By: Tamer Farid Rev. 6
G1201
Adams Challenge
Event Description [Contract] Key Date
Effective Date of Agreement 5-Nov-14
Start of Cutting Project Steel 15-Dec-14
Mobilization of Sleeper / Riser Installation Marine Spread 14-Aug-15
Completion of Full Deck Main Structure + Full Jacket Fabrication 7-Sep-15
Mobilization of Pipeline / Platform Installation Marine Spread 8-Sep-15
Installation of Jacket at the Worksite 10-Oct-15
Completion of Installation of All Pipelines 21-Nov-15
Installation of the Rashid-C Deck at the Work Site 24-Nov-15
Pre-Commissioning of All Pipelines 26-Dec-15
Mechanical Completion of All Facilities 26-Dec-15
Handover of All Project Documentation 4-Feb-16
DSV Adams Challenge
Sleepers Installation
SMART Flange Preparation
Risers Installation
Bowstring Installation
Production Spools
Metrology, Closing Spools, Jacket Grouting, Crossing
Completion, Susea Protection Frames & Bowstring Removal
Pre-commissioning Support
DSV Oceanic Installer
Subsea FCG of 14" & 20" Replacement Pipelines
Metrology, Fixed & Closing Spools Installation
G1201
Rashid C Jacket & Boat Landing Installation
Pipelines Installation (30", 20" & 14")
Pipelines Installation (18", 10" & 12")
Deck Installation
Pre-Commissioning
30", 20" & 14"
18", 12" & 10"
Feb-16 Mar-16Jan-16May-15 Dec-15Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15
Jacket
Topsides
Piles
Risers
Tie-in Spools
Installation Aids
Pre-Engineering
Survey
Geophysical & ROV Jacket Face
Surveys
Bowstring Installation (4 nos.)
Concrete Sleepers Installation
102 Km of Pipelines; 30", 20", 18", 14",
12" & 10"
In-line Barred Tees (6 nos.)
Risers (8 nos.) + Riser Clamps (29 nos.)
Free Span Corrections
Tie-in / Closing Spools
Production Spools
Smart Flanges (8 nos.)
Valve Assemblies
Subsea Protection Frames (6 nos.)
FCG & Hydrotest of all Pipeline
Systems.
De-watering & Nitrogen Purging of 10"
Gas Lift Pipeine System.
As-Built Survey ROV & CP Potential Surveys
Pre-Commissioning
Fabrication
(Dubai Dry Docks)
DSV Preparatory
Works
Scope of Work
DSV Works
Pipelying
(G1201)

More Related Content

What's hot

Vedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas ShipsVedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas Ships
Vedam design & Techincal Consultancy Pvt Ltd.
 
03.224 - Stern_trawler_Sandettie_upgrading.PDF
03.224 - Stern_trawler_Sandettie_upgrading.PDF03.224 - Stern_trawler_Sandettie_upgrading.PDF
03.224 - Stern_trawler_Sandettie_upgrading.PDF
Hans Tompot
 
Multiphase Desanding for Upstream Oil & Gas Industry
Multiphase Desanding for Upstream Oil & Gas IndustryMultiphase Desanding for Upstream Oil & Gas Industry
Multiphase Desanding for Upstream Oil & Gas Industry
Hank Rawlins
 
Method of Statement - Pavement works
Method of Statement - Pavement worksMethod of Statement - Pavement works
Method of Statement - Pavement works
Mohd Nizam Mohd Zan
 
ERNEST HODGINS CV
ERNEST HODGINS CVERNEST HODGINS CV
ERNEST HODGINS CV
Ernie Hodgins
 
10-02-03
10-02-0310-02-03
10-02-03
Alan Gardner
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016
zuraidi Ismail
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
Ahmad Hassan
 
Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions
Vedam design & Techincal Consultancy Pvt Ltd.
 
Method statement tank base concrete pouring
Method statement  tank base concrete pouringMethod statement  tank base concrete pouring
Method statement tank base concrete pouring
Bharatha Rathnayke
 
Vedam Design:- BWTS - Retrofits Services
Vedam Design:-  BWTS - Retrofits Services Vedam Design:-  BWTS - Retrofits Services
Vedam Design:- BWTS - Retrofits Services
Vedam design & Techincal Consultancy Pvt Ltd.
 
Work Experience large
Work Experience largeWork Experience large
Work Experience large
Travis Costello P.Tech
 
vikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioningvikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioning
vikash kumar
 
CV Novo
CV NovoCV Novo
CV Novo
Novo Blanco
 
2 l 65z
2 l 65z2 l 65z
2 l 65z
Adi Manurung
 
ATTEEQUE CV
ATTEEQUE CVATTEEQUE CV
ATTEEQUE CV
Atteeque Rehman
 
Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01
Zachary Maddox
 
Falcon Spirit FSO
Falcon Spirit FSOFalcon Spirit FSO
Falcon Spirit FSO
Teekay Corporation
 

What's hot (18)

Vedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas ShipsVedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas Ships
 
03.224 - Stern_trawler_Sandettie_upgrading.PDF
03.224 - Stern_trawler_Sandettie_upgrading.PDF03.224 - Stern_trawler_Sandettie_upgrading.PDF
03.224 - Stern_trawler_Sandettie_upgrading.PDF
 
Multiphase Desanding for Upstream Oil & Gas Industry
Multiphase Desanding for Upstream Oil & Gas IndustryMultiphase Desanding for Upstream Oil & Gas Industry
Multiphase Desanding for Upstream Oil & Gas Industry
 
Method of Statement - Pavement works
Method of Statement - Pavement worksMethod of Statement - Pavement works
Method of Statement - Pavement works
 
ERNEST HODGINS CV
ERNEST HODGINS CVERNEST HODGINS CV
ERNEST HODGINS CV
 
10-02-03
10-02-0310-02-03
10-02-03
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 
Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions
 
Method statement tank base concrete pouring
Method statement  tank base concrete pouringMethod statement  tank base concrete pouring
Method statement tank base concrete pouring
 
Vedam Design:- BWTS - Retrofits Services
Vedam Design:-  BWTS - Retrofits Services Vedam Design:-  BWTS - Retrofits Services
Vedam Design:- BWTS - Retrofits Services
 
Work Experience large
Work Experience largeWork Experience large
Work Experience large
 
vikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioningvikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioning
 
CV Novo
CV NovoCV Novo
CV Novo
 
2 l 65z
2 l 65z2 l 65z
2 l 65z
 
ATTEEQUE CV
ATTEEQUE CVATTEEQUE CV
ATTEEQUE CV
 
Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01
 
Falcon Spirit FSO
Falcon Spirit FSOFalcon Spirit FSO
Falcon Spirit FSO
 

Similar to Rashid C_Synopsis_R6

Glenn Ross-CV
Glenn Ross-CVGlenn Ross-CV
Glenn Ross-CV
Glenn Ross
 
10. Overall Implementation Programme
10. Overall Implementation Programme10. Overall Implementation Programme
10. Overall Implementation Programme
Sam Kendall, MSc, BSc Civil Eng., PMP®, MIEAust
 
Bill ure cv 31 08-16
Bill ure cv 31 08-16Bill ure cv 31 08-16
Bill ure cv 31 08-16
bill ure
 
Cv mm
Cv mmCv mm
YH profile (E)
YH profile (E)YH profile (E)
YH profile (E)
Flora Vincent ™
 
Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)
Guntur Rudy
 
Marginal offshore production platform feasibility
Marginal offshore production platform feasibilityMarginal offshore production platform feasibility
Marginal offshore production platform feasibility
guest651e92c
 
BradCVSept2015
BradCVSept2015BradCVSept2015
BradCVSept2015
Brad Plunkett
 
MSD Engineering Manager-Senior Designer 2015oct
MSD Engineering Manager-Senior Designer 2015octMSD Engineering Manager-Senior Designer 2015oct
MSD Engineering Manager-Senior Designer 2015oct
Mark S. Davis
 
Cv paoloaguzzinov16
Cv paoloaguzzinov16Cv paoloaguzzinov16
Cv paoloaguzzinov16
Paolo Aguzzi
 
KOM Presentation STN-N Conductor_rev 2
KOM Presentation STN-N Conductor_rev 2KOM Presentation STN-N Conductor_rev 2
KOM Presentation STN-N Conductor_rev 2
Brian Quan (Minh)
 
sharndencv
sharndencvsharndencv
sharndencv
Shaun Harnden
 
Marginal satellite study Noordzee
Marginal satellite study NoordzeeMarginal satellite study Noordzee
Marginal satellite study Noordzee
Sander_van_oirschot
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
PRASHANT MATKAR
 
Instrument Engineer
Instrument EngineerInstrument Engineer
Instrument Engineer
PRASHANT MATKAR
 
CV at 2015 Aug
CV at 2015 AugCV at 2015 Aug
CV at 2015 Aug
Brian Campbell
 
pipeline foreman
pipeline foremanpipeline foreman
pipeline foreman
merajuddin shaikh
 
Project Mechanical Engineer C.V
Project Mechanical Engineer C.VProject Mechanical Engineer C.V
Project Mechanical Engineer C.V
ali ibrahim
 
Project mechanical engineer c.v
Project mechanical engineer c.vProject mechanical engineer c.v
Project mechanical engineer c.v
ali ibrahim
 
Bgl solar update210614
Bgl solar update210614Bgl solar update210614
Bgl solar update210614
Tejas Kale
 

Similar to Rashid C_Synopsis_R6 (20)

Glenn Ross-CV
Glenn Ross-CVGlenn Ross-CV
Glenn Ross-CV
 
10. Overall Implementation Programme
10. Overall Implementation Programme10. Overall Implementation Programme
10. Overall Implementation Programme
 
Bill ure cv 31 08-16
Bill ure cv 31 08-16Bill ure cv 31 08-16
Bill ure cv 31 08-16
 
Cv mm
Cv mmCv mm
Cv mm
 
YH profile (E)
YH profile (E)YH profile (E)
YH profile (E)
 
Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)Guntur Rudy CV (2016.10)
Guntur Rudy CV (2016.10)
 
Marginal offshore production platform feasibility
Marginal offshore production platform feasibilityMarginal offshore production platform feasibility
Marginal offshore production platform feasibility
 
BradCVSept2015
BradCVSept2015BradCVSept2015
BradCVSept2015
 
MSD Engineering Manager-Senior Designer 2015oct
MSD Engineering Manager-Senior Designer 2015octMSD Engineering Manager-Senior Designer 2015oct
MSD Engineering Manager-Senior Designer 2015oct
 
Cv paoloaguzzinov16
Cv paoloaguzzinov16Cv paoloaguzzinov16
Cv paoloaguzzinov16
 
KOM Presentation STN-N Conductor_rev 2
KOM Presentation STN-N Conductor_rev 2KOM Presentation STN-N Conductor_rev 2
KOM Presentation STN-N Conductor_rev 2
 
sharndencv
sharndencvsharndencv
sharndencv
 
Marginal satellite study Noordzee
Marginal satellite study NoordzeeMarginal satellite study Noordzee
Marginal satellite study Noordzee
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Instrument Engineer
Instrument EngineerInstrument Engineer
Instrument Engineer
 
CV at 2015 Aug
CV at 2015 AugCV at 2015 Aug
CV at 2015 Aug
 
pipeline foreman
pipeline foremanpipeline foreman
pipeline foreman
 
Project Mechanical Engineer C.V
Project Mechanical Engineer C.VProject Mechanical Engineer C.V
Project Mechanical Engineer C.V
 
Project mechanical engineer c.v
Project mechanical engineer c.vProject mechanical engineer c.v
Project mechanical engineer c.v
 
Bgl solar update210614
Bgl solar update210614Bgl solar update210614
Bgl solar update210614
 

Rashid C_Synopsis_R6

  • 1. By: Tamer Farid Rev. 6 G1201 Adams Challenge Event Description [Contract] Key Date Effective Date of Agreement 5-Nov-14 Start of Cutting Project Steel 15-Dec-14 Mobilization of Sleeper / Riser Installation Marine Spread 14-Aug-15 Completion of Full Deck Main Structure + Full Jacket Fabrication 7-Sep-15 Mobilization of Pipeline / Platform Installation Marine Spread 8-Sep-15 Installation of Jacket at the Worksite 10-Oct-15 Completion of Installation of All Pipelines 21-Nov-15 Installation of the Rashid-C Deck at the Work Site 24-Nov-15 Pre-Commissioning of All Pipelines 26-Dec-15 Mechanical Completion of All Facilities 26-Dec-15 Handover of All Project Documentation 4-Feb-16 DSV Adams Challenge Sleepers Installation SMART Flange Preparation Risers Installation Bowstring Installation Production Spools Metrology, Closing Spools, Jacket Grouting, Crossing Completion, Susea Protection Frames & Bowstring Removal Pre-commissioning Support DSV Oceanic Installer Subsea FCG of 14" & 20" Replacement Pipelines Metrology, Fixed & Closing Spools Installation G1201 Rashid C Jacket & Boat Landing Installation Pipelines Installation (30", 20" & 14") Pipelines Installation (18", 10" & 12") Deck Installation Pre-Commissioning 30", 20" & 14" 18", 12" & 10" Feb-16 Mar-16Jan-16May-15 Dec-15Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Jacket Topsides Piles Risers Tie-in Spools Installation Aids Pre-Engineering Survey Geophysical & ROV Jacket Face Surveys Bowstring Installation (4 nos.) Concrete Sleepers Installation 102 Km of Pipelines; 30", 20", 18", 14", 12" & 10" In-line Barred Tees (6 nos.) Risers (8 nos.) + Riser Clamps (29 nos.) Free Span Corrections Tie-in / Closing Spools Production Spools Smart Flanges (8 nos.) Valve Assemblies Subsea Protection Frames (6 nos.) FCG & Hydrotest of all Pipeline Systems. De-watering & Nitrogen Purging of 10" Gas Lift Pipeine System. As-Built Survey ROV & CP Potential Surveys Pre-Commissioning Fabrication (Dubai Dry Docks) DSV Preparatory Works Scope of Work DSV Works Pipelying (G1201)