SlideShare a Scribd company logo
MUHMMAD ADNAN ABDUL MATEEN
Present Address: Al Ghubrah Muscat Oman
Phone No.: Mobile#+ 00968- 97739031
E-mail: (1) adnanabul_khan@yaoo.com,
And (2) adnan.abdulmateen@Drakescull.com
OBJECTIVE
Seeking a challenging, development-oriented career within a dynamic and
progressive organization where enthusiasm, dedication and the ability to manage
tasks effectively are the pre-requisite in driving the organization forward.
EDUCATION
Diploma in Electrical Engineering from Board of technical education Peshawar -
1998 Pakistan
EXPERIENCE SUMMARY
(15) Years of various working experience as MEP QA/QC inspector.
Familiar with below standard
• BS standard
• ASME section XI ( WPS & BPS) also has done CSWIP 3.0 (Level 1): Visual Welding
Inspector
• NFPA standard
• SMACNA standard
DUTIES AND RESPONSIBILITY
AS QUALITY CONTROL:
• Operation & Maintenance instruction manual Preparation.
• Witness Pre commissioning and commissioning testing & Attend Testing &
Commissioning from supplier and records all test which are not
• Snagging & De snagging.
• Method Statement Preparation.
• Coordinate MEP works / drawings to all Eng. disciplines
• Perform Inspection and witness test as required.
• Prepare reports and quality records in compliance with procedures
• Monitor all works related to MEP works as per approved drawing and record all works
that are not complied with the Contract Specifications.
• Perform system verification on completed on system to assure correct installation per
design specification.
• Coordinate with Consultants prior for site inspection.
• Complying with standards and specifications.
• Rejecting materials that do not complying with Contract Specification and not as per
Approved Material Submittals.
• Developing ITP’s
• Material Inspection Requests(MIR)
• Preparing Activity Commencement Notice
• Issuing Internal NCR and Closing Consultant’s NCR
• Manage the MEP Contractors daily construction activities, schedule and progress.
• Generate Field Change Request (FCR), Field Purchase Request (FPR) and Request for
Information (RFI). Inspect and approve MEP Installation on site.
• Witness and verify Continuity, Merger, HI-POT and component testing for Medium
voltage & Low voltage equipment.
• Supervise and Inspect Subcontractor construction activities.
• Witness Pre commissioning and commissioning testing.
• Review all test packages; prepare QA/QC documentation for Turn over
Specialty
LV, HV SYSTEMS
• HV & LV Cable Trenches and Ducts
• LV Panels
• L.T Switchgears
• Distribution Board
• MCC Panels
• Lighting Control Panels
• Dimming Control Panels
• Fuse Switches & Isolator Units
• Cables, Bus Bars & Conduits
• Cable Trays & Trunking
• Electrical Wiring and its Accessories
• UPS and Battery Banks
• Light Fixtures
• Earthing System(Mesh type & Bore Type, FURSE ,UK)
• Lightening Protection System(Internal & External, FURSE, UK)
1-EMPLOYER: - DRAKE AND SCULL INTERNATIONAL
1. GOLDEN MILE HOTEL PROJECT (PALUM JUMEIRAH) DUBAI)
14-APR-2005 TO 20-APR-2008. Electrical QA/QC Inspector
Golden Mile Project
$ 300 million Cost of the Project Nakheel & IFA Launch the 10 Buildings of the "Golden Mile" Jumeirah
Dubai. The flagship Golden Mile - an international shopping and residential destination - will cover 60,000
square meters - one whole side of The Palm, Jumeirah's trunk and will include a 1.5 kilometer waterside
Corniche. Being developed at a cost of US $300 million it comprises 780 luxury apartments, in 10 waterside
buildings and 220 upscale boutique shops and restaurants. The Palm Golden Mile joins IFA's extensive
development portfolio for The Palm, Jumeirah. The company is also behind The Palm Hotel & Resort with 300
rooms, the five-star Palm Vacation Club on the island's trunk, a 1,000 room five-star Palm Sun Hotel and
Resort on the island's crescent. In addition, IFA Hotels & Resorts is behind The Palm Residence, with luxury
apartments in the twin Al Nabat and Al Haseer towers.
Client: Nakheel & IFA.
Consultant: RPW Int’l. & CKR Int’l.
MEP Contractor: Drake & Scull Int’l.
2. KINGDOM OF SHEBA APPARTMENTS & VILLAS PROJECT (PALUM JUMEIRAH) DUBAI.
Mechanical QA/QC Inspector 21-APR-2008 TO 31-JAN-2009
The resort covers 141,500 sq. meters in a prime location on
The Crescent of The Palm Jumeirah, adjacent to the renowned
Atlantis development. The Kingdom of Sheba will be managed
by Fairmont Hotels & Resorts (Fairmont) and will consist of
five separate and unique elements, each strongly influenced by
classic Arab architecture - Residences, Hotel, Private
Residence Club, Vacation Club and a Souq (Retail Plaza). The
combined value of the resort is in excess of US$1 billion.
Client: Nakheel & IFA.
Consultant: ACC Int’l,
MEP Contractor: Drake & Scull Int’l
3. Ocean-Heights Dubai Marina
Electrical QA/QC Inspector (01-FEB-2009 TO 05-MAR-2010)
Ocean Heights is a supertall residential skyscraper in Dubai
Marina, Dubai, UAE. The tower stands 310 m (1,017 ft) tall with
83floors.[4] The tower is designed by Andrew
Bromberg of Aedas.[5] The building was topped-out on 22 December
2009,[6] and completed in 2010. Currently Ocean Heights is the fifth
tallest residential building in the world,[7] and fourth tallest residential
building in Dubai, behind The Marina Torch, and HHHR Tower.
Project Title: Ocean Heights
Client: DAMAC
Main Contractor: ARABTEC
Consultant: Engineering Consultant Group /
Ian Banham
Contract Value: AED 122,000,000.00
4. FAIRMONT PALUM HOTEL & RESORTS (PALUM JUMEIRAH) DUBAI)
01-FEB-2009 TO 30-APR-2011
Mechanical QA/QC Inspector
The Fairmont Palum Hotel & Resorts Dubai
US$115 million project is Fairmont Palum Hotel & Resorts in Palm Jumeirah Dubai hotel is features 381
guestrooms and suites including two Presidential Suites and a Fairmont Gold Lounge and rooms, 3,000 squares
meters of Conference and meeting Room space and a full service business center
Client: Nakheel & IFA.
Consultant: RPW Int’l. & CKR Int’l
MEP Contractor: Drake & Scull Int’l.
5. NEW OFFICE BUILDING FOR ROYAL COURT AFFAIRS AT AL GHUBRAH
01-JUN-2011 TO 20 -DEC-2012
Client: Royal Court Affairs (RCA)
Consultant: Royal Court Affairs (RCA)
MEP Contractor: Drake & Scull Int’l.(DSI)
6. COMPLEX FOR MUSCAT ROYAL PHILHARMONIC ORCHESTRA AT NAGAMAT
PHASE –II AT BAIT AL BARAKAH
05 -FEB-2012 TO 20 -JUN-2013
Client: Royal Court Affairs (RCA)
Consultant: Consulting Engineering Services (CES)
MEP Contractor: Drake & Scull Int’l. (DSI)
7. DIWAN OF ROYAL COURT CLINIC AT SALALAH
02 -FEB-2014 TO 20 -JUN-2014
Client: Royal Court Affairs (RCA)
Consultant: National Engineering Office (NEO)
MEP Contractor: Drake & Scull Int’l. (DSI)
8. MAIN CONTRACT-2 DEVLOPMENT OF MUSCAT INTERNATIONAL AIRPORT
02 -FEB-2013 TO 27 -JUL-2015
Client: Sultanate of Oman Ministry of Transport and Communications
Consultant:
MEP Contractor: Drake & Scull Int’l. (DSI)
9. OMAN CONVENTION AND EXHIBITION CENTER PACKAGE -3
27 -JUL-2015 UP TO NOW
Oman Convention and Exhibition Centre (OCEC) - Scheduled to open in 2017, the larger OCEC
complex (Wadi Irfan) will include four hotels, a business park, retail shopping areas and residential
districts, surrounded by a nature reserve.] The completed OCEC will also feature the largest fixed
seating auditorium in the GCC (3,200 seats) and the largest car park structure in Oman (4,200
spaces), the country’s largest district cooling plant (32,500 refrigeration tons), the largest steel truss
span (80 metres) supporting the Exhibition Halls and the largest dome in Oman (120 metre span).
Client: OMRAN
Consultant: SSH
MEP Contractor: Drake & Scull Int’l.
COMPUTER SKILLS
MS office, AutoCAD 2007, Primavera, P3
LANGUAGES
English, Urdu/Hindi, Arabic, Pashto

More Related Content

What's hot

CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEERCV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
Nguyen Thuc
 
SABER CV
SABER CVSABER CV
SABER CV
Saber Muallem
 
Sadiq new Resume
Sadiq new ResumeSadiq new Resume
Sadiq new Resume
sadiq rizan
 
Haider Ali_CV
Haider Ali_CVHaider Ali_CV
Haider Ali_CV
Haider Ali
 
Abhilash CV
Abhilash CVAbhilash CV
QAQC E&I
QAQC E&IQAQC E&I
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
Mubashir ahmee
 
jameen new senior instrument cv
jameen new senior instrument cvjameen new senior instrument cv
jameen new senior instrument cv
jameen rahman
 
CV OF ELECTRICAL ENGINEER
CV OF ELECTRICAL ENGINEERCV OF ELECTRICAL ENGINEER
CV OF ELECTRICAL ENGINEER
SURENDRAN CHANDRASEKARAN
 
Sameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CVSameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CV
Sameh Youssef
 
Update profile 2015
Update profile 2015Update profile 2015
Update profile 2015
khaliqsharif sharif
 
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)
Khalid Eltahir
 
Ervin Guinit Buagas CV & Resume
Ervin Guinit Buagas CV & ResumeErvin Guinit Buagas CV & Resume
Ervin Guinit Buagas CV & Resume
Ervin Buagas
 
9 years Exp Electrical engineer
9 years Exp Electrical engineer9 years Exp Electrical engineer
9 years Exp Electrical engineer
DURGA PRASAD
 
Prem CV Oct 2015
Prem CV Oct 2015Prem CV Oct 2015
Prem CV Oct 2015
Prem Kumar
 
Thomas vincent cv
Thomas vincent cvThomas vincent cv
Thomas vincent cv
Thomas Vincent
 
Moh'd Gaweish_CV
Moh'd Gaweish_CVMoh'd Gaweish_CV
Moh'd Gaweish_CV
Mohammed Gaweish
 
Syed C.V
Syed C.VSyed C.V
JADE SANTOS CV
JADE SANTOS CVJADE SANTOS CV
JADE SANTOS CV
Jade Santos ECE
 

What's hot (19)

CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEERCV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
CV NGUYEN HUU THUC - ELECTRICAL & INSTRUMENT ENGINEER
 
SABER CV
SABER CVSABER CV
SABER CV
 
Sadiq new Resume
Sadiq new ResumeSadiq new Resume
Sadiq new Resume
 
Haider Ali_CV
Haider Ali_CVHaider Ali_CV
Haider Ali_CV
 
Abhilash CV
Abhilash CVAbhilash CV
Abhilash CV
 
QAQC E&I
QAQC E&IQAQC E&I
QAQC E&I
 
mubashir Electrical engineer
mubashir Electrical engineermubashir Electrical engineer
mubashir Electrical engineer
 
jameen new senior instrument cv
jameen new senior instrument cvjameen new senior instrument cv
jameen new senior instrument cv
 
CV OF ELECTRICAL ENGINEER
CV OF ELECTRICAL ENGINEERCV OF ELECTRICAL ENGINEER
CV OF ELECTRICAL ENGINEER
 
Sameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CVSameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CV
 
Update profile 2015
Update profile 2015Update profile 2015
Update profile 2015
 
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)
 
Ervin Guinit Buagas CV & Resume
Ervin Guinit Buagas CV & ResumeErvin Guinit Buagas CV & Resume
Ervin Guinit Buagas CV & Resume
 
9 years Exp Electrical engineer
9 years Exp Electrical engineer9 years Exp Electrical engineer
9 years Exp Electrical engineer
 
Prem CV Oct 2015
Prem CV Oct 2015Prem CV Oct 2015
Prem CV Oct 2015
 
Thomas vincent cv
Thomas vincent cvThomas vincent cv
Thomas vincent cv
 
Moh'd Gaweish_CV
Moh'd Gaweish_CVMoh'd Gaweish_CV
Moh'd Gaweish_CV
 
Syed C.V
Syed C.VSyed C.V
Syed C.V
 
JADE SANTOS CV
JADE SANTOS CVJADE SANTOS CV
JADE SANTOS CV
 

Viewers also liked

The Enterprise - Utah millennials finding success launching entrepreneurial e...
The Enterprise - Utah millennials finding success launching entrepreneurial e...The Enterprise - Utah millennials finding success launching entrepreneurial e...
The Enterprise - Utah millennials finding success launching entrepreneurial e...
Sheena Steedman
 
Sumber Hukum Islam
Sumber Hukum IslamSumber Hukum Islam
Sumber Hukum Islam
Muhibbudin Kamal
 
Perion - NOAH14 London
Perion - NOAH14 LondonPerion - NOAH14 London
Perion - NOAH14 London
NOAH Advisors
 
Find best business loans
Find best business loansFind best business loans
Find best business loans
RaymondCarroll
 
Best business loans
Best business loansBest business loans
Best business loans
RaymondCarroll
 
Care Wars: The BPCI Force Awakens
Care Wars: The BPCI Force AwakensCare Wars: The BPCI Force Awakens
Care Wars: The BPCI Force Awakens
EmCare
 
ShahKhalid-97-2003_PM
ShahKhalid-97-2003_PMShahKhalid-97-2003_PM
ShahKhalid-97-2003_PM
Shah Khalid
 
Herramientas tecnologicas equipo 2
Herramientas tecnologicas equipo 2Herramientas tecnologicas equipo 2
Herramientas tecnologicas equipo 2
Danilo Jimenes
 
10 Steps to Manage Your Online Ratings #RDJ2016
10 Steps to Manage Your Online Ratings #RDJ201610 Steps to Manage Your Online Ratings #RDJ2016
10 Steps to Manage Your Online Ratings #RDJ2016
Surefire Local
 
10 λόγοι για να δώσεις στον εαυτό σου ένα... στιγμιαίο διάλειμμα
10 λόγοι για να δώσεις στον εαυτό σου ένα... στιγμιαίο διάλειμμα10 λόγοι για να δώσεις στον εαυτό σου ένα... στιγμιαίο διάλειμμα
10 λόγοι για να δώσεις στον εαυτό σου ένα... στιγμιαίο διάλειμμα
nutrimed_health_diet
 
Малоинвазивная хирургия щитовидной железы, Ashok Shaha
Малоинвазивная хирургия щитовидной железы, Ashok ShahaМалоинвазивная хирургия щитовидной железы, Ashok Shaha
Малоинвазивная хирургия щитовидной железы, Ashok ShahaEurasian Federation of Oncology
 
Monband water soluble fertilizer
Monband water soluble fertilizerMonband water soluble fertilizer
Monband water soluble fertilizer
Peter Li
 
VMS Updated - 19th Jan-2017
VMS Updated - 19th Jan-2017VMS Updated - 19th Jan-2017
VMS Updated - 19th Jan-2017
Maruti Srinivas Vishnubhotla
 
revista Jennifer
revista Jenniferrevista Jennifer
revista Jennifer
jennifer escobar
 

Viewers also liked (15)

The Enterprise - Utah millennials finding success launching entrepreneurial e...
The Enterprise - Utah millennials finding success launching entrepreneurial e...The Enterprise - Utah millennials finding success launching entrepreneurial e...
The Enterprise - Utah millennials finding success launching entrepreneurial e...
 
Sumber Hukum Islam
Sumber Hukum IslamSumber Hukum Islam
Sumber Hukum Islam
 
Perion - NOAH14 London
Perion - NOAH14 LondonPerion - NOAH14 London
Perion - NOAH14 London
 
Find best business loans
Find best business loansFind best business loans
Find best business loans
 
Best business loans
Best business loansBest business loans
Best business loans
 
Care Wars: The BPCI Force Awakens
Care Wars: The BPCI Force AwakensCare Wars: The BPCI Force Awakens
Care Wars: The BPCI Force Awakens
 
ShahKhalid-97-2003_PM
ShahKhalid-97-2003_PMShahKhalid-97-2003_PM
ShahKhalid-97-2003_PM
 
Herramientas tecnologicas equipo 2
Herramientas tecnologicas equipo 2Herramientas tecnologicas equipo 2
Herramientas tecnologicas equipo 2
 
10 Steps to Manage Your Online Ratings #RDJ2016
10 Steps to Manage Your Online Ratings #RDJ201610 Steps to Manage Your Online Ratings #RDJ2016
10 Steps to Manage Your Online Ratings #RDJ2016
 
10 λόγοι για να δώσεις στον εαυτό σου ένα... στιγμιαίο διάλειμμα
10 λόγοι για να δώσεις στον εαυτό σου ένα... στιγμιαίο διάλειμμα10 λόγοι για να δώσεις στον εαυτό σου ένα... στιγμιαίο διάλειμμα
10 λόγοι για να δώσεις στον εαυτό σου ένα... στιγμιαίο διάλειμμα
 
Малоинвазивная хирургия щитовидной железы, Ashok Shaha
Малоинвазивная хирургия щитовидной железы, Ashok ShahaМалоинвазивная хирургия щитовидной железы, Ashok Shaha
Малоинвазивная хирургия щитовидной железы, Ashok Shaha
 
RCV
RCVRCV
RCV
 
Monband water soluble fertilizer
Monband water soluble fertilizerMonband water soluble fertilizer
Monband water soluble fertilizer
 
VMS Updated - 19th Jan-2017
VMS Updated - 19th Jan-2017VMS Updated - 19th Jan-2017
VMS Updated - 19th Jan-2017
 
revista Jennifer
revista Jenniferrevista Jennifer
revista Jennifer
 

Similar to - CV ADNAN

Michael E. Cruz - C.V.
Michael E. Cruz - C.V.Michael E. Cruz - C.V.
Michael E. Cruz - C.V.
Michael Cruz
 
Michael e. cruz c.v.
Michael e. cruz   c.v.Michael e. cruz   c.v.
Michael e. cruz c.v.
Michael Cruz
 
Abdelmagid Abdel Aziz
Abdelmagid Abdel AzizAbdelmagid Abdel Aziz
Abdelmagid Abdel Aziz
Abdelmajid Abdelaziz
 
project electrical engineer
project electrical engineerproject electrical engineer
project electrical engineer
Engr.Jahangir Ali Ahmed
 
mohamed fawzy cv 2712016
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016
Mohamed Fawzy
 
mohamed fawzy cv 2712016
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016
Mohamed Fawzy
 
CV 2016 .
CV 2016 .CV 2016 .
CV 2016 .
Mohamed Al Sebay
 
RESUME-Sijin
RESUME-SijinRESUME-Sijin
RESUME-Sijin
SiJiN SiDharTH
 
Eng ALI ABDULFATAH 2015
Eng ALI ABDULFATAH 2015Eng ALI ABDULFATAH 2015
Eng ALI ABDULFATAH 2015
ALI ABD EL FATTAH
 
THOWFIC AHAMED CV
THOWFIC AHAMED CVTHOWFIC AHAMED CV
THOWFIC AHAMED CV
Thowfic Ahamed
 
Rana maqsood alam resume (e&i) and construction
Rana maqsood alam  resume (e&i) and constructionRana maqsood alam  resume (e&i) and construction
Rana maqsood alam resume (e&i) and construction
rana maqsood
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)
rana maqsood
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
shaik karimulla
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
shaik karimulla
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
shaik karimulla
 
Mostafa CV
Mostafa CVMostafa CV
Mostafa CV
Mostafa Aly
 
Cv of nageshwar sharma 2019 (ce)
Cv of nageshwar sharma 2019 (ce)Cv of nageshwar sharma 2019 (ce)
Cv of nageshwar sharma 2019 (ce)
Nageshwar Sharma
 
Shameem Ahamed - Electrical Engineer
Shameem Ahamed - Electrical EngineerShameem Ahamed - Electrical Engineer
Shameem Ahamed - Electrical Engineer
Shameem Ahamed
 
Raveendran Pillai_7777 LinkedIn
Raveendran Pillai_7777 LinkedInRaveendran Pillai_7777 LinkedIn
Raveendran Pillai_7777 LinkedIn
Ravi Pilla
 

Similar to - CV ADNAN (20)

Michael E. Cruz - C.V.
Michael E. Cruz - C.V.Michael E. Cruz - C.V.
Michael E. Cruz - C.V.
 
Michael e. cruz c.v.
Michael e. cruz   c.v.Michael e. cruz   c.v.
Michael e. cruz c.v.
 
Abdelmagid Abdel Aziz
Abdelmagid Abdel AzizAbdelmagid Abdel Aziz
Abdelmagid Abdel Aziz
 
project electrical engineer
project electrical engineerproject electrical engineer
project electrical engineer
 
mohamed fawzy cv 2712016
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016
 
mohamed fawzy cv 2712016
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016
 
CV 2016 .
CV 2016 .CV 2016 .
CV 2016 .
 
RESUME-Sijin
RESUME-SijinRESUME-Sijin
RESUME-Sijin
 
Eng ALI ABDULFATAH 2015
Eng ALI ABDULFATAH 2015Eng ALI ABDULFATAH 2015
Eng ALI ABDULFATAH 2015
 
THOWFIC AHAMED CV
THOWFIC AHAMED CVTHOWFIC AHAMED CV
THOWFIC AHAMED CV
 
Rana maqsood alam resume (e&i) and construction
Rana maqsood alam  resume (e&i) and constructionRana maqsood alam  resume (e&i) and construction
Rana maqsood alam resume (e&i) and construction
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Mostafa CV
Mostafa CVMostafa CV
Mostafa CV
 
Cv of nageshwar sharma 2019 (ce)
Cv of nageshwar sharma 2019 (ce)Cv of nageshwar sharma 2019 (ce)
Cv of nageshwar sharma 2019 (ce)
 
Shameem Ahamed - Electrical Engineer
Shameem Ahamed - Electrical EngineerShameem Ahamed - Electrical Engineer
Shameem Ahamed - Electrical Engineer
 
Raveendran Pillai_7777 LinkedIn
Raveendran Pillai_7777 LinkedInRaveendran Pillai_7777 LinkedIn
Raveendran Pillai_7777 LinkedIn
 

Recently uploaded

Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
Mahmoud Morsy
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...
IJECEIAES
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
AjmalKhan50578
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
integral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdfintegral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdf
gaafergoudaay7aga
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 

Recently uploaded (20)

Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
integral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdfintegral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdf
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 

- CV ADNAN

  • 1. MUHMMAD ADNAN ABDUL MATEEN Present Address: Al Ghubrah Muscat Oman Phone No.: Mobile#+ 00968- 97739031 E-mail: (1) adnanabul_khan@yaoo.com, And (2) adnan.abdulmateen@Drakescull.com OBJECTIVE Seeking a challenging, development-oriented career within a dynamic and progressive organization where enthusiasm, dedication and the ability to manage tasks effectively are the pre-requisite in driving the organization forward. EDUCATION Diploma in Electrical Engineering from Board of technical education Peshawar - 1998 Pakistan EXPERIENCE SUMMARY (15) Years of various working experience as MEP QA/QC inspector. Familiar with below standard • BS standard • ASME section XI ( WPS & BPS) also has done CSWIP 3.0 (Level 1): Visual Welding Inspector • NFPA standard • SMACNA standard DUTIES AND RESPONSIBILITY AS QUALITY CONTROL: • Operation & Maintenance instruction manual Preparation. • Witness Pre commissioning and commissioning testing & Attend Testing & Commissioning from supplier and records all test which are not • Snagging & De snagging. • Method Statement Preparation. • Coordinate MEP works / drawings to all Eng. disciplines • Perform Inspection and witness test as required. • Prepare reports and quality records in compliance with procedures • Monitor all works related to MEP works as per approved drawing and record all works that are not complied with the Contract Specifications. • Perform system verification on completed on system to assure correct installation per design specification. • Coordinate with Consultants prior for site inspection. • Complying with standards and specifications. • Rejecting materials that do not complying with Contract Specification and not as per Approved Material Submittals. • Developing ITP’s • Material Inspection Requests(MIR) • Preparing Activity Commencement Notice
  • 2. • Issuing Internal NCR and Closing Consultant’s NCR • Manage the MEP Contractors daily construction activities, schedule and progress. • Generate Field Change Request (FCR), Field Purchase Request (FPR) and Request for Information (RFI). Inspect and approve MEP Installation on site. • Witness and verify Continuity, Merger, HI-POT and component testing for Medium voltage & Low voltage equipment. • Supervise and Inspect Subcontractor construction activities. • Witness Pre commissioning and commissioning testing. • Review all test packages; prepare QA/QC documentation for Turn over Specialty LV, HV SYSTEMS • HV & LV Cable Trenches and Ducts • LV Panels • L.T Switchgears • Distribution Board • MCC Panels • Lighting Control Panels • Dimming Control Panels • Fuse Switches & Isolator Units • Cables, Bus Bars & Conduits • Cable Trays & Trunking • Electrical Wiring and its Accessories • UPS and Battery Banks • Light Fixtures • Earthing System(Mesh type & Bore Type, FURSE ,UK) • Lightening Protection System(Internal & External, FURSE, UK) 1-EMPLOYER: - DRAKE AND SCULL INTERNATIONAL 1. GOLDEN MILE HOTEL PROJECT (PALUM JUMEIRAH) DUBAI) 14-APR-2005 TO 20-APR-2008. Electrical QA/QC Inspector Golden Mile Project $ 300 million Cost of the Project Nakheel & IFA Launch the 10 Buildings of the "Golden Mile" Jumeirah Dubai. The flagship Golden Mile - an international shopping and residential destination - will cover 60,000 square meters - one whole side of The Palm, Jumeirah's trunk and will include a 1.5 kilometer waterside Corniche. Being developed at a cost of US $300 million it comprises 780 luxury apartments, in 10 waterside buildings and 220 upscale boutique shops and restaurants. The Palm Golden Mile joins IFA's extensive development portfolio for The Palm, Jumeirah. The company is also behind The Palm Hotel & Resort with 300 rooms, the five-star Palm Vacation Club on the island's trunk, a 1,000 room five-star Palm Sun Hotel and Resort on the island's crescent. In addition, IFA Hotels & Resorts is behind The Palm Residence, with luxury apartments in the twin Al Nabat and Al Haseer towers. Client: Nakheel & IFA. Consultant: RPW Int’l. & CKR Int’l. MEP Contractor: Drake & Scull Int’l.
  • 3. 2. KINGDOM OF SHEBA APPARTMENTS & VILLAS PROJECT (PALUM JUMEIRAH) DUBAI. Mechanical QA/QC Inspector 21-APR-2008 TO 31-JAN-2009 The resort covers 141,500 sq. meters in a prime location on The Crescent of The Palm Jumeirah, adjacent to the renowned Atlantis development. The Kingdom of Sheba will be managed by Fairmont Hotels & Resorts (Fairmont) and will consist of five separate and unique elements, each strongly influenced by classic Arab architecture - Residences, Hotel, Private Residence Club, Vacation Club and a Souq (Retail Plaza). The combined value of the resort is in excess of US$1 billion. Client: Nakheel & IFA. Consultant: ACC Int’l, MEP Contractor: Drake & Scull Int’l 3. Ocean-Heights Dubai Marina Electrical QA/QC Inspector (01-FEB-2009 TO 05-MAR-2010) Ocean Heights is a supertall residential skyscraper in Dubai Marina, Dubai, UAE. The tower stands 310 m (1,017 ft) tall with 83floors.[4] The tower is designed by Andrew Bromberg of Aedas.[5] The building was topped-out on 22 December 2009,[6] and completed in 2010. Currently Ocean Heights is the fifth tallest residential building in the world,[7] and fourth tallest residential building in Dubai, behind The Marina Torch, and HHHR Tower. Project Title: Ocean Heights Client: DAMAC Main Contractor: ARABTEC Consultant: Engineering Consultant Group / Ian Banham Contract Value: AED 122,000,000.00 4. FAIRMONT PALUM HOTEL & RESORTS (PALUM JUMEIRAH) DUBAI) 01-FEB-2009 TO 30-APR-2011 Mechanical QA/QC Inspector The Fairmont Palum Hotel & Resorts Dubai US$115 million project is Fairmont Palum Hotel & Resorts in Palm Jumeirah Dubai hotel is features 381 guestrooms and suites including two Presidential Suites and a Fairmont Gold Lounge and rooms, 3,000 squares meters of Conference and meeting Room space and a full service business center Client: Nakheel & IFA. Consultant: RPW Int’l. & CKR Int’l MEP Contractor: Drake & Scull Int’l.
  • 4. 5. NEW OFFICE BUILDING FOR ROYAL COURT AFFAIRS AT AL GHUBRAH 01-JUN-2011 TO 20 -DEC-2012 Client: Royal Court Affairs (RCA) Consultant: Royal Court Affairs (RCA) MEP Contractor: Drake & Scull Int’l.(DSI) 6. COMPLEX FOR MUSCAT ROYAL PHILHARMONIC ORCHESTRA AT NAGAMAT PHASE –II AT BAIT AL BARAKAH 05 -FEB-2012 TO 20 -JUN-2013 Client: Royal Court Affairs (RCA) Consultant: Consulting Engineering Services (CES) MEP Contractor: Drake & Scull Int’l. (DSI) 7. DIWAN OF ROYAL COURT CLINIC AT SALALAH 02 -FEB-2014 TO 20 -JUN-2014 Client: Royal Court Affairs (RCA) Consultant: National Engineering Office (NEO) MEP Contractor: Drake & Scull Int’l. (DSI) 8. MAIN CONTRACT-2 DEVLOPMENT OF MUSCAT INTERNATIONAL AIRPORT 02 -FEB-2013 TO 27 -JUL-2015 Client: Sultanate of Oman Ministry of Transport and Communications Consultant: MEP Contractor: Drake & Scull Int’l. (DSI)
  • 5. 9. OMAN CONVENTION AND EXHIBITION CENTER PACKAGE -3 27 -JUL-2015 UP TO NOW Oman Convention and Exhibition Centre (OCEC) - Scheduled to open in 2017, the larger OCEC complex (Wadi Irfan) will include four hotels, a business park, retail shopping areas and residential districts, surrounded by a nature reserve.] The completed OCEC will also feature the largest fixed seating auditorium in the GCC (3,200 seats) and the largest car park structure in Oman (4,200 spaces), the country’s largest district cooling plant (32,500 refrigeration tons), the largest steel truss span (80 metres) supporting the Exhibition Halls and the largest dome in Oman (120 metre span). Client: OMRAN Consultant: SSH MEP Contractor: Drake & Scull Int’l. COMPUTER SKILLS MS office, AutoCAD 2007, Primavera, P3 LANGUAGES English, Urdu/Hindi, Arabic, Pashto