CURRICULUM VITAE
RAVINDRA BHARAT KAUTHALIKAR
CURRENT POSITION QUALIFICATIONS
Planning Manager M. Tech (Civil Engineering)
ISO 9000 Series Lead Auditor (Certificate No: 27352-91480)
Primavera Project Planner P6 (Version-8.1), Primavera 3, MSP
E-Mail: ravindrakauthalikar@gmail.com Mobile No: (Oman +968 94885875), (India +91 9420436861)
EXPERIENCE, SKILLS AND CORPORATE FOCUS
Highly skilled, results-driven post graduate civil engineer with 19 years of professional experience. During the nine
plus years spent in United Arab Emirates and Oman, I have been involved in a number of multimillion dollar projects
ranging from five star hotels, Shopping Malls, Airport, Commercial and residential high rise buildings and Water park.
I have particular expertise in contract programmes, periodic progress monitoring & updating, delay analysis,
extension of Time claims, and Tender programmes.
I posses a keen ability to multitask and can plan, develop, and coordinate multiple projects simultaneously. Highly
motivated, a self-starter, excellent team player. I keep myself abreast with the current technological developments
and industry trends.
PROFESSIONAL EXPERIENCE
Employer Shapoorji Pallonji Mideast LLC, Oman
Period December 2015 – Till date
Position Senior Planning Manager
Project Royal Oman Police Residential Apartments and Villas,Muscat Oman(OMR 43 Million)
Employer Self Employed as Senior Consultant (Freelancer)
Associated with ConfluenceTBH (India)
Period August 2013 – November 2015
Position Senior Consultant
Employer Al Jaber L.E.G.T. Engineering & contracting (ALEC) LLC., Dubai (UAE)
Period June 2004 – January 2013
Position Project Planning Engineer (March-2007 Till January 2013)
Planning & Scheduling
 Prepare Cost and Resource loaded Baseline Programme
 Preparation of Progress ‘S ‘curves
 Manpower Histogram
 Measure Project performance ((SV,SPI, CV,CPI)Schedule and Cost performance Indices)
 Dashboard/ Key Performance Indicators (KPIs)
 Tracking E1 (Drawings tracking) and E2 (Materials tracking) Logs.
 Procurement Schedule (Long lead items), Sub-contractor log
 Delay Event Register
 Tender Programmes
Construction Phase
 Progress monitoring and periodic progress updates of contractual baseline programme.
Record actual against planned.
 Preparation of daily, weekly & monthly progress reports in line with client requirements.
 Participating and giving planning inputs in Progress and Management meetings (Internal/
Client/Consultant)
 Preparation of look ahead schedule
 Prepare and monitor Working programmes
 To assist the Project Head by giving planning inputs about the Red Flagged/ Critical
items in the project.
 Reviewing and Monitoring Subcontractor's Programme
Analysis & Reporting
 Preparation of Delay analysis, EOT claims etc.
 Earned Value Management
 Project Risks - Identify. Mitigation measures.
 Preparation of Recovery Programme
Position Senior QA/QC Engineer (June 2004 - February 2007)
 To assist QA/QC Manager in preparing Inspection Test Plan (ITP)
 To assist QA/QC Manager in identifying, documenting and providing solutions for Non-
Conformances (NCR), Corrective & Preventive actions.
 To conduct and co-ordinate inspections & testing activities as per ITP and specifications.
 Monitoring the material received on site.
 To assist and control QA/QC inspector’s works.
LIST OF PROJECTS
ROYAL OMAN POLICE - NEW GENERAL HOSPITAL
(BP2, Package P-II) Muscat. Oman.
Period: December 2015 – Till Date
Package II comprises of 12 Nos. (G+5) Apartment buildings, 19 Nos. Villas,
Dormitary building, 3 Nos. Rehabilitation buildings and Electrical Substations
Contract Value : Omani Riyal 43 Millions
Area : 69, 056m²
Duration : 24 Months
Client : Royal Oman Police, Oman
Worli Mixed Use Project (WMUP), Worli, Mumbai, India
Period: August 2013 – November 2015
WMUP is a second tallest building in India. It consists of two towers.
(1) Residential Tower (G+87 Floors, Height -372 m) : Comprises of 4
Basements, Ground, 3 Levels of Podium, 12 Levels of Car Park, 68
residential floors and 4 Levels of Plant Rooms.
(2) Mix-use Tower (Height-239 m) : 65 Storey Tower comprises of Offices
and a Hotel.
Contract Value : USD 563 Millions
Area : 279,000 m²
Duration : 55 Months
Client : Oasis Realty (JV between Oberai Realty and
Sahana Realty).
Main Contractor :Samsung C&T (Main Contractor for World's tallest
tower "Burj Khaleefa", Dubai, UAE)
MEP Contractor : Bluestar Limited.
Dubai International Airport (Phase-III) – Concourse 4 and
Associated Projects (Dubai, UAE)
Period: March 2012 – January 2013
Concourse 4 is a state of the art airport terminal complex comprising of
Departure gates and lounges, Arrival Lounges, Circulation areas, Duty free,
Food services, Automated Public Mover (APM) station, Baggage handling
system, Passanger conveyance link between existing Terminal-1 and
Concourse 4, GSE (Ground Service Equipment) roads, Apron works and
Support facilities.
Contract Value : AED 3.14 billions
Area : 144,907 m²
Duration : 30 Months
Client : DACC-EP (Dubai Aviation City Corporation -
Engineering Projects )
Position Senior QA/QC Engineer (June 2004 - February 2007)
 To assist QA/QC Manager in preparing Inspection Test Plan (ITP)
 To assist QA/QC Manager in identifying, documenting and providing solutions for Non-
Conformances (NCR), Corrective & Preventive actions.
 To conduct and co-ordinate inspections & testing activities as per ITP and specifications.
 Monitoring the material received on site.
 To assist and control QA/QC inspector’s works.
LIST OF PROJECTS
ROYAL OMAN POLICE - NEW GENERAL HOSPITAL
(BP2, Package P-II) Muscat. Oman.
Period: December 2015 – Till Date
Package II comprises of 12 Nos. (G+5) Apartment buildings, 19 Nos. Villas,
Dormitary building, 3 Nos. Rehabilitation buildings and Electrical Substations
Contract Value : Omani Riyal 43 Millions
Area : 69, 056m²
Duration : 24 Months
Client : Royal Oman Police, Oman
Worli Mixed Use Project (WMUP), Worli, Mumbai, India
Period: August 2013 – November 2015
WMUP is a second tallest building in India. It consists of two towers.
(1) Residential Tower (G+87 Floors, Height -372 m) : Comprises of 4
Basements, Ground, 3 Levels of Podium, 12 Levels of Car Park, 68
residential floors and 4 Levels of Plant Rooms.
(2) Mix-use Tower (Height-239 m) : 65 Storey Tower comprises of Offices
and a Hotel.
Contract Value : USD 563 Millions
Area : 279,000 m²
Duration : 55 Months
Client : Oasis Realty (JV between Oberai Realty and
Sahana Realty).
Main Contractor :Samsung C&T (Main Contractor for World's tallest
tower "Burj Khaleefa", Dubai, UAE)
MEP Contractor : Bluestar Limited.
Dubai International Airport (Phase-III) – Concourse 4 and
Associated Projects (Dubai, UAE)
Period: March 2012 – January 2013
Concourse 4 is a state of the art airport terminal complex comprising of
Departure gates and lounges, Arrival Lounges, Circulation areas, Duty free,
Food services, Automated Public Mover (APM) station, Baggage handling
system, Passanger conveyance link between existing Terminal-1 and
Concourse 4, GSE (Ground Service Equipment) roads, Apron works and
Support facilities.
Contract Value : AED 3.14 billions
Area : 144,907 m²
Duration : 30 Months
Client : DACC-EP (Dubai Aviation City Corporation -
Engineering Projects )
Position Senior QA/QC Engineer (June 2004 - February 2007)
 To assist QA/QC Manager in preparing Inspection Test Plan (ITP)
 To assist QA/QC Manager in identifying, documenting and providing solutions for Non-
Conformances (NCR), Corrective & Preventive actions.
 To conduct and co-ordinate inspections & testing activities as per ITP and specifications.
 Monitoring the material received on site.
 To assist and control QA/QC inspector’s works.
LIST OF PROJECTS
ROYAL OMAN POLICE - NEW GENERAL HOSPITAL
(BP2, Package P-II) Muscat. Oman.
Period: December 2015 – Till Date
Package II comprises of 12 Nos. (G+5) Apartment buildings, 19 Nos. Villas,
Dormitary building, 3 Nos. Rehabilitation buildings and Electrical Substations
Contract Value : Omani Riyal 43 Millions
Area : 69, 056m²
Duration : 24 Months
Client : Royal Oman Police, Oman
Worli Mixed Use Project (WMUP), Worli, Mumbai, India
Period: August 2013 – November 2015
WMUP is a second tallest building in India. It consists of two towers.
(1) Residential Tower (G+87 Floors, Height -372 m) : Comprises of 4
Basements, Ground, 3 Levels of Podium, 12 Levels of Car Park, 68
residential floors and 4 Levels of Plant Rooms.
(2) Mix-use Tower (Height-239 m) : 65 Storey Tower comprises of Offices
and a Hotel.
Contract Value : USD 563 Millions
Area : 279,000 m²
Duration : 55 Months
Client : Oasis Realty (JV between Oberai Realty and
Sahana Realty).
Main Contractor :Samsung C&T (Main Contractor for World's tallest
tower "Burj Khaleefa", Dubai, UAE)
MEP Contractor : Bluestar Limited.
Dubai International Airport (Phase-III) – Concourse 4 and
Associated Projects (Dubai, UAE)
Period: March 2012 – January 2013
Concourse 4 is a state of the art airport terminal complex comprising of
Departure gates and lounges, Arrival Lounges, Circulation areas, Duty free,
Food services, Automated Public Mover (APM) station, Baggage handling
system, Passanger conveyance link between existing Terminal-1 and
Concourse 4, GSE (Ground Service Equipment) roads, Apron works and
Support facilities.
Contract Value : AED 3.14 billions
Area : 144,907 m²
Duration : 30 Months
Client : DACC-EP (Dubai Aviation City Corporation -
Engineering Projects )
Park Hyatt Hotel (Saadiyat Island, Abu Dhabi)
Period: Mar 2010 – Aug 2011
A 314 key six-storey Hotel on Saadiyat Island including all FF&E, a single
basement for MEP and parking for 430 vehicles, a health club, four F&B
outlets, ballroom & conference facilities; a presidential villa, three 2-
bedroom villas; four single storey ryads; three double storey ryads; a kids
club; a beach house; all landscaping, external works and services.
Contract Value : AED 672 Million
Area : 79,000 m²
Duration : 18 Months
Client : Abu Dhabi National Hotels
Marina Plaza (Plot 3F) (Dubai, UAE)
Period: Jun 2008 – Feb 2010 (In parallel with Marina Mall Project)
The 41 floor shell and core commercial office tower “Marina Plaza” is part of
the Dubai Marina Mall Complex, overlooking the Marina.
Contract Value : AED 555 Million
Area : 160,000m²
ContractPeriod : 22 months
Client : Emaar Properties
Dubai Marina Mall & Hotel Aparments (Dubai, UAE)
Period: July 2006 – Aug 2009
The Dubai Marina Mall complex includes the Mall, 35 storied Hotel &
Serviced Apartments. The Dubai Marina Mall, a modern shopping, and
entertainment destination and an 8 storey gourmet tower dedicated to
diverse restaurants. The development features a 200 rooms, 35 storied, five
star hotel and 440 hotel apartments, while the mall contains 180 outlets.
Contract Value : AED 2.300 Billion
Area : 360,000m²
ContractPeriod : 27 months
Client : Emaar Properties
Hotel Qamaruddin – Old Town, Burj Dubai (Dubai, UAE)
Period: Jun 2005 – Jun 2006
Located in the prestigious Downtown Burj Dubai development, offer 21
suites and over 350 rooms.The project also features a host of amenities
including business centres, swimming pools, all day diners, conference and
meeting rooms, specialty restaurants and coffee shops.
Contract Value : AED 255 Million
Area : 51,000m²
Contract Period : 16 months
Client : Emaar Properties
Hotel Kempenski – Mall of the Emirates (Dubai, UAE)
Period: Jun 2004 – Jun 2005
A 393 bedroom five star deluxe hotel attached to UAE's first indoor ski
resort and the region's biggest shopping mall, Mall of the Emirates.
Contract Value : AED 407 Million
Area : 88,000m²
Contract Period : 23 months
Client : Majid Al-Futtaim
Previous Employment history (1997 till 2004)
Emlpoyer Structon Project Consultant pvt. Ltd. (India)
Position Assistant engineer
Emlpoyer Boston Education and Software Technology Ltd. (India)
Position Software engineer
Emlpoyer Lea Associates South Asia pvt. Ltd. (India) (Canada based Project Management Consultant)
Position Assistant engineer.
Personal details
Passport No J 2542372 (Expiring on 08-Dec-2020)
Email id ravindrakauthalikar@gmail.com

Ravindra_Planning Manager_CV_2016_Latest

  • 1.
    CURRICULUM VITAE RAVINDRA BHARATKAUTHALIKAR CURRENT POSITION QUALIFICATIONS Planning Manager M. Tech (Civil Engineering) ISO 9000 Series Lead Auditor (Certificate No: 27352-91480) Primavera Project Planner P6 (Version-8.1), Primavera 3, MSP E-Mail: ravindrakauthalikar@gmail.com Mobile No: (Oman +968 94885875), (India +91 9420436861) EXPERIENCE, SKILLS AND CORPORATE FOCUS Highly skilled, results-driven post graduate civil engineer with 19 years of professional experience. During the nine plus years spent in United Arab Emirates and Oman, I have been involved in a number of multimillion dollar projects ranging from five star hotels, Shopping Malls, Airport, Commercial and residential high rise buildings and Water park. I have particular expertise in contract programmes, periodic progress monitoring & updating, delay analysis, extension of Time claims, and Tender programmes. I posses a keen ability to multitask and can plan, develop, and coordinate multiple projects simultaneously. Highly motivated, a self-starter, excellent team player. I keep myself abreast with the current technological developments and industry trends. PROFESSIONAL EXPERIENCE Employer Shapoorji Pallonji Mideast LLC, Oman Period December 2015 – Till date Position Senior Planning Manager Project Royal Oman Police Residential Apartments and Villas,Muscat Oman(OMR 43 Million) Employer Self Employed as Senior Consultant (Freelancer) Associated with ConfluenceTBH (India) Period August 2013 – November 2015 Position Senior Consultant Employer Al Jaber L.E.G.T. Engineering & contracting (ALEC) LLC., Dubai (UAE) Period June 2004 – January 2013 Position Project Planning Engineer (March-2007 Till January 2013) Planning & Scheduling  Prepare Cost and Resource loaded Baseline Programme  Preparation of Progress ‘S ‘curves  Manpower Histogram  Measure Project performance ((SV,SPI, CV,CPI)Schedule and Cost performance Indices)  Dashboard/ Key Performance Indicators (KPIs)  Tracking E1 (Drawings tracking) and E2 (Materials tracking) Logs.  Procurement Schedule (Long lead items), Sub-contractor log  Delay Event Register  Tender Programmes Construction Phase  Progress monitoring and periodic progress updates of contractual baseline programme. Record actual against planned.  Preparation of daily, weekly & monthly progress reports in line with client requirements.  Participating and giving planning inputs in Progress and Management meetings (Internal/ Client/Consultant)  Preparation of look ahead schedule  Prepare and monitor Working programmes  To assist the Project Head by giving planning inputs about the Red Flagged/ Critical items in the project.  Reviewing and Monitoring Subcontractor's Programme Analysis & Reporting  Preparation of Delay analysis, EOT claims etc.  Earned Value Management  Project Risks - Identify. Mitigation measures.  Preparation of Recovery Programme
  • 2.
    Position Senior QA/QCEngineer (June 2004 - February 2007)  To assist QA/QC Manager in preparing Inspection Test Plan (ITP)  To assist QA/QC Manager in identifying, documenting and providing solutions for Non- Conformances (NCR), Corrective & Preventive actions.  To conduct and co-ordinate inspections & testing activities as per ITP and specifications.  Monitoring the material received on site.  To assist and control QA/QC inspector’s works. LIST OF PROJECTS ROYAL OMAN POLICE - NEW GENERAL HOSPITAL (BP2, Package P-II) Muscat. Oman. Period: December 2015 – Till Date Package II comprises of 12 Nos. (G+5) Apartment buildings, 19 Nos. Villas, Dormitary building, 3 Nos. Rehabilitation buildings and Electrical Substations Contract Value : Omani Riyal 43 Millions Area : 69, 056m² Duration : 24 Months Client : Royal Oman Police, Oman Worli Mixed Use Project (WMUP), Worli, Mumbai, India Period: August 2013 – November 2015 WMUP is a second tallest building in India. It consists of two towers. (1) Residential Tower (G+87 Floors, Height -372 m) : Comprises of 4 Basements, Ground, 3 Levels of Podium, 12 Levels of Car Park, 68 residential floors and 4 Levels of Plant Rooms. (2) Mix-use Tower (Height-239 m) : 65 Storey Tower comprises of Offices and a Hotel. Contract Value : USD 563 Millions Area : 279,000 m² Duration : 55 Months Client : Oasis Realty (JV between Oberai Realty and Sahana Realty). Main Contractor :Samsung C&T (Main Contractor for World's tallest tower "Burj Khaleefa", Dubai, UAE) MEP Contractor : Bluestar Limited. Dubai International Airport (Phase-III) – Concourse 4 and Associated Projects (Dubai, UAE) Period: March 2012 – January 2013 Concourse 4 is a state of the art airport terminal complex comprising of Departure gates and lounges, Arrival Lounges, Circulation areas, Duty free, Food services, Automated Public Mover (APM) station, Baggage handling system, Passanger conveyance link between existing Terminal-1 and Concourse 4, GSE (Ground Service Equipment) roads, Apron works and Support facilities. Contract Value : AED 3.14 billions Area : 144,907 m² Duration : 30 Months Client : DACC-EP (Dubai Aviation City Corporation - Engineering Projects ) Position Senior QA/QC Engineer (June 2004 - February 2007)  To assist QA/QC Manager in preparing Inspection Test Plan (ITP)  To assist QA/QC Manager in identifying, documenting and providing solutions for Non- Conformances (NCR), Corrective & Preventive actions.  To conduct and co-ordinate inspections & testing activities as per ITP and specifications.  Monitoring the material received on site.  To assist and control QA/QC inspector’s works. LIST OF PROJECTS ROYAL OMAN POLICE - NEW GENERAL HOSPITAL (BP2, Package P-II) Muscat. Oman. Period: December 2015 – Till Date Package II comprises of 12 Nos. (G+5) Apartment buildings, 19 Nos. Villas, Dormitary building, 3 Nos. Rehabilitation buildings and Electrical Substations Contract Value : Omani Riyal 43 Millions Area : 69, 056m² Duration : 24 Months Client : Royal Oman Police, Oman Worli Mixed Use Project (WMUP), Worli, Mumbai, India Period: August 2013 – November 2015 WMUP is a second tallest building in India. It consists of two towers. (1) Residential Tower (G+87 Floors, Height -372 m) : Comprises of 4 Basements, Ground, 3 Levels of Podium, 12 Levels of Car Park, 68 residential floors and 4 Levels of Plant Rooms. (2) Mix-use Tower (Height-239 m) : 65 Storey Tower comprises of Offices and a Hotel. Contract Value : USD 563 Millions Area : 279,000 m² Duration : 55 Months Client : Oasis Realty (JV between Oberai Realty and Sahana Realty). Main Contractor :Samsung C&T (Main Contractor for World's tallest tower "Burj Khaleefa", Dubai, UAE) MEP Contractor : Bluestar Limited. Dubai International Airport (Phase-III) – Concourse 4 and Associated Projects (Dubai, UAE) Period: March 2012 – January 2013 Concourse 4 is a state of the art airport terminal complex comprising of Departure gates and lounges, Arrival Lounges, Circulation areas, Duty free, Food services, Automated Public Mover (APM) station, Baggage handling system, Passanger conveyance link between existing Terminal-1 and Concourse 4, GSE (Ground Service Equipment) roads, Apron works and Support facilities. Contract Value : AED 3.14 billions Area : 144,907 m² Duration : 30 Months Client : DACC-EP (Dubai Aviation City Corporation - Engineering Projects ) Position Senior QA/QC Engineer (June 2004 - February 2007)  To assist QA/QC Manager in preparing Inspection Test Plan (ITP)  To assist QA/QC Manager in identifying, documenting and providing solutions for Non- Conformances (NCR), Corrective & Preventive actions.  To conduct and co-ordinate inspections & testing activities as per ITP and specifications.  Monitoring the material received on site.  To assist and control QA/QC inspector’s works. LIST OF PROJECTS ROYAL OMAN POLICE - NEW GENERAL HOSPITAL (BP2, Package P-II) Muscat. Oman. Period: December 2015 – Till Date Package II comprises of 12 Nos. (G+5) Apartment buildings, 19 Nos. Villas, Dormitary building, 3 Nos. Rehabilitation buildings and Electrical Substations Contract Value : Omani Riyal 43 Millions Area : 69, 056m² Duration : 24 Months Client : Royal Oman Police, Oman Worli Mixed Use Project (WMUP), Worli, Mumbai, India Period: August 2013 – November 2015 WMUP is a second tallest building in India. It consists of two towers. (1) Residential Tower (G+87 Floors, Height -372 m) : Comprises of 4 Basements, Ground, 3 Levels of Podium, 12 Levels of Car Park, 68 residential floors and 4 Levels of Plant Rooms. (2) Mix-use Tower (Height-239 m) : 65 Storey Tower comprises of Offices and a Hotel. Contract Value : USD 563 Millions Area : 279,000 m² Duration : 55 Months Client : Oasis Realty (JV between Oberai Realty and Sahana Realty). Main Contractor :Samsung C&T (Main Contractor for World's tallest tower "Burj Khaleefa", Dubai, UAE) MEP Contractor : Bluestar Limited. Dubai International Airport (Phase-III) – Concourse 4 and Associated Projects (Dubai, UAE) Period: March 2012 – January 2013 Concourse 4 is a state of the art airport terminal complex comprising of Departure gates and lounges, Arrival Lounges, Circulation areas, Duty free, Food services, Automated Public Mover (APM) station, Baggage handling system, Passanger conveyance link between existing Terminal-1 and Concourse 4, GSE (Ground Service Equipment) roads, Apron works and Support facilities. Contract Value : AED 3.14 billions Area : 144,907 m² Duration : 30 Months Client : DACC-EP (Dubai Aviation City Corporation - Engineering Projects )
  • 3.
    Park Hyatt Hotel(Saadiyat Island, Abu Dhabi) Period: Mar 2010 – Aug 2011 A 314 key six-storey Hotel on Saadiyat Island including all FF&E, a single basement for MEP and parking for 430 vehicles, a health club, four F&B outlets, ballroom & conference facilities; a presidential villa, three 2- bedroom villas; four single storey ryads; three double storey ryads; a kids club; a beach house; all landscaping, external works and services. Contract Value : AED 672 Million Area : 79,000 m² Duration : 18 Months Client : Abu Dhabi National Hotels Marina Plaza (Plot 3F) (Dubai, UAE) Period: Jun 2008 – Feb 2010 (In parallel with Marina Mall Project) The 41 floor shell and core commercial office tower “Marina Plaza” is part of the Dubai Marina Mall Complex, overlooking the Marina. Contract Value : AED 555 Million Area : 160,000m² ContractPeriod : 22 months Client : Emaar Properties Dubai Marina Mall & Hotel Aparments (Dubai, UAE) Period: July 2006 – Aug 2009 The Dubai Marina Mall complex includes the Mall, 35 storied Hotel & Serviced Apartments. The Dubai Marina Mall, a modern shopping, and entertainment destination and an 8 storey gourmet tower dedicated to diverse restaurants. The development features a 200 rooms, 35 storied, five star hotel and 440 hotel apartments, while the mall contains 180 outlets. Contract Value : AED 2.300 Billion Area : 360,000m² ContractPeriod : 27 months Client : Emaar Properties Hotel Qamaruddin – Old Town, Burj Dubai (Dubai, UAE) Period: Jun 2005 – Jun 2006 Located in the prestigious Downtown Burj Dubai development, offer 21 suites and over 350 rooms.The project also features a host of amenities including business centres, swimming pools, all day diners, conference and meeting rooms, specialty restaurants and coffee shops. Contract Value : AED 255 Million Area : 51,000m² Contract Period : 16 months Client : Emaar Properties Hotel Kempenski – Mall of the Emirates (Dubai, UAE) Period: Jun 2004 – Jun 2005 A 393 bedroom five star deluxe hotel attached to UAE's first indoor ski resort and the region's biggest shopping mall, Mall of the Emirates. Contract Value : AED 407 Million Area : 88,000m² Contract Period : 23 months Client : Majid Al-Futtaim
  • 4.
    Previous Employment history(1997 till 2004) Emlpoyer Structon Project Consultant pvt. Ltd. (India) Position Assistant engineer Emlpoyer Boston Education and Software Technology Ltd. (India) Position Software engineer Emlpoyer Lea Associates South Asia pvt. Ltd. (India) (Canada based Project Management Consultant) Position Assistant engineer. Personal details Passport No J 2542372 (Expiring on 08-Dec-2020) Email id ravindrakauthalikar@gmail.com