1. Jihad Mahmoud Mohammed Amro
Address: Riyadh - Saudi Arabia Kingdom
Mobile: +966 564556092
E-mail Address: jihadamro2007@yahoo.com, Or jihadamro2007@hotmail.com
Objective
To utilize and improve my skills and increasing my experience in field of my major.
Education
Bachelor of Engineering Degree in Mechanical Engineering .
Refrigeration & Air-Conditioning Engineering Branch.
Palestine Polytechnic University. Hebron, Palestine. August 2007
Graduation Project
Movempick Hotel Swimming Pools, Spa & Ornamental Water Features, (Excellent Evaluating )
Movempick Hotel, Ramallah, Palestine.
Practical Experiences
Thermo Saudi L.L.C. , Tadawul Tower, Riyadh
MEP Coordinator & Technical Engineer From September 2013 To Present
SACC-Thermo JV , Anjum Hotel Project , Makkah AL-Mukarramah
Mechanical Project Engineer From March 2012 To August 2013
El-Seif –Thermo JV , King Abdullah Financial District Project, Parcels 3.04 & 3.05, Riyadh
Mechanical Project Engineer From October 2011 To March 2012
ELMACS – Electro Mechanical & Air Cond. Systems, Abu Dhabi, UAE
HVAC Design Engineer From September 2008 To September 2011
Engineering Consultant Offices , Hebron, Palestine
Mechanical & Environmental Engineering Office
Alabraj Association For Engineering & Consultant
Mechanical Engineer From August 2007 To September 2008
2. Tadawul Tower (KAFD – Parcel 1.17)
From September 2013 To Present
- Office Tower + Data Center
50 Floors + 4 Mechanical Floors + 12 Public Floors + Typical Floors
- Project value: SR500 million
- Main contractor : Samsung Contracting Company
- Consultant : Nikken Sekkei (Japanese )
Tadawul Tower - Riyadh
MEP Coordinator & Technical Engineer
Responsibilities:
- Shop drawings for all mechanical services.
- Coordination drawings for MEP services.
- Mechanical design calculations.
- Review the calculations before submitted to consultant.
- Review material submittal.
- Coordination and solve coordination problems between
all systems.
- Coordinate with consultant and main contractor.
- Coordinate design meeting.
- Review material orders and contact with suppliers for orders.
- Preparation of time schedules for shop drawings, approval, delivery and installation/ ensure finishing the
project on time, milestones were important to indicate critical paths.
- Ensure all client requirements are reflected in the design / specification and quality according contract /
budget.
- Organize approvals for materials and workshop drawings.
- Participate in shop drawing workshops with client, architect, designer and construction company and if
required gave input on design/detailed/feasibility and costing.
- Preparation of logistic plans for all MEP equipment’s and follow up the consultant comments.
Anjum Hotel Project (The Largest Hotel At Middle East )
From March 2012 To August 2013
5 Star Hotel , 26 floors, 1800 rooms, 30 presidential suite. 3300 sq. meter, 9 public floors.
- Main contractor and client : ALJ- Abdul Latif Jameel Co. Ltd.
- Consultant : Dar AL-Handasah-(Shair and Partners)
Mechanical Project Engineer
Anjum Hotel - Makkah
Responsibilities:
- Shop drawings, submittal, RFI, IR, MIR, ECR, etc..
- Cooling load, static calculations…
- Coordination and solve coordination problems between all systems at site.
- Follow up the site engineers for the work progress, materials & inspections.
- Follow up the QA/QC engineers for the work progress & the comments from
consultant.
- Coordinate with planning engineer for work progress.
- Follow up the testing & commissioning team and solve problems.
- Contact with consultant, Project management, Client & other contractors.
3. - Material orders, contact with suppliers.
- Daily, weekly & monthly reports for the work and balance works.
- Checking subcontractors invoices and controlling variations.
KAFD 3.04 &3.05 Offices & Residential Towers
From October 2011 To March 2012
- Office Tower 3.04 (33 Floors)
- Residential Tower 3.04 (24 Floors)
- Office Tower 3.05 (17 Floors)
- Residential Tower 3.05 (17 Floors).
Main contractor : El-seif Contracting Co. Ltd.
Consultant : Dar AL-Riyadh
Mechanical Project Engineer
Responsibilities:
- RFI, IR, MIR, reply of NCR etc KAFD Towers 3.04 & 3.05 – Riyadh
- Coordination and solve coordination problems between all systems at site
- Contact with consultant, Project management, main contractors, and other contractors.
- Material orders, contact with suppliers.
- Daily, weekly, monthly reports for the work and balance works.
ELMACS Co. – At the Head Office – Abu Dhabi
From September 2008 To September 2011
HVAC Design Engineer
Responsibilities:
Design Division
HVAC System Designing
HVAC Shop Drawings
Cooling Load Calculations
Pumps Head Calculations
(I calculated more than 50 groups of pumps)
Fans Static Calculations
(I calculated more than 1500 Fan, AHU, FAHU )
Sound level calculations & selection of sound
attenuators.
Equipment Selections & Comparisons
Estimation Division
Quantity Surveyor
Estimation
Submittal
Variations
Sheikh Zayed Grand Masjid
Abu Dhabi - UAE
In the attached schedule list of my famous projects at ELMACS Company
4. Training Courses
176 Hours Fresh graduates populating implemented by the industrial modernization center.
(Business Communication, Accounting & Finance Analysis, Management & its types, ISO,
Marketing, Statistical Quality Control).
Hebron. Palestine March 2008
150 Hours Training course in Al-Ahli Hospital. In maintenance section.
Hebron. Palestine. June 2007
Skills
Language
Arabic (Mother Tongue).
English (speaking, writing and reading).
Good culture of Urdu, Indian & Philippine languages
Computer
Operating system: Window…
Microsoft Office: Excel, Word, Power Point…
Graphic Design: AutoCAD Program 2D & 3D.
MS Project ( Project management ).
HVAC software :
Block Load E-20, HAP (Carrier heat load calculations).
McQuay Duct Size (Duct design)
McQuay Pipe Size (Pipe design)
Pumps Head Calculations
Fans Static Calculations
Beta Program (Beta industrial selection program –grilles diffusers, louvers … )
Ruskin Program (Sound attenuators selection )
Cool pack (Refrigeration cycles calculations)
ASHRAE Psychometric Chart.
ASHRAE Duct Fitting.
Interested:
Interested and collect the scientific books and international codes such as:
ASHRAE handbooks
SMACNA handbooks
Carrier handbooks
Trains handbooks
NFPA
International plumbing code
Palestinian energy code
5. Cooling Load
Design
(Tender Drawings)
Shop Drawings
As Built
Drawings
HVAC
Coordination
Pump Head
Calculations
External Static
calculations
Variations
Quantity Survey
Material Submittal
№ Project Description Consultant AC Type
1
Centro Hotel – Abu Dhabi
24 Floors + 3 Basements
My Famous Projects Details @ ELMACS Company
Ghazi Awad
Consultant Engineer
Main Contractor
Polensky & Zoellner ‐ P & Z Air Cooled Chillers √ √ √ √ √ √ √ √
2
Al Bustan Complex, Mixed Use Development – Abu Dhabi
Hotel,Office,Unfurnished & Serviced Buildings (17 Floors each)+ 5
Basements
COX Group
AL‐ Habtoor Engineering Enterprises
Co.
District Cooling From Tabreed
By Heat Exchangers √ √ √ √ √ √
3
Hotel, Residential and Commercial Complex – Abu Dhabi
Hotel (45 Floors ),Office (17 Floors),Unfurnished & Serviced Buildings(17
Floors each) + 3 Basements
Bainona Consulting Engineers
AL‐ Habtoor Engineering Enterprises
Co.
District Cooling From Tabreed
By Heat Exchangers √ √ √ √ √
4
Commercial Building For Mr.Sultan Al Hamely – Abu Dhabi
20 Floors + 3 Basements
Dar Elemara Dhafir Development & Contracting Air Cooled Chillers √ √ √ √
5
H.H. Sheikha Fatima Building – Abu Dhabi
14 Floors + 3 Basements
Hannover ‐Consulting Engineers TARGET Air Cooled Chillers √ √ √ √ √
6
Commercial Building For Mr. Sorrour Al Kaabi – Abu Dhabi
15 Floors + 4 Basements
Eng. Adnan Saffarini
Design,Supervision, & consulting
Gulf Eagle Contracting Air Cooled Chillers √ √ √ √ √
7
Commercial Building For Mr. Saeed Al Naidi – Abu Dhabi
15 Floors + 3 Basements
Syrconsult ‐Consulting Engineers Gulf Eagle Contracting Air Cooled Chillers √ √ √ √ √
8
Exemplary School For Police – ALAin
5 Accommodation Buildings, 2 Education Buildings,
Administration Building, Restaurant & 2 Serviced Block Buildings
APG ‐ Architecture and Planning Group FORCE 10 ‐ General Contracting Air Cooled Chillers √ √ √ √ √
9
Emirates National School (Staff Accommodation) – Abu Dhabi
6 Accomodation Buildings + one Basement
Future Architecture Consultants
Ghantoot Transport
& Gen.Cont.Est. (Building Division)
Air Cooled Chillers √ √ √ √ √ √ √ √ √
10
Emirates National School (School Building) – Abu Dhabi
3 Floors Contain classes, offices, labs, swimming pool,theater,restaurant
Future Architecture Consultants
Ghantoot Transport
& Gen.Cont.Est. (Building Division)
Air Cooled Chillers √ √ √ √ √ √ √ √ √
11
Mr. Dababah Saif AL‐Masghouni – Abu Dhabi
G,M & 7 Floors
Eng. Adnan Saffarini
Design,Supervision, & consulting
Mr. Dababah Air Cooled Chillers √ √ √
12
Al Bahar Palace – Abu Dhabi
(Renovation Of The Palace)
Ian Banham & Associates Consulting
Engineers
TABREED Air Cooled Chillers √ √ √ √
13
Private Villa For Mr. Hamdan AL‐Mulla – Abu Dhabi
4 Floors + One Basement
ELMACS Package Units & Split Units √ √ √ √ √ √
14
Commercial Building For H.H. SH. Saif – Abu Dhabi
25 Floors + 3 Basements
Hannover ‐Consulting Engineers S.S.LOOTAH CONT. CO. L.L.C. Air Cooled Chillers √ √ √
15
Commercial Building For Mr.Hamoodah – Abu Dhabi
20 Floors + 3 Basements
Ian Banham & Associates Consulting
Engineers
Bin Harmal Cont. & Irrigation Est. Air Cooled Chillers √ √ √ √
1/3
6. Cooling Load
Design
(Tender Drawings)
Shop Drawings
As Built
Drawings
HVAC
Coordination
Pump Head
Calculations
External Static
calculations
Variations
Quantity Survey
Material Submittal
My Famous Projects Details @ ELMACS Company
№ Project Description Consultant Main Contractor
AC Type
16
Mubadala ‐ Erwda Building – Abu Dhabi
G,M & 12 Floors
Khatib & ALami
Consolidated Contractors
International Company (CCC)
Air Cooled Chillers √
17
Commercial Building for Mr. Obied Salem Al Khyali – Abu Dhabi
22 Floors + 2 Basements
Future Architecture Consultants S.S.LOOTAH CONT. CO. L.L.C. Air Cooled Chillers √ √
18
AL Bateen Air Base ‐ Abu Dhabi
G,First & Roof
Art Style ‐ Air Cooled Chillers √
19
Private Villa For Mr. Ahmed ALMuhairy – ALAin
3 Floors + service block
ELMACS ‐ Package Units & Split Units √ √ √
20
Emirates National School (Staff Accommodation) – M.Bin Z. City
7Accomodation Buildings
ELMACS ‐ Air Cooled Chillers √ √
21
Emirates National School (School Building) – M.Bin Z. City
3 Floors Contain classes, offices, labs, swimming pool,theater.
ELMACS ‐ Air Cooled Chillers √ √
22
Emirates National School (Kindergarten) – M.Bin Z. City
3 Floors Contain classes, offices, labs, swimming pool,theater.
ELMACS ‐ Air Cooled Chillers √ √
23
Emirates National School (ALMasjed) – M.Bin Z. City
One Floor+Roof
ELMACS ‐ Package Units & Split Units √ √
24
Emirates National School (Supermarket & Gym) – M.Bin Z. City
Tow Floors + Roof
ELMACS ‐ Package Units & Split Units √ √
25
Private Villa For Mr. Khaled ALMuhry – ALAin
3 Floors + service block
ELMACS ‐ Package Units & Split Units √ √
26
Private Villa For Mr. Ibrahim ALMarzoqi – Khalifa City
3 Floors + service block
ELMACS ‐ Package Units & Split Units √ √ √
27
Private Villa For Mr. Khalifa ALDahri – Abu Dhabi
3 Floors
ELMACS ‐ Split Units √ √
28
Private Building In Syria – Syria
4 Floors + 2 Basements
ELMACS ‐ Split Units √ √
29
Presidential Palace – Abu Dhabi
Presidential Palace 2010
‐ ‐
District Cooling From Tabreed
By Heat Exchangers √
30
Khalidia Shining Towers – Abu Dhabi
2 Towers ‐ 38 Floors + 3 Basements
‐ ‐ Water Coolled Chillers √
31
Bloom Central – Abu Dhabi
Hotel & Office Buildings
( 5 Basements + G + M + 25 Floors esch building)
‐ ‐ Water Coolled Chillers √
2/3
7. Cooling Load
Design
(Tender Drawings)
Shop Drawings
As Built
Drawings
HVAC
Coordination
Pump Head
Calculations
External Static
calculations
Variations
Quantity Survey
Material Submittal
My Famous Projects Details @ ELMACS Company
№ Project Description Consultant Main Contractor
AC Type
32
Abu Dhabi Court House – Abu Dhabi
Basement + G + 7 Floors + Roof
‐ ‐ Water Coolled Chillers √
33
Life Care Hospital – Abu Dhabi
Basement + G + 5 Floors
‐ ‐
District Cooling From Tabreed
By Heat Exchangers √
34
Ghantoot Naval Base – Abu Dhabi
3 Parts ( G + M+ 3 Floors Each Part )
‐ ‐
District Cooling From Tabreed
By Heat Exchangers √
35
Amaya Towers – Reem Island‐ Abu Dhabi
Tow Towers (one Basement + G + 28 Floors) Each
‐ ‐
District Cooling From Tabreed
By Heat Exchangers √
36
ALMansori Tower – Abu Dhabi
3 Basements + G + M + 17 Floors
‐ ‐ Air Cooled Chillers √
37
H.H. SH Saif Tower – Abu Dhabi
5 Basements + G + M + 38 Floors
‐ ‐ Air Cooled Chillers √
38
ADNOC Administration – Abu Dhabi
Ground +First + Roorf
‐ ‐ Air Cooled Chillers √
39
Arjaan Residence – Abu Dhabi
4 Basements + G + 27 Floors
‐ ‐
District Cooling From Tabreed
By Heat Exchangers √
3/3