2013: Chicago Bridge & Iron – Rigger
► All rigging duties as required at Sheffield Power Station
Dec 2012 – Jun 2013: Shaw Group Ltd – Rigger & Erector
► All rigging duties as required at Sleaford Power Station
Jun 2012 – Dec 2012: Daniel J Kilburn Ltd – Rigger
► Employed at the Gwynt Y Mor Offshore Windfarm Project
► Rigging various pieces of equipment for transition joint pit site set up. Equipment includes sub
sea quadrants, diablo beach rollers, bruce anchors, 10te mobile winch, site cabins and welfare
► Cable landfall, beach compound and beach set up in preparation of export cable landing.
Quadrant rigging and assembly at low water level, roller position at 5m centre along cable route.
► Inspect, report and quarantine of any damaged and faulty rigging equipment
Feb 2012 – Jun 2012: A J S Contracts Ltd – Rigger & Erector
► Erection of Logging Plant and installation of Gear Boxes and Conveyors in West Scotland
► Installation of Waste Management Plant, steel and various types of machinery and conveyors in
Nottingham
► Refurbishment of Bio-Mass Plant at Ironbridge Power Station
2011 – 2012: S P Fabrications ( 2007 ) Ltd – Erector
► Erection of conveyors at coal and sand quarries
► Working for National Grid in the erection of Hack conveyors
All previous roles were involved in Rigging & Erecting, full details available on request:-
2011: R.J.D Engineering Company
2010: H.S Carlsteel Engineering Ltd
2009: Promanex
2008: Doosan Babcock
2000 – 2008: S P Services Ltd
1998 – 2000: Senior Thermal International
1992 – 1998: The Royal Oak – Landlord of a Public House
1988 – 1992: S Haywood & Sons Ltd
Hobbies & Interests:
4. My personal time is very important to me and as such, I choose to spend it with my family by enjoying
meals out, shows and holidays abroad. I am an avid Scuba Diver and try to fit in as much dive time as
possible, particularly on holidays, where my son can now join me in our joint interest.
References:
Personal and employment references are available on request.