NAME: Brian Campbell
DATE OF BIRTH: 22/02/1954
NATIONALITY: British
TOWN/RESIDENCE: Aberdeen – 146 Crown Street AB11 6HS
CONTACT NUMBERS. 07841474089…….. New Number
QUALIFICATIONS: City & Guilds Certificates: Craft Engineering,
Mechanical Craft Studies
TRAINING: IMPALA/MCSII / Schedule Publisher/Microsoft: Excel,
Microsoft Word, Fox Pro, WordPerfect, Team links for
Windows, Freelance Graphics, Window,s Draw & Cimage
Microsoft Access 7 for Windows 95, Microsoft Project for
Windows, Primavera Systems SureTrak and P3 P3e P6
Babcock internal systems ,Starfish and CMS
Babcock Integrated Technology March 15 to Aug 15
Rosyth Business Park
Dunferrmline
Fife
Matchtech
1450 Solent Business Park Whiteley,Fareham
Detail Planner on HMS Queen Elisabeth Air Craft Carrier
Create and maintain detail plans and oversee execution of same to ensure work claimed as
complete was in fact carried out
On site visits to Carrier to validate work had been executed
(Due to the nature of this work I cannot elaborate)
Due to illness and recovery from minor operation (Hernia) I did not seek work from July 14
until Feb 15
Houlder Ltd Feb 14 to July 14
Suite C3, Excel Ctr
Exploration Drive
Aberdeen Science & Energy Park
B O D
Production planner (3 month contract)
Produce and maintain production plans as directed by project engineer
1 | P a g e
Premier Oil March 13 to Dec 13
Methill Shipyard
SOLAN Project
Construction Planning engineer (3 month contract)
Duties: To produce and maintain detailed construction plans in conjunction with Solan
contractors
Liaise with construction planners and update master plans accordingly
Produce reports on progress and projected completion dates
Trouble shoot any projected delays with a view to recovering project completion dates
Site walk the project and check / confirm progress was accurate
CB&I March 12 to Nov 13
40 Eastbourne Terrace
Paddington
London W2 6LG
Senior Planning Engineer
Project planning for BP – SCPX Project.
Duties: To create and maintain detailed plans for the execution of all sub projects for the 56”
pipeline from Supa to Baku and return line to Ceyhan this to include all excavation works
Pumping Stations subsea work and the new tanker terminal.
To create and maintain mini sub project plans for aspects of main and sub projects
Petrofac April 12 to March 13
Offshore Projects & Operations
Planning Engineer
Duties: Planning for All rotating equipment on BG assets, Amada Everest & Lomond
Using Maximo and P6. Liaise and agree work scopes and mobilizations with Client and
Vendor Create plans for Turbine maintenance and present to BG for approval
Create work plans for all rotating and associated equipment PMR Ad-Hoc and Shutdowns.
Liaise with materials controller for shipment of all relevant tools and replacement parts to
ensure on board platform prior to mobilization of vendor personnel. Attend platform
planning meetings to confirm all is ready to commence work on designated dates
BIS Salamis: CNRi projects May 11 to April 12
Duties: Project Planner - for CNRi assets Ninian North. South &
Central, Murchison and Tiffany
To create Project plans as required for each asset and ensure all fabric maintenance
essentials are in place. Scaffolds to be erected over side work platforms etc. . . . This work can
include removal or encapsulation of asbestos, application of various coatings Fabrication and
installation stair wells lifeboat davits etc cover side inspections and repairs for any /all of the
five installations above installations. Monitor and update plans and highlight any delays and
give reason where known, also investigate reason for slippage and report to supervisors with
recommendation for recovery of lost time
Freelance Planning Sept 10 to May 11
Duties – Holiday – Sickness Cover – Various Clients
Create / update plans schedules as requested / required by client. (At times - Working from
home)
AMEC OIL AND Gas May 10 to Sept 10
BP FPS Project
Project Planner
Duties – Create and maintain integrated plan for the safe and timely execution of hot tap
work on Cruden bay pipeline – this to consist of an 18” and 24” valve hot tap.
G E Oil & Gas Oct 09 to May 10
Aberdeen
Holiday cover. Duties included creation of fabrication and manufacturing plan for five subsea
trees 3 for Addax and 2 for Taqa. Create and maintain fabrication plan and manufacturing
plan and integrate same. Monitor and expedite all components required for build of tree to
include nuts bolted forgings etc. Update plan create s curves and histograms as required.
Lease with client and clients /vendors planning dept and monitor progress. Compile daily /
weekly reports.
Rig mar Services Ltd June 09 to Oct 09
Steadfast House
Greenwell Road
Aberdeen
Senior Project Planning Engineer
Working on Safe Scandinavia under deck refurb project, this consisted of using ALPS Access
ASF platforms to be installed underside of decking and blast and paint same.
This is the first time theses platforms have been utilized on an offshore vessel and has
generated much interest within the industry. My Position was to update Project plan, monitor
hire equipment and assist in admin duties (timesheets, invoices, mob and de-mob of
personnel.
Working for and reporting to Project Manager.
Rig mar Services Ltd Jan 09 June 09
Steadfast House
Greenwell Road
Aberdeen
Senior Project Planning Engineer
Sub contracted to Hercules Offshore to assist in the refurbishment of the Hercules 185 which
had been working off Angola and was to be refurbished and returned to service.
3 | P a g e
Planning for a 72 meter leg extension ( 3 legs ).Also included pre works of positioning legs in
place and welding plus teeth racking and jet lines,etc in conjunction with this the
accommodation had an extensive refurb and modernization program me, the Galley had
extensive repairs and replacement of equipment and also the repair ,refitting of all vessel
tanks
Create plan for 72 meter leg extension to include 3x30” full penetration butt welds and fitting
of racking teeth and jet lines.
Total Accommodation refurbishment and HVAC up grade in Galley to include all ducting
and fans fire dampers etc.
Accommodation extension of 10 man cabin block full fit up.
Extensive repairs to all tanks.
Renewal of corroded pipe work all systems
The project was commissioned for 120 days but on closer examination of the work scope the
project was extended to include the works required for rig 185,s 10 year insurance certificate.
AKER SOLUTIONS Aug 08 to Jan 09
ADMERAL COURT
ABERDEEN
Senior Planning Engineer.
Responsible for all construction planning requirements for the Nexen Scott Platform
AMEC Oil & Gas Overseas Div
Aberdeen
Senior Planning engineer
Short term contract in Sakhalin Island Russia
I was asked if I would help out in the short term as SAP planning engineer
On Sakhalin Island for the last 3 to 4 month of contract
My duties included the monitoring and updating of 14, 28, 90 day plans currently in place.
Maersk Contractors June to August 2007
Short Term Cover
Working on Dumbarton and Curlew Shutdowns. Short term contract
SIGMA 3 PROJECT 2007 JANUARY - JUNE 2007
Duties to include Monitor Maintain, Develop Upgrade projects on Cormorant North Tern A and
Eider A. Rebase line plans for Offshore Construction. Input to Shell 28, 90, and integrated plans.
Produce, maintain month end reports.
WOODGROUP 2006 NOVEMBER TO JANUARY 2007
Given the Talisman projects to monitor and, maintain. Contract Short term
PETROFAC BROWEN FIELDS 2006 MARCH – NOVEMBER 2006
Contract to cover UK and Russian Shutdowns
Create shutdown / construction /commissioning / plans and programmers as required.
Shutdown planning for various clients / platforms / assets’ Arbroath, Montrose, Thistle.
Create Construction / Commissioning plans for engineering dept as reqd
Attend and participate in all planning meetings, challenge meetings, for various clients / assets.
General project assistance where appropriate. No Further Shutdowns
SCHOFIELD LOTHIAN - Consultancy 2005 JULY – MARCH 2006
Short Term Contract
Planning Consultant to Balfour Beatty for the Greater Manchester Gas Ring main Upgrade
To maintain & improve the existing planning system.
To assist in the design and build of new improved planning system using P3e to its full potential.
J P KENNY – AMEC- BP RHUM 2005 APRIL - JULY 2005
Short term Contract
Three month contract to collate Subsea data for the population of BP systems – OPTIMA &
MAXIMO. Optima being BP construction data records Maximo being BP Maintenance database.
To visit Vendors and data gather from documentation –data sheets the information required to
populate BP systems. Create / populate data spreadsheets for various menu criteria in order to
satisfy BP’s legal requirements to the Department of trade and industry.
BG – GROUP AUGEST 2004 – APRIL 2005
Armada Hub Integrated Planner
Producing and maintaining the Armada Look-ahead plan and schedule.
Optimizing the platform bedding plan to maximize bed usage against flight availability
AMEC Oil & Gas APRIL 2004 – AUGEST 2004
Recommended by BP Villages to AMEC with regard to position as Federal Planning engineer.
Compiled and maintained project construction plans for several independent projects and
progressed, updated same.
ROEVIN MANAGEMENT SERVICES FEBRUARY 2004 – APRIL 2004
SUB-CONTRACTED TO PETROFAC
Sub contracted out to BP Villages BU to cover for BP planning engineer for general planning
duties.
Requested to review planning process within BP Villages and compile a report with
recommendations. This was a six weeks secondment.
ROEVIN MANAGEMENT SERVICES OCTOBER 2003 – FEBRUARY 2004
SUB-CONTRACTED TO PETROFAC
Short Term Contract
Maintenance Planner
Working for Petrofac Consultants subcontracted to BP Bruce.
BP Had identified a maintenance backlog that was not acceptable and hired Petrofac to analyze data and
advice of a solution for the liquidation of said backlog.
Prepare a plan for each discipline to reflect liquidation of work orders by year end. Project manpower
requirements, vendors, specialists etc. Submit plans for general agreement both onshore and offshore and
issue as working documents. Monitor and update all plans as required
5 | P a g e
SHELL FEBRUARY 2002 – MAY 2003
Maintenance Planner
Gabon Oilfield Rabi & Gambia Terminal.
Working primarily in Rabi Oilfield in the middle of Gabon’s tropical jungle producing 90day 28 day and 14
day plans. As the workforce is split into teams by discipline and has to cover both Rabi Oilfield and Gambia
terminal .In Rabi had an assistant but in Gambia have three where spend 25% of my time leasing with them.
This is to ensure maximum optimization of workforce and to ensure and safeguard the integrity of plant.
Have an assistant scheduler in Gambia with a data input clerk and an assistant to the Gambia scheduler
duties include the overseeing of the work orders converted from Notifications and checking the correct data
codes have been selected. Insure man-hour recording process and history recording process are adhered to
and kept up to date. Check the compliance against to planned / actual work list and report on the same.
Liaise with both Maintenance Co-coordinators with a view to improving manpower utilization.
KERR- MCGEE NORTH SEA LIMITED DECEMBER 2001 - FEBRUARY 2002
De-Commissioning Planning Engineer
Based at Riverview House Riverside Drive Aberdeen.
Decommissioning planning for the Hutton Tension Leg Platform. Topside structure had been sold for reuse
as designed. The decommissioning had to be precisely planned in order to meet. New onsite delivery dates
in conjunction with Department of Trade and Environment regulations, Produce a detailed decommissioning
plan to include the cutting of riser casings, Risers, Tension Leg anchors, also the environmentally friendly
removal of all drill cuttings resting on seabed. Liaise with current owner, new owner and DT&E. This was
the first time a project such as this had been undertaken and was very much pioneering work. All situations
had to be planned to the etch degree. Very interesting and invigorating work.
HALLIBURTON GROUP FEBRUARY 2001 – DECEMBER 2001
(ROCKWATER BUILDINGS) ABERDEEN
Planning Engineer
Working on the West of Shetland BP Project.
JOINT VENTURE INTERNATIONAL, ABERDEEN NOVEMBER 2000 - FEBRUARY 2001
Planning Engineer
To create and maintain a construction plan for the Janice Platform Improvements. Liaise with client in order
to maximize labor uptimes and minimize disruption to Platform production.
UNITED KINGDOM ATOMIC ENERGY AUTHORITY, APRIL 2000 - NOVEMBER 2000
DOUNREAY
Planning Engineer
Planning Engineer for the decommissioning of the Proto Type fast Reactor PFR. Planning Engineer for the
Five Team Alliance for the Alkali Metals Residues Removal AMRR
PFR
To create a decommissioning program me for the Prototype Fast. Reactor. To liaise with three main
contractors. To produce reports for the UKAEA authority for the Department of Trade & Industry, project
engineers and the main contractors.
AMRR
Appointed Programme Manager for AMRR. Liaise with the five alliance partners...
VEBA OIL, AMAL, LIBYA JUNE 1999 - APRIL 2000
Head of Planning Section
All data input to the FoxPro program me. All shutdown activities and schedules. Produced 14, 21, & 90 day
plans to includes manning levels, material requirements, costs, & also stock replenishment to min/max
levels. Created 1, 2, 5, & 10-year projections with various permutations in an attempt to maximize plant life
and minimize manpower & material costs. Produced month end quarterly, half yearly, reports on progress,
manpower & material costs. For Tripoli. Analyses reports and information to determine the maintenance
strategy and budget for the ensuing 12 months and beyond. Analyze the data in order to determine the
correct frequencies for the equipment’s planned maintenance strategy are not compromised.
MARINE DRILLING MARCH 1999 - JUNE 1999
(COMMISSIONING MARINE 700 DRILL RIG)
Planning Engineer
Frieda Goldman Shipyard East Pascagoula Mississippi, USA
Part of a two-man team recruited to create a plan to maintain and report on the last 13% of construction, pre-
commission & commissioning planning. To compile a schedule from a predetermined priority list of
instrument, electrical, mechanical and piping etc. From a typical template common to all work packages a
schedule consisting of 675 packages. With a total of 9380 line items monitored, progressed and reported on.
Update main dataset with progress reported by shipyard. Site visits on occasions to verify/cross check
contractor estimates. Customized reports were supplied to each discipline engineer and marked up for input
one week later. Regular meetings were attended with senior management to explain/highlight any problem
areas/concerns and were addressed in a timely manner. Liaise with Exxon representatives and furnish them
with any number of reports tailored to their requirements.
EUROPEAN GAS TURBINES DECEMBER 1996 – JANUARY 1999
ALSTOM ATLANTIC POWER & GAS
Planning & Maintenance Systems Engineer
Planning & Maintenance Systems Engineer, reporting to the managing Director and responsible for
providing a comprehensive engineering planning service covering a wide range of rotating equipment..
ENTERPRISE OIL 1994 - 1996
Offshore Operations Scheduler
Nelson Platform
All aspects of offshore planning and scheduling.
AMEC OFFSHORE DEVELOPMENTS 1994 - 1994
Offshore Hook-Up Planning Engineer
Working on AMOCO CATS Project: North Everest Platform
General construction /hook up planning.
A.O.C. INTERNATIONAL 1994 - 1994
IMIS Operator
Working on Shell Expro UK Brent Bravo.
7 | P a g e
Duties as per Tern & North Cormorant.
BP FORTIES BRAVO, CHARLIE AND ECHO 1993 - 1994
Offshore Construction Planning Engineer
Construction planning for FALP project.
SHELL 1993 - 1993
IMIS QC Engineer
Appointed Shell Central Field Unit QC Engineer.
Quality control of maintenance database for all Central field installations.
SHELL EXPRO UK 1991 - 1993
Maintenance Planning Engineer
All aspects of maintenance planning.
For AUK A, FSU Kittiwake & Gannet.
TOTAL OIL 1990 - 1991
Offshore Maintenance Planning Engineer
Onboard MCP-01.
Process all safety audit actions, raise and input work orders into CMMS.
SHELL EXPRO UK 1985 -1990
1989 – 1990: IMIS Technician
Tern A.
Assisting platform planner with 90 day plan, bedding allocation and shut down work.
1985 – 1989: IMIS Operator
North Cormorant.
Operating IMIS system, EMA system and Artemis system. IMIS data input and retrieval. Rationalization of
maintenance routines
1985: Technical Clerk (Spares and Maintenance Dept.)
Responsible for the integrity of the asset register.
BRITOIL 1984 - 1985
Mechanical Fitter (SPEL)
Maintenance Tech on Thistle A
All aspects of general maintenance.
SUBSEA INTERNATIONAL 1982 - 1984
Mechanical Fitter/Welder/Technical Clerk
Fabrication and general maintenance of diving equipment.
ENTERPRISE LTD 1980 - 1982
Mechanical Fitter & Technician
Onshore fabrication in Aberdeen workshop. Offshore maintenance Tech.
BARRY, HENRY AND COOKE 1970 - 1980
Apprentice / Mechanical Fitter / Engineer
Extensive and varied apprenticeship in heavy fabrication & mechanical engineering.
9 | P a g e
SUBSEA INTERNATIONAL 1982 - 1984
Mechanical Fitter/Welder/Technical Clerk
Fabrication and general maintenance of diving equipment.
ENTERPRISE LTD 1980 - 1982
Mechanical Fitter & Technician
Onshore fabrication in Aberdeen workshop. Offshore maintenance Tech.
BARRY, HENRY AND COOKE 1970 - 1980
Apprentice / Mechanical Fitter / Engineer
Extensive and varied apprenticeship in heavy fabrication & mechanical engineering.
9 | P a g e

More Related Content

What's hot

CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15
Dave Beveridge
 
CV TO DATE 25062015
CV TO DATE 25062015CV TO DATE 25062015
CV TO DATE 25062015
Des Jameson
 
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
Shaukat Mahmood Khan
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16
Randy Seperak
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
Edward Byrne
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
Sajith Nair
 
SimonBaarde_CV2016
SimonBaarde_CV2016SimonBaarde_CV2016
SimonBaarde_CV2016
Simon Baarde
 
A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP
Robert Romero
 

What's hot (20)

CeeVee-13th January 2017_update
CeeVee-13th January 2017_updateCeeVee-13th January 2017_update
CeeVee-13th January 2017_update
 
DE LANGE - CV
DE LANGE - CVDE LANGE - CV
DE LANGE - CV
 
CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15
 
Shoaib Resume
Shoaib ResumeShoaib Resume
Shoaib Resume
 
Roberto Guevara-CV
Roberto Guevara-CVRoberto Guevara-CV
Roberto Guevara-CV
 
CV TO DATE 25062015
CV TO DATE 25062015CV TO DATE 25062015
CV TO DATE 25062015
 
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
 
Vinoth
VinothVinoth
Vinoth
 
ronald coventry cv n5
ronald coventry cv n5ronald coventry cv n5
ronald coventry cv n5
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16
 
RESUME_080615_FLUOR
RESUME_080615_FLUORRESUME_080615_FLUOR
RESUME_080615_FLUOR
 
CeeVee-10th January 2017_update
CeeVee-10th January 2017_updateCeeVee-10th January 2017_update
CeeVee-10th January 2017_update
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
 
jahangir
jahangirjahangir
jahangir
 
SimonBaarde_CV2016
SimonBaarde_CV2016SimonBaarde_CV2016
SimonBaarde_CV2016
 
Cv's Nitinai_Ratchawat
Cv's Nitinai_RatchawatCv's Nitinai_Ratchawat
Cv's Nitinai_Ratchawat
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
 
A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP
 

Similar to CV at 2015 Aug

Similar to CV at 2015 Aug (20)

Dhanasekaran_Resume
Dhanasekaran_ResumeDhanasekaran_Resume
Dhanasekaran_Resume
 
CV
CVCV
CV
 
Ahmad Faiz_Resume 2016
Ahmad Faiz_Resume 2016Ahmad Faiz_Resume 2016
Ahmad Faiz_Resume 2016
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
Satyavir-Resume_01
Satyavir-Resume_01Satyavir-Resume_01
Satyavir-Resume_01
 
Cv.Cumshud Rahimov
Cv.Cumshud RahimovCv.Cumshud Rahimov
Cv.Cumshud Rahimov
 
Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015
 
cv march 2014
cv march 2014cv march 2014
cv march 2014
 
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_Current
 
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
 
CV - HV-1
CV - HV-1CV - HV-1
CV - HV-1
 
JG Mech Eng CV
JG Mech Eng CVJG Mech Eng CV
JG Mech Eng CV
 
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEERResume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
 
Jonathan Hemming CV
Jonathan Hemming CVJonathan Hemming CV
Jonathan Hemming CV
 
JJC-CV - April-2016
JJC-CV - April-2016JJC-CV - April-2016
JJC-CV - April-2016
 
Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016
 
Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016
 

CV at 2015 Aug

  • 1. NAME: Brian Campbell DATE OF BIRTH: 22/02/1954 NATIONALITY: British TOWN/RESIDENCE: Aberdeen – 146 Crown Street AB11 6HS CONTACT NUMBERS. 07841474089…….. New Number QUALIFICATIONS: City & Guilds Certificates: Craft Engineering, Mechanical Craft Studies TRAINING: IMPALA/MCSII / Schedule Publisher/Microsoft: Excel, Microsoft Word, Fox Pro, WordPerfect, Team links for Windows, Freelance Graphics, Window,s Draw & Cimage Microsoft Access 7 for Windows 95, Microsoft Project for Windows, Primavera Systems SureTrak and P3 P3e P6 Babcock internal systems ,Starfish and CMS Babcock Integrated Technology March 15 to Aug 15 Rosyth Business Park Dunferrmline Fife Matchtech 1450 Solent Business Park Whiteley,Fareham Detail Planner on HMS Queen Elisabeth Air Craft Carrier Create and maintain detail plans and oversee execution of same to ensure work claimed as complete was in fact carried out On site visits to Carrier to validate work had been executed (Due to the nature of this work I cannot elaborate) Due to illness and recovery from minor operation (Hernia) I did not seek work from July 14 until Feb 15 Houlder Ltd Feb 14 to July 14 Suite C3, Excel Ctr Exploration Drive Aberdeen Science & Energy Park B O D Production planner (3 month contract) Produce and maintain production plans as directed by project engineer 1 | P a g e
  • 2. Premier Oil March 13 to Dec 13 Methill Shipyard SOLAN Project Construction Planning engineer (3 month contract) Duties: To produce and maintain detailed construction plans in conjunction with Solan contractors Liaise with construction planners and update master plans accordingly Produce reports on progress and projected completion dates Trouble shoot any projected delays with a view to recovering project completion dates Site walk the project and check / confirm progress was accurate CB&I March 12 to Nov 13 40 Eastbourne Terrace Paddington London W2 6LG Senior Planning Engineer Project planning for BP – SCPX Project. Duties: To create and maintain detailed plans for the execution of all sub projects for the 56” pipeline from Supa to Baku and return line to Ceyhan this to include all excavation works Pumping Stations subsea work and the new tanker terminal. To create and maintain mini sub project plans for aspects of main and sub projects Petrofac April 12 to March 13 Offshore Projects & Operations Planning Engineer Duties: Planning for All rotating equipment on BG assets, Amada Everest & Lomond Using Maximo and P6. Liaise and agree work scopes and mobilizations with Client and Vendor Create plans for Turbine maintenance and present to BG for approval Create work plans for all rotating and associated equipment PMR Ad-Hoc and Shutdowns. Liaise with materials controller for shipment of all relevant tools and replacement parts to ensure on board platform prior to mobilization of vendor personnel. Attend platform planning meetings to confirm all is ready to commence work on designated dates BIS Salamis: CNRi projects May 11 to April 12 Duties: Project Planner - for CNRi assets Ninian North. South & Central, Murchison and Tiffany To create Project plans as required for each asset and ensure all fabric maintenance essentials are in place. Scaffolds to be erected over side work platforms etc. . . . This work can include removal or encapsulation of asbestos, application of various coatings Fabrication and installation stair wells lifeboat davits etc cover side inspections and repairs for any /all of the five installations above installations. Monitor and update plans and highlight any delays and give reason where known, also investigate reason for slippage and report to supervisors with recommendation for recovery of lost time
  • 3. Freelance Planning Sept 10 to May 11 Duties – Holiday – Sickness Cover – Various Clients Create / update plans schedules as requested / required by client. (At times - Working from home) AMEC OIL AND Gas May 10 to Sept 10 BP FPS Project Project Planner Duties – Create and maintain integrated plan for the safe and timely execution of hot tap work on Cruden bay pipeline – this to consist of an 18” and 24” valve hot tap. G E Oil & Gas Oct 09 to May 10 Aberdeen Holiday cover. Duties included creation of fabrication and manufacturing plan for five subsea trees 3 for Addax and 2 for Taqa. Create and maintain fabrication plan and manufacturing plan and integrate same. Monitor and expedite all components required for build of tree to include nuts bolted forgings etc. Update plan create s curves and histograms as required. Lease with client and clients /vendors planning dept and monitor progress. Compile daily / weekly reports. Rig mar Services Ltd June 09 to Oct 09 Steadfast House Greenwell Road Aberdeen Senior Project Planning Engineer Working on Safe Scandinavia under deck refurb project, this consisted of using ALPS Access ASF platforms to be installed underside of decking and blast and paint same. This is the first time theses platforms have been utilized on an offshore vessel and has generated much interest within the industry. My Position was to update Project plan, monitor hire equipment and assist in admin duties (timesheets, invoices, mob and de-mob of personnel. Working for and reporting to Project Manager. Rig mar Services Ltd Jan 09 June 09 Steadfast House Greenwell Road Aberdeen Senior Project Planning Engineer Sub contracted to Hercules Offshore to assist in the refurbishment of the Hercules 185 which had been working off Angola and was to be refurbished and returned to service. 3 | P a g e
  • 4. Planning for a 72 meter leg extension ( 3 legs ).Also included pre works of positioning legs in place and welding plus teeth racking and jet lines,etc in conjunction with this the accommodation had an extensive refurb and modernization program me, the Galley had extensive repairs and replacement of equipment and also the repair ,refitting of all vessel tanks Create plan for 72 meter leg extension to include 3x30” full penetration butt welds and fitting of racking teeth and jet lines. Total Accommodation refurbishment and HVAC up grade in Galley to include all ducting and fans fire dampers etc. Accommodation extension of 10 man cabin block full fit up. Extensive repairs to all tanks. Renewal of corroded pipe work all systems The project was commissioned for 120 days but on closer examination of the work scope the project was extended to include the works required for rig 185,s 10 year insurance certificate. AKER SOLUTIONS Aug 08 to Jan 09 ADMERAL COURT ABERDEEN Senior Planning Engineer. Responsible for all construction planning requirements for the Nexen Scott Platform AMEC Oil & Gas Overseas Div Aberdeen Senior Planning engineer Short term contract in Sakhalin Island Russia I was asked if I would help out in the short term as SAP planning engineer On Sakhalin Island for the last 3 to 4 month of contract My duties included the monitoring and updating of 14, 28, 90 day plans currently in place. Maersk Contractors June to August 2007 Short Term Cover Working on Dumbarton and Curlew Shutdowns. Short term contract SIGMA 3 PROJECT 2007 JANUARY - JUNE 2007 Duties to include Monitor Maintain, Develop Upgrade projects on Cormorant North Tern A and Eider A. Rebase line plans for Offshore Construction. Input to Shell 28, 90, and integrated plans. Produce, maintain month end reports. WOODGROUP 2006 NOVEMBER TO JANUARY 2007 Given the Talisman projects to monitor and, maintain. Contract Short term PETROFAC BROWEN FIELDS 2006 MARCH – NOVEMBER 2006 Contract to cover UK and Russian Shutdowns Create shutdown / construction /commissioning / plans and programmers as required. Shutdown planning for various clients / platforms / assets’ Arbroath, Montrose, Thistle.
  • 5. Create Construction / Commissioning plans for engineering dept as reqd Attend and participate in all planning meetings, challenge meetings, for various clients / assets. General project assistance where appropriate. No Further Shutdowns SCHOFIELD LOTHIAN - Consultancy 2005 JULY – MARCH 2006 Short Term Contract Planning Consultant to Balfour Beatty for the Greater Manchester Gas Ring main Upgrade To maintain & improve the existing planning system. To assist in the design and build of new improved planning system using P3e to its full potential. J P KENNY – AMEC- BP RHUM 2005 APRIL - JULY 2005 Short term Contract Three month contract to collate Subsea data for the population of BP systems – OPTIMA & MAXIMO. Optima being BP construction data records Maximo being BP Maintenance database. To visit Vendors and data gather from documentation –data sheets the information required to populate BP systems. Create / populate data spreadsheets for various menu criteria in order to satisfy BP’s legal requirements to the Department of trade and industry. BG – GROUP AUGEST 2004 – APRIL 2005 Armada Hub Integrated Planner Producing and maintaining the Armada Look-ahead plan and schedule. Optimizing the platform bedding plan to maximize bed usage against flight availability AMEC Oil & Gas APRIL 2004 – AUGEST 2004 Recommended by BP Villages to AMEC with regard to position as Federal Planning engineer. Compiled and maintained project construction plans for several independent projects and progressed, updated same. ROEVIN MANAGEMENT SERVICES FEBRUARY 2004 – APRIL 2004 SUB-CONTRACTED TO PETROFAC Sub contracted out to BP Villages BU to cover for BP planning engineer for general planning duties. Requested to review planning process within BP Villages and compile a report with recommendations. This was a six weeks secondment. ROEVIN MANAGEMENT SERVICES OCTOBER 2003 – FEBRUARY 2004 SUB-CONTRACTED TO PETROFAC Short Term Contract Maintenance Planner Working for Petrofac Consultants subcontracted to BP Bruce. BP Had identified a maintenance backlog that was not acceptable and hired Petrofac to analyze data and advice of a solution for the liquidation of said backlog. Prepare a plan for each discipline to reflect liquidation of work orders by year end. Project manpower requirements, vendors, specialists etc. Submit plans for general agreement both onshore and offshore and issue as working documents. Monitor and update all plans as required 5 | P a g e
  • 6. SHELL FEBRUARY 2002 – MAY 2003 Maintenance Planner Gabon Oilfield Rabi & Gambia Terminal. Working primarily in Rabi Oilfield in the middle of Gabon’s tropical jungle producing 90day 28 day and 14 day plans. As the workforce is split into teams by discipline and has to cover both Rabi Oilfield and Gambia terminal .In Rabi had an assistant but in Gambia have three where spend 25% of my time leasing with them. This is to ensure maximum optimization of workforce and to ensure and safeguard the integrity of plant. Have an assistant scheduler in Gambia with a data input clerk and an assistant to the Gambia scheduler duties include the overseeing of the work orders converted from Notifications and checking the correct data codes have been selected. Insure man-hour recording process and history recording process are adhered to and kept up to date. Check the compliance against to planned / actual work list and report on the same. Liaise with both Maintenance Co-coordinators with a view to improving manpower utilization. KERR- MCGEE NORTH SEA LIMITED DECEMBER 2001 - FEBRUARY 2002 De-Commissioning Planning Engineer Based at Riverview House Riverside Drive Aberdeen. Decommissioning planning for the Hutton Tension Leg Platform. Topside structure had been sold for reuse as designed. The decommissioning had to be precisely planned in order to meet. New onsite delivery dates in conjunction with Department of Trade and Environment regulations, Produce a detailed decommissioning plan to include the cutting of riser casings, Risers, Tension Leg anchors, also the environmentally friendly removal of all drill cuttings resting on seabed. Liaise with current owner, new owner and DT&E. This was the first time a project such as this had been undertaken and was very much pioneering work. All situations had to be planned to the etch degree. Very interesting and invigorating work. HALLIBURTON GROUP FEBRUARY 2001 – DECEMBER 2001 (ROCKWATER BUILDINGS) ABERDEEN Planning Engineer Working on the West of Shetland BP Project. JOINT VENTURE INTERNATIONAL, ABERDEEN NOVEMBER 2000 - FEBRUARY 2001 Planning Engineer To create and maintain a construction plan for the Janice Platform Improvements. Liaise with client in order to maximize labor uptimes and minimize disruption to Platform production. UNITED KINGDOM ATOMIC ENERGY AUTHORITY, APRIL 2000 - NOVEMBER 2000 DOUNREAY Planning Engineer Planning Engineer for the decommissioning of the Proto Type fast Reactor PFR. Planning Engineer for the Five Team Alliance for the Alkali Metals Residues Removal AMRR PFR To create a decommissioning program me for the Prototype Fast. Reactor. To liaise with three main contractors. To produce reports for the UKAEA authority for the Department of Trade & Industry, project engineers and the main contractors. AMRR Appointed Programme Manager for AMRR. Liaise with the five alliance partners...
  • 7. VEBA OIL, AMAL, LIBYA JUNE 1999 - APRIL 2000 Head of Planning Section All data input to the FoxPro program me. All shutdown activities and schedules. Produced 14, 21, & 90 day plans to includes manning levels, material requirements, costs, & also stock replenishment to min/max levels. Created 1, 2, 5, & 10-year projections with various permutations in an attempt to maximize plant life and minimize manpower & material costs. Produced month end quarterly, half yearly, reports on progress, manpower & material costs. For Tripoli. Analyses reports and information to determine the maintenance strategy and budget for the ensuing 12 months and beyond. Analyze the data in order to determine the correct frequencies for the equipment’s planned maintenance strategy are not compromised. MARINE DRILLING MARCH 1999 - JUNE 1999 (COMMISSIONING MARINE 700 DRILL RIG) Planning Engineer Frieda Goldman Shipyard East Pascagoula Mississippi, USA Part of a two-man team recruited to create a plan to maintain and report on the last 13% of construction, pre- commission & commissioning planning. To compile a schedule from a predetermined priority list of instrument, electrical, mechanical and piping etc. From a typical template common to all work packages a schedule consisting of 675 packages. With a total of 9380 line items monitored, progressed and reported on. Update main dataset with progress reported by shipyard. Site visits on occasions to verify/cross check contractor estimates. Customized reports were supplied to each discipline engineer and marked up for input one week later. Regular meetings were attended with senior management to explain/highlight any problem areas/concerns and were addressed in a timely manner. Liaise with Exxon representatives and furnish them with any number of reports tailored to their requirements. EUROPEAN GAS TURBINES DECEMBER 1996 – JANUARY 1999 ALSTOM ATLANTIC POWER & GAS Planning & Maintenance Systems Engineer Planning & Maintenance Systems Engineer, reporting to the managing Director and responsible for providing a comprehensive engineering planning service covering a wide range of rotating equipment.. ENTERPRISE OIL 1994 - 1996 Offshore Operations Scheduler Nelson Platform All aspects of offshore planning and scheduling. AMEC OFFSHORE DEVELOPMENTS 1994 - 1994 Offshore Hook-Up Planning Engineer Working on AMOCO CATS Project: North Everest Platform General construction /hook up planning. A.O.C. INTERNATIONAL 1994 - 1994 IMIS Operator Working on Shell Expro UK Brent Bravo. 7 | P a g e
  • 8. Duties as per Tern & North Cormorant. BP FORTIES BRAVO, CHARLIE AND ECHO 1993 - 1994 Offshore Construction Planning Engineer Construction planning for FALP project. SHELL 1993 - 1993 IMIS QC Engineer Appointed Shell Central Field Unit QC Engineer. Quality control of maintenance database for all Central field installations. SHELL EXPRO UK 1991 - 1993 Maintenance Planning Engineer All aspects of maintenance planning. For AUK A, FSU Kittiwake & Gannet. TOTAL OIL 1990 - 1991 Offshore Maintenance Planning Engineer Onboard MCP-01. Process all safety audit actions, raise and input work orders into CMMS. SHELL EXPRO UK 1985 -1990 1989 – 1990: IMIS Technician Tern A. Assisting platform planner with 90 day plan, bedding allocation and shut down work. 1985 – 1989: IMIS Operator North Cormorant. Operating IMIS system, EMA system and Artemis system. IMIS data input and retrieval. Rationalization of maintenance routines 1985: Technical Clerk (Spares and Maintenance Dept.) Responsible for the integrity of the asset register. BRITOIL 1984 - 1985 Mechanical Fitter (SPEL) Maintenance Tech on Thistle A All aspects of general maintenance.
  • 9. SUBSEA INTERNATIONAL 1982 - 1984 Mechanical Fitter/Welder/Technical Clerk Fabrication and general maintenance of diving equipment. ENTERPRISE LTD 1980 - 1982 Mechanical Fitter & Technician Onshore fabrication in Aberdeen workshop. Offshore maintenance Tech. BARRY, HENRY AND COOKE 1970 - 1980 Apprentice / Mechanical Fitter / Engineer Extensive and varied apprenticeship in heavy fabrication & mechanical engineering. 9 | P a g e
  • 10. SUBSEA INTERNATIONAL 1982 - 1984 Mechanical Fitter/Welder/Technical Clerk Fabrication and general maintenance of diving equipment. ENTERPRISE LTD 1980 - 1982 Mechanical Fitter & Technician Onshore fabrication in Aberdeen workshop. Offshore maintenance Tech. BARRY, HENRY AND COOKE 1970 - 1980 Apprentice / Mechanical Fitter / Engineer Extensive and varied apprenticeship in heavy fabrication & mechanical engineering. 9 | P a g e