Swatantra Kumar Tripathi
Mobile: +91-7280062465
Swatantratripathi84@gmail.com
PROFESSIONAL SUMMARY:
Having Seven and Half years of hands-on Telecom experience Industry in the areas of
Operational Maintenance, Commissioning & Integration of Ceragon IP-20C , IP-20N , IP-10G,
NEC IP PASO, Dragon wave Harmoni-800, Alcatel-Lucent GSM & NEC, LMDS (Walk Air), UBR
(Ceregon)
EMPLOYMENT HISTORY:
 Working as , Project Manager at Triadss Tec Solution Pvt Ltd. In Ceragon Since March-
2016 to till date.
 Worked as Transmission Expert at Dragonwave HFCL Pvt. Ltd. –Airtel and Reliance jio
Lucknow from March -2015 – March 2016March.
 Worked as Transmission Engineer in Ceragon - for Bharti , Reliance jio , IDEA
Jharkhand, UPEAST from Jun 2013 - March-2015
 Worked as Field engineer in Alcatel lucent ( Payroll of telesiya), from Oct 2011– Jun
2013.
 Deputed as Network Field Engineer at HCL Info system for BSNL & Indian Post office
2009 to May 2011.
EXPERIENCE SUMMARY:
 Experience in Dragonwave MW, Configuration, Integrating & Commissioning.
 Experience in Ceragon MW, Configuration, Integrating & Commissioning.
 Experience in NEC MW, Configuration, Integrating & Commissioning.
 Good Knowledge & Experience in SDH, Configuration, troubleshooting, Commissioning
and Integration .
 Good Experience in GSM BTS Installation and commissioning.
 Good Experience in Configuration of cisco, maipu router and troubleshooting.
 Hands-on Experience working with ECI-NMS light soft 4.2 in Monitoring and configuring
ECI- Syncom (Microsdm) .
TRAININGS ATTENDED:
 Fundamentals of Data Communications. ABES Engineering college Ghaziabad
 UBR (Ceragon) Jharkhand
 Ceragon IP-20C – RCP Mumbai
 SDH Basic- Ceragon , Dragon wave
 PMP 35 Hrs Training – Knowledge wood Delhi.
EQUIPMENTS HANDLED:
 GPS, knowledge of Pathloss Tool.
 Ceragon IP-20C. IP-20N, IP-10G
 NEC-IP PASO.
 Site Master (Bird Analyser)
 BER (Bit Error rate-Sunset, Acterna).
 Dragonwave HFCL Harmoni-800.
 Alcatel MUX.
Expertise In:
1- SDH , PDH Link.
2- NOC Visibility.
3- Excel Database
4- Sound Knowledge of SS7.
5- Technical support
6- MW up gradations, Migrations, E1 routings & Repair and R maintenance
 Proactive Identification and Prevention of Critical Outages
 Improve Technical and Behavioral Skill set of Transmission Engineers by conducting the
Trainings
 Maintaining all the Database related to Transmission and spares management
Project-IV.
Position: Transmission Engineer.
Customer: Airtel, reliance Jio, Idea
Client: Dragonwave HFCL, IDEA
Responsibilities:
 Operational & maintenance and Integration of NEC-MW (SDH&PDH)
 Operational & Maintenance and Integration of Dragonwave HFCL SDH (STM1 to STM4)
 Coordinating with the installation team in the field during integration of network
elements to the new rings as well as to the existing rings from the NMS.
 Operational & maintenance of Transmission Network, IDEA.
 Installation and Commissioning and integration of UBR Microwave Antennas
 O&M of POI sites, TNIC, OME’s, NEC, LMDS (Walk air), UBR Ceragon Microwaves
 Installation commissioning & O&M of UTSTARCOM DLC equipment in Coordination with
NOC
 Coordinating with Project, Deployment and AT team for Project execution work
Project-III.
Position: Transmission Engineer and ATP Lead
Customer: Reliance JIO, Bharti, idea
Client: Ceragon
Responsibilities:
 End-to end project management to install equipment IP20C ,IP10G,IP20N
 Links Installation, Alignment, Commissioning & Integrations
 Co-ordinate activities related to LOS survey for MW Network.
 Assemble, Install , Align and commission Ceragon Microwave Ant’s like 0.3,0.6,1.2,1.8
etc
 Monitoring all the project execution activities through bidding process
 Coordinating with the installation team in the field during Installation Commissioning
and integration of Network elements.
 Preparing the documentations about the sites for AT
 Executing Tower Foundation, Erection, Painting, Earthen works
Project-II.
Position: Transmission Engineer (I& C)
Customer : Alcatel & Lucent
Client : Reliance Communication
Responsibilities:
 Installation & Commissioning of ALCATEL BTS and LUCENT BTS
 Swapping of LUCENT BTS to ALCATEL BTS
 VSWR measurement, Power Measurement and Integration of Sites
 Project coordination like material management to sites, Teams Management
 Final installation check, Conducting AT’s and documentations for clients.
 SMPS installation and commissioning in indoor and outdoor site.
 Coordinating with vendor team for new installation and maintenance (Indoor & outdoor
& ILA)
 DAY to day activity planned with customer reliance
 Site commissioning for new deliveries
 Managing DPR.
 Manage I&C at P1 and RP1 SITES.
 Complete maximum AT in Karnataka and Jharkhand Circle.
 Team coordination.
 Mange whole Infra project.
Project-I
Position: Network Field Engineer
Customer: BSNL/INDIAN POST OFFICE
Responsibilities:
 Provide support to NIC , BSNL, INDIAN POST OFFICE NETWORK Loop testing
 Verifying weekly and monthly MIS reports
 Tracking the site progress and updating and escalating to next level for them to take
corrective action
 Ensuring the status is shared to customer and interacting with them
 Ensuring our online system is updated to the current status
 Act as first level escalation for the customer in case if any issue with operational teams
 Tracking the billable record and items
 Verifying the same along with inventory system and process for billing
 Troubleshoot the network related problem.
 Projecting manpower and resource and creating the good TL and next generation
peoples for smooth operations and team growth

EDUCATIONAL QUALIFICATIONS:
 MCA: Master in computer Application (2009). ABES Engineering College Ghaziabad,
UPTU.
 PMP Certified.
 Unix, Linux training from Softpro india.
 Salesforce Certified
 Training Completed from HCL info system at Cisco -9000 series route.
PERSONAL DETAILS:
Father’s Name : Mr. Shiv Nath tripathi
Date of Birth : 09/07/1984
Nationality : Indian
Languages known : English, Hindi
Pass Port No : J3338277
Permanent Address : (Vi) Bharohiya,(Post) Bharohiya, PS: Khajani Bazar,
Dist-Gorakhpur UP INDIA

Transmission_Profile_swatantra tripathi

  • 1.
    Swatantra Kumar Tripathi Mobile:+91-7280062465 Swatantratripathi84@gmail.com PROFESSIONAL SUMMARY: Having Seven and Half years of hands-on Telecom experience Industry in the areas of Operational Maintenance, Commissioning & Integration of Ceragon IP-20C , IP-20N , IP-10G, NEC IP PASO, Dragon wave Harmoni-800, Alcatel-Lucent GSM & NEC, LMDS (Walk Air), UBR (Ceregon) EMPLOYMENT HISTORY:  Working as , Project Manager at Triadss Tec Solution Pvt Ltd. In Ceragon Since March- 2016 to till date.  Worked as Transmission Expert at Dragonwave HFCL Pvt. Ltd. –Airtel and Reliance jio Lucknow from March -2015 – March 2016March.  Worked as Transmission Engineer in Ceragon - for Bharti , Reliance jio , IDEA Jharkhand, UPEAST from Jun 2013 - March-2015  Worked as Field engineer in Alcatel lucent ( Payroll of telesiya), from Oct 2011– Jun 2013.  Deputed as Network Field Engineer at HCL Info system for BSNL & Indian Post office 2009 to May 2011. EXPERIENCE SUMMARY:  Experience in Dragonwave MW, Configuration, Integrating & Commissioning.  Experience in Ceragon MW, Configuration, Integrating & Commissioning.  Experience in NEC MW, Configuration, Integrating & Commissioning.  Good Knowledge & Experience in SDH, Configuration, troubleshooting, Commissioning and Integration .  Good Experience in GSM BTS Installation and commissioning.  Good Experience in Configuration of cisco, maipu router and troubleshooting.  Hands-on Experience working with ECI-NMS light soft 4.2 in Monitoring and configuring ECI- Syncom (Microsdm) . TRAININGS ATTENDED:
  • 2.
     Fundamentals ofData Communications. ABES Engineering college Ghaziabad  UBR (Ceragon) Jharkhand  Ceragon IP-20C – RCP Mumbai  SDH Basic- Ceragon , Dragon wave  PMP 35 Hrs Training – Knowledge wood Delhi. EQUIPMENTS HANDLED:  GPS, knowledge of Pathloss Tool.  Ceragon IP-20C. IP-20N, IP-10G  NEC-IP PASO.  Site Master (Bird Analyser)  BER (Bit Error rate-Sunset, Acterna).  Dragonwave HFCL Harmoni-800.  Alcatel MUX. Expertise In: 1- SDH , PDH Link. 2- NOC Visibility. 3- Excel Database 4- Sound Knowledge of SS7. 5- Technical support 6- MW up gradations, Migrations, E1 routings & Repair and R maintenance  Proactive Identification and Prevention of Critical Outages  Improve Technical and Behavioral Skill set of Transmission Engineers by conducting the Trainings  Maintaining all the Database related to Transmission and spares management Project-IV. Position: Transmission Engineer. Customer: Airtel, reliance Jio, Idea Client: Dragonwave HFCL, IDEA Responsibilities:  Operational & maintenance and Integration of NEC-MW (SDH&PDH)  Operational & Maintenance and Integration of Dragonwave HFCL SDH (STM1 to STM4)
  • 3.
     Coordinating withthe installation team in the field during integration of network elements to the new rings as well as to the existing rings from the NMS.  Operational & maintenance of Transmission Network, IDEA.  Installation and Commissioning and integration of UBR Microwave Antennas  O&M of POI sites, TNIC, OME’s, NEC, LMDS (Walk air), UBR Ceragon Microwaves  Installation commissioning & O&M of UTSTARCOM DLC equipment in Coordination with NOC  Coordinating with Project, Deployment and AT team for Project execution work Project-III. Position: Transmission Engineer and ATP Lead Customer: Reliance JIO, Bharti, idea Client: Ceragon Responsibilities:  End-to end project management to install equipment IP20C ,IP10G,IP20N  Links Installation, Alignment, Commissioning & Integrations  Co-ordinate activities related to LOS survey for MW Network.  Assemble, Install , Align and commission Ceragon Microwave Ant’s like 0.3,0.6,1.2,1.8 etc  Monitoring all the project execution activities through bidding process  Coordinating with the installation team in the field during Installation Commissioning and integration of Network elements.  Preparing the documentations about the sites for AT  Executing Tower Foundation, Erection, Painting, Earthen works Project-II. Position: Transmission Engineer (I& C) Customer : Alcatel & Lucent Client : Reliance Communication Responsibilities:  Installation & Commissioning of ALCATEL BTS and LUCENT BTS  Swapping of LUCENT BTS to ALCATEL BTS  VSWR measurement, Power Measurement and Integration of Sites  Project coordination like material management to sites, Teams Management  Final installation check, Conducting AT’s and documentations for clients.  SMPS installation and commissioning in indoor and outdoor site.  Coordinating with vendor team for new installation and maintenance (Indoor & outdoor & ILA)
  • 4.
     DAY today activity planned with customer reliance  Site commissioning for new deliveries  Managing DPR.  Manage I&C at P1 and RP1 SITES.  Complete maximum AT in Karnataka and Jharkhand Circle.  Team coordination.  Mange whole Infra project. Project-I Position: Network Field Engineer Customer: BSNL/INDIAN POST OFFICE Responsibilities:  Provide support to NIC , BSNL, INDIAN POST OFFICE NETWORK Loop testing  Verifying weekly and monthly MIS reports  Tracking the site progress and updating and escalating to next level for them to take corrective action  Ensuring the status is shared to customer and interacting with them  Ensuring our online system is updated to the current status  Act as first level escalation for the customer in case if any issue with operational teams  Tracking the billable record and items  Verifying the same along with inventory system and process for billing  Troubleshoot the network related problem.  Projecting manpower and resource and creating the good TL and next generation peoples for smooth operations and team growth  EDUCATIONAL QUALIFICATIONS:  MCA: Master in computer Application (2009). ABES Engineering College Ghaziabad, UPTU.  PMP Certified.
  • 5.
     Unix, Linuxtraining from Softpro india.  Salesforce Certified  Training Completed from HCL info system at Cisco -9000 series route. PERSONAL DETAILS: Father’s Name : Mr. Shiv Nath tripathi Date of Birth : 09/07/1984 Nationality : Indian Languages known : English, Hindi Pass Port No : J3338277 Permanent Address : (Vi) Bharohiya,(Post) Bharohiya, PS: Khajani Bazar, Dist-Gorakhpur UP INDIA