SlideShare a Scribd company logo
Presentation
on
railway reservation system
Presented By:
Priyanka Sharma
Meenu Mittal
Railway reservation system:
Introduction:
 This system is basically concerned with the
reservation of railway tickets to the passengers.
 In this we are discussing that how the reservation is
done.
 What are the rules and regulations and procedure
for reservation?
Cntd…
 In this project we are going to include all the entities
related to reservation.
 Employees
 Customers
 Stations
 Trains
 Forms
 Ticket
 Fare
 Class
 Time
Scope & Objectives:
 All the manual work should be converted into
computerized so that the load of employees should
decrease.
 The database should be stored in computer rather
than in register/manually.
Cntd…
 Easy to store information and fast accessing of
information.
 Centralized management reporting & decision
support.
 Accurate and timely control program.
 To make it easy for fast processing and
modification.
 List of accounts of all customers is available.
 Easy retrieval of accounts.
 To make the Railway system is interactive.
 Quick feed back.
Features:
1) Searching of data is easy
2) Passengers don’t have to wait for a long time.
3) Information is accurate
4) It is a fast process
5) Data efficiency is more
Limitations:
1) Data Redundancy
2) Difficulty in accessing the Data
Requirements:
1) Hardware Requirements:
 Processor : Pentium IV 2GHz and Above
 RAM : 1GB
 Monitor : VGA Color Monitor
2) Software Requirements:
 Operating System : Windows XP
onwards
 Developing Tool : VB (front end)
 Database : MS-ACCESS (back end)
Data flow diagram:
 The data flow diagram is a graphical
representation that depicts information flow and
the transforms that are applied as data moves
from input to output.
1) Context level or 0-level DFD
2) 1-level DFD
3) 2-Level DFD
Context level or 0-level DFD:
1-level DFD:
2-level DFD:
Logical Design:
1) EMPLOYEES: In this part we are covering that how the
employees are working in reservation section of railway.
In this all the details related to employee’s.
 Emp_name
 Emp_id
 Address
 Gender
 Phone no
 Date joined
 Salary
 Designation
 Duty _shift
1)Employee:
Attribute Data type Primary key Foreign key Constraints
Emp_name Char(10) Not null
Emp_id Number Pk Primary key
Address Varchar(50) Not null
Gender Char(10) ‘f’,’m’,‘F’,’M’
Phn_no Number(10) Not null
Date_ joined Date(8) Not null
Duty_shift Time(10) Not null
2)Customer:
In this part we are covering all the details related to
customer required for reservation.
• Customer_name
• Customer_id
• Address
• Age
• Gender
• Phone no
Customer:
Attribute Data type Primary key Foreign key Constraints
cust_name Char(10) Not null
cust_id Number(10) Pk Primary key
Ticket_num Number(50) Ticket(ticket_id) Not null
Gender Text(8) ‘f’,’m’,‘F’,’M’
Phn_no Number(10) Not null
Emp_id Number(8) Employee
(emp_id)
Not null
Form_id Number(10) Form(form_id) Not null
3)Ticket:
This is the part where we are covering the tickets detail. It
includes many attributes like id of tickets, class, fare,
source stations, destination station etc. Ticket can be
booked online as well as onsite.
• PNR_no
• Ticket_num
• Source and destination
• Class
• Fare
• Train_id
• Seat_id
Ticket:
Attribute Data type Primary key Foreign key Constraints
Ticket_num Number(10) Pk Primary key
P.N.R_No. Number Not null
Source Text Not null
Destination Text Not null
Class_id Number (10) Class(class_id) Foreign key
Fare Number(10) Not null
Train_id Number(8) Train(train_id) Not null
Seat_id Number (10) Not null
4) Station:
In this part we are covering the details of the station
ex; station name, number of trains passing or going
from that station or coming to that station. Number of
platforms, number of lines.
• Station_name
• No. Of lines
• Station_id
• No. Of platforms
Station:
Attribute Data type Primary key Foreign key Constraints
Stn_name Text(10) Not null
No_of_ lines Number (10) Not null
Stn_id Number(10) Pk Primary key
No_of _platform Number (10) Not null
5) Train:
•In this part we are covering all the details related to
the trains. We are covering train no, train name, no. of
passengers traveling through train, classes is train,
Route through which the train is going.
•The trains source and destination etc. what are the
different trains are going and coming at one station in
one day?
• Train_name
• Train_num
Train:
Attribute Data type Primary key Foreign key Constraints
Stn_id Number (10) Station(stn_id) Foreign key
Trn_name Text (10) Not null
Trn_id Number(10) Pk Primary key
Ticket_num Number (10) Ticket
(ticket_num)
Foreign key
6)Form:
•Forms are the most important part of reservation.
Forms are the source to know the details of the
customers.
•Form_name
•Form_id
Form:
Attribute Data type Primary key Foreign key Constraints
Form name Text(10) Not null
Form_id Number (10) Pk Primary key
cust_id Number (10) Customer
(cust_id)
Foreign key
7)Class:
•In this part we are covering the different types of
classes that is:
• 1st class
• 2nd class
• Sleeper class
• General class
So, the price depends upon the class the customer
selects. General class is the cheapest.
Class:
Attribute Data type Primary key Foreign key Constraints
Date Number(10) Not null
Trn_id Text Train(trn_id) Foreign key
No_of_seats Text Not null
Class_id Number (10) Pk Primary key
8)Fare
•Fare is the charges spent by the customer. Fare is
decided according to the train which is selected by the
customer.
•For example- We take the example of different trains
going from Ludhiana and their different charges/fare.
•Shtabadi
7:00am and 7:00pm
Chair car – Rs 450/ -
1st class – Rs 1099
Fare:
Attribute Data type Primary key Foreign key Constraints
Trn_id Number(10) Not null
Source Text (10) Not null
Destination Text (10) Not null
Class Text (10) Not null
Fare Text(10) Not null
Ticket_num Number(8) Ticket
(ticket_num)
Foreign key
Receipt_num Number (10) Pk Primary key
9)Time:
In this part all the details related to time are covered.
This includes:
•Departure time
•Train id
•Arrival time
Each train has different time. It can be in morning or
evening or night.
Time:
Attribute Data type Primary key Foreign key Constraints
Ref_no Number(10) Pk Primary key
Dep_time Date/time (8) Not null
Arrival_time Date/time (8) Not null
Train_id Number (10) Train(trn_id) Foreign key
Stn_id Number(10) Station(trn_id) Foreign key
E-R Diagram:

More Related Content

What's hot

Railway Reservation System - Requirement Engineering
Railway Reservation System - Requirement EngineeringRailway Reservation System - Requirement Engineering
Railway Reservation System - Requirement Engineering
Danish Javed
 
TRAIN TICKETING SYSTEM
TRAIN TICKETING SYSTEMTRAIN TICKETING SYSTEM
TRAIN TICKETING SYSTEMNimRaH NaZaR
 
Online Bus Reservation
Online Bus ReservationOnline Bus Reservation
Online Bus Reservation
Astha Patel
 
Database Management System of Travel Co.
Database Management System of Travel Co.Database Management System of Travel Co.
Database Management System of Travel Co.Awais Ali
 
Report on online bus management
Report on online bus managementReport on online bus management
Report on online bus management
Naeem Ahmad
 
Online bus reservation system
Online bus reservation systemOnline bus reservation system
Online bus reservation system
SannanGulzar
 
vehicle management system project report
vehicle management system project reportvehicle management system project report
vehicle management system project report
Ashik Khan
 
Bus Ticket Management System Documentation
Bus Ticket Management System DocumentationBus Ticket Management System Documentation
Bus Ticket Management System Documentationmuzammil siddiq
 
Presentation on Online Bus Service(In Progress)
Presentation on Online Bus Service(In Progress)Presentation on Online Bus Service(In Progress)
Presentation on Online Bus Service(In Progress)
Naeem Ahmad
 
Daewoo reservation and transport system database
Daewoo reservation and transport system databaseDaewoo reservation and transport system database
Daewoo reservation and transport system database
Efrah Shakir
 
Database project design report of Centro bus transit system
Database project design report of Centro bus transit systemDatabase project design report of Centro bus transit system
Database project design report of Centro bus transit system
Ankur Gupta
 
online bus ticket booking system
online bus ticket booking systemonline bus ticket booking system
online bus ticket booking system
Umme habiba
 
Tousif Resume - Copy
Tousif Resume - CopyTousif Resume - Copy
Tousif Resume - CopyTOUSIF RAZA
 
Railway reservation(c++ project)
Railway reservation(c++ project)Railway reservation(c++ project)
Railway reservation(c++ project)
Debashis Rath
 
Bus Booking Management System
Bus Booking Management SystemBus Booking Management System
Bus Booking Management System
Mike Marshall
 
Travel management system in html 1
Travel management system in html 1Travel management system in html 1
Travel management system in html 1
Ashik Khan
 
Dhakavehiclesystem 170417113343.pdf abid
Dhakavehiclesystem 170417113343.pdf abidDhakavehiclesystem 170417113343.pdf abid
Dhakavehiclesystem 170417113343.pdf abid
Ashik Khan
 
Refund rules
Refund rulesRefund rules
Refund rules
Himanshu Gupta
 

What's hot (20)

Railway Reservation System - Requirement Engineering
Railway Reservation System - Requirement EngineeringRailway Reservation System - Requirement Engineering
Railway Reservation System - Requirement Engineering
 
TRAIN TICKETING SYSTEM
TRAIN TICKETING SYSTEMTRAIN TICKETING SYSTEM
TRAIN TICKETING SYSTEM
 
Online Bus Reservation
Online Bus ReservationOnline Bus Reservation
Online Bus Reservation
 
Database Management System of Travel Co.
Database Management System of Travel Co.Database Management System of Travel Co.
Database Management System of Travel Co.
 
Report on online bus management
Report on online bus managementReport on online bus management
Report on online bus management
 
Online bus reservation system
Online bus reservation systemOnline bus reservation system
Online bus reservation system
 
vehicle management system project report
vehicle management system project reportvehicle management system project report
vehicle management system project report
 
Bus Ticket Management System Documentation
Bus Ticket Management System DocumentationBus Ticket Management System Documentation
Bus Ticket Management System Documentation
 
Presentation on Online Bus Service(In Progress)
Presentation on Online Bus Service(In Progress)Presentation on Online Bus Service(In Progress)
Presentation on Online Bus Service(In Progress)
 
IBS Assessment 2 Case Study Project
IBS Assessment 2 Case Study ProjectIBS Assessment 2 Case Study Project
IBS Assessment 2 Case Study Project
 
Daewoo reservation and transport system database
Daewoo reservation and transport system databaseDaewoo reservation and transport system database
Daewoo reservation and transport system database
 
Database project design report of Centro bus transit system
Database project design report of Centro bus transit systemDatabase project design report of Centro bus transit system
Database project design report of Centro bus transit system
 
online bus ticket booking system
online bus ticket booking systemonline bus ticket booking system
online bus ticket booking system
 
Tousif Resume - Copy
Tousif Resume - CopyTousif Resume - Copy
Tousif Resume - Copy
 
Railway reservation(c++ project)
Railway reservation(c++ project)Railway reservation(c++ project)
Railway reservation(c++ project)
 
Bus Booking Management System
Bus Booking Management SystemBus Booking Management System
Bus Booking Management System
 
Travel management system in html 1
Travel management system in html 1Travel management system in html 1
Travel management system in html 1
 
Dhakavehiclesystem 170417113343.pdf abid
Dhakavehiclesystem 170417113343.pdf abidDhakavehiclesystem 170417113343.pdf abid
Dhakavehiclesystem 170417113343.pdf abid
 
Refund rules
Refund rulesRefund rules
Refund rules
 
58
5858
58
 

Similar to RAILWAY

Railway Management PPT.pptx
Railway Management PPT.pptxRailway Management PPT.pptx
Railway Management PPT.pptx
SandeepKumar81296
 
Documentation of railway reservation system
Documentation of railway reservation systemDocumentation of railway reservation system
Documentation of railway reservation systemSandip Murari
 
Sahil Dhungel & Het Unadkat Data Mining.pdf
Sahil Dhungel & Het Unadkat Data Mining.pdfSahil Dhungel & Het Unadkat Data Mining.pdf
Sahil Dhungel & Het Unadkat Data Mining.pdf
HetUnadkat
 
202412343_Relational_Database_Presentation.pptx
202412343_Relational_Database_Presentation.pptx202412343_Relational_Database_Presentation.pptx
202412343_Relational_Database_Presentation.pptx
SanjanaDeshpande8
 
Railway Reservation system
Railway Reservation systemRailway Reservation system
Railway Reservation system
Nikhil Yennampally
 
COMPUTER SCIENCE PROJECT OF RAILWAY RESERVATION SYSTEM PYTHON PROGRAMMING.pdf
COMPUTER SCIENCE PROJECT OF RAILWAY RESERVATION SYSTEM PYTHON PROGRAMMING.pdfCOMPUTER SCIENCE PROJECT OF RAILWAY RESERVATION SYSTEM PYTHON PROGRAMMING.pdf
COMPUTER SCIENCE PROJECT OF RAILWAY RESERVATION SYSTEM PYTHON PROGRAMMING.pdf
AkshatTiwari530170
 
E-TICKETING ON RAILWAY TICKET RESERVATION
E-TICKETING ON RAILWAY TICKET RESERVATIONE-TICKETING ON RAILWAY TICKET RESERVATION
E-TICKETING ON RAILWAY TICKET RESERVATION
Nandana Priyanka Eluri
 
railway_PROJECT.doc on python my SQL connectivity
railway_PROJECT.doc on python my SQL connectivityrailway_PROJECT.doc on python my SQL connectivity
railway_PROJECT.doc on python my SQL connectivity
vicky9095916747
 
railway reservation software documentaion
railway reservation software documentaionrailway reservation software documentaion
railway reservation software documentaion
Joveria Beg
 
Report On Travel Cab Agency
Report On Travel Cab AgencyReport On Travel Cab Agency
Report On Travel Cab Agency
Nitish Xavier Tirkey
 
Transport Management
Transport ManagementTransport Management
Transport Management
MeghzSalesSupport
 
RAILWAY RESERVATION SYSTEM.pptx
RAILWAY RESERVATION SYSTEM.pptxRAILWAY RESERVATION SYSTEM.pptx
RAILWAY RESERVATION SYSTEM.pptx
ManishBhoir6
 
Bus transportation query report
Bus transportation query reportBus transportation query report
Bus transportation query report
Sudhanshu Moolya
 
Sterling Integrator Map Editor
Sterling Integrator Map EditorSterling Integrator Map Editor
Sterling Integrator Map EditorJeyhind M
 
srs for railway reservation system
 srs for railway reservation system srs for railway reservation system
srs for railway reservation system
khushi kalaria
 
IRJET- Mumbai Suburban Train Ticketing System
IRJET- Mumbai Suburban Train Ticketing SystemIRJET- Mumbai Suburban Train Ticketing System
IRJET- Mumbai Suburban Train Ticketing System
IRJET Journal
 
Service Provider
Service Provider Service Provider
Service Provider
Jatin Devani
 
Railway tracking system
Railway tracking systemRailway tracking system
Railway tracking system
MustafaQaiser1
 
Online Movie Ticket Booking
Online Movie Ticket BookingOnline Movie Ticket Booking
Online Movie Ticket Booking
Astha Patel
 

Similar to RAILWAY (20)

Railway Management PPT.pptx
Railway Management PPT.pptxRailway Management PPT.pptx
Railway Management PPT.pptx
 
Documentation of railway reservation system
Documentation of railway reservation systemDocumentation of railway reservation system
Documentation of railway reservation system
 
Sahil Dhungel & Het Unadkat Data Mining.pdf
Sahil Dhungel & Het Unadkat Data Mining.pdfSahil Dhungel & Het Unadkat Data Mining.pdf
Sahil Dhungel & Het Unadkat Data Mining.pdf
 
202412343_Relational_Database_Presentation.pptx
202412343_Relational_Database_Presentation.pptx202412343_Relational_Database_Presentation.pptx
202412343_Relational_Database_Presentation.pptx
 
Railway Reservation system
Railway Reservation systemRailway Reservation system
Railway Reservation system
 
COMPUTER SCIENCE PROJECT OF RAILWAY RESERVATION SYSTEM PYTHON PROGRAMMING.pdf
COMPUTER SCIENCE PROJECT OF RAILWAY RESERVATION SYSTEM PYTHON PROGRAMMING.pdfCOMPUTER SCIENCE PROJECT OF RAILWAY RESERVATION SYSTEM PYTHON PROGRAMMING.pdf
COMPUTER SCIENCE PROJECT OF RAILWAY RESERVATION SYSTEM PYTHON PROGRAMMING.pdf
 
E-TICKETING ON RAILWAY TICKET RESERVATION
E-TICKETING ON RAILWAY TICKET RESERVATIONE-TICKETING ON RAILWAY TICKET RESERVATION
E-TICKETING ON RAILWAY TICKET RESERVATION
 
railway_PROJECT.doc on python my SQL connectivity
railway_PROJECT.doc on python my SQL connectivityrailway_PROJECT.doc on python my SQL connectivity
railway_PROJECT.doc on python my SQL connectivity
 
railway reservation software documentaion
railway reservation software documentaionrailway reservation software documentaion
railway reservation software documentaion
 
Report On Travel Cab Agency
Report On Travel Cab AgencyReport On Travel Cab Agency
Report On Travel Cab Agency
 
Transport Management
Transport ManagementTransport Management
Transport Management
 
Operation Research
Operation ResearchOperation Research
Operation Research
 
RAILWAY RESERVATION SYSTEM.pptx
RAILWAY RESERVATION SYSTEM.pptxRAILWAY RESERVATION SYSTEM.pptx
RAILWAY RESERVATION SYSTEM.pptx
 
Bus transportation query report
Bus transportation query reportBus transportation query report
Bus transportation query report
 
Sterling Integrator Map Editor
Sterling Integrator Map EditorSterling Integrator Map Editor
Sterling Integrator Map Editor
 
srs for railway reservation system
 srs for railway reservation system srs for railway reservation system
srs for railway reservation system
 
IRJET- Mumbai Suburban Train Ticketing System
IRJET- Mumbai Suburban Train Ticketing SystemIRJET- Mumbai Suburban Train Ticketing System
IRJET- Mumbai Suburban Train Ticketing System
 
Service Provider
Service Provider Service Provider
Service Provider
 
Railway tracking system
Railway tracking systemRailway tracking system
Railway tracking system
 
Online Movie Ticket Booking
Online Movie Ticket BookingOnline Movie Ticket Booking
Online Movie Ticket Booking
 

Recently uploaded

block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 

Recently uploaded (20)

block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 

RAILWAY

  • 1. Presentation on railway reservation system Presented By: Priyanka Sharma Meenu Mittal
  • 3. Introduction:  This system is basically concerned with the reservation of railway tickets to the passengers.  In this we are discussing that how the reservation is done.  What are the rules and regulations and procedure for reservation?
  • 4. Cntd…  In this project we are going to include all the entities related to reservation.  Employees  Customers  Stations  Trains  Forms  Ticket  Fare  Class  Time
  • 5. Scope & Objectives:  All the manual work should be converted into computerized so that the load of employees should decrease.  The database should be stored in computer rather than in register/manually.
  • 6. Cntd…  Easy to store information and fast accessing of information.  Centralized management reporting & decision support.  Accurate and timely control program.  To make it easy for fast processing and modification.  List of accounts of all customers is available.  Easy retrieval of accounts.  To make the Railway system is interactive.  Quick feed back.
  • 7. Features: 1) Searching of data is easy 2) Passengers don’t have to wait for a long time. 3) Information is accurate 4) It is a fast process 5) Data efficiency is more
  • 8. Limitations: 1) Data Redundancy 2) Difficulty in accessing the Data
  • 9. Requirements: 1) Hardware Requirements:  Processor : Pentium IV 2GHz and Above  RAM : 1GB  Monitor : VGA Color Monitor 2) Software Requirements:  Operating System : Windows XP onwards  Developing Tool : VB (front end)  Database : MS-ACCESS (back end)
  • 10. Data flow diagram:  The data flow diagram is a graphical representation that depicts information flow and the transforms that are applied as data moves from input to output. 1) Context level or 0-level DFD 2) 1-level DFD 3) 2-Level DFD
  • 11. Context level or 0-level DFD:
  • 14. Logical Design: 1) EMPLOYEES: In this part we are covering that how the employees are working in reservation section of railway. In this all the details related to employee’s.  Emp_name  Emp_id  Address  Gender  Phone no  Date joined  Salary  Designation  Duty _shift
  • 15. 1)Employee: Attribute Data type Primary key Foreign key Constraints Emp_name Char(10) Not null Emp_id Number Pk Primary key Address Varchar(50) Not null Gender Char(10) ‘f’,’m’,‘F’,’M’ Phn_no Number(10) Not null Date_ joined Date(8) Not null Duty_shift Time(10) Not null
  • 16. 2)Customer: In this part we are covering all the details related to customer required for reservation. • Customer_name • Customer_id • Address • Age • Gender • Phone no
  • 17. Customer: Attribute Data type Primary key Foreign key Constraints cust_name Char(10) Not null cust_id Number(10) Pk Primary key Ticket_num Number(50) Ticket(ticket_id) Not null Gender Text(8) ‘f’,’m’,‘F’,’M’ Phn_no Number(10) Not null Emp_id Number(8) Employee (emp_id) Not null Form_id Number(10) Form(form_id) Not null
  • 18. 3)Ticket: This is the part where we are covering the tickets detail. It includes many attributes like id of tickets, class, fare, source stations, destination station etc. Ticket can be booked online as well as onsite. • PNR_no • Ticket_num • Source and destination • Class • Fare • Train_id • Seat_id
  • 19. Ticket: Attribute Data type Primary key Foreign key Constraints Ticket_num Number(10) Pk Primary key P.N.R_No. Number Not null Source Text Not null Destination Text Not null Class_id Number (10) Class(class_id) Foreign key Fare Number(10) Not null Train_id Number(8) Train(train_id) Not null Seat_id Number (10) Not null
  • 20. 4) Station: In this part we are covering the details of the station ex; station name, number of trains passing or going from that station or coming to that station. Number of platforms, number of lines. • Station_name • No. Of lines • Station_id • No. Of platforms
  • 21. Station: Attribute Data type Primary key Foreign key Constraints Stn_name Text(10) Not null No_of_ lines Number (10) Not null Stn_id Number(10) Pk Primary key No_of _platform Number (10) Not null
  • 22. 5) Train: •In this part we are covering all the details related to the trains. We are covering train no, train name, no. of passengers traveling through train, classes is train, Route through which the train is going. •The trains source and destination etc. what are the different trains are going and coming at one station in one day? • Train_name • Train_num
  • 23. Train: Attribute Data type Primary key Foreign key Constraints Stn_id Number (10) Station(stn_id) Foreign key Trn_name Text (10) Not null Trn_id Number(10) Pk Primary key Ticket_num Number (10) Ticket (ticket_num) Foreign key
  • 24. 6)Form: •Forms are the most important part of reservation. Forms are the source to know the details of the customers. •Form_name •Form_id
  • 25. Form: Attribute Data type Primary key Foreign key Constraints Form name Text(10) Not null Form_id Number (10) Pk Primary key cust_id Number (10) Customer (cust_id) Foreign key
  • 26. 7)Class: •In this part we are covering the different types of classes that is: • 1st class • 2nd class • Sleeper class • General class So, the price depends upon the class the customer selects. General class is the cheapest.
  • 27. Class: Attribute Data type Primary key Foreign key Constraints Date Number(10) Not null Trn_id Text Train(trn_id) Foreign key No_of_seats Text Not null Class_id Number (10) Pk Primary key
  • 28. 8)Fare •Fare is the charges spent by the customer. Fare is decided according to the train which is selected by the customer. •For example- We take the example of different trains going from Ludhiana and their different charges/fare. •Shtabadi 7:00am and 7:00pm Chair car – Rs 450/ - 1st class – Rs 1099
  • 29. Fare: Attribute Data type Primary key Foreign key Constraints Trn_id Number(10) Not null Source Text (10) Not null Destination Text (10) Not null Class Text (10) Not null Fare Text(10) Not null Ticket_num Number(8) Ticket (ticket_num) Foreign key Receipt_num Number (10) Pk Primary key
  • 30. 9)Time: In this part all the details related to time are covered. This includes: •Departure time •Train id •Arrival time Each train has different time. It can be in morning or evening or night.
  • 31. Time: Attribute Data type Primary key Foreign key Constraints Ref_no Number(10) Pk Primary key Dep_time Date/time (8) Not null Arrival_time Date/time (8) Not null Train_id Number (10) Train(trn_id) Foreign key Stn_id Number(10) Station(trn_id) Foreign key