In accordance with the Department of Labor and
Industry’s statute 326.0981, Subd. 11,
“This educational offering is recognized by the
Minnesota Department of Labor and Industry as
satisfying 1.5 hours of credit toward Building Officials
and Residential Contractors continuing education
requirements.”
For additional continuing education approvals, please
see your credit tracking card.
1
Center for Energy & Environment
Quality Assurance Program Using
Picture Phones
Duluth Energy Design Conference and Expo
February 25, 2014
Kevin Brauer| Senior Building Analyst
2
• Who is the Center for Energy and Environment
• Authorized Insulation Contractor QA Program
• Lessons learned
• Discussion
Session Outline
3
CEE is a nonprofit organization that promotes energy efficiency
to strengthen the economy while improving the environment.
• CEE conducts research and develops programs so that:
• Businesses operate more efficiently and profitably;
• Government agencies and nonprofits spend less on facilities
and functions;
• Utilities achieve their energy-efficiency goals at least-cost;
and
• Households save money and improve comfort.
The Center for Energy and Environment
4
Collaboration with Minnesota Energy Resources
was key to the development of this QA program
• Supports their Authorized Insulation Contractor
program for residential insulation rebates
• CEE is also applying this QA process in several
MN communities on Home Energy Squad
referred air seal/insulation work rebated by
CenterPoint Energy
CEE QA Program Using Picture Phones
5
1. Contractor work requirements
2. Interactive on-line training module
3. Protocols for virtual – phone QA – inspection
4. On-site inspect 10% of jobs & all complaints
A Four Part QA Process Was Designed
6
• Crew has blower door, manometer, smoke puffer and
insulation machine capable of dense pack installation
1. Contractor Requirements
7
• Crew has blower door, manometer, smoke puffer and
insulation machine capable of dense pack installation
• Crew leader trains for and passes the Building
Performance Institute certification for Residential
Building Envelope-Whole House Air Leakage
Control Installer www.bpi.org/rbewhalci
 ID opening, select material, seal, cfm50 smoke test, fix seal
1. Contractor Requirements
8
• Crew has blower door, manometer, smoke puffer and
insulation machine capable of dense pack installation
• Crew leader trains and passes BPI RBE-WHALCI cert
• Crew leader passes online combustion safety training
1. Contractor Requirements
9
• Crew has blower door, manometer, smoke puffer and
insulation machine capable of dense pack installation
• Crew leader trains and passes BPI RBE-WHALCI cert
• Crew leader passes online combustion safety training
• Crew follows program Combustion Safety protocols
and Material and Installation standards
o Contractor corrects non-conforming work scope
details no customer charge
1. Contractor Requirements
10
• Crew has blower door, manometer, smoke puffer and insulation
machine capable of dense pack installation
• Crew leader trains and passes BPI RBE-WHALCI cert
• Crew leader passes online combustion safety training
• Crew follows program Combustion Safety protocols and Material
and Installation standards
o Correct non-conforming details no customer charge
• Crew leader verifies work performed and test results
on Rebate Form
1. Contractor Requirements
11
• Successive on-line training and quizzes
assess crew leader knowledge and
understanding of program combustion safety
requirements.
o Follow-up to program orientation training
2. Interactive on-line training module designed
12
• Successive on-line training and quizzes assess crew
leader knowledge and understanding of program
combustion safety requirements.
o Follow-up to program orientation training
• Crew leader must pass to be considered
eligible to lead rebate program work
o Convenient “as-needed” refresher instruction
2. Interactive on-line training module designed
13
• Contractor sends work scope to CEE before job
o CEE ID’s typical photos, sends list for crew
leader
3. Protocols for virtual inspection developed
14
• Contractor sends work scope to CEE before job
o CEE ID’s typical photos, sends list for crew leader
• After job test-in: CL sends photo of house, comb
appliances & cfm50 reading; makes 1st call to confirm:
 Photos rec’d, combustion safety, work scope, photo
list: Job is a Go
 Air seal and insulation prep-work can start
3. Protocols for virtual inspection developed
15
• Contractor sends work scope to CEE before job
o CEE ID’s typical photos, sends list for crew leader
• After job test-in: CL sends photos, 1st call to confirm:
o Photos rec’d, Combustion Safety, Work Scope, Photo List: Job is a Go
o Air seal and insulation prep-work can start – When Completed:
• CL sends air seal/ insulation prep photos and makes
2nd call to confirm:
 Photos rec’d, prep-work complete, ready to insulate.
3. Protocols for virtual inspection developed
16
• Contractor sends work scope to CEE before job
o CEE ID’s typical photos, sends list for crew leader
• After job test-in: CL sends photos, makes 1st call to confirm:
o Photos rec’d, Combustion Safety, Work Scope, Photo List: Job is a Go
• CL sends air seal/ insul. prep photos, makes 2nd call to confirm:
o Photos rec’d, prep complete, ready to insulate – When completed:
• CL test out: cfm50 & comb safety; sends insul. & cfm50
photos makes 3rd call to confirm:
 Combustion Safety, Photos rec’d, Job finished
3. Protocols for virtual inspection developed
17
• Scoring guide for 35 typical work scope tasks
defines Pass, Cond. Pass , Fail 70% of score
o Also scored:
• Documentation & Testing 20% of score
• Customer Service (home owner survey)10%
4. On-site inspect 10% of jobs & all complaints
18
• Scoring guide for 35 typical tasks defines Pass, Cond. Pass , Fail
o Also: Documentation & Testing, Customer Service (homeowner survey)
• At site visit custom iPad software calculates the crew
leader job score, syncs with program data base, emails
contractor a job report with crew leader score and any
call back issues w/ photos
4. On-site inspect 10% of jobs & all complaints
19
• Scoring guide for 35 typical tasks defines Pass, Cond. Pass , Fail
o Also: Documentation & Testing, Customer Service (homeowner survey)
• At site visit custom iPad software calculates the crew leader job score,
syncs with program data base, emails contractor a job report with crew
leader score and any call back issues w/ photos
• Crew leader to maintain > 80% avg score for site QA’s
o Under 80% avg. score can require crew leader to
• Resume picture phone QA, and/or
• More QA site visits, or
• Program suspension
4. On-site inspect 10% of jobs & all complaints
20
• BPI RBE–WHALCI certification verifies
knowledge, skills, abilities
 Identify opening,
 Select material,
 Seal opening,
 Test seal with smoke at cfm50,
 Fix seal as needed.
Benefits of this QA Approach
21
• BPI RBE-WHALCI cert verifies knowledge, skills, abilities
• Online combustion safety training verifies crew
leader knowledge of program protocols
 Follow up to program orientation, successive on-line training and
quizzes assess crew leader knowledge and understanding of
program combustion safety requirements.
 Crew leader must pass to be considered eligible to lead rebate
program work.
 Convenient “as-needed” refresher instruction.
Benefits of this QA Approach
22
• BPI RBE-WHALCI cert verifies knowledge, skills, abilities
• Online comb. safety trng. verifies crew leader knowledge
• Material & Installation standards and Scoring Guide
establishes work installation expectations
Benefits of this QA Approach
23
• BPI RBE-WHALCI cert verifies knowledge, skills, abilities
• Online comb. safety trng. verifies crew leader knowledge
• M&I standards & scoring guide establishes expectations.
• Picture phone QA simplifies scheduling
o CAN be at more than one job in a day,
o Jobs can be 100s of miles apart
Benefits of this QA Approach
24
• BPI RBE-WHALCI cert verifies knowledge, skills, abilities
• Online comb. safety trng. verifies crew leader knowledge
• M&I standards & scoring guide establishes expectations.
• Picture phone QA simplifies scheduling – CAN be at more than one
job in a day, jobs can be 100s of miles apart.
• Picture phone provides real time feedback and
promotes continuous improvement
o Issues quickly become training opportunities
o Crew leader has a picture phone “shout-out” anytime
Benefits of this QA Approach
25
• BPI RBE-WHALCI cert verifies knowledge, skills, abilities
• Online comb. safety trng. verifies crew leader knowledge
• M&I standards & scoring guide establishes expectations.
• Picture phone QA simplifies scheduling – CAN be at more than one job in a day,
jobs can be 100s of miles apart.
• Picture phone provides real time feedback and promotes continuous improvement
o Issues quickly become training opportunities
o Crew leader has a picture phone “shout-out” anytime
• Picture phones can lower training and administration
costs of QA program delivery.
Benefits of this QA Approach
26
1. Verify no pre-existing combustion safety conditions
Perform “Fans-Off” combustion safety test:
• Air handler and all exhaust fans off,
• All interior doors open (house set up for BD test)
• All appliances pass smoke test or no work till fixed
o“Fans Off” Fail = Written homeowner notice
2. CFM50 blower door test
Contractor Requirements Pre-Work
27
1. CFM50 blower door test
2. If pre-work combustion safety test done
• Install a VentRite spill alarm
or perform
• “Fans On” Combustion Safety Test
o Air handler, dryer, kitchen fan, fans >150cfm
o Last door into CAZ positioned with smoke
• All appliances pass smoke test, if not: retest “Fans Off”
o “Fans On” Fail = Written home owner notice
3. Crew leader verifies tests and work on Rebate Form
Contractor Requirements Post-Work
28
Vent-Rite Spill Alarm
29
1 of 2 temperature sensors
Example of typical picture phone QA process
• Contractor is sent a 4-6 photos/page crew leader job report
o photo # is followed by typical job report captions
CEE QA Program Using Picture Phones
30
Step 1: CEE Picture Phone QA Process
1. Contractor sends work
scope for CEE review
2. CEE sends list
of likely photos,
confirmed at job
31
Bill’s Insulation
Homeowner
(Photo 1) Job Address, Work: Attic air seal & insulate
28 Phone QA photo details (confirmed at job site)
CEE Picture Phone QA Process
32
(Photos 2,3) Nat Draft Water Heater, ID Furnace
Both Pass: “Fans OFF” test-in
(& Pass “Fans ON” test-out)
CEE Picture Phone QA Process
33
(Photo 4) Water heater common vent connection
CEE Picture Phone QA Process
34
(Photo 5) Before work CFM50: 1916
Now:
1st call – crew leader confirms
Combustion safety
Work scope details
Photos to send from list
Work OK to start
CEE Picture Phone QA Process
35
(Photo 6) Plumbing vent sealed
CEE Picture Phone QA Process
36
(Photo 7) Electrical wiring sealed
CEE Picture Phone QA Process
37
(Photo 8) Bath fan sealed
CEE Picture Phone QA Process
38
(Photo 9) Bath fan termination connection sealed
CEE Picture Phone QA Process
39
(Photo 10) Drop soffit sealed
CEE Picture Phone QA Process
40
(Photo 11) Chimney bypass sealed
CEE Picture Phone QA Process
41
 proper
material
(Photo 12) Chimney insulation dam installed
CEE Picture Phone QA Process
42
 proper
clearance
(Photos 13,14,15) Vent chute, wind block & top plate seal
CEE Picture Phone QA Process
43
(Photo 16) Depth markers – 15” install depth circled
CEE Picture Phone QA Process
15”
44
 1 marker
per 100
SF of
attic
(Photo 17) Non-IC can light boxed and sealed
CEE Picture Phone QA Process
45
Crew has completed attic prep work,
Now:
2nd call – crew leader confirms
All photos sent and received
Prep work done, ready to insulate
CEE Picture Phone QA Process
46
Crew has completed attic prep work,
Now:
2nd call – crew leader confirms
• All photos sent and received
• Prep work done, ready to insulate
Finding: Not ready to insulate
! Insulating cover above Non-IC can lights Not Allowed
! Remove & replace covers with drywall or equal
CEE Picture Phone QA Process
47
(Photo 17) Non-IC can light boxed and sealed
CEE Picture Phone QA Process
48
Insulating cover
NOT ALLOWED
above
Non-IC lights
per NEC 410-66
Crew leader corrects issue,
 texts photos confirming correction
 NOW OK to insulate
CEE Picture Phone QA Process
49
Photos 18,19 Non-IC can light correction completed
CEE Picture Phone QA Process
 Foam covers off non-IC can lights  Sealed drywall cover on
50
 NOW OK to insulate
(Photo 20) Insulation added over 15”, > R-50 on bid
CEE Picture Phone QA Process
51
(Photo 21) IC-can box tops above insulation level
CEE Picture Phone QA Process
52
 proper
clearance
(Photo 22) Chimney dam above insulation level
CEE Picture Phone QA Process
53
(Photos 23,24,25,26,27) Access dam, Panel 10” >R25,
W/S, Signed Insulation Card and Mfg Coverage Chart
CEE Picture Phone QA Process
54
Crew has completed work scope,
(Photo 28) Post CFM50 followed by comb safety test
Now:
3nd call – crew leader confirms
Combustion safety
Photos rec’d
Job done
(CFM50 pre: 1916
Post: 1282
Reduction: 643 = 33%
CEE Picture Phone QA Process
55
• Job score
• Monthly status
• Training updates
Typical QA report with score and crew leader next steps
56
Lesson Learned
CEE QA Program Using Picture Phones
57
Lesson Learned
o Building Performance Institute
Residential Building Envelope – Whole House Air
Leakage Control Installer certification verifies
knowledge, skills and abilities, and
defines job quality norm:
Identify opening,
Select material,
Seal opening,
Test seal with smoke at cfm50,
Fix seal as needed.
CEE QA Program Using Picture Phones
58
Lesson Learned
o BPI RBE-WHALCI cert defines job quality norm
o Materials & Installation Standards and Scoring
Guides set expectations
CEE QA Program Using Picture Phones
59
Lesson Learned
o BPI RBE-WHALCI cert defines job quality norm
o M&I Standards and Scoring Guides set expectations
o Photo take-off from work scope; Crew Leader
site confirms photo list to maximize utility with
minimum # photos and job progress check-in.
CEE QA Program Using Picture Phones
60
Lesson Learned
o BPI RBE-WHALCI cert defines job quality norm
o M&I Standards, Scoring Guides set expectations
o Photo take-off from work scope; Crew Leader site
confirms photos to send and job progress check-in
o Photos can identify training opportunities
CEE QA Program Using Picture Phones
61
Lesson Learned
o BPI RBE-WHALCI cert defines job quality norm
o M&I Standards, Scoring Guides set expectations
o Photo take-off from work scope; Crew Leader site
confirms photos to send and job progress check-in
o Photos can identify training opportunities
o Able to photo QA more than one site/day -
no travel time, start when crew starts.
CEE QA Program Using Picture Phones
62
Lesson Learned
o BPI RBE-WHALCI cert defines job quality norm
o M&I Standards, Scoring Guides set expectations
o Photo take-off from work scope; Crew Leader site
confirms photos to send and job progress check-in
o Photos can identify training opportunities
o Able to photo QA more than one site/day – no travel
o Photo date/time-stamp aid multiple QA jobs/day
CEE QA Program Using Picture Phones
63
Lesson Learned
o BPI RBE-WHALCI cert defines job quality norm
o M&I Standards, Scoring Guides set expectations
o Photo take-off from work scope; Crew Leader site
confirms photos to send and job progress check-in
o Photos can identify training opportunities
o Able to photo QA more than one site/day
o Photo date/time-stamp aid multiple QA jobs/day
o Texting photos expands coverage, less sender cost
CEE QA Program Using Picture Phones
64
Lesson Learned
o BPI RBE-WHALCI cert defines job quality norm
o M&I Standards, Scoring Guides set expectations
o Photo take-off from work scope; Crew Leader site
confirms photos to send and job progress check-in
o Photos can identify training opportunities
o Able to photo QA more than one site/day
o Photo date/time-stamp aid multiple QA jobs/day
o Texting photos expands coverage, less sender cost
o Provides crew leader a job “shout-out” anytime
CEE QA Program Using Picture Phones
65
Lesson Learned
o BPI RBE-WHALCI cert defines job quality norm
o M&I Standards, Scoring Guides set expectations
o Photo take-off from work scope; Crew Leader site
confirms photos to send and job progress check-in
o Photos can identify training opportunities
o Able to photo QA more than one site/day
o Photo date/time-stamp aid multiple QA jobs/day
o Texting photos expands coverage, less sender cost
o Provides crew leader a job “shout-out” anytime
o Phones, software, on-line trng. aid QA, cut costs
CEE QA Program Using Picture Phones
66
Kevin Brauer
kbrauer@mncee.org
612-804-0369
www.mncee.org

More Related Content

What's hot

Edwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin b 1.baldelovar resume
Edwin b 1.baldelovar resume
Edwin Baldelovar
 
QC INSPECTOR E&I
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&I
NASIM NEZAM
 
Commissioning Technician
Commissioning TechnicianCommissioning Technician
Commissioning Technician
udipta dey
 
vikash resume.25.09
vikash resume.25.09vikash resume.25.09
vikash resume.25.09
Vikash Pilli
 
John Gantzresume2016
John Gantzresume2016John Gantzresume2016
John Gantzresume2016
John Gantz
 
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updated
Nouman Jamil
 

What's hot (18)

Giridhar
GiridharGiridhar
Giridhar
 
cv
cvcv
cv
 
Icc Broadband Presintation
Icc Broadband PresintationIcc Broadband Presintation
Icc Broadband Presintation
 
E&I inspector cv
E&I inspector cvE&I inspector cv
E&I inspector cv
 
Nagaraj FA & FF
Nagaraj FA & FFNagaraj FA & FF
Nagaraj FA & FF
 
CV of Dinesh
CV of DineshCV of Dinesh
CV of Dinesh
 
Edwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin b 1.baldelovar resume
Edwin b 1.baldelovar resume
 
QC INSPECTOR E&I
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&I
 
Commissioning Technician
Commissioning TechnicianCommissioning Technician
Commissioning Technician
 
cv 2016
cv 2016cv 2016
cv 2016
 
vikash resume.25.09
vikash resume.25.09vikash resume.25.09
vikash resume.25.09
 
E&I QAQC Rajakumar Velayuthan
E&I QAQC  Rajakumar VelayuthanE&I QAQC  Rajakumar Velayuthan
E&I QAQC Rajakumar Velayuthan
 
John Gantzresume2016
John Gantzresume2016John Gantzresume2016
John Gantzresume2016
 
2.annexure mep projects executed
2.annexure mep projects executed2.annexure mep projects executed
2.annexure mep projects executed
 
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updated
 
Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CV
 
M Imran
M ImranM Imran
M Imran
 
Ateeq cv
Ateeq cv Ateeq cv
Ateeq cv
 

Viewers also liked

ở đâu dịch vụ giúp việc quận 7 tại tphcm
ở đâu dịch vụ giúp việc quận 7 tại tphcmở đâu dịch vụ giúp việc quận 7 tại tphcm
ở đâu dịch vụ giúp việc quận 7 tại tphcm
cristen861
 
Packaging Considerations
Packaging ConsiderationsPackaging Considerations
Packaging Considerations
Jill Allden
 

Viewers also liked (12)

Ceph Day New York 2014: Ceph Ecosystem Update
Ceph Day New York 2014: Ceph Ecosystem UpdateCeph Day New York 2014: Ceph Ecosystem Update
Ceph Day New York 2014: Ceph Ecosystem Update
 
Building customer relationship.pptx (swe zin lei)
Building customer relationship.pptx (swe zin lei)Building customer relationship.pptx (swe zin lei)
Building customer relationship.pptx (swe zin lei)
 
Elit 10 q fall 2014
Elit 10 q fall 2014 Elit 10 q fall 2014
Elit 10 q fall 2014
 
Xuhuong
XuhuongXuhuong
Xuhuong
 
Stickyeyes e-Brochure 2012
Stickyeyes e-Brochure 2012Stickyeyes e-Brochure 2012
Stickyeyes e-Brochure 2012
 
Safabaitulmaal
SafabaitulmaalSafabaitulmaal
Safabaitulmaal
 
Gaziantep cuisine İLT366
Gaziantep cuisine İLT366Gaziantep cuisine İLT366
Gaziantep cuisine İLT366
 
ở đâu dịch vụ giúp việc quận 7 tại tphcm
ở đâu dịch vụ giúp việc quận 7 tại tphcmở đâu dịch vụ giúp việc quận 7 tại tphcm
ở đâu dịch vụ giúp việc quận 7 tại tphcm
 
Ewrt 1 b class 9
Ewrt 1 b class 9 Ewrt 1 b class 9
Ewrt 1 b class 9
 
Supply Chain
Supply ChainSupply Chain
Supply Chain
 
concept are
concept areconcept are
concept are
 
Packaging Considerations
Packaging ConsiderationsPackaging Considerations
Packaging Considerations
 

Similar to Quality Assurance Program Using Picture Phones

Walid Saliba resume 2015
Walid Saliba resume 2015Walid Saliba resume 2015
Walid Saliba resume 2015
walid Saliba
 
13 lv switchboard inspection guide
13   lv switchboard inspection guide13   lv switchboard inspection guide
13 lv switchboard inspection guide
Sơn Trà
 
Eric K Reneker 2016.1
Eric K Reneker 2016.1Eric K Reneker 2016.1
Eric K Reneker 2016.1
Eric Reneker
 
090701 Link Acseu Ppp
090701 Link Acseu Ppp090701 Link Acseu Ppp
090701 Link Acseu Ppp
ACSEU
 
Curriculum_vitae
Curriculum_vitaeCurriculum_vitae
Curriculum_vitae
Kiran Gp
 

Similar to Quality Assurance Program Using Picture Phones (20)

Project Review Presentation (2)
Project Review Presentation (2)Project Review Presentation (2)
Project Review Presentation (2)
 
Walid Saliba resume 2015
Walid Saliba resume 2015Walid Saliba resume 2015
Walid Saliba resume 2015
 
13 lv switchboard inspection guide
13   lv switchboard inspection guide13   lv switchboard inspection guide
13 lv switchboard inspection guide
 
MMS-Subpt-OTesting-Workshop_02FEB2009.ppt
MMS-Subpt-OTesting-Workshop_02FEB2009.pptMMS-Subpt-OTesting-Workshop_02FEB2009.ppt
MMS-Subpt-OTesting-Workshop_02FEB2009.ppt
 
Husains CV
Husains CVHusains CV
Husains CV
 
presentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxpresentation quality awareness draft02.pptx
presentation quality awareness draft02.pptx
 
Quality inspection-guide-abstract
Quality inspection-guide-abstractQuality inspection-guide-abstract
Quality inspection-guide-abstract
 
CEA SBP Overview
CEA SBP OverviewCEA SBP Overview
CEA SBP Overview
 
Donald Wilkinson-Resume
Donald Wilkinson-ResumeDonald Wilkinson-Resume
Donald Wilkinson-Resume
 
RESUME-Sijin
RESUME-SijinRESUME-Sijin
RESUME-Sijin
 
Samaa CV
Samaa CVSamaa CV
Samaa CV
 
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
 
Eric K Reneker 2016.1
Eric K Reneker 2016.1Eric K Reneker 2016.1
Eric K Reneker 2016.1
 
090701 Link Acseu Ppp
090701 Link Acseu Ppp090701 Link Acseu Ppp
090701 Link Acseu Ppp
 
Curriculum_vitae
Curriculum_vitaeCurriculum_vitae
Curriculum_vitae
 
Resume 23-05-16
Resume 23-05-16Resume 23-05-16
Resume 23-05-16
 
CHUNNEL PROJECT OUALITY MANAGEMENT
CHUNNEL PROJECT OUALITY MANAGEMENTCHUNNEL PROJECT OUALITY MANAGEMENT
CHUNNEL PROJECT OUALITY MANAGEMENT
 
commissioning guideline
commissioning guidelinecommissioning guideline
commissioning guideline
 
Module 6 qaqc training
Module 6 qaqc trainingModule 6 qaqc training
Module 6 qaqc training
 
Quality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract managementQuality control inspection reports and outcomes wrt contract management
Quality control inspection reports and outcomes wrt contract management
 

More from Center for Energy and Environment

More from Center for Energy and Environment (20)

Field Assessment of Cold-Climate Air-Source Heat Pumps in Minnesota
Field Assessment of Cold-Climate Air-Source Heat Pumps in MinnesotaField Assessment of Cold-Climate Air-Source Heat Pumps in Minnesota
Field Assessment of Cold-Climate Air-Source Heat Pumps in Minnesota
 
Cold-Climate Air-Source Heat Pumps: Insights form the Field
Cold-Climate Air-Source Heat Pumps: Insights form the FieldCold-Climate Air-Source Heat Pumps: Insights form the Field
Cold-Climate Air-Source Heat Pumps: Insights form the Field
 
Presentation for Home Energy and Climate Finance and Policy Committee
Presentation for Home Energy and Climate Finance and Policy CommitteePresentation for Home Energy and Climate Finance and Policy Committee
Presentation for Home Energy and Climate Finance and Policy Committee
 
Achieving a Healthy Low-Carbon Economy in Minnesota
Achieving a Healthy Low-Carbon Economy in MinnesotaAchieving a Healthy Low-Carbon Economy in Minnesota
Achieving a Healthy Low-Carbon Economy in Minnesota
 
Field Assessment of Cold-Climate Air-Source Heat Pumps
Field Assessment of Cold-Climate Air-Source Heat PumpsField Assessment of Cold-Climate Air-Source Heat Pumps
Field Assessment of Cold-Climate Air-Source Heat Pumps
 
Condensing Boilers: Are they cost effective?
Condensing Boilers: Are they cost effective?Condensing Boilers: Are they cost effective?
Condensing Boilers: Are they cost effective?
 
Results from Commercial Energy Code Compliance Pilot Program
Results from Commercial Energy Code Compliance Pilot ProgramResults from Commercial Energy Code Compliance Pilot Program
Results from Commercial Energy Code Compliance Pilot Program
 
Really Selling Efficiency
Really Selling EfficiencyReally Selling Efficiency
Really Selling Efficiency
 
CEE's Strategic Electrification Forum
CEE's Strategic Electrification ForumCEE's Strategic Electrification Forum
CEE's Strategic Electrification Forum
 
Humidification Retrofits Deliver Residential Furnace Efficiency
Humidification Retrofits Deliver Residential Furnace EfficiencyHumidification Retrofits Deliver Residential Furnace Efficiency
Humidification Retrofits Deliver Residential Furnace Efficiency
 
Automated House Sealing - Aerosol Envelope Sealing of New Homes
Automated House Sealing - Aerosol Envelope Sealing of New HomesAutomated House Sealing - Aerosol Envelope Sealing of New Homes
Automated House Sealing - Aerosol Envelope Sealing of New Homes
 
Demand Control Systems Deliver Efficiency in Commercial Hot Water Use
Demand Control Systems Deliver Efficiency in Commercial Hot Water UseDemand Control Systems Deliver Efficiency in Commercial Hot Water Use
Demand Control Systems Deliver Efficiency in Commercial Hot Water Use
 
Energy Fit Homes - Realtor Benefits
Energy Fit Homes - Realtor BenefitsEnergy Fit Homes - Realtor Benefits
Energy Fit Homes - Realtor Benefits
 
Optimized Operation of Indoor Public Pool Facilities
Optimized Operation of Indoor Public Pool FacilitiesOptimized Operation of Indoor Public Pool Facilities
Optimized Operation of Indoor Public Pool Facilities
 
Deep Carbonization
Deep CarbonizationDeep Carbonization
Deep Carbonization
 
Webinar- Air Source Heat Pumps: Cold Climate Ready
Webinar- Air Source Heat Pumps: Cold Climate ReadyWebinar- Air Source Heat Pumps: Cold Climate Ready
Webinar- Air Source Heat Pumps: Cold Climate Ready
 
Small Embedded Data Center Pilot
Small Embedded Data Center PilotSmall Embedded Data Center Pilot
Small Embedded Data Center Pilot
 
The Ons & Offs of ERV Effectiveness
The Ons & Offs of ERV EffectivenessThe Ons & Offs of ERV Effectiveness
The Ons & Offs of ERV Effectiveness
 
New Technology for Efficient Multifamily Building Envelope Sealing
New Technology for Efficient Multifamily Building Envelope SealingNew Technology for Efficient Multifamily Building Envelope Sealing
New Technology for Efficient Multifamily Building Envelope Sealing
 
Cost-Effective Duct Retrofit & Leakage Reduction
Cost-Effective Duct Retrofit & Leakage ReductionCost-Effective Duct Retrofit & Leakage Reduction
Cost-Effective Duct Retrofit & Leakage Reduction
 

Recently uploaded

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Recently uploaded (20)

Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by Anitaraj
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 

Quality Assurance Program Using Picture Phones

  • 1. In accordance with the Department of Labor and Industry’s statute 326.0981, Subd. 11, “This educational offering is recognized by the Minnesota Department of Labor and Industry as satisfying 1.5 hours of credit toward Building Officials and Residential Contractors continuing education requirements.” For additional continuing education approvals, please see your credit tracking card. 1
  • 2. Center for Energy & Environment Quality Assurance Program Using Picture Phones Duluth Energy Design Conference and Expo February 25, 2014 Kevin Brauer| Senior Building Analyst 2
  • 3. • Who is the Center for Energy and Environment • Authorized Insulation Contractor QA Program • Lessons learned • Discussion Session Outline 3
  • 4. CEE is a nonprofit organization that promotes energy efficiency to strengthen the economy while improving the environment. • CEE conducts research and develops programs so that: • Businesses operate more efficiently and profitably; • Government agencies and nonprofits spend less on facilities and functions; • Utilities achieve their energy-efficiency goals at least-cost; and • Households save money and improve comfort. The Center for Energy and Environment 4
  • 5. Collaboration with Minnesota Energy Resources was key to the development of this QA program • Supports their Authorized Insulation Contractor program for residential insulation rebates • CEE is also applying this QA process in several MN communities on Home Energy Squad referred air seal/insulation work rebated by CenterPoint Energy CEE QA Program Using Picture Phones 5
  • 6. 1. Contractor work requirements 2. Interactive on-line training module 3. Protocols for virtual – phone QA – inspection 4. On-site inspect 10% of jobs & all complaints A Four Part QA Process Was Designed 6
  • 7. • Crew has blower door, manometer, smoke puffer and insulation machine capable of dense pack installation 1. Contractor Requirements 7
  • 8. • Crew has blower door, manometer, smoke puffer and insulation machine capable of dense pack installation • Crew leader trains for and passes the Building Performance Institute certification for Residential Building Envelope-Whole House Air Leakage Control Installer www.bpi.org/rbewhalci  ID opening, select material, seal, cfm50 smoke test, fix seal 1. Contractor Requirements 8
  • 9. • Crew has blower door, manometer, smoke puffer and insulation machine capable of dense pack installation • Crew leader trains and passes BPI RBE-WHALCI cert • Crew leader passes online combustion safety training 1. Contractor Requirements 9
  • 10. • Crew has blower door, manometer, smoke puffer and insulation machine capable of dense pack installation • Crew leader trains and passes BPI RBE-WHALCI cert • Crew leader passes online combustion safety training • Crew follows program Combustion Safety protocols and Material and Installation standards o Contractor corrects non-conforming work scope details no customer charge 1. Contractor Requirements 10
  • 11. • Crew has blower door, manometer, smoke puffer and insulation machine capable of dense pack installation • Crew leader trains and passes BPI RBE-WHALCI cert • Crew leader passes online combustion safety training • Crew follows program Combustion Safety protocols and Material and Installation standards o Correct non-conforming details no customer charge • Crew leader verifies work performed and test results on Rebate Form 1. Contractor Requirements 11
  • 12. • Successive on-line training and quizzes assess crew leader knowledge and understanding of program combustion safety requirements. o Follow-up to program orientation training 2. Interactive on-line training module designed 12
  • 13. • Successive on-line training and quizzes assess crew leader knowledge and understanding of program combustion safety requirements. o Follow-up to program orientation training • Crew leader must pass to be considered eligible to lead rebate program work o Convenient “as-needed” refresher instruction 2. Interactive on-line training module designed 13
  • 14. • Contractor sends work scope to CEE before job o CEE ID’s typical photos, sends list for crew leader 3. Protocols for virtual inspection developed 14
  • 15. • Contractor sends work scope to CEE before job o CEE ID’s typical photos, sends list for crew leader • After job test-in: CL sends photo of house, comb appliances & cfm50 reading; makes 1st call to confirm:  Photos rec’d, combustion safety, work scope, photo list: Job is a Go  Air seal and insulation prep-work can start 3. Protocols for virtual inspection developed 15
  • 16. • Contractor sends work scope to CEE before job o CEE ID’s typical photos, sends list for crew leader • After job test-in: CL sends photos, 1st call to confirm: o Photos rec’d, Combustion Safety, Work Scope, Photo List: Job is a Go o Air seal and insulation prep-work can start – When Completed: • CL sends air seal/ insulation prep photos and makes 2nd call to confirm:  Photos rec’d, prep-work complete, ready to insulate. 3. Protocols for virtual inspection developed 16
  • 17. • Contractor sends work scope to CEE before job o CEE ID’s typical photos, sends list for crew leader • After job test-in: CL sends photos, makes 1st call to confirm: o Photos rec’d, Combustion Safety, Work Scope, Photo List: Job is a Go • CL sends air seal/ insul. prep photos, makes 2nd call to confirm: o Photos rec’d, prep complete, ready to insulate – When completed: • CL test out: cfm50 & comb safety; sends insul. & cfm50 photos makes 3rd call to confirm:  Combustion Safety, Photos rec’d, Job finished 3. Protocols for virtual inspection developed 17
  • 18. • Scoring guide for 35 typical work scope tasks defines Pass, Cond. Pass , Fail 70% of score o Also scored: • Documentation & Testing 20% of score • Customer Service (home owner survey)10% 4. On-site inspect 10% of jobs & all complaints 18
  • 19. • Scoring guide for 35 typical tasks defines Pass, Cond. Pass , Fail o Also: Documentation & Testing, Customer Service (homeowner survey) • At site visit custom iPad software calculates the crew leader job score, syncs with program data base, emails contractor a job report with crew leader score and any call back issues w/ photos 4. On-site inspect 10% of jobs & all complaints 19
  • 20. • Scoring guide for 35 typical tasks defines Pass, Cond. Pass , Fail o Also: Documentation & Testing, Customer Service (homeowner survey) • At site visit custom iPad software calculates the crew leader job score, syncs with program data base, emails contractor a job report with crew leader score and any call back issues w/ photos • Crew leader to maintain > 80% avg score for site QA’s o Under 80% avg. score can require crew leader to • Resume picture phone QA, and/or • More QA site visits, or • Program suspension 4. On-site inspect 10% of jobs & all complaints 20
  • 21. • BPI RBE–WHALCI certification verifies knowledge, skills, abilities  Identify opening,  Select material,  Seal opening,  Test seal with smoke at cfm50,  Fix seal as needed. Benefits of this QA Approach 21
  • 22. • BPI RBE-WHALCI cert verifies knowledge, skills, abilities • Online combustion safety training verifies crew leader knowledge of program protocols  Follow up to program orientation, successive on-line training and quizzes assess crew leader knowledge and understanding of program combustion safety requirements.  Crew leader must pass to be considered eligible to lead rebate program work.  Convenient “as-needed” refresher instruction. Benefits of this QA Approach 22
  • 23. • BPI RBE-WHALCI cert verifies knowledge, skills, abilities • Online comb. safety trng. verifies crew leader knowledge • Material & Installation standards and Scoring Guide establishes work installation expectations Benefits of this QA Approach 23
  • 24. • BPI RBE-WHALCI cert verifies knowledge, skills, abilities • Online comb. safety trng. verifies crew leader knowledge • M&I standards & scoring guide establishes expectations. • Picture phone QA simplifies scheduling o CAN be at more than one job in a day, o Jobs can be 100s of miles apart Benefits of this QA Approach 24
  • 25. • BPI RBE-WHALCI cert verifies knowledge, skills, abilities • Online comb. safety trng. verifies crew leader knowledge • M&I standards & scoring guide establishes expectations. • Picture phone QA simplifies scheduling – CAN be at more than one job in a day, jobs can be 100s of miles apart. • Picture phone provides real time feedback and promotes continuous improvement o Issues quickly become training opportunities o Crew leader has a picture phone “shout-out” anytime Benefits of this QA Approach 25
  • 26. • BPI RBE-WHALCI cert verifies knowledge, skills, abilities • Online comb. safety trng. verifies crew leader knowledge • M&I standards & scoring guide establishes expectations. • Picture phone QA simplifies scheduling – CAN be at more than one job in a day, jobs can be 100s of miles apart. • Picture phone provides real time feedback and promotes continuous improvement o Issues quickly become training opportunities o Crew leader has a picture phone “shout-out” anytime • Picture phones can lower training and administration costs of QA program delivery. Benefits of this QA Approach 26
  • 27. 1. Verify no pre-existing combustion safety conditions Perform “Fans-Off” combustion safety test: • Air handler and all exhaust fans off, • All interior doors open (house set up for BD test) • All appliances pass smoke test or no work till fixed o“Fans Off” Fail = Written homeowner notice 2. CFM50 blower door test Contractor Requirements Pre-Work 27
  • 28. 1. CFM50 blower door test 2. If pre-work combustion safety test done • Install a VentRite spill alarm or perform • “Fans On” Combustion Safety Test o Air handler, dryer, kitchen fan, fans >150cfm o Last door into CAZ positioned with smoke • All appliances pass smoke test, if not: retest “Fans Off” o “Fans On” Fail = Written home owner notice 3. Crew leader verifies tests and work on Rebate Form Contractor Requirements Post-Work 28
  • 29. Vent-Rite Spill Alarm 29 1 of 2 temperature sensors
  • 30. Example of typical picture phone QA process • Contractor is sent a 4-6 photos/page crew leader job report o photo # is followed by typical job report captions CEE QA Program Using Picture Phones 30
  • 31. Step 1: CEE Picture Phone QA Process 1. Contractor sends work scope for CEE review 2. CEE sends list of likely photos, confirmed at job 31 Bill’s Insulation Homeowner
  • 32. (Photo 1) Job Address, Work: Attic air seal & insulate 28 Phone QA photo details (confirmed at job site) CEE Picture Phone QA Process 32
  • 33. (Photos 2,3) Nat Draft Water Heater, ID Furnace Both Pass: “Fans OFF” test-in (& Pass “Fans ON” test-out) CEE Picture Phone QA Process 33
  • 34. (Photo 4) Water heater common vent connection CEE Picture Phone QA Process 34
  • 35. (Photo 5) Before work CFM50: 1916 Now: 1st call – crew leader confirms Combustion safety Work scope details Photos to send from list Work OK to start CEE Picture Phone QA Process 35
  • 36. (Photo 6) Plumbing vent sealed CEE Picture Phone QA Process 36
  • 37. (Photo 7) Electrical wiring sealed CEE Picture Phone QA Process 37
  • 38. (Photo 8) Bath fan sealed CEE Picture Phone QA Process 38
  • 39. (Photo 9) Bath fan termination connection sealed CEE Picture Phone QA Process 39
  • 40. (Photo 10) Drop soffit sealed CEE Picture Phone QA Process 40
  • 41. (Photo 11) Chimney bypass sealed CEE Picture Phone QA Process 41  proper material
  • 42. (Photo 12) Chimney insulation dam installed CEE Picture Phone QA Process 42  proper clearance
  • 43. (Photos 13,14,15) Vent chute, wind block & top plate seal CEE Picture Phone QA Process 43
  • 44. (Photo 16) Depth markers – 15” install depth circled CEE Picture Phone QA Process 15” 44  1 marker per 100 SF of attic
  • 45. (Photo 17) Non-IC can light boxed and sealed CEE Picture Phone QA Process 45
  • 46. Crew has completed attic prep work, Now: 2nd call – crew leader confirms All photos sent and received Prep work done, ready to insulate CEE Picture Phone QA Process 46
  • 47. Crew has completed attic prep work, Now: 2nd call – crew leader confirms • All photos sent and received • Prep work done, ready to insulate Finding: Not ready to insulate ! Insulating cover above Non-IC can lights Not Allowed ! Remove & replace covers with drywall or equal CEE Picture Phone QA Process 47
  • 48. (Photo 17) Non-IC can light boxed and sealed CEE Picture Phone QA Process 48 Insulating cover NOT ALLOWED above Non-IC lights per NEC 410-66
  • 49. Crew leader corrects issue,  texts photos confirming correction  NOW OK to insulate CEE Picture Phone QA Process 49
  • 50. Photos 18,19 Non-IC can light correction completed CEE Picture Phone QA Process  Foam covers off non-IC can lights  Sealed drywall cover on 50  NOW OK to insulate
  • 51. (Photo 20) Insulation added over 15”, > R-50 on bid CEE Picture Phone QA Process 51
  • 52. (Photo 21) IC-can box tops above insulation level CEE Picture Phone QA Process 52  proper clearance
  • 53. (Photo 22) Chimney dam above insulation level CEE Picture Phone QA Process 53
  • 54. (Photos 23,24,25,26,27) Access dam, Panel 10” >R25, W/S, Signed Insulation Card and Mfg Coverage Chart CEE Picture Phone QA Process 54
  • 55. Crew has completed work scope, (Photo 28) Post CFM50 followed by comb safety test Now: 3nd call – crew leader confirms Combustion safety Photos rec’d Job done (CFM50 pre: 1916 Post: 1282 Reduction: 643 = 33% CEE Picture Phone QA Process 55
  • 56. • Job score • Monthly status • Training updates Typical QA report with score and crew leader next steps 56
  • 57. Lesson Learned CEE QA Program Using Picture Phones 57
  • 58. Lesson Learned o Building Performance Institute Residential Building Envelope – Whole House Air Leakage Control Installer certification verifies knowledge, skills and abilities, and defines job quality norm: Identify opening, Select material, Seal opening, Test seal with smoke at cfm50, Fix seal as needed. CEE QA Program Using Picture Phones 58
  • 59. Lesson Learned o BPI RBE-WHALCI cert defines job quality norm o Materials & Installation Standards and Scoring Guides set expectations CEE QA Program Using Picture Phones 59
  • 60. Lesson Learned o BPI RBE-WHALCI cert defines job quality norm o M&I Standards and Scoring Guides set expectations o Photo take-off from work scope; Crew Leader site confirms photo list to maximize utility with minimum # photos and job progress check-in. CEE QA Program Using Picture Phones 60
  • 61. Lesson Learned o BPI RBE-WHALCI cert defines job quality norm o M&I Standards, Scoring Guides set expectations o Photo take-off from work scope; Crew Leader site confirms photos to send and job progress check-in o Photos can identify training opportunities CEE QA Program Using Picture Phones 61
  • 62. Lesson Learned o BPI RBE-WHALCI cert defines job quality norm o M&I Standards, Scoring Guides set expectations o Photo take-off from work scope; Crew Leader site confirms photos to send and job progress check-in o Photos can identify training opportunities o Able to photo QA more than one site/day - no travel time, start when crew starts. CEE QA Program Using Picture Phones 62
  • 63. Lesson Learned o BPI RBE-WHALCI cert defines job quality norm o M&I Standards, Scoring Guides set expectations o Photo take-off from work scope; Crew Leader site confirms photos to send and job progress check-in o Photos can identify training opportunities o Able to photo QA more than one site/day – no travel o Photo date/time-stamp aid multiple QA jobs/day CEE QA Program Using Picture Phones 63
  • 64. Lesson Learned o BPI RBE-WHALCI cert defines job quality norm o M&I Standards, Scoring Guides set expectations o Photo take-off from work scope; Crew Leader site confirms photos to send and job progress check-in o Photos can identify training opportunities o Able to photo QA more than one site/day o Photo date/time-stamp aid multiple QA jobs/day o Texting photos expands coverage, less sender cost CEE QA Program Using Picture Phones 64
  • 65. Lesson Learned o BPI RBE-WHALCI cert defines job quality norm o M&I Standards, Scoring Guides set expectations o Photo take-off from work scope; Crew Leader site confirms photos to send and job progress check-in o Photos can identify training opportunities o Able to photo QA more than one site/day o Photo date/time-stamp aid multiple QA jobs/day o Texting photos expands coverage, less sender cost o Provides crew leader a job “shout-out” anytime CEE QA Program Using Picture Phones 65
  • 66. Lesson Learned o BPI RBE-WHALCI cert defines job quality norm o M&I Standards, Scoring Guides set expectations o Photo take-off from work scope; Crew Leader site confirms photos to send and job progress check-in o Photos can identify training opportunities o Able to photo QA more than one site/day o Photo date/time-stamp aid multiple QA jobs/day o Texting photos expands coverage, less sender cost o Provides crew leader a job “shout-out” anytime o Phones, software, on-line trng. aid QA, cut costs CEE QA Program Using Picture Phones 66