Topics to be Covered
 Overview of project scheduling
management
 Importance of scheduling
 Objective of scheduling
 Planning and scheduling
 Project scheduling tools &
techniques
2
1
2
09 Feb 2022
2
Scope
Quality
Cost
Schedule
Procurement
Stakeholder
Risk Resource
Communication
EFFECT CAUSE
3
Overview of project scheduling management
Overview of project scheduling management
■ Project Schedule is a technique that imparts what work should be
performed, which resource will perform the work and the time spans
in which that work should be performed
■ Without a complete & workable schedule, the project manager will not
be able to communicate with regard to resources deployment that are
important to deliver the project
4
3
4
09 Feb 2022
3
Overview of project scheduling management
■ Scheduling is the listing of deliverables, activities, and milestones
within a project
■ A schedule usually includes a planned start and finish date, duration,
sequence, and resources assigned to each activity
■ Effective scheduling is a critical component of successful project
schedule management
5
Importance of project scheduling
6
To
S.O/P.D
Ensure compliance to the Condition of Contract which
require the Contractor to submit the Work Program for
S.O. or P.D. approval
Basis for monitoring & controlling project progress:
• Progress reporting & analysis of performance
• Evaluation of progress claim/interim payment
• Evaluation of EOT claim
Basis for preparation of cash flow projection and
budgeting
5
6
09 Feb 2022
4
Importance of project scheduling
7
To
Client
Basis for preparing & channeling allocations
Basis for monitoring project progress
Importance of project scheduling
8
To
Contractor
Basis for resource planning (man, machine & material)
Basis for execution of works, monitor work progress,
and coordinating the works
Basis for preparation of cash flow projection and
budgeting
Basis/evidence for interim payment claims &
application of EOT
7
8
09 Feb 2022
5
Objectives project scheduling
Scheduling provides the following benefits:
■ Provides a "road map" for project manager & project team members
■ Assists with tracking, reporting, and communicating progress
■ Ensures everyone is on the same page with tasks, dependencies, and
deadlines
■ Highlights issues and concerns
■ Monitors progress and identify issues early
9
Planning and scheduling
■ Planning and scheduling are distinct but inseparable aspects of
project schedule management
■ Planning primarily deals with selecting the appropriate strategies and
procedures in order to achieve project objectives, such as:
– How the work will be decomposed
– How monitoring & controlling will be done
– How resource usage will be optimised
– Interface between operation zone & those involve
– Method of construction to be employed
10
9
10
09 Feb 2022
6
Planning and scheduling
■ Scheduling converts the project action plans into an operating
timetable using appropriate software and technique to determine:
– Start and completion dates for activities
– Activity sequencing
– Activity implementation duration
– Resources for the execution of activities
– Information to be maintained & monitored for progress reporting
11
Scheduling tools & technique
■ There are a range of tools and techniques to develop, monitor and
control project schedules, which includes:
– Gantt Chart
– Schedule Network Diagram
– Critical Path Method (CPM)
– Schedule compression
12
11
12
09 Feb 2022
7
13
Scheduling Tools &
Techniques
Gantt Chart:
• Chart shows activity start date &
finish date
• Milestones are used to
represent important activities or
events
• Relationship/dependency
between activities can be shown
using arrows
14
13
14
09 Feb 2022
8
15
Scheduling Tools &
Techniques
Schedule Network Diagram
(Precedence Diagram Method)
• Network diagram that uses
box/node to represent an
activity and linking it using an
arrow that represent
relationship/dependency
Critical Path Method (CPM)
16
■ Scheduling method that used the network
diagram to represent a project and
activity sequencing required to complete
it, known as path
■ Duration for each path is calculated to
identify the critical path, that determine
duration for the whole project
■ Using critical path-specific software is key
to effectively using the CPM
■ The CPM is incredibly common and a
powerful tool used across the
construction industry
Scheduling Tools &
Techniques
15
16
09 Feb 2022
9
17
Start Finish
ES D EF
A
LS S LF
ES D EF
B
LS S LF
ES D EF
D
LS S LF
ES D EF
E
LS S LF
ES D EF
F
LS S LF
ES D EF
C
LS S LF
ES D EF
G
LS S LF
ES Dur EF
Description
LS
Total
Slack
LF
Critical Path Analysis
18
Scheduling Tools &
Techniques
Schedule Compression:
• A schedule can be shortened in
two ways:
• crashing: using more resources
than planned on the task
• fast-tracking: activities that
were originally planned to be
performed sequentially are
performed in parallel
17
18
09 Feb 2022
10
19
Scheduling Process
 PMBoK Scheduling Process
 6-Steps Scheduling Model
PMBoK Scheduling Process
20
Plan schedule management
Define project activities
Sequence activities
Estimate durations
Develop the project
schedule
19
20
09 Feb 2022
11
21
Scope
Definition
Create WBS
Activity
Resource
Planning
Activity
Duration
Estimating
Activity
Sequencing
Create
Schedule
Cost
Estimating
Cost
Budgeting
Scope
Management
Schedule
Management
Cost Management
6-Steps Scheduling Model
21

More Related Content

Similar to Project Scheduling

Planning_and_scheduling.pptx
Planning_and_scheduling.pptxPlanning_and_scheduling.pptx
Planning_and_scheduling.pptx
KAhmedRehman
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Lovely Professional University
 
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
pisal3
 
AYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdfAYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdf
rinkumandaljis
 
Folder1_Overview of PM.pptx
Folder1_Overview of PM.pptxFolder1_Overview of PM.pptx
Folder1_Overview of PM.pptx
ZizouZie
 
Construction Project management
Construction Project management Construction Project management
Construction Project management
Anupama holla
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
PRIYANSHU KUMAR
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
Ajeesh Mk
 
AMTPJ-Presentn-Lvl3 Sched Dev-2010-11
AMTPJ-Presentn-Lvl3 Sched Dev-2010-11AMTPJ-Presentn-Lvl3 Sched Dev-2010-11
AMTPJ-Presentn-Lvl3 Sched Dev-2010-11Robert (Bob) Owens
 
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET Journal
 
Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)
ShudipPal
 
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
TinotendaChivese
 
Pm chapter 5...
Pm chapter 5...Pm chapter 5...
Pm chapter 5...
Golam Bitonsir
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt
PedadaSaikumar
 
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARETIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
KHUSHBU SHAH
 
Unit II.pptx
Unit II.pptxUnit II.pptx
Unit II.pptx
PraveenVundrajavarap
 
Summer Internship Report by waqar ahmed javed
Summer Internship Report by waqar ahmed javedSummer Internship Report by waqar ahmed javed
Summer Internship Report by waqar ahmed javedWaqar Ahmed
 

Similar to Project Scheduling (20)

Planning_and_scheduling.pptx
Planning_and_scheduling.pptxPlanning_and_scheduling.pptx
Planning_and_scheduling.pptx
 
Network Analysis- CPM ppt..pptx
Network Analysis- CPM  ppt..pptxNetwork Analysis- CPM  ppt..pptx
Network Analysis- CPM ppt..pptx
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
 
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
 
AYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdfAYESA Presentation - GC East Coast Railway_12th January.pdf
AYESA Presentation - GC East Coast Railway_12th January.pdf
 
Folder1_Overview of PM.pptx
Folder1_Overview of PM.pptxFolder1_Overview of PM.pptx
Folder1_Overview of PM.pptx
 
Construction Project management
Construction Project management Construction Project management
Construction Project management
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
ppt for primevera
ppt for primeverappt for primevera
ppt for primevera
 
AMTPJ-Presentn-Lvl3 Sched Dev-2010-11
AMTPJ-Presentn-Lvl3 Sched Dev-2010-11AMTPJ-Presentn-Lvl3 Sched Dev-2010-11
AMTPJ-Presentn-Lvl3 Sched Dev-2010-11
 
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
 
Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)
 
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
 
Pm chapter 5...
Pm chapter 5...Pm chapter 5...
Pm chapter 5...
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt
 
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARETIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
 
Unit II.pptx
Unit II.pptxUnit II.pptx
Unit II.pptx
 
Summer Internship Report by waqar ahmed javed
Summer Internship Report by waqar ahmed javedSummer Internship Report by waqar ahmed javed
Summer Internship Report by waqar ahmed javed
 
4-ProjectPlanning.ppt
4-ProjectPlanning.ppt4-ProjectPlanning.ppt
4-ProjectPlanning.ppt
 

More from Zara Bizan, P.E., MIEM

Pengurusan Nilai Strategik (VMS)
Pengurusan Nilai Strategik (VMS)Pengurusan Nilai Strategik (VMS)
Pengurusan Nilai Strategik (VMS)
Zara Bizan, P.E., MIEM
 
Traffic Impact Assessment (TIA) and Level of Service (LoS)
Traffic Impact Assessment (TIA) and Level of Service (LoS)Traffic Impact Assessment (TIA) and Level of Service (LoS)
Traffic Impact Assessment (TIA) and Level of Service (LoS)
Zara Bizan, P.E., MIEM
 
Pengurusan Projek
Pengurusan ProjekPengurusan Projek
Pengurusan Projek
Zara Bizan, P.E., MIEM
 
Pasukan Projek Kompeten
Pasukan Projek KompetenPasukan Projek Kompeten
Pasukan Projek Kompeten
Zara Bizan, P.E., MIEM
 
Teamwork
TeamworkTeamwork
Crib wall
Crib wall Crib wall
Kelemahan dalam pemantauan projek
Kelemahan dalam pemantauan projekKelemahan dalam pemantauan projek
Kelemahan dalam pemantauan projek
Zara Bizan, P.E., MIEM
 
Kelemahan dalam Pentadbiran Kontrak
Kelemahan dalam Pentadbiran Kontrak Kelemahan dalam Pentadbiran Kontrak
Kelemahan dalam Pentadbiran Kontrak
Zara Bizan, P.E., MIEM
 
Pengurusan & Pentadbiran Kontrak
Pengurusan & Pentadbiran Kontrak Pengurusan & Pentadbiran Kontrak
Pengurusan & Pentadbiran Kontrak
Zara Bizan, P.E., MIEM
 

More from Zara Bizan, P.E., MIEM (9)

Pengurusan Nilai Strategik (VMS)
Pengurusan Nilai Strategik (VMS)Pengurusan Nilai Strategik (VMS)
Pengurusan Nilai Strategik (VMS)
 
Traffic Impact Assessment (TIA) and Level of Service (LoS)
Traffic Impact Assessment (TIA) and Level of Service (LoS)Traffic Impact Assessment (TIA) and Level of Service (LoS)
Traffic Impact Assessment (TIA) and Level of Service (LoS)
 
Pengurusan Projek
Pengurusan ProjekPengurusan Projek
Pengurusan Projek
 
Pasukan Projek Kompeten
Pasukan Projek KompetenPasukan Projek Kompeten
Pasukan Projek Kompeten
 
Teamwork
TeamworkTeamwork
Teamwork
 
Crib wall
Crib wall Crib wall
Crib wall
 
Kelemahan dalam pemantauan projek
Kelemahan dalam pemantauan projekKelemahan dalam pemantauan projek
Kelemahan dalam pemantauan projek
 
Kelemahan dalam Pentadbiran Kontrak
Kelemahan dalam Pentadbiran Kontrak Kelemahan dalam Pentadbiran Kontrak
Kelemahan dalam Pentadbiran Kontrak
 
Pengurusan & Pentadbiran Kontrak
Pengurusan & Pentadbiran Kontrak Pengurusan & Pentadbiran Kontrak
Pengurusan & Pentadbiran Kontrak
 

Recently uploaded

Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 

Recently uploaded (20)

Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 

Project Scheduling

  • 1. 09 Feb 2022 1 Project Scheduling INTRODUCTION Topics to be Covered  Overview of project scheduling management  Importance of scheduling  Objective of scheduling  Planning and scheduling  Project scheduling tools & techniques 2 1 2
  • 2. 09 Feb 2022 2 Scope Quality Cost Schedule Procurement Stakeholder Risk Resource Communication EFFECT CAUSE 3 Overview of project scheduling management Overview of project scheduling management ■ Project Schedule is a technique that imparts what work should be performed, which resource will perform the work and the time spans in which that work should be performed ■ Without a complete & workable schedule, the project manager will not be able to communicate with regard to resources deployment that are important to deliver the project 4 3 4
  • 3. 09 Feb 2022 3 Overview of project scheduling management ■ Scheduling is the listing of deliverables, activities, and milestones within a project ■ A schedule usually includes a planned start and finish date, duration, sequence, and resources assigned to each activity ■ Effective scheduling is a critical component of successful project schedule management 5 Importance of project scheduling 6 To S.O/P.D Ensure compliance to the Condition of Contract which require the Contractor to submit the Work Program for S.O. or P.D. approval Basis for monitoring & controlling project progress: • Progress reporting & analysis of performance • Evaluation of progress claim/interim payment • Evaluation of EOT claim Basis for preparation of cash flow projection and budgeting 5 6
  • 4. 09 Feb 2022 4 Importance of project scheduling 7 To Client Basis for preparing & channeling allocations Basis for monitoring project progress Importance of project scheduling 8 To Contractor Basis for resource planning (man, machine & material) Basis for execution of works, monitor work progress, and coordinating the works Basis for preparation of cash flow projection and budgeting Basis/evidence for interim payment claims & application of EOT 7 8
  • 5. 09 Feb 2022 5 Objectives project scheduling Scheduling provides the following benefits: ■ Provides a "road map" for project manager & project team members ■ Assists with tracking, reporting, and communicating progress ■ Ensures everyone is on the same page with tasks, dependencies, and deadlines ■ Highlights issues and concerns ■ Monitors progress and identify issues early 9 Planning and scheduling ■ Planning and scheduling are distinct but inseparable aspects of project schedule management ■ Planning primarily deals with selecting the appropriate strategies and procedures in order to achieve project objectives, such as: – How the work will be decomposed – How monitoring & controlling will be done – How resource usage will be optimised – Interface between operation zone & those involve – Method of construction to be employed 10 9 10
  • 6. 09 Feb 2022 6 Planning and scheduling ■ Scheduling converts the project action plans into an operating timetable using appropriate software and technique to determine: – Start and completion dates for activities – Activity sequencing – Activity implementation duration – Resources for the execution of activities – Information to be maintained & monitored for progress reporting 11 Scheduling tools & technique ■ There are a range of tools and techniques to develop, monitor and control project schedules, which includes: – Gantt Chart – Schedule Network Diagram – Critical Path Method (CPM) – Schedule compression 12 11 12
  • 7. 09 Feb 2022 7 13 Scheduling Tools & Techniques Gantt Chart: • Chart shows activity start date & finish date • Milestones are used to represent important activities or events • Relationship/dependency between activities can be shown using arrows 14 13 14
  • 8. 09 Feb 2022 8 15 Scheduling Tools & Techniques Schedule Network Diagram (Precedence Diagram Method) • Network diagram that uses box/node to represent an activity and linking it using an arrow that represent relationship/dependency Critical Path Method (CPM) 16 ■ Scheduling method that used the network diagram to represent a project and activity sequencing required to complete it, known as path ■ Duration for each path is calculated to identify the critical path, that determine duration for the whole project ■ Using critical path-specific software is key to effectively using the CPM ■ The CPM is incredibly common and a powerful tool used across the construction industry Scheduling Tools & Techniques 15 16
  • 9. 09 Feb 2022 9 17 Start Finish ES D EF A LS S LF ES D EF B LS S LF ES D EF D LS S LF ES D EF E LS S LF ES D EF F LS S LF ES D EF C LS S LF ES D EF G LS S LF ES Dur EF Description LS Total Slack LF Critical Path Analysis 18 Scheduling Tools & Techniques Schedule Compression: • A schedule can be shortened in two ways: • crashing: using more resources than planned on the task • fast-tracking: activities that were originally planned to be performed sequentially are performed in parallel 17 18
  • 10. 09 Feb 2022 10 19 Scheduling Process  PMBoK Scheduling Process  6-Steps Scheduling Model PMBoK Scheduling Process 20 Plan schedule management Define project activities Sequence activities Estimate durations Develop the project schedule 19 20
  • 11. 09 Feb 2022 11 21 Scope Definition Create WBS Activity Resource Planning Activity Duration Estimating Activity Sequencing Create Schedule Cost Estimating Cost Budgeting Scope Management Schedule Management Cost Management 6-Steps Scheduling Model 21