Solcrete Melbourne - Camberwell Library Project in Annual Construction Review...Solcrete
Solcrete is an innovative Melbourne company specializing in concreting and formwork construction. Their work in the commercial and industrial sector ranges from basic groundwork through to complex multi-storey developments and everything in between. The company recently completed the Camberwell Library with a team of 25 staff, taking 8 months to complete.
Solcrete Melbourne - Camberwell Library Project in Annual Construction Review...Solcrete
Solcrete is an innovative Melbourne company specializing in concreting and formwork construction. Their work in the commercial and industrial sector ranges from basic groundwork through to complex multi-storey developments and everything in between. The company recently completed the Camberwell Library with a team of 25 staff, taking 8 months to complete.
The study is done on four steel companies namely, Tata Steel Ltd, JSW Steel Ltd, Steel Authority of India Ltd & Visa Steel Ltd. The study was done to know the comparative position of steel companies in working capital management, by using various ratio analyses & by taking data from year 2005 to 2012. The comparative position of the company is found by taking out the liquidity ratio, management efficiency ratio, profitability ratio and debt coverage ratio of each of the company and then comparing it with each other.
etude de cas SEO et démonstration d'un article sur : les mot clé .
lien:http://blog.axe-net.fr/reveler-le-not-provided-un-veritable-avantage-concurrentiel/
This study was done for the purpose of identifying the Hypothesis of :-
1. Influence of the Number of Members on Number of Policies.
2. Influence of the Number of Policies on the Number of Claim.
3. Influence of the Number of Claims on the Number of Members.
4. Influence of Premium paid on Claim paid.
5. Influence of Total Sum Insured on Total Claims Paid.
Always ready to get the job done. On time an under budget. Minimal time lose, with a view to zero injury which in turn leads to maximum profit to any project.
1. CURRICULUM VITAE
Bradley Plunkett
7 Derwentwater Avenue
Acklam
Middlesbrough
TS5 7DB
D.O.B. 10.11.75
Mobile: 07966 517419
E-Mail: b.plunkett100@gmail.com
Safety Passport: No.-T05969
Expiry Date: 28-6-2016
Summary
Plater / Fabricator / Supervisor
Experienced Time Served Plater, also trained in Fabrication, Welding and Burning.
After qualifying, my first work was on small fabrications and ship repairs, moving on to
various sub-sea work, including mobilisation and de-mobilisation.
Other jobs have provided experience in modification and maintenance of pipe and cable
laying, ploughs and trenchers. I have also gained experience in tack and MIG welding,
burning, quickie burning, plasma cutting, Messa plasma and gas CNC burning bench,
Omniwin cad design for plate cutting templates, Durma CNC press break 3m x 12mm.
Held the instruction for new users on the CNC machines.
I have experience in working from both engineering and isometric drawings.
Recently Supervising complete jobs acting project Engineer duties.
Apprenticeship
Worked mainly shop based for the first year, training in basic fabrication and welding,
but also worked on site on dredging vessels and sub-sea mobilisations
Attended Longlands College of FE for three years on a day release basis.
Qualifications
Longlands College Middlesbrough 1993 – 1996
City & Guilds Part 2. Fabrication and Welding Components
NVQ Level 2. Fabrication and Welding
City & Guilds. Advanced Welding Engineering Studies
NVQ Level 3. Fabrication and Welding.
Cswip 3.0 visual welding inspector
IPAF mewp operator – 3A-3B-PAV
Employment history
2. Feb 2015- Sept 2015 Agotnes Sveis Norway
Fabrication supervisor
Duties include managing platers and welders,
Fabrication inspection and visual welding inspection,
Documentation (tracable weld logs and As Builts)
Various works for the oil sector and looked after the
complete build of a swivel structure for an FPSO in Angola
July 2013 – Feb 2015 Hereema Hartlepool Ltd
GDF Cygnus Project
Working within a large team building new build
gas modules, involved in all aspects of the build, from
setting nodes and primary steel to sail away sea fastening,
Trained as part of the emergency response teams, where
I attended the following courses,
Fire awareness, Confined rescue, Emergency First aid
April 2011 – June 2013 Agotnes svies Norway
Fabrication Supervisor /Project manager / Engineer
Responsible for all fabrication disciplines
Supervising heavy fabrication following up from drawing
board to fabrication through to ndt and delivery
Fabrication and Welding inspection
On site project Manager for drilling rig overhauls
project mobilisations for various sub sea companies
Client and designer liaison
Jan 2011 – April 2011 Global Energy
Jack up drilling rig over haul for Ensco drilling
May 2010 – Jan 2011 Agones Svies Norway
Fabrication Supervisor
Semi sub rig repair, off shore/sub-sea fabrications,
April 2010 – May 2010 Promanex
Marchwood power station – Southampton
Strengthening on turbine casing
May 2009 – March 2010 Heerema Hartlepool Ltd
Nexus Petroleum Buzzard Project – Module construction
April 2009 – May 2009 Agones Svies Norway
Fabrication, pipe fitting and welding & mechanical works
Songa Offshore - Smi Sub rig repair
Jan 2009 – April 2009 Heerema Hartlepool Ltd
Gabbard transformer modular – Secondary steel work on main decks. Construction of tubular lifting frame
3. Feb 2008 – Oct 2008 River Tees Engineering & Welding
Structural steel fabrication
Jan 2007 – Feb 2008 Vander Giesenn De Nord
Container barge construction
Jan 2006 - Dec 2007 River Tees Engineering & Welding
Site and Workshop fabrications
June 2005 – Jan 2006 Steel Forge Bomech- Genesis project
Installing staircases and Handrails
Feb 2004 – June 2005 River Tees Engineering & Welding
Site and Workshop fabrications
May 2003 – Feb 2004 Thermal Energy Construction
Modifications and snagging on newly constructed Cement Factory in Buxton
Sept 2002 – May 2003 Heerama Hartlepool Ltd
Bonga F.P.S.O Topside fabrication plate girdles and plate cutting
Aug 2001 – Aug 2002 Cleveland Bridge
Workshop based – Fabricating plate girders for Canary Wharf and Greek Bridge
May 2001 – June 2001 Jenkins Newall Doncaster
Pressure vesselwork for British Sugar
Nov 2000 – May 2001 Crew Mech Services Van Der Geissen Rotterdam
All aspects of ship building, working on luxurius yacht construction
June 1999 – Nov 2000 McDermott Sub Sea
Maintenance work on R.O.V. / Cable laying ploughs and trenchers
Jan 1999 – June 1999 STM Engineering Dode Waard Holland
Construction of new build cargo barges
Oct 1996 – Jan 1999 River Tees Engineering & Welding
Time Served on site
Oct 1992 – Oct 1996 River Tees Engineering & Welding
4 year apprenticeship