Holistic Hetnet Hauling Solutionsg
April 2013
Ceragon’s Value Proposition
Backhaul Specialist
Gl b l R&D E i i
Rapidly Growing
35% R CAGR 2004 2011
Transparent and Trusted
NASDAQ T d d (CRNT) • Global R&D, Engineering,
Manufacturing, Sales &
Support
• In-house RFIC & Modem
S t Chi kill t
• 35% Rev CAGR 2004-2011
• A clear M&A strategy
• Proven ramp-up capabilities
based on vertical radio
i t ti
• NASDAQ Traded (CRNT)
• 446M USD in 2012
• Profitable
Wireless Backhaul Portfolio:
To meet European high end wireless service requirements
System-on-Chip skillsetintegration
Dedicated portfolio for Scale and cost to serve India:
p g q
and different deployment or migration scenarios
p
North America:
Compact All Indoor High
Power, FCC, NEBS
Scale and cost to serve India:
Tailored for Indian networks
in cost, performance, topology & reliability.
Complete service offering
Long haul trunk leadership:
Total Cost, Power consumption
and turn key across Africa
Complete portfolio of Small
Cells & E-band solutions, based
on in-house radio technology
Proprietary and Confidential2
We challenge disruptive hauling requirements
with disruptive, high-capacity hauling solutions
ss
m2012
usines
Source:Ovum
Bu
Capacity OTT
Value 
Chain
Over the Top Sharing & SCaaSOrder of Magnitude
es
Over the Top Sharing & SCaaSOrder of Magnitude
nologi
C‐RAN CoMP WiFi 2.0
IEEE 802 11u ac adCl d RAN
Techn
Proprietary and Confidential3
Coordinated Multipoint IEEE 802.11u, ac, ad,…Cloud RAN
Ceragon’s Superior Technology
Breakthrough
Revolutionary
Multi-Core RadioIndustry 1st Doubling g
radio technology
for Native
TDM/Native IP
Multi Core Radio
sets new industry
standards
Industry 1
STM1 Radio
at 38 GHz
g
capacity
with XPIC
1998 2005 2008 2012
With a proven history of technological leadership – we
Proprietary and Confidential4
are now ready to introduce a new benchmark solution to
the market
Traditional Mobile Backhaul
MSC/RNC/S-GW
Microwave
60GHz
E‐Band
Fiber Aggregation
Network
PtMP Sub 6GHz
Aggregation
Macro Site
DU
Carrier Ethernet
MPLS-TP
IP/MPLS
gg g
Node
Macro Site
Aggregation
Node
Aggregation
Node
Macro Site
DU
Proprietary and Confidential5
Evolution to Holistic HetNet Hauling (3H)
MSC/RNC/S-GW
Microwave
60GHz
E‐Band
The Hauling Dimensions
• Capacity
C
Fiber Aggregation
Network
PtMP Sub 6GHz
Aggregation
• Coverage
• Intelligence
• Modernization
• Simplification
Super Size
DU
Carrier Ethernet
MPLS-TP
IP/MPLS
gg g
Node• Simplification
RU
Super Size
Macro Site
E-Band
60GHz
Aggregation
Node
Aggregation
Node
Super Size
Macro Site
RU
Small
Cells
PtMP
Sub 6GHz
DU
Small
Cells • Heterogeneous
• Flat-Hierarchy
Proprietary and Confidential6
• Backhaul + Fronthaul
Evolution to Holistic HetNet Hauling (3H)
Macro
MSC/RNC/S-GW
Fiber Aggregation
Network
Macrocell
Backhaul
Versatile deployment
Macro+
Macro Macro-Site
AggregationAggregation
DU
Carrier Ethernet
MPLS-TP
IP/MPLS
Versatile deployment
scenarios, incl. E-band
Aggregation
High capacity &
interoperability
Super Size
gg g
Node
RU
E-Band
60GHz
Super Size
Macro Site Aggregation
Node
Aggregation
Node
Macro+
RU
Small
Cells
PtMP
Sub 6GHz
DU
Super Size
Macro Site
Super Macro
Small
Cells
Compressed CPRI
li b d
RU
C-RAN
F th l
DU
Proprietary and Confidential7
over license bands Fronthaul
High capacity, low latency
3H Product Portfolio
Macrocell
Backhaul MSC/RNC/S-GW
IP-20N MPLS-TP & IP/MPLS
IP-20C
Fiber Aggregation
Network
Versatile deployment
scenarios
Macro-Site
AggregationAggregation
IP-20C
Carrier Ethernet
DU
Carrier Ethernet
MPLS-TP
IP/MPLS
gg g
High capacity &
interoperability
Super Size
gg g
Node
RU
E-Band
60GHz
Super Size
Macro Site Aggregation
Node
Aggregation
Node
IP-80X
E-Band 70-80GHz Radio
C i Eth t
RU
Small
Cells
PtMP
Sub 6GHz
DU
Super Size
Macro Site
Carrier Ethernet
60GHz Street Level
IP-60S
Small
Cells
C-RAN
F th l
FA‐2500/2000
Sub 6GHz
IP-20C CPRI
E-Band 70-80GHz Radio
Proprietary and Confidential8
Fronthaul
High capacity, low latency
Carrier Ethernet
Strategic Investment in Radio Innovation
• In-house development of patented, single chip RFIC & Modem
technologies
• Complete spectrum: 6-42GHz, E/V-bandCo p ete spect u 6 G , / ba d
• Enables complete control of E/V-band mmW systems technologies
• Enables delivery of systems with unique requirements per network
and geography
• High-performance integrated transceiver solutions in CMOS
and SiGe processes
V-Band & E-band
RFIC
• Unique E/V-band RFIC supporting up to 10Gbps
Single chipSingle chip
6 – 42GHz RFIC
Providing the Highest performance
at the lowest power & smallest form fit
Proprietary and Confidential9
p
Ceragon’s Integrated Small Cells Solutions Portfolio
6060GHz(VGHz(V‐‐band)band)
Application:
• High capacity (up to 1Gbps)
6060GHz(VGHz(V‐‐band)band)
Application:
• High capacity (up to 1Gbps)
Sub Sub 66GHz (PtP/PtMP)GHz (PtP/PtMP)
Application:
• NLoS Backhaul
• Medium capacity (50 200Mbps)
Sub Sub 66GHz (PtP/PtMP)GHz (PtP/PtMP)
Application:
• NLoS Backhaul
• Medium capacity (50 200Mbps) • High capacity (up to 1Gbps)
Benefits :
• Very small form‐fit
• Lower TCO – unlicensed 
band
• High capacity (up to 1Gbps)
Benefits :
• Very small form‐fit
• Lower TCO – unlicensed 
band
• Medium capacity (50‐200Mbps)
Benefits :
• No antenna alignment
• Lower TCO – unlicensed spectrum
• Medium capacity (50‐200Mbps)
Benefits :
• No antenna alignment
• Lower TCO – unlicensed spectrum
bandband
7070‐‐8080GHz (EGHz (E‐‐band)band)
Application:
7070‐‐8080GHz (EGHz (E‐‐band)band)
Application:
Multi technology Node Multi technology Node ‐‐ Macro sitesMacro sites
Application:
• High capacity node for Macro sites
• Multiple direction
Multi technology Node Multi technology Node ‐‐ Macro sitesMacro sites
Application:
• High capacity node for Macro sites
• Multiple direction
• Small Cells Aggregation to first mile
• Access/Aggregation backhaul
Characteristics/Benefits :
• Low interference – Licensed channels
• Small Cells Aggregation to first mile
• Access/Aggregation backhaul
Characteristics/Benefits :
• Low interference – Licensed channels
• Multiple direction
Benefits :
• Multi‐technology: PtP, PtMP, 6‐42GHz, 
Sub 6GHz,  60GHz, 70‐80GHzHigh 
• Advanced service management
• Multiple direction
Benefits :
• Multi‐technology: PtP, PtMP, 6‐42GHz, 
Sub 6GHz,  60GHz, 70‐80GHzHigh 
• Advanced service management
Proprietary and Confidential10
• High Capacity• High Capacity
• Advanced service management
• High density node
• Advanced service management
• High density node
Small Cell Portfolio
MSC/RNC/S-GW
Fiber Aggregation
Network
Aggregation
DU
Carrier Ethernet
MPLS-TP
IP/MPLS
Super Size
gg g
Node
RU
E-Band
60GHz
Super Size
Macro Site Aggregation
Node
Aggregation
Node
IP-80X
E-Band 70-80GHz Radio
C i Eth t
RU
Small
Cells
PtMP
Sub 6GHz
DU
Super Size
Macro Site
Carrier Ethernet
60GHz Street Level
IP-60S
Small
Cells
C-RAN
F th l
FA‐2500/2000
Sub 6GHz
Proprietary and Confidential11
Fronthaul
High capacity, low latency
FibeAir FA-2500 / FA-2000
Sub 6GHz – LoS and NLoS Small Cells BH
FA‐2000
FA‐2500
(Hub Unit)
Sub 6GHz LoS and NLoS Small Cells BH
• Applications:
• Street Level LoS and NLoS
• Point-to-point and Point-to-Multipoint deployments (Hub Unit)
• Frequency bands:
• License Exempt: 4.8-6.06 GHz
• Licensed: 2.3 – 2.4GHz, 2.5 - 2.7GHz, 3.3 - 3.8GHz
• 10,20,40MHz channels, ,
• Configurations: All-outdoor
• Capacity Highlights
FA‐2500
Capacity Highlights
• Aggregate throughput: Up to 260Mbps, at 40MHz
• Remote Terminal throughput: up to 65Mbps
• Multi Layer Header compression, 30% capacity gain
• Integrated Traffic Optimizer 40% capacity gain
(Remote 
Terminal)
Integrated Traffic Optimizer, 40% capacity gain
• Networking
• E2E service provisioning and management
• Integrated CET MEF2.0 compliantIntegrated CET MEF2.0 compliant
• Advanced H-QoS
• Comprehensive Service OA&M (802.3ag, Y.1731) & Link OA&M
• Ultra low latency
• Flexible packet synch – SyncE 1588v2
Proprietary and Confidential12
Flexible packet synch SyncE,1588v2
• Power: DC (48VDC), PoE, 110-240V
FibeAir IP-60S
Street Optimized V-band All OutdoorStreet Optimized V band All Outdoor
• Applications:
• Street Level Small Cells Interconnectivity
• Small Cells AggregationSmall Cells Aggregation
• Frequencies: FDD 57-66GHz
• Nx50MHz channel aggregation up to 500MHz channels
• Configurations:• Configurations:
• Street optimized all outdoor–Pole/ Wall Mount installation
• Mechanical solutions for single box enclosure
• Very low power consumption
• Capacity Highlights
• 1Gbps for 0.5km (rain zone K, 99.99%)
• Multi Layer Header compression, 30% capacity gain
I t t d T ffi O ti i 40% it i• Integrated Traffic Optimizer, 40% capacity gain
• Networking
• E2E service provisioning and management
I t t d CET MEF2 0 li t
IP‐60S
• Integrated CET MEF2.0 compliant
• Advanced H-QoS
• Flexible packet synch – SyncE,1588v2
• Comprehensive Service OA&M (802.3ag, Y.1731) & Link OA&M
Proprietary and Confidential13
• Ultra low latency
• Power: DC (48VDC), PoE, optional:110-240V
FibeAir IP-80X E-Band Solution
Tail Sites and Small Cells Aggregation
• Applications:
• Tail Sites and Small Cells Aggregation
• High Capacity Access “38GHz replacement”
Tail Sites and Small Cells Aggregation
• High Capacity Access – 38GHz replacement
• Frequencies: FDD 71-76 / 81-86 GHz
• 250,500MHz channels
IP‐80X
• Configurations
• All-outdoor
• 2Gbps at 1.5km (1ft, 500MHz, 99.99% Zone K)
1Gb t 1 7k (1ft 250MH 99 99% Z K)• 1Gbps at 1.7km (1ft, 250MHz, 99.99%, Zone K)
• Multi Layer Header compression, 30% capacity gain
• Integrated Traffic Optimizer, 40% capacity gain
• Networking
• E2E service provisioning and management
• Integrated CET
• Flexible packet synch – SyncE,1588v2
• Power: DC (48VDC), PoE, optional:110-240VAC
Proprietary and Confidential14
Introducing IP-20C
Macrocell
Backhaul MSC/RNC/S-GW
MPLS-TP & IP/MPLS
IP-20C
Fiber Aggregation
Network
Versatile deployment
scenarios
Macro-Site
AggregationAggregation
IP-20C
Carrier Ethernet
DU
Carrier Ethernet
MPLS-TP
IP/MPLS
gg g
High capacity &
interoperability
Super Size
gg g
Node
RU
E-Band
60GHz
C-RAN
Super Size
Macro Site Aggregation
Node
Aggregation
Node
RU
Small
Cells
PtMP
Sub 6GHz
DU
Fronthaul
High capacity, low latency
Super Size
Macro Site
Small
Cells
IP-20C CPRI
6 – 42GHz compressed
Proprietary and Confidential15
CPRI
FibeAir IP-20C
A New Standard in Microwave Transmission
Ceragon MultiMulti--Core Radio TechnologyCore Radio Technology Sets a
N St d d i Mi T i iNew Standard in Microwave Transmission
Delivering Multi-Gbps Anywhere
Proprietary and Confidential16
A New Standard in Microwave Transmission
FibeAir IP-20CFibeAir IP 20C
• Multi-Core Radio technology -
Parallel radio processing engine to
double performance
• Integrated 4X4 LoS MIMO
Hi h d l ti 2048 QAM• High modulation: 2048 QAM
• Compact All-outdoor MULTI-CORE RADIO
Revolutionary Compact Radio Combining Multi-Core Radio,
2048 QAM M d l ti d Li f i ht 4 4 MIMO
Proprietary and Confidential17
2048 QAM Modulation and Line-of-sight 4x4 MIMO
FibeAir IP-20C
Deliver Multi-Gbps Where Needed
• For Any LICENSED BAND
Deliver Multi-Gbps Where Needed
• Licensed frequencies 6-42 GHz (overcome E-Band limitations)
• For Any of your available CHANNELSy y
• True 12 Gbps over a single 2856MHz channel (MIMO)
• For Any APPLICATIONFor Any APPLICATION
• Backhaul & Fronthaul
• For Any LOCATION• For Any LOCATION
• “1 Gbps in a Box” that can even fit in street corners
Breaking capacity barriers in licensed bands, 
d li i i bit h !
Proprietary and Confidential
delivering gigabits anywhere!
FibeAir IP-20C Multi Core Radio
MODEM RFIC
• Multi-Core Radio - Parallel radio processing engine that can double
your radio capacity, distance and availability any way you wantyour radio capacity, distance and availability any way you want
• Enabled by Ceragon’s unique in-house chipset technology
Proprietary and Confidential19
Introducing IP-20N
Macrocell
Backhaul MSC/RNC/S-GW
MPLS-TP & IP/MPLS
IP-20C
Fiber Aggregation
Network
Versatile deployment
scenarios
Macro-Site
AggregationAggregation
Carrier Ethernet
IP-20N
DU
Carrier Ethernet
MPLS-TP
IP/MPLS
gg g
High capacity &
interoperability
Super Size
gg g
Node
RU
E-Band
60GHz
Super Size
Macro Site Aggregation
Node
Aggregation
Node
RU
Small
Cells
PtMP
Sub 6GHz
DU
Super Size
Macro Site
Small
Cells
Proprietary and Confidential20
FibeAir IP-20N
The basis of Multi Technology NodeThe basis of Multi Technology Node
Unified architecture with
1RU chassis, Up to 5 RFUs
common cards
• Traffic/Control card (TCC)
• 10Gbps switching capacity, p 10Gbps switching capacity
• Radio interface cards (RMC)
• Line cards (LIC)
• Eth – 4 x 1GEEth 4 x 1GE
• TDM – 16 x DS1
• TDM – 1x ch-OC3
2RU chassis, Up to 10 RFUs
Full redundancy option (No SPoF)
Purpose-built for aggregation nodal sites
S l l bi i R di T h l i
Proprietary and Confidential21
Seamlessly combining Radio Technologies
Header Deduplication
• Performs compression of L2 – L4 , including
GTP tunnels and MPLS headers
O t b t 2 d f th li k• Operates between 2 ends of the same link
• Does not impact or alter traffic
• Does not affect latency
Header 30% Deduplication
+30%
Header
Deduplication
30% Deduplication
260Mbps
High
Modulation
260Mbps
(2048 QAM)
240Mbps
(1024QAM)
Modulation
28MHz
195Mbps
(256 QAM)
Proprietary and Confidential22
A realistic live Network Headers
Headers taking away from End User Capacity
Proprietary and Confidential23
Headers – taking away from End User Capacity
Results with 28Mhz channels
Frame Size Capacity @ 2048QAM , 28Mhz
No Header Compression
Capacity @ 2048QAM , 28Mhz
With Header CompressionNo Header Compression With Header Compression
180B 281Mbps 860Mbps
512B 267Mbps 351Mbps
1518B 262Mbps 285Mbps
Traffic Model 2 267Mbps 365Mbps
+100Mbps
Real LTE Network  Mix 
of : Short  mid size
Additional 37% of capacity
of : Short   mid size 
, long frames
Proprietary and Confidential24
Additional 37% of capacity
Payload DeDuplication Technology
• Exploits repetitive bit patterns in traffic
• Content, Application & Protocol agnostic
• Does not affect network functionality
• Additive to header DeDuplication offered by Ceragon
• Improved link utilization by transmitting traffic patterns indices
instead of traffic patterns
Aggregation
D
D
D
Network
Aggregation Site
C
D
Compressor
M C ll
D
D
C DD
Proprietary and Confidential25
De-compressor Macro Cell
(Roof Top)
D
Example
R tR RequestResponse
IP payload analyzed. 
If pattern not identified 
th l d
MW Radio Link
then learned.
A1D
MW Radio Link
C D
Proprietary and Confidential
Aggregation Site Macro Cell Site
26
FibeAir Traffic Optimizer - Identification
RResponse
IP payload analyzed 
 Pattern identified!
MW Radio Link
A1D
C D
MW Radio Link
Start signing session
Proprietary and Confidential
Aggregation Site Macro Cell Site
g g
Next signatures B6U, GG9, K4W
27
FibeAir Traffic Optimizer – Optimization
RResponse
Original
MW Radio Link
A1DA1D
Signed
B6UGG9K4W
C D
MW Radio Link
Proprietary and Confidential
Aggregation Site Macro Cell Site
28
LTE Backhaul Network Performance
Benefits of using Payload Deduplication - Reported ResultsBenefits of using Payload Deduplication Reported Results
30% - 50% more available capacity !p y
Results Summary
• 30-50% expansion ratio
• 20% reached within an hour. 35% achieved within 12 hours
Results Summary
• 30-50% expansion ratio
• 20% reached within an hour. 35% achieved within 12 hours
Proprietary and Confidential29
FibeAir LTE Traffic Optimizer is Unique
• Fully integrated and imbedded into FibeAir product line
• Content Application & Protocol agnosticContent, Application & Protocol agnostic
• Additive to other traffic acceleration techniques (e.g. header comp.)
Additi t h i l l i t ( hi h d l ti )• Additive to any physical layer improvement (e.g. higher modulations)
• Does not affect network functionality
• Traffic shaping, Service Selection, Charging, Ad Insertion
• Efficient: 30-50% extra capacity
• complementary to core network optimization
• Caching, CDN, Video compression, Adaptive bitrate, Protocol
optimization
Available for demonstrations in live LTE networks!
Proprietary and Confidential30
Available for demonstrations in live LTE networks!
Multi Technology Backhaul Node (IP-20N)
For Macro sites with Small Cell AggregationFor Macro sites with Small Cell Aggregation
• Integrated Nodal Solution
• L2 switch, MPLS-TP readyy
• Baseband & RF technologies in Radio Units
• Multiple radio technologies
• Sub 6GHz PtMP & PtP
• 60GHz (V-band)
• 70-80GHZ (E-band)
• 6-42GHz6 G
FibeAir Multi Technology Backhaul Node
Proprietary and Confidential
FibeAir Multi Technology Backhaul Node
31
Multi Technology Backhaul Node (IP-20N)
For Macro Sites to High Capacity Small Cell Aggregation PointFor Macro Sites to High Capacity Small Cell Aggregation Point
• Combining multiple radio BH technologies in a compact form-fit
• Integrated Nodal Solution
L2 it h MPLS TP d• L2 switch, MPLS-TP ready
• Advanced H-QoS
• Integrating multiple radio technologies
• 6-42GHz6 42GHz
• 70-80GHZ (E-band)
• 60GHz (V-band)
• Sub 6GHz PtMP & PtP
FA‐2500/2000 IP‐20C
6‐42GHz
MIMO Enabled
IP‐60S IP‐80XRFU‐C
2RU – up to 10 Radios1RU – up to 5 Radios
Proprietary and Confidential32
FibeAir Multi Technology Backhaul Node
Fronthaul Solutions
33
Introducing IP-20N
MSC/RNC/S-GW
Fiber Aggregation
Network
Aggregation
IP-80X CPRI
E-band CPRI
DU
Carrier Ethernet
MPLS-TP
IP/MPLS
Super Size
gg g
Node
RU
E-Band
60GHzC-RAN
Super Size
Macro Site Aggregation
Node
Aggregation
Node
RU
Small
Cells
PtMP
Sub 6GHz
DU
Fronthaul
High capacity, low latency
Super Size
Macro Site
Small
Cells
IP-20C CPRI
6 – 42GHz compressed
Proprietary and Confidential34
CPRI
Distributed Macro Cell
Distributed
pRRU
5-7 km
Compressed
Distributed
eNB
AggregationCPRI
1-40 km
Fronthaul Backhaul
pRRU 500-1000 m
Raw CPRI
Ethernet
PtP Microwave
PtP Millimeter Radio
• More sectors per base station
• Mainly for indoor coverage
• Real estate, truck rolls and equipment savings
Proprietary and Confidential35
Macro Cell, the Size of a City (C-RAN)
RU
5-7 km
Cloud RANCompressed CPRI
DU
Fronthaul
RU
RU
DU
Cloud
500-1000 m
Raw CPRI
RU
PtP Microwave
PtP Millimeter Radio
• Cloud means more operational savings
• But cloud fronthaul requires fiber everywhere
• APAC and Europe looking for disruption
Proprietary and Confidential36
CPRI Rate for LTE
S b l R D C l
LTE BW
Symbol 
Rate
[Mbaud]
No of 
antennas
Raw Data 
(IQ Samples) 
[Mbps]
Control 
Word OH
[Mbps]
Over all rate 
[Mbps]
CPRI option
[Mbps]
20 30 72 2 1843 2 122 88 2457 6 Opt 3: 2457 620 30.72 2 1843.2 122.88 2457.6 Opt 3: 2457.6
15 23.04 2 1382.4 122.88 1881.6 Opt 3: 2457.6
10 15.36 2 921.6 61.44 1228.8 Opt 2: 1228.8
5 7.68 2 460.8 30.72 614.4 Opt 1: 614.4
Proprietary and Confidential37
Sample Width = 15bit
Samples per symbol = 1
CPRI Transport Options
Compression of CPRI SignalCompression of CPRI Signal
Compression Rate Degradation to Original Signal
Line coding 8B/10B 1:1 25 NoneLine coding 8B/10B 1:1.25 None
IQ Compression 1:2.3 EVM degradation of < 3%
Overall Compression Rate 2.875
LTE 2x2 Actual Data Rate
(IQ Samples)
[Mbps]
IQ After 
compression
[Mbps]
CPRI AFTER
Compression 
(with OH)
[Mb ][Mbps]
20MHz 1843.2 801.4 924.28
15MHz 1382.4 601.04 723.92
10MHz 921.6 400.7 462.14
5MHz 460.8 200.35 231.06
EVM degradation will be capped by 3% - ETSI TS 136 104
(0.57dB additional to total degradation)
Actual Radio
Throughput
Proprietary and Confidential38
Throughput
Required
Transporting CPRI with IP-20C
6-42GHz6 42GHz
ETSI
LTE 2x2 CPRI BEFORE 
compression [Mbps]
CPRI AFTER
compression 
[Mbps][Mbps]
20MHz
2457.6 
(CPRI Opt.3)
924.28
56MHz: 1.06 Gbps
15MHz
2457.6 
(CPRI Opt.3)
723.92
10MHz
1228.8
(CPRI Opt.2)
462.14
(C Opt. )
5MHz
614.4
(CPRI Opt.1)
231.06
28MHz: 522 Mbps
T ti CPRI i i l itTransporting CPRI in a single unit
Proprietary and Confidential39
Latency
• CPRI compression adds the following Latency (compared to
transparent CPRI)p )
IQ Packet size Packet delay
[μsec]
Compression 
delay [μsec]
Overall delay
[μsec][μsec] delay [μsec] [μsec]
256 8.333 1.77 10.103
512 16.667 2.60 19.267
1024 33.333 4.27 37.6
• Over all link Latency - ~100usec
CPRI l t i t BBU d i d t t i 50• CPRI latency requirement: BBU designed to compensate a min 50us
(10km of FO)
Proprietary and Confidential40
Network Management System for Small Cells
• Supports complete range of small cells backhaul technologies
• Sub 6GHz PtMP and PtP
60GH• 60GHz
• 70-80GHz
• Enabler for large scale small cells networksg
• End-to-end provisioning
• User friendly provisioning wizards
• Group mass configurations• Group-mass configurations
• Advanced root cause analysis
• Zero Touch Provisioning for simplified site configuration
• Saving installation timeSaving installation time
• Reducing installation and configuration errors to minimum
Hi h l l f d
Proprietary and Confidential41
• High level of secured access
Summary
• Global Wireless Backhaul & Fronthaul Supplier
• Publicly traded, 446M$ revenues in 2012, profitable
Gl b l R&D E i i d M f i f ili i• Global R&D, Engineering and Manufacturing facilities
• Global sales & support
• Complete In-House Portfolio
• Comprehensive, Best-of-Breed solutions portfolio for Small Cells
• Most advanced Radio technologies• Most advanced Radio technologies
• Unique value-added networking capabilities
• Optimized for any deployment scenario at any region, any market,
globally
• In-House RFIC and Modem Technologies for outstanding solutiong g
performance
• Highest integration based on “Radio on a Chip”
• Up to 10Gbps up to 1000MHz E/V-band
Proprietary and Confidential42
Up to 10Gbps, up to 1000MHz, E/V band
Thank You

Ceragon

  • 1.
    Holistic Hetnet HaulingSolutionsg April 2013
  • 2.
    Ceragon’s Value Proposition BackhaulSpecialist Gl b l R&D E i i Rapidly Growing 35% R CAGR 2004 2011 Transparent and Trusted NASDAQ T d d (CRNT) • Global R&D, Engineering, Manufacturing, Sales & Support • In-house RFIC & Modem S t Chi kill t • 35% Rev CAGR 2004-2011 • A clear M&A strategy • Proven ramp-up capabilities based on vertical radio i t ti • NASDAQ Traded (CRNT) • 446M USD in 2012 • Profitable Wireless Backhaul Portfolio: To meet European high end wireless service requirements System-on-Chip skillsetintegration Dedicated portfolio for Scale and cost to serve India: p g q and different deployment or migration scenarios p North America: Compact All Indoor High Power, FCC, NEBS Scale and cost to serve India: Tailored for Indian networks in cost, performance, topology & reliability. Complete service offering Long haul trunk leadership: Total Cost, Power consumption and turn key across Africa Complete portfolio of Small Cells & E-band solutions, based on in-house radio technology Proprietary and Confidential2
  • 3.
    We challenge disruptivehauling requirements with disruptive, high-capacity hauling solutions ss m2012 usines Source:Ovum Bu Capacity OTT Value  Chain Over the Top Sharing & SCaaSOrder of Magnitude es Over the Top Sharing & SCaaSOrder of Magnitude nologi C‐RAN CoMP WiFi 2.0 IEEE 802 11u ac adCl d RAN Techn Proprietary and Confidential3 Coordinated Multipoint IEEE 802.11u, ac, ad,…Cloud RAN
  • 4.
    Ceragon’s Superior Technology Breakthrough Revolutionary Multi-CoreRadioIndustry 1st Doubling g radio technology for Native TDM/Native IP Multi Core Radio sets new industry standards Industry 1 STM1 Radio at 38 GHz g capacity with XPIC 1998 2005 2008 2012 With a proven history of technological leadership – we Proprietary and Confidential4 are now ready to introduce a new benchmark solution to the market
  • 5.
    Traditional Mobile Backhaul MSC/RNC/S-GW Microwave 60GHz E‐Band FiberAggregation Network PtMP Sub 6GHz Aggregation Macro Site DU Carrier Ethernet MPLS-TP IP/MPLS gg g Node Macro Site Aggregation Node Aggregation Node Macro Site DU Proprietary and Confidential5
  • 6.
    Evolution to HolisticHetNet Hauling (3H) MSC/RNC/S-GW Microwave 60GHz E‐Band The Hauling Dimensions • Capacity C Fiber Aggregation Network PtMP Sub 6GHz Aggregation • Coverage • Intelligence • Modernization • Simplification Super Size DU Carrier Ethernet MPLS-TP IP/MPLS gg g Node• Simplification RU Super Size Macro Site E-Band 60GHz Aggregation Node Aggregation Node Super Size Macro Site RU Small Cells PtMP Sub 6GHz DU Small Cells • Heterogeneous • Flat-Hierarchy Proprietary and Confidential6 • Backhaul + Fronthaul
  • 7.
    Evolution to HolisticHetNet Hauling (3H) Macro MSC/RNC/S-GW Fiber Aggregation Network Macrocell Backhaul Versatile deployment Macro+ Macro Macro-Site AggregationAggregation DU Carrier Ethernet MPLS-TP IP/MPLS Versatile deployment scenarios, incl. E-band Aggregation High capacity & interoperability Super Size gg g Node RU E-Band 60GHz Super Size Macro Site Aggregation Node Aggregation Node Macro+ RU Small Cells PtMP Sub 6GHz DU Super Size Macro Site Super Macro Small Cells Compressed CPRI li b d RU C-RAN F th l DU Proprietary and Confidential7 over license bands Fronthaul High capacity, low latency
  • 8.
    3H Product Portfolio Macrocell BackhaulMSC/RNC/S-GW IP-20N MPLS-TP & IP/MPLS IP-20C Fiber Aggregation Network Versatile deployment scenarios Macro-Site AggregationAggregation IP-20C Carrier Ethernet DU Carrier Ethernet MPLS-TP IP/MPLS gg g High capacity & interoperability Super Size gg g Node RU E-Band 60GHz Super Size Macro Site Aggregation Node Aggregation Node IP-80X E-Band 70-80GHz Radio C i Eth t RU Small Cells PtMP Sub 6GHz DU Super Size Macro Site Carrier Ethernet 60GHz Street Level IP-60S Small Cells C-RAN F th l FA‐2500/2000 Sub 6GHz IP-20C CPRI E-Band 70-80GHz Radio Proprietary and Confidential8 Fronthaul High capacity, low latency Carrier Ethernet
  • 9.
    Strategic Investment inRadio Innovation • In-house development of patented, single chip RFIC & Modem technologies • Complete spectrum: 6-42GHz, E/V-bandCo p ete spect u 6 G , / ba d • Enables complete control of E/V-band mmW systems technologies • Enables delivery of systems with unique requirements per network and geography • High-performance integrated transceiver solutions in CMOS and SiGe processes V-Band & E-band RFIC • Unique E/V-band RFIC supporting up to 10Gbps Single chipSingle chip 6 – 42GHz RFIC Providing the Highest performance at the lowest power & smallest form fit Proprietary and Confidential9 p
  • 10.
    Ceragon’s Integrated SmallCells Solutions Portfolio 6060GHz(VGHz(V‐‐band)band) Application: • High capacity (up to 1Gbps) 6060GHz(VGHz(V‐‐band)band) Application: • High capacity (up to 1Gbps) Sub Sub 66GHz (PtP/PtMP)GHz (PtP/PtMP) Application: • NLoS Backhaul • Medium capacity (50 200Mbps) Sub Sub 66GHz (PtP/PtMP)GHz (PtP/PtMP) Application: • NLoS Backhaul • Medium capacity (50 200Mbps) • High capacity (up to 1Gbps) Benefits : • Very small form‐fit • Lower TCO – unlicensed  band • High capacity (up to 1Gbps) Benefits : • Very small form‐fit • Lower TCO – unlicensed  band • Medium capacity (50‐200Mbps) Benefits : • No antenna alignment • Lower TCO – unlicensed spectrum • Medium capacity (50‐200Mbps) Benefits : • No antenna alignment • Lower TCO – unlicensed spectrum bandband 7070‐‐8080GHz (EGHz (E‐‐band)band) Application: 7070‐‐8080GHz (EGHz (E‐‐band)band) Application: Multi technology Node Multi technology Node ‐‐ Macro sitesMacro sites Application: • High capacity node for Macro sites • Multiple direction Multi technology Node Multi technology Node ‐‐ Macro sitesMacro sites Application: • High capacity node for Macro sites • Multiple direction • Small Cells Aggregation to first mile • Access/Aggregation backhaul Characteristics/Benefits : • Low interference – Licensed channels • Small Cells Aggregation to first mile • Access/Aggregation backhaul Characteristics/Benefits : • Low interference – Licensed channels • Multiple direction Benefits : • Multi‐technology: PtP, PtMP, 6‐42GHz,  Sub 6GHz,  60GHz, 70‐80GHzHigh  • Advanced service management • Multiple direction Benefits : • Multi‐technology: PtP, PtMP, 6‐42GHz,  Sub 6GHz,  60GHz, 70‐80GHzHigh  • Advanced service management Proprietary and Confidential10 • High Capacity• High Capacity • Advanced service management • High density node • Advanced service management • High density node
  • 11.
    Small Cell Portfolio MSC/RNC/S-GW FiberAggregation Network Aggregation DU Carrier Ethernet MPLS-TP IP/MPLS Super Size gg g Node RU E-Band 60GHz Super Size Macro Site Aggregation Node Aggregation Node IP-80X E-Band 70-80GHz Radio C i Eth t RU Small Cells PtMP Sub 6GHz DU Super Size Macro Site Carrier Ethernet 60GHz Street Level IP-60S Small Cells C-RAN F th l FA‐2500/2000 Sub 6GHz Proprietary and Confidential11 Fronthaul High capacity, low latency
  • 12.
    FibeAir FA-2500 /FA-2000 Sub 6GHz – LoS and NLoS Small Cells BH FA‐2000 FA‐2500 (Hub Unit) Sub 6GHz LoS and NLoS Small Cells BH • Applications: • Street Level LoS and NLoS • Point-to-point and Point-to-Multipoint deployments (Hub Unit) • Frequency bands: • License Exempt: 4.8-6.06 GHz • Licensed: 2.3 – 2.4GHz, 2.5 - 2.7GHz, 3.3 - 3.8GHz • 10,20,40MHz channels, , • Configurations: All-outdoor • Capacity Highlights FA‐2500 Capacity Highlights • Aggregate throughput: Up to 260Mbps, at 40MHz • Remote Terminal throughput: up to 65Mbps • Multi Layer Header compression, 30% capacity gain • Integrated Traffic Optimizer 40% capacity gain (Remote  Terminal) Integrated Traffic Optimizer, 40% capacity gain • Networking • E2E service provisioning and management • Integrated CET MEF2.0 compliantIntegrated CET MEF2.0 compliant • Advanced H-QoS • Comprehensive Service OA&M (802.3ag, Y.1731) & Link OA&M • Ultra low latency • Flexible packet synch – SyncE 1588v2 Proprietary and Confidential12 Flexible packet synch SyncE,1588v2 • Power: DC (48VDC), PoE, 110-240V
  • 13.
    FibeAir IP-60S Street OptimizedV-band All OutdoorStreet Optimized V band All Outdoor • Applications: • Street Level Small Cells Interconnectivity • Small Cells AggregationSmall Cells Aggregation • Frequencies: FDD 57-66GHz • Nx50MHz channel aggregation up to 500MHz channels • Configurations:• Configurations: • Street optimized all outdoor–Pole/ Wall Mount installation • Mechanical solutions for single box enclosure • Very low power consumption • Capacity Highlights • 1Gbps for 0.5km (rain zone K, 99.99%) • Multi Layer Header compression, 30% capacity gain I t t d T ffi O ti i 40% it i• Integrated Traffic Optimizer, 40% capacity gain • Networking • E2E service provisioning and management I t t d CET MEF2 0 li t IP‐60S • Integrated CET MEF2.0 compliant • Advanced H-QoS • Flexible packet synch – SyncE,1588v2 • Comprehensive Service OA&M (802.3ag, Y.1731) & Link OA&M Proprietary and Confidential13 • Ultra low latency • Power: DC (48VDC), PoE, optional:110-240V
  • 14.
    FibeAir IP-80X E-BandSolution Tail Sites and Small Cells Aggregation • Applications: • Tail Sites and Small Cells Aggregation • High Capacity Access “38GHz replacement” Tail Sites and Small Cells Aggregation • High Capacity Access – 38GHz replacement • Frequencies: FDD 71-76 / 81-86 GHz • 250,500MHz channels IP‐80X • Configurations • All-outdoor • 2Gbps at 1.5km (1ft, 500MHz, 99.99% Zone K) 1Gb t 1 7k (1ft 250MH 99 99% Z K)• 1Gbps at 1.7km (1ft, 250MHz, 99.99%, Zone K) • Multi Layer Header compression, 30% capacity gain • Integrated Traffic Optimizer, 40% capacity gain • Networking • E2E service provisioning and management • Integrated CET • Flexible packet synch – SyncE,1588v2 • Power: DC (48VDC), PoE, optional:110-240VAC Proprietary and Confidential14
  • 15.
    Introducing IP-20C Macrocell Backhaul MSC/RNC/S-GW MPLS-TP& IP/MPLS IP-20C Fiber Aggregation Network Versatile deployment scenarios Macro-Site AggregationAggregation IP-20C Carrier Ethernet DU Carrier Ethernet MPLS-TP IP/MPLS gg g High capacity & interoperability Super Size gg g Node RU E-Band 60GHz C-RAN Super Size Macro Site Aggregation Node Aggregation Node RU Small Cells PtMP Sub 6GHz DU Fronthaul High capacity, low latency Super Size Macro Site Small Cells IP-20C CPRI 6 – 42GHz compressed Proprietary and Confidential15 CPRI
  • 16.
    FibeAir IP-20C A NewStandard in Microwave Transmission Ceragon MultiMulti--Core Radio TechnologyCore Radio Technology Sets a N St d d i Mi T i iNew Standard in Microwave Transmission Delivering Multi-Gbps Anywhere Proprietary and Confidential16
  • 17.
    A New Standardin Microwave Transmission FibeAir IP-20CFibeAir IP 20C • Multi-Core Radio technology - Parallel radio processing engine to double performance • Integrated 4X4 LoS MIMO Hi h d l ti 2048 QAM• High modulation: 2048 QAM • Compact All-outdoor MULTI-CORE RADIO Revolutionary Compact Radio Combining Multi-Core Radio, 2048 QAM M d l ti d Li f i ht 4 4 MIMO Proprietary and Confidential17 2048 QAM Modulation and Line-of-sight 4x4 MIMO
  • 18.
    FibeAir IP-20C Deliver Multi-GbpsWhere Needed • For Any LICENSED BAND Deliver Multi-Gbps Where Needed • Licensed frequencies 6-42 GHz (overcome E-Band limitations) • For Any of your available CHANNELSy y • True 12 Gbps over a single 2856MHz channel (MIMO) • For Any APPLICATIONFor Any APPLICATION • Backhaul & Fronthaul • For Any LOCATION• For Any LOCATION • “1 Gbps in a Box” that can even fit in street corners Breaking capacity barriers in licensed bands,  d li i i bit h ! Proprietary and Confidential delivering gigabits anywhere!
  • 19.
    FibeAir IP-20C MultiCore Radio MODEM RFIC • Multi-Core Radio - Parallel radio processing engine that can double your radio capacity, distance and availability any way you wantyour radio capacity, distance and availability any way you want • Enabled by Ceragon’s unique in-house chipset technology Proprietary and Confidential19
  • 20.
    Introducing IP-20N Macrocell Backhaul MSC/RNC/S-GW MPLS-TP& IP/MPLS IP-20C Fiber Aggregation Network Versatile deployment scenarios Macro-Site AggregationAggregation Carrier Ethernet IP-20N DU Carrier Ethernet MPLS-TP IP/MPLS gg g High capacity & interoperability Super Size gg g Node RU E-Band 60GHz Super Size Macro Site Aggregation Node Aggregation Node RU Small Cells PtMP Sub 6GHz DU Super Size Macro Site Small Cells Proprietary and Confidential20
  • 21.
    FibeAir IP-20N The basisof Multi Technology NodeThe basis of Multi Technology Node Unified architecture with 1RU chassis, Up to 5 RFUs common cards • Traffic/Control card (TCC) • 10Gbps switching capacity, p 10Gbps switching capacity • Radio interface cards (RMC) • Line cards (LIC) • Eth – 4 x 1GEEth 4 x 1GE • TDM – 16 x DS1 • TDM – 1x ch-OC3 2RU chassis, Up to 10 RFUs Full redundancy option (No SPoF) Purpose-built for aggregation nodal sites S l l bi i R di T h l i Proprietary and Confidential21 Seamlessly combining Radio Technologies
  • 22.
    Header Deduplication • Performscompression of L2 – L4 , including GTP tunnels and MPLS headers O t b t 2 d f th li k• Operates between 2 ends of the same link • Does not impact or alter traffic • Does not affect latency Header 30% Deduplication +30% Header Deduplication 30% Deduplication 260Mbps High Modulation 260Mbps (2048 QAM) 240Mbps (1024QAM) Modulation 28MHz 195Mbps (256 QAM) Proprietary and Confidential22
  • 23.
    A realistic liveNetwork Headers Headers taking away from End User Capacity Proprietary and Confidential23 Headers – taking away from End User Capacity
  • 24.
    Results with 28Mhzchannels Frame Size Capacity @ 2048QAM , 28Mhz No Header Compression Capacity @ 2048QAM , 28Mhz With Header CompressionNo Header Compression With Header Compression 180B 281Mbps 860Mbps 512B 267Mbps 351Mbps 1518B 262Mbps 285Mbps Traffic Model 2 267Mbps 365Mbps +100Mbps Real LTE Network  Mix  of : Short  mid size Additional 37% of capacity of : Short   mid size  , long frames Proprietary and Confidential24 Additional 37% of capacity
  • 25.
    Payload DeDuplication Technology •Exploits repetitive bit patterns in traffic • Content, Application & Protocol agnostic • Does not affect network functionality • Additive to header DeDuplication offered by Ceragon • Improved link utilization by transmitting traffic patterns indices instead of traffic patterns Aggregation D D D Network Aggregation Site C D Compressor M C ll D D C DD Proprietary and Confidential25 De-compressor Macro Cell (Roof Top) D
  • 26.
    Example R tR RequestResponse IP payload analyzed.  If pattern not identified  thl d MW Radio Link then learned. A1D MW Radio Link C D Proprietary and Confidential Aggregation Site Macro Cell Site 26
  • 27.
    FibeAir Traffic Optimizer- Identification RResponse IP payload analyzed   Pattern identified! MW Radio Link A1D C D MW Radio Link Start signing session Proprietary and Confidential Aggregation Site Macro Cell Site g g Next signatures B6U, GG9, K4W 27
  • 28.
    FibeAir Traffic Optimizer– Optimization RResponse Original MW Radio Link A1DA1D Signed B6UGG9K4W C D MW Radio Link Proprietary and Confidential Aggregation Site Macro Cell Site 28
  • 29.
    LTE Backhaul NetworkPerformance Benefits of using Payload Deduplication - Reported ResultsBenefits of using Payload Deduplication Reported Results 30% - 50% more available capacity !p y Results Summary • 30-50% expansion ratio • 20% reached within an hour. 35% achieved within 12 hours Results Summary • 30-50% expansion ratio • 20% reached within an hour. 35% achieved within 12 hours Proprietary and Confidential29
  • 30.
    FibeAir LTE TrafficOptimizer is Unique • Fully integrated and imbedded into FibeAir product line • Content Application & Protocol agnosticContent, Application & Protocol agnostic • Additive to other traffic acceleration techniques (e.g. header comp.) Additi t h i l l i t ( hi h d l ti )• Additive to any physical layer improvement (e.g. higher modulations) • Does not affect network functionality • Traffic shaping, Service Selection, Charging, Ad Insertion • Efficient: 30-50% extra capacity • complementary to core network optimization • Caching, CDN, Video compression, Adaptive bitrate, Protocol optimization Available for demonstrations in live LTE networks! Proprietary and Confidential30 Available for demonstrations in live LTE networks!
  • 31.
    Multi Technology BackhaulNode (IP-20N) For Macro sites with Small Cell AggregationFor Macro sites with Small Cell Aggregation • Integrated Nodal Solution • L2 switch, MPLS-TP readyy • Baseband & RF technologies in Radio Units • Multiple radio technologies • Sub 6GHz PtMP & PtP • 60GHz (V-band) • 70-80GHZ (E-band) • 6-42GHz6 G FibeAir Multi Technology Backhaul Node Proprietary and Confidential FibeAir Multi Technology Backhaul Node 31
  • 32.
    Multi Technology BackhaulNode (IP-20N) For Macro Sites to High Capacity Small Cell Aggregation PointFor Macro Sites to High Capacity Small Cell Aggregation Point • Combining multiple radio BH technologies in a compact form-fit • Integrated Nodal Solution L2 it h MPLS TP d• L2 switch, MPLS-TP ready • Advanced H-QoS • Integrating multiple radio technologies • 6-42GHz6 42GHz • 70-80GHZ (E-band) • 60GHz (V-band) • Sub 6GHz PtMP & PtP FA‐2500/2000 IP‐20C 6‐42GHz MIMO Enabled IP‐60S IP‐80XRFU‐C 2RU – up to 10 Radios1RU – up to 5 Radios Proprietary and Confidential32 FibeAir Multi Technology Backhaul Node
  • 33.
  • 34.
    Introducing IP-20N MSC/RNC/S-GW Fiber Aggregation Network Aggregation IP-80XCPRI E-band CPRI DU Carrier Ethernet MPLS-TP IP/MPLS Super Size gg g Node RU E-Band 60GHzC-RAN Super Size Macro Site Aggregation Node Aggregation Node RU Small Cells PtMP Sub 6GHz DU Fronthaul High capacity, low latency Super Size Macro Site Small Cells IP-20C CPRI 6 – 42GHz compressed Proprietary and Confidential34 CPRI
  • 35.
    Distributed Macro Cell Distributed pRRU 5-7km Compressed Distributed eNB AggregationCPRI 1-40 km Fronthaul Backhaul pRRU 500-1000 m Raw CPRI Ethernet PtP Microwave PtP Millimeter Radio • More sectors per base station • Mainly for indoor coverage • Real estate, truck rolls and equipment savings Proprietary and Confidential35
  • 36.
    Macro Cell, theSize of a City (C-RAN) RU 5-7 km Cloud RANCompressed CPRI DU Fronthaul RU RU DU Cloud 500-1000 m Raw CPRI RU PtP Microwave PtP Millimeter Radio • Cloud means more operational savings • But cloud fronthaul requires fiber everywhere • APAC and Europe looking for disruption Proprietary and Confidential36
  • 37.
    CPRI Rate forLTE S b l R D C l LTE BW Symbol  Rate [Mbaud] No of  antennas Raw Data  (IQ Samples)  [Mbps] Control  Word OH [Mbps] Over all rate  [Mbps] CPRI option [Mbps] 20 30 72 2 1843 2 122 88 2457 6 Opt 3: 2457 620 30.72 2 1843.2 122.88 2457.6 Opt 3: 2457.6 15 23.04 2 1382.4 122.88 1881.6 Opt 3: 2457.6 10 15.36 2 921.6 61.44 1228.8 Opt 2: 1228.8 5 7.68 2 460.8 30.72 614.4 Opt 1: 614.4 Proprietary and Confidential37 Sample Width = 15bit Samples per symbol = 1
  • 38.
    CPRI Transport Options Compressionof CPRI SignalCompression of CPRI Signal Compression Rate Degradation to Original Signal Line coding 8B/10B 1:1 25 NoneLine coding 8B/10B 1:1.25 None IQ Compression 1:2.3 EVM degradation of < 3% Overall Compression Rate 2.875 LTE 2x2 Actual Data Rate (IQ Samples) [Mbps] IQ After  compression [Mbps] CPRI AFTER Compression  (with OH) [Mb ][Mbps] 20MHz 1843.2 801.4 924.28 15MHz 1382.4 601.04 723.92 10MHz 921.6 400.7 462.14 5MHz 460.8 200.35 231.06 EVM degradation will be capped by 3% - ETSI TS 136 104 (0.57dB additional to total degradation) Actual Radio Throughput Proprietary and Confidential38 Throughput Required
  • 39.
    Transporting CPRI withIP-20C 6-42GHz6 42GHz ETSI LTE 2x2 CPRI BEFORE  compression [Mbps] CPRI AFTER compression  [Mbps][Mbps] 20MHz 2457.6  (CPRI Opt.3) 924.28 56MHz: 1.06 Gbps 15MHz 2457.6  (CPRI Opt.3) 723.92 10MHz 1228.8 (CPRI Opt.2) 462.14 (C Opt. ) 5MHz 614.4 (CPRI Opt.1) 231.06 28MHz: 522 Mbps T ti CPRI i i l itTransporting CPRI in a single unit Proprietary and Confidential39
  • 40.
    Latency • CPRI compressionadds the following Latency (compared to transparent CPRI)p ) IQ Packet size Packet delay [μsec] Compression  delay [μsec] Overall delay [μsec][μsec] delay [μsec] [μsec] 256 8.333 1.77 10.103 512 16.667 2.60 19.267 1024 33.333 4.27 37.6 • Over all link Latency - ~100usec CPRI l t i t BBU d i d t t i 50• CPRI latency requirement: BBU designed to compensate a min 50us (10km of FO) Proprietary and Confidential40
  • 41.
    Network Management Systemfor Small Cells • Supports complete range of small cells backhaul technologies • Sub 6GHz PtMP and PtP 60GH• 60GHz • 70-80GHz • Enabler for large scale small cells networksg • End-to-end provisioning • User friendly provisioning wizards • Group mass configurations• Group-mass configurations • Advanced root cause analysis • Zero Touch Provisioning for simplified site configuration • Saving installation timeSaving installation time • Reducing installation and configuration errors to minimum Hi h l l f d Proprietary and Confidential41 • High level of secured access
  • 42.
    Summary • Global WirelessBackhaul & Fronthaul Supplier • Publicly traded, 446M$ revenues in 2012, profitable Gl b l R&D E i i d M f i f ili i• Global R&D, Engineering and Manufacturing facilities • Global sales & support • Complete In-House Portfolio • Comprehensive, Best-of-Breed solutions portfolio for Small Cells • Most advanced Radio technologies• Most advanced Radio technologies • Unique value-added networking capabilities • Optimized for any deployment scenario at any region, any market, globally • In-House RFIC and Modem Technologies for outstanding solutiong g performance • Highest integration based on “Radio on a Chip” • Up to 10Gbps up to 1000MHz E/V-band Proprietary and Confidential42 Up to 10Gbps, up to 1000MHz, E/V band
  • 43.