Curriculum Vitae
IBRAHIM AHMED AL-KISHKI
Profession: Senior Architect
Mob: + 20 100 2583991
E-mail: ialkishki@hotmail.com
EDUCATION
B.Sc. in Architectural Engineering, Cairo University - May 1997.
Project Grade: Very Good
Overall Grade: Good
Affiliations: Egyptian Syndicate of Engineers, 1997 - Professional Registration No.: 7652/68
OVERVIEW
With more than (18) years of professional experience (including more than 7 years in Dar Al-Handasah-
Cairo office) in the architectural design development and detailing of various aspects of projects. having a
wide exposure to all phases of the design, supervision and coordination of large projects , and well known
of using the international codes and regional design standards for major projects in Egypt ,Arab gulf
region and south American country. Participating in all stages of project design from proposal preparation
till project supervision. Respected and self‐motivated managing multiple projects simultaneously.
Extensive experience managing large‐scale projects from the requirements gathering phase to completion.
Highly skilled in tracking details, communicating deadlines, and following‐up with internal and external
partners to ensure on‐time completion within budget. Ability and interest in learning and incorporating
new technology. Consistently receive positive feedback from managers, co‐workers and clients.
PROFESSIONAL EXPERIENCE
Dec. 2008 up to Dec.2015: Dar Al-Handasah (Shair and Partners).
June 2002 to Dec. 2008: Look Pavillion Int. Consultant.
June 1999 to June 2002: Habitat (for furniture & Contract Furnishings).
May 1997 to June 1999: Look Pavillion Int. Consultant.
Before graduation: Worked as a trainee designer at Dr. Aly Gabr , Dr. Maysa M. Abdel-Aziz Consulting
Office, and Dr. Naila Toulan Consulting Office.
CONSTRUCTION FIELD EXPERIENCE
My work in construction supervision and as a technical office architect has added to the detail design and
the construction documentation more experience since my graduation through the flowing projects:
Dar Al-Handasah (Shair and Partners)
Project: Princess Nora Bint Abdulrahman University (PNBAU) - Saudi Arabia.
As Site Architect
Supervision of construction for one main university campus in Riyadh with total built-up area: 1,250,000 m².
i participated in the review of architectural designs and submittals, inspection of site works in coordination
with other trades to ensure compliance with the approved drawings and specifications, preparation of
progress reports and other technical documentation, etc.
Look Pavillion Int. Consultant,
Project: Grand plaza Resort and hotel at sharm El Sheikh- Egypt.
As Site Architect
I participated in the review of architectural designs and submittals, inspection of site works in
coordination with other trades to ensure compliance with the approved drawings and specifications,
preparation of progress reports and other technical documentation, etc.
Habitat (for furniture & Contract Furnishings), Egypt.
As Owner Representative Architect
I participated in handling quantities’ take-off, monitoring material submittals, preparation of contract
documents, evaluation of subcontractors, and follow-up on time schedules. Inspection of site works for the
following projects:
- Five residential apartments of 220 m² each.
- Industrial facility for furniture and foam manufacturing at El-Oboor, Egypt (19,500 m²).
- Five residential villas of 600 m² each at el Rabwa compound in sheikh Zayed.
- Office building in Cairo, Egypt (1,800 m²).
- Showroom at El-Oboor 4000m2
- Showroom at Arcadia Mall 3500m2
- Showroom at Elharam 2000m2
- Showroom at Abass Elakaad 1200m2
- Showroom at Alex. 1200m2
INTERNATIONAL WORK EXPERIENCE
Includes some countries such as Saudi Arabia, Qatar and Panama. In these projects, I have participated in
the architectural design, including coordination with other disciplines, and preparation of specifications,
cost estimates and other technical documents, for the following projects:
Doha Metro at Doha, Qatar.
I participated in the architectural design & build package, green line elevated station. Al Rayan stadium
station (AL-RIFFA), which located in green line, the new Doha metro network, is a major component of
the Qatar integrated railway project (QIRP), applied q-rail employee requirements and architecture
branding under deep coordination with other disciplines.
LUSAIL Towers, Light Rail Station and Underground Car Parking at Doha, Qatar.
I participated in the architectural design & build package, light rail transit (LRT) and underground parking
lusail city has a comprehensive plan for establishing a network of light trains which will connect the
various districts, lusail city’s car parking and waiting areas is that they are equally accessible to both
residents and visitors.
Makkah Metro Network, Saudi Arabia.
I participated in advanced concept design for a rail network consisting of 7 lines leading to the
Holy haram and serving the existing Makkah area as well as its future developments for the year 2030.
The 7 lines cross an orbital line along the third ring road, and end at 7 multi-modal stations around the
holy haram, stations was initially started by the design firm systra as part of the design consortium
awarded.
Makkah First Ring Road and Bus Station, Saudi Arabia.
I participated in the architectural design, including coordination with other disciplines, and preparation of
specifications, cost estimates and other technical documents for 3 multi-level bus stations (total built-up
area of 675,000 m²), rehabilitation and widening of several vehicular tunnels, and all related landscaping
and infrastructure utilities.
The Panama Metro. Panama.
I participated in the architectural design, including coordination with other disciplines, and preparation of
specifications, cost estimates and other technical documents, for the panama. Detailed architectural design
for 4 metro stations, design & build package –elevated. The package includes four elevated stations,
namely, Pueblo Nuevo, San Manuelito, Pan De Azucar and Los Andes Stations.
Line one (LINEA UNO) consists of a planned mostly, north- south route, from multi station in the south
to the north, and is 13.7 km long including7 km of tunnel and 6.3 km of viaduct. Design of the five
stations was initially started by the design firm Systra as part of the design consortium awarded. The
project in partnership with International (TYLIN) Miami.
I participated in architectural design, developments, including coordination in early stage for the
following projects:
Prophet's Mosque Expansion, Saudi Arabia.
I participating in development design stages of project design and study and proposals.
Security Buildings in Shamiyah Area, Saudi Arabia.
I participated in detailed design and tender documents for security buildings in Shamiyah area around the
Makkah holy haram.
Shamiyah Expansion, Saudi Arabia.
I participated in detailed design and tender documents for an extension to the Makkah holy haram.
Jabal Omar Development Project, Saudi Arabia.
I participated in planning, detailed design and construction drawings for a first class mixed-use
development on a site area of 116,535 m², consisting of 7 seasonal residential ,towers, commercial
activities, restaurants, food courts, car-parking, mussalas and serviced villas.
Podiums’ heights range from 7 up to 13 stores. Towers’ heights range from 18 up to 23 typical stores
(120 m to 150 m) from the top of the podium.
LOCAL WORK EXPERIENCE
I have participated in the architectural design, including coordination with other disciplines, and
preparation of specifications, cost estimates and other technical documents, for the following projects:
Dar Al-Handasah (Shair and Partners)
Emaar Squire at Uptown Cairo .Cairo, Egypt
I participate in one of EMAAR MISR projects which are EMAAR squire in its conceptual design
with RTKL, to applying Egyptian fire codes and regional design standards for the projects phases in
comply with Egyptian requirements of executive and administrative buildings authority and stakeholders.
Look Pavillion Int. Consultant, (second period)
I participate as senior architect in the architectural design, including coordination with other disciplines,
and preparation of specifications, cost estimates and other technical documents in the following projects:
- Sindbad resort and aqua bark at Hurghada 5 stars projects
- Marsa Alam International Airport
- Coral Beach Montazah Restaurant at sharm El sheikh 5 s Projects
- Developing Coral Beach Resort at Hurghada in five stages
- Japanese embassy in Cairo
- Segas Compound and Sporting club at Domiat
- Boda bar night club at Hurghada
- Residential Compound at Hurghada
- Residential Compound at Marsa Alam
Look Pavillion Int. Consultant, (first period)
I participate as an architect in the architectural design, including coordination in the following projects:
- New falcon hotel at Sharm El Shikh
- Egyptian Gulf Bank
- upgrading and renovation all existing branches
- Emak headquarters offices
- Merry land complex
- Taycon village at Hurgada
- Private villa at Manial Sheiha
- Private villa at El Maady
- Private villa at sun set resort
- Coral beach Tiran Sharm El Sheikh
TECHNICAL SKILLS
Presentation Work
- BIM Rivet Ver. 2014 & 2015 Excellent
- AutoCAD Ver. 2012 Excellent
- Photoshop Good
- Sketch up Good
Computer Skills
- Windows and Microsoft Office Good
- Microsoft Project Good
- Primavera Good
EMPLOYMENTS RECORDS
2008 – Currently Dar Al-Handasah (Shair and Partners).
Senior Architect Group leader in charge for multi-tasking projects.
2002 – 2008 Look Pavillion Int.
Project Senior Architect
1999 –2002 Habitat Egypt.
Owner Representative Engineer
1997 – 1999 Look Pavillion Int.
Junior staff Architect
PERSONAL PROFILE
 Nationality: Egyptian
 Date of Birth: July 9th
.1970
 Marital Status : Married
 Language: Arabic & English
 Interests: Football, Swimming and Internet Browsing
REFERENCES
Eng. Ahmad Sherine
Project Manager
Dar Al-Handasah
(Shair and Partners)
Mob. +20 101 5020565
ahmad.sherine@dargroup.com
Eng. Samar Nabil
Senior Associate
Dar Al-Handasah
(Shair and Partners)
Mob. +20 100 2218523
samar.nabil@dargroup.com
Eng. Mohamed Adel
CEO & Founder
Look Pavillion Int.
Consultant
Mob. +20 122 2109772
madel@pavillion.com.eg
ANY documents will be submitted upon request.

Ibrahim al kishki -cv

  • 1.
    Curriculum Vitae IBRAHIM AHMEDAL-KISHKI Profession: Senior Architect Mob: + 20 100 2583991 E-mail: ialkishki@hotmail.com EDUCATION B.Sc. in Architectural Engineering, Cairo University - May 1997. Project Grade: Very Good Overall Grade: Good Affiliations: Egyptian Syndicate of Engineers, 1997 - Professional Registration No.: 7652/68 OVERVIEW With more than (18) years of professional experience (including more than 7 years in Dar Al-Handasah- Cairo office) in the architectural design development and detailing of various aspects of projects. having a wide exposure to all phases of the design, supervision and coordination of large projects , and well known of using the international codes and regional design standards for major projects in Egypt ,Arab gulf region and south American country. Participating in all stages of project design from proposal preparation till project supervision. Respected and self‐motivated managing multiple projects simultaneously. Extensive experience managing large‐scale projects from the requirements gathering phase to completion. Highly skilled in tracking details, communicating deadlines, and following‐up with internal and external partners to ensure on‐time completion within budget. Ability and interest in learning and incorporating new technology. Consistently receive positive feedback from managers, co‐workers and clients. PROFESSIONAL EXPERIENCE Dec. 2008 up to Dec.2015: Dar Al-Handasah (Shair and Partners). June 2002 to Dec. 2008: Look Pavillion Int. Consultant. June 1999 to June 2002: Habitat (for furniture & Contract Furnishings). May 1997 to June 1999: Look Pavillion Int. Consultant. Before graduation: Worked as a trainee designer at Dr. Aly Gabr , Dr. Maysa M. Abdel-Aziz Consulting Office, and Dr. Naila Toulan Consulting Office. CONSTRUCTION FIELD EXPERIENCE My work in construction supervision and as a technical office architect has added to the detail design and the construction documentation more experience since my graduation through the flowing projects:
  • 2.
    Dar Al-Handasah (Shairand Partners) Project: Princess Nora Bint Abdulrahman University (PNBAU) - Saudi Arabia. As Site Architect Supervision of construction for one main university campus in Riyadh with total built-up area: 1,250,000 m². i participated in the review of architectural designs and submittals, inspection of site works in coordination with other trades to ensure compliance with the approved drawings and specifications, preparation of progress reports and other technical documentation, etc. Look Pavillion Int. Consultant, Project: Grand plaza Resort and hotel at sharm El Sheikh- Egypt. As Site Architect I participated in the review of architectural designs and submittals, inspection of site works in coordination with other trades to ensure compliance with the approved drawings and specifications, preparation of progress reports and other technical documentation, etc. Habitat (for furniture & Contract Furnishings), Egypt. As Owner Representative Architect I participated in handling quantities’ take-off, monitoring material submittals, preparation of contract documents, evaluation of subcontractors, and follow-up on time schedules. Inspection of site works for the following projects: - Five residential apartments of 220 m² each. - Industrial facility for furniture and foam manufacturing at El-Oboor, Egypt (19,500 m²). - Five residential villas of 600 m² each at el Rabwa compound in sheikh Zayed. - Office building in Cairo, Egypt (1,800 m²). - Showroom at El-Oboor 4000m2 - Showroom at Arcadia Mall 3500m2 - Showroom at Elharam 2000m2 - Showroom at Abass Elakaad 1200m2 - Showroom at Alex. 1200m2 INTERNATIONAL WORK EXPERIENCE Includes some countries such as Saudi Arabia, Qatar and Panama. In these projects, I have participated in the architectural design, including coordination with other disciplines, and preparation of specifications, cost estimates and other technical documents, for the following projects: Doha Metro at Doha, Qatar. I participated in the architectural design & build package, green line elevated station. Al Rayan stadium station (AL-RIFFA), which located in green line, the new Doha metro network, is a major component of the Qatar integrated railway project (QIRP), applied q-rail employee requirements and architecture branding under deep coordination with other disciplines.
  • 3.
    LUSAIL Towers, LightRail Station and Underground Car Parking at Doha, Qatar. I participated in the architectural design & build package, light rail transit (LRT) and underground parking lusail city has a comprehensive plan for establishing a network of light trains which will connect the various districts, lusail city’s car parking and waiting areas is that they are equally accessible to both residents and visitors. Makkah Metro Network, Saudi Arabia. I participated in advanced concept design for a rail network consisting of 7 lines leading to the Holy haram and serving the existing Makkah area as well as its future developments for the year 2030. The 7 lines cross an orbital line along the third ring road, and end at 7 multi-modal stations around the holy haram, stations was initially started by the design firm systra as part of the design consortium awarded. Makkah First Ring Road and Bus Station, Saudi Arabia. I participated in the architectural design, including coordination with other disciplines, and preparation of specifications, cost estimates and other technical documents for 3 multi-level bus stations (total built-up area of 675,000 m²), rehabilitation and widening of several vehicular tunnels, and all related landscaping and infrastructure utilities. The Panama Metro. Panama. I participated in the architectural design, including coordination with other disciplines, and preparation of specifications, cost estimates and other technical documents, for the panama. Detailed architectural design for 4 metro stations, design & build package –elevated. The package includes four elevated stations, namely, Pueblo Nuevo, San Manuelito, Pan De Azucar and Los Andes Stations. Line one (LINEA UNO) consists of a planned mostly, north- south route, from multi station in the south to the north, and is 13.7 km long including7 km of tunnel and 6.3 km of viaduct. Design of the five stations was initially started by the design firm Systra as part of the design consortium awarded. The project in partnership with International (TYLIN) Miami. I participated in architectural design, developments, including coordination in early stage for the following projects: Prophet's Mosque Expansion, Saudi Arabia. I participating in development design stages of project design and study and proposals. Security Buildings in Shamiyah Area, Saudi Arabia. I participated in detailed design and tender documents for security buildings in Shamiyah area around the Makkah holy haram. Shamiyah Expansion, Saudi Arabia. I participated in detailed design and tender documents for an extension to the Makkah holy haram. Jabal Omar Development Project, Saudi Arabia. I participated in planning, detailed design and construction drawings for a first class mixed-use development on a site area of 116,535 m², consisting of 7 seasonal residential ,towers, commercial activities, restaurants, food courts, car-parking, mussalas and serviced villas.
  • 4.
    Podiums’ heights rangefrom 7 up to 13 stores. Towers’ heights range from 18 up to 23 typical stores (120 m to 150 m) from the top of the podium. LOCAL WORK EXPERIENCE I have participated in the architectural design, including coordination with other disciplines, and preparation of specifications, cost estimates and other technical documents, for the following projects: Dar Al-Handasah (Shair and Partners) Emaar Squire at Uptown Cairo .Cairo, Egypt I participate in one of EMAAR MISR projects which are EMAAR squire in its conceptual design with RTKL, to applying Egyptian fire codes and regional design standards for the projects phases in comply with Egyptian requirements of executive and administrative buildings authority and stakeholders. Look Pavillion Int. Consultant, (second period) I participate as senior architect in the architectural design, including coordination with other disciplines, and preparation of specifications, cost estimates and other technical documents in the following projects: - Sindbad resort and aqua bark at Hurghada 5 stars projects - Marsa Alam International Airport - Coral Beach Montazah Restaurant at sharm El sheikh 5 s Projects - Developing Coral Beach Resort at Hurghada in five stages - Japanese embassy in Cairo - Segas Compound and Sporting club at Domiat - Boda bar night club at Hurghada - Residential Compound at Hurghada - Residential Compound at Marsa Alam Look Pavillion Int. Consultant, (first period) I participate as an architect in the architectural design, including coordination in the following projects: - New falcon hotel at Sharm El Shikh - Egyptian Gulf Bank - upgrading and renovation all existing branches - Emak headquarters offices - Merry land complex - Taycon village at Hurgada - Private villa at Manial Sheiha - Private villa at El Maady - Private villa at sun set resort - Coral beach Tiran Sharm El Sheikh
  • 5.
    TECHNICAL SKILLS Presentation Work -BIM Rivet Ver. 2014 & 2015 Excellent - AutoCAD Ver. 2012 Excellent - Photoshop Good - Sketch up Good Computer Skills - Windows and Microsoft Office Good - Microsoft Project Good - Primavera Good EMPLOYMENTS RECORDS 2008 – Currently Dar Al-Handasah (Shair and Partners). Senior Architect Group leader in charge for multi-tasking projects. 2002 – 2008 Look Pavillion Int. Project Senior Architect 1999 –2002 Habitat Egypt. Owner Representative Engineer 1997 – 1999 Look Pavillion Int. Junior staff Architect PERSONAL PROFILE  Nationality: Egyptian  Date of Birth: July 9th .1970  Marital Status : Married  Language: Arabic & English  Interests: Football, Swimming and Internet Browsing REFERENCES Eng. Ahmad Sherine Project Manager Dar Al-Handasah (Shair and Partners) Mob. +20 101 5020565 ahmad.sherine@dargroup.com Eng. Samar Nabil Senior Associate Dar Al-Handasah (Shair and Partners) Mob. +20 100 2218523 samar.nabil@dargroup.com Eng. Mohamed Adel CEO & Founder Look Pavillion Int. Consultant Mob. +20 122 2109772 madel@pavillion.com.eg ANY documents will be submitted upon request.