1. The document provides steps for installing and configuring a Ceragon 0.6m radio system, including mounting the antenna and radio equipment, connecting cables, installing the indoor unit rack, and configuring the radio parameters.
2. It outlines assembling the antenna mount brackets, mounting the outdoor radio unit, connecting cables between the indoor and outdoor units, and installing the indoor equipment rack with power and networking.
3. The configuration steps include connecting the indoor unit to power, accessing the management interface to configure IP addresses and licenses, setting the modulation type and frequencies, and enabling the Ethernet port before aligning the radio link.