Productivity Improvement Plan
 Revisiting Process & Productivity Benchmarks, plan to reduce Complexities.
 Focus shifted from Average Productivity to Person wise Hourly Productivity
Tracking.
 To eliminate Low Productivity Hours – Minimize Startup time & Lunch Break Time.
 Identification of Grade wise Performers, Rewards for High Performer &
Counseling/ Training for Low/ Medium Performers. To be reviewed every fortnight.
Picking, Put away & Sorting on individual basis and Team wise tracking for Inward,
Outward & GPS.
 Daily Display of High & Low Performers in their respective areas and briefing at the
start and end of the shift.
 Project wise accountability assigned.
To ensure accurate inventory by putting enough control/ Checks and daily
reconcilliation.
 Separate Team for Quality / Excellence and Exception Management.
Productivity Improvement
Inward Department:
Concern: Overall productivity getting affected due to:
 Time Lag between Vehicle change over at the Docks.
 Mixed vehicles taking longer time to unload.
 Issues related to Import Container.
 Delay in X- Doc allocation during Peak.
 LC Stocks waiting time at Stage is more then a day.
Plan:
 Productivity Tracking for GM & Apps separately .(Started from this week.)
 To reduce time lag for vehicle changeover: (Started from this week)
o Additional vehicle placed at the Dock 15 mints before First vehicle Unload.
oSupervisor to print out QC Report and arrange for Pallets/ Stage before vehicle
unload starts.
oWith more staging area available now for Apps, Stage stocks to be moved to std
Area & X-Doc Area ( Now defined) for further Processing so that the Dock Stage area
is always available for vehicle Unload.
Concern and Plan
Inward:
With the start of NEP, the Mixed vehicle cases should reduce. Feed back to SCS is
being Provided for rest of the vehicles.
Define limit to PO/SKU/XD/STD/Format/Vendor mixing proportion to arrive at a
optimal unloading benchmark condition, and monitor the real unloading and Dock
TAT productivity. Will complete this activity in two weeks by 29th Feb.
 For Import Containers : Advance allocation & Inbound release from SCS Team.
 Need support from IT Team to ensure minimal delay in X- Dock allocation. Change in
Process for X-Doc to be initiated.
Balancing of X-Doc & Standard ASN, During peak maximum X-Doc on any given day
should not exceed 60%. Already discussed with Sankat & Team.
LC Stocks – Now the stocks are expected for BB & BF Only. Change in Process from
SO/ PO Process to intercompany PO ( ZTSP Document Type, already discussed with
Sankat & Team)
Concern and Plan
Put away Department:
Concern:
Insufficient HPTS at all the shelving Floors increases idle Time, as the Pallet
Movement from Unloading gate to aisle is also done by the Put away person.
 in high depth bins transaction increases with no. of boxes, ( No of locations remains
less)
 Time spent in resolving discrepancies.
Frequent Zone alignment , inter movement of Stocks.
Aisles getting choked in Racks with Picked up stocks.
Plan:
 Dedicated resources for FRL & FLFL with complete accountability.
Additional HPT’S to be inducted in shelving's (Indent raised from our end)
Review time & motion for this activity and redefine benchmark which is currently 60
box per hour. To be completed by 20th Feb.
Discrepancy resolution to be routed through Inventory Audit Team separately.
Increase Putaway Audit to 30% once the New HHT Comes in.
 Revisited Material Flow to ensure clutter Free Aisles. Focus to move the stocks
immediately to packing area & GPS.
Concern and Plan
Picking (Shelving): Champion - Iliyash & Kishore
Concern:
Insufficient crates for Batch Pick – With 1.5 times crate turns per shift Pick task gets
restricted to 6000 task only, for which picker either need to wait or work in extended
shifts.
 Short tasks & Inventory inaccuracy.
Plan:
 Increase the crate Turn Per shift to two Per shift.
o Load balancing across all the PTL Zones and PTL to run with all the six Zones.
o 2nd Shift for PTL during peak load to manage X-Doc & Batch Pick.
oBatch Pick to happen in only one shift.
o2000 New Crates to be inducted in system.
 Short tasks to be minimized and inventory accuracy to be increased.
o Picking & Put away Audit % to be increased to min 30%.
oDaily short task analysis & Correction on the same day.
o Hourly monitoring & daily feedback.
Concern and Plan
Picking (Racks): Champion – Srinidhi
Concern:
 Each/ IP Picking from Racks reduce Picking Speed.
Choked Aisles due to lag in material flow, Insufficient HPT’s & Choked GPS.
Left over of tail stocks increases no of Pick Location.
Short task/ Inventory accuracy.
Plan:
Orders are being taken for Old SKU lying in Racks (Tail Stocks) but picked in IP/EA for
clearance.
Space created for mapping SKU’S to shelving which are Picked in IP/ Each.
Material Flow maintained for Clutter free aisles.
Hourly/ daily monitoring & Feed back.
 To minimize short task & Ensure 100% Inventory accuracy.
With installation of Sorting Racks for GM the productivity of X-Doc Break pack for
GM will Improve. Will start from 17th Feb.
Concern and Plan
PTL :
Concern:
 Frequent change over of Zones due to shortage of HHT.
 Imbalance Load across all the Zones, which leads to lower utilization.
 Server capacity issue leads to data low error & Invalid Boxes.
Plan:
 Picking/ Sorting & X-Doc all aligned for load balancing.
With Induction of new HHT’S will be able to run all the Six Zones simultaneously
without frequent changes.
Need IT support to overcome server capacity issues.
Concern and Plan
GPS :
Concern:
Staging area for keeping store sorted material was a major concern in GPS.
Data accuracy is a concern as this activity is not captured in system.
Time lag between cluster sorting and Store sorting due to PTL shifting.
Plan:
After PTL shifting & Outward from both the sides GPS has been Decongested.
More DSD Lanes has been allocated for keeping ready stocks.
With the induction of 3 BOPTS by 5th March, the time lag will be reduced to an
extent.
Monitor productivity separately manually both for cluster and store sorting in Apps
and non Apps.
Correct material flow will enhance productivity.
Concern and Plan
Outward :
Concern:
 Issue in availability of packed boxes from GPS due to delay in sorting & tracing the
Boxes.
Cluster Vehicle loading takes longer time due to LR Sticker pasting in every Boxes.
Delay in getting SAP DC & Way bill generation.
Plan:
 Two major clusters Kulana & Neelmangla shifted to the other side. 100% Sorting will
be ensured for these clusters.
With Decongested GPS & DSD lanes for packed stocks, the packed stocks can be
retrieved more efficiently.
Productivity for DSD & Cluster Vehicle will be measured separately.
Concern and Plan
Inward: Measuring real time current productivity for all types combination vehicles
separately and define slab for productivity benchmark.
Put away: Measuring real time current productivity for shelving put away .
Implementation of packing in packing area only and not in aisles.
Picking: Picker wise display of weekly productivity trend with highlighting low and
high performer. Addressing low performer on daily briefing. Identifying each pick sku
in rack and moving to Shelving.
PTL: Allocation of picker as per % allocation in Men’s/Ladies/Kid’s, so as to get
continuous flow in PTL for sorting.
GPS: Indentify stores that can be moved to cluster in consultation with SCS team, so
that all DSD stores can have lanes allocated.
Outward: Measuring real time current productivity for DSD and cluster vehicles
separately considering vehicle size.
Projects identified
• Started displaying
productivity trend for
previous week, and
addressing in daily briefing.
• Identification &
Counseling of low
performer and knowing
their constraints.
• High performer will be
appreciated and motivated
with small rewards like
chocolates for maintaining
consistency and further
improvement.
Productivity tracking

More Related Content

What's hot

Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)
Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)
Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)
TKMG, Inc.
 
Facility Layout in production management
Facility Layout in production managementFacility Layout in production management
Facility Layout in production management
Joshua Miranda
 
Value Analysis Value Engineering & Business Process Reengineering
Value Analysis Value Engineering  &  Business Process ReengineeringValue Analysis Value Engineering  &  Business Process Reengineering
Value Analysis Value Engineering & Business Process ReengineeringT HARI KUMAR
 
TPS Lean and Agile - Brief History and Future
TPS Lean and Agile - Brief History and FutureTPS Lean and Agile - Brief History and Future
TPS Lean and Agile - Brief History and Future
Kiro Harada
 
The SMED Method by CLT Services
The SMED Method by CLT ServicesThe SMED Method by CLT Services
The SMED Method by CLT Services
CLT Valuebased Services
 
Leading using the Oobeya Room
Leading using the Oobeya RoomLeading using the Oobeya Room
Leading using the Oobeya Room
Lean Enterprise Academy
 
Just in-time
Just in-timeJust in-time
Just in-time
gaurav_einstien
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
Muhammad Mueez Nazakat
 
Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)
Ishan Parekh
 
Independent demand inventory
Independent demand inventoryIndependent demand inventory
Independent demand inventory
Maya Shasha
 
Operation management_process strategies
Operation management_process strategies Operation management_process strategies
Operation management_process strategies Roshaan Rosh
 
One Page Problem Solving Sheet
One Page Problem Solving Sheet One Page Problem Solving Sheet
One Page Problem Solving Sheet
Eda Yilmaz
 
Just In Time - Operations Management
Just In Time - Operations ManagementJust In Time - Operations Management
Just In Time - Operations Management
Gargi Kapadia
 
SMED Training
SMED Training SMED Training
SMED Training
lumensolutions
 
Plant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CasePlant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CaseMohammed Hamed Ahmed Soliman
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
Hpm India
 
Cost reduction in manufacturing industry
Cost reduction in manufacturing industryCost reduction in manufacturing industry
Cost reduction in manufacturing industry
Dr. Lutfi Apiliogullari
 
Cellular layout/Manufacturing
Cellular layout/ManufacturingCellular layout/Manufacturing
Cellular layout/Manufacturing
Fahad Ali
 
Delayed Product Differentiation
Delayed Product DifferentiationDelayed Product Differentiation
Delayed Product Differentiation3abooodi
 

What's hot (20)

Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)
Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)
Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)
 
Facility Layout in production management
Facility Layout in production managementFacility Layout in production management
Facility Layout in production management
 
Value Analysis Value Engineering & Business Process Reengineering
Value Analysis Value Engineering  &  Business Process ReengineeringValue Analysis Value Engineering  &  Business Process Reengineering
Value Analysis Value Engineering & Business Process Reengineering
 
TPS Lean and Agile - Brief History and Future
TPS Lean and Agile - Brief History and FutureTPS Lean and Agile - Brief History and Future
TPS Lean and Agile - Brief History and Future
 
The SMED Method by CLT Services
The SMED Method by CLT ServicesThe SMED Method by CLT Services
The SMED Method by CLT Services
 
Leading using the Oobeya Room
Leading using the Oobeya RoomLeading using the Oobeya Room
Leading using the Oobeya Room
 
Just in-time
Just in-timeJust in-time
Just in-time
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)
 
Independent demand inventory
Independent demand inventoryIndependent demand inventory
Independent demand inventory
 
Operation management_process strategies
Operation management_process strategies Operation management_process strategies
Operation management_process strategies
 
One Page Problem Solving Sheet
One Page Problem Solving Sheet One Page Problem Solving Sheet
One Page Problem Solving Sheet
 
Just In Time - Operations Management
Just In Time - Operations ManagementJust In Time - Operations Management
Just In Time - Operations Management
 
SMED Jabil Juarez
SMED Jabil JuarezSMED Jabil Juarez
SMED Jabil Juarez
 
SMED Training
SMED Training SMED Training
SMED Training
 
Plant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CasePlant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business Case
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Cost reduction in manufacturing industry
Cost reduction in manufacturing industryCost reduction in manufacturing industry
Cost reduction in manufacturing industry
 
Cellular layout/Manufacturing
Cellular layout/ManufacturingCellular layout/Manufacturing
Cellular layout/Manufacturing
 
Delayed Product Differentiation
Delayed Product DifferentiationDelayed Product Differentiation
Delayed Product Differentiation
 

Viewers also liked

Process Improvement Plan by Barry Botha
Process Improvement Plan by Barry BothaProcess Improvement Plan by Barry Botha
Process Improvement Plan by Barry BothaBarry Botha, CSM
 
Senior Capstone Presentation: Process Improvement Plan
Senior Capstone Presentation: Process Improvement PlanSenior Capstone Presentation: Process Improvement Plan
Senior Capstone Presentation: Process Improvement Plan
aldenknibbs
 
Process improvement proposal for site plan and appearance 9.5.12
Process improvement proposal for site plan and appearance 9.5.12Process improvement proposal for site plan and appearance 9.5.12
Process improvement proposal for site plan and appearance 9.5.12
cityofevanston
 
Business Process Improvement plan - SQL
Business Process Improvement plan - SQLBusiness Process Improvement plan - SQL
Business Process Improvement plan - SQLrubylu818
 
Alpha Case Study - Process Improvement Plan_Sample
Alpha Case Study - Process Improvement Plan_SampleAlpha Case Study - Process Improvement Plan_Sample
Alpha Case Study - Process Improvement Plan_SampleAgatha Maia Duarte de Assis
 
Research paper: Productivity Improvement in a Centralized Warehouse
Research paper: Productivity Improvement in a Centralized WarehouseResearch paper: Productivity Improvement in a Centralized Warehouse
Research paper: Productivity Improvement in a Centralized Warehouse
Faizan Ali
 
Supply Chain Process Improvement Methodology V1
Supply Chain Process Improvement Methodology V1Supply Chain Process Improvement Methodology V1
Supply Chain Process Improvement Methodology V1
John Paulson
 
Scrap management
Scrap managementScrap management
Scrap management
Nomie Jha
 
Merchandising process in the apparel industry
Merchandising process in the apparel industryMerchandising process in the apparel industry
Merchandising process in the apparel industry
Muhundhan Muhu
 
Warehouse Management System
Warehouse Management SystemWarehouse Management System
Warehouse Management SystemRRChandran
 
What Is Digital Quality Management?
What Is Digital Quality Management?What Is Digital Quality Management?
What Is Digital Quality Management?
Crownpeak
 

Viewers also liked (12)

Process Improvement Plan by Barry Botha
Process Improvement Plan by Barry BothaProcess Improvement Plan by Barry Botha
Process Improvement Plan by Barry Botha
 
Senior Capstone Presentation: Process Improvement Plan
Senior Capstone Presentation: Process Improvement PlanSenior Capstone Presentation: Process Improvement Plan
Senior Capstone Presentation: Process Improvement Plan
 
Process improvement proposal for site plan and appearance 9.5.12
Process improvement proposal for site plan and appearance 9.5.12Process improvement proposal for site plan and appearance 9.5.12
Process improvement proposal for site plan and appearance 9.5.12
 
Business Process Improvement plan - SQL
Business Process Improvement plan - SQLBusiness Process Improvement plan - SQL
Business Process Improvement plan - SQL
 
Alpha Case Study - Process Improvement Plan_Sample
Alpha Case Study - Process Improvement Plan_SampleAlpha Case Study - Process Improvement Plan_Sample
Alpha Case Study - Process Improvement Plan_Sample
 
Research paper: Productivity Improvement in a Centralized Warehouse
Research paper: Productivity Improvement in a Centralized WarehouseResearch paper: Productivity Improvement in a Centralized Warehouse
Research paper: Productivity Improvement in a Centralized Warehouse
 
Supply Chain Process Improvement Methodology V1
Supply Chain Process Improvement Methodology V1Supply Chain Process Improvement Methodology V1
Supply Chain Process Improvement Methodology V1
 
Scrap management
Scrap managementScrap management
Scrap management
 
Merchandising process in the apparel industry
Merchandising process in the apparel industryMerchandising process in the apparel industry
Merchandising process in the apparel industry
 
Warehouse Management System
Warehouse Management SystemWarehouse Management System
Warehouse Management System
 
What Is Digital Quality Management?
What Is Digital Quality Management?What Is Digital Quality Management?
What Is Digital Quality Management?
 
Warehousing
WarehousingWarehousing
Warehousing
 

Similar to Project on Productivity Improvement.

PMI Global 2007 - Urucu/Manaus
PMI Global 2007 - Urucu/ManausPMI Global 2007 - Urucu/Manaus
PMI Global 2007 - Urucu/Manaus
Peter Mello
 
Final Presentation Gap Reduction
Final Presentation   Gap ReductionFinal Presentation   Gap Reduction
Final Presentation Gap Reduction
Anthony Scarchilli
 
Danone-a practitioner approach to packaging line productivity by Mathieu Lora...
Danone-a practitioner approach to packaging line productivity by Mathieu Lora...Danone-a practitioner approach to packaging line productivity by Mathieu Lora...
Danone-a practitioner approach to packaging line productivity by Mathieu Lora...
Monique Watkins
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
Julian Kalac P.Eng
 
estee lauder - Productivity and Operational Capacity Improvement Plan
estee lauder - Productivity and Operational Capacity Improvement Planestee lauder - Productivity and Operational Capacity Improvement Plan
estee lauder - Productivity and Operational Capacity Improvement PlanTharanga Jayalal
 
Internship Report - Tactical Supply Chain Improvements.pptx
Internship Report - Tactical Supply Chain Improvements.pptxInternship Report - Tactical Supply Chain Improvements.pptx
Internship Report - Tactical Supply Chain Improvements.pptx
PedroFerreira876615
 
White paper: How to build a real-time vehicle route optimiser
White paper: How to build a real-time vehicle route optimiserWhite paper: How to build a real-time vehicle route optimiser
White paper: How to build a real-time vehicle route optimiser
Philip Welch
 
Hasan yousef 2017cv
Hasan yousef 2017cvHasan yousef 2017cv
Hasan yousef 2017cv
Hasan Yousef
 
Nokia manaus090828 final_presentation_vsa_v4
Nokia manaus090828 final_presentation_vsa_v4Nokia manaus090828 final_presentation_vsa_v4
Nokia manaus090828 final_presentation_vsa_v4
CarlosMoura111
 
Javid Resume - New
Javid Resume - NewJavid Resume - New
Javid Resume - NewJavid Mulani
 
Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018
Julian Kalac P.Eng
 
05262016 resume
05262016 resume05262016 resume
05262016 resumeDan Faust
 
FC VSM Presentation Future State Aug 5 -7 2013
FC VSM Presentation Future State Aug 5 -7  2013FC VSM Presentation Future State Aug 5 -7  2013
FC VSM Presentation Future State Aug 5 -7 2013Donna Skala
 
Vikram_Resume_5 Years_PPC_B Tech_NIT K
Vikram_Resume_5 Years_PPC_B Tech_NIT KVikram_Resume_5 Years_PPC_B Tech_NIT K
Vikram_Resume_5 Years_PPC_B Tech_NIT KVikram Sengar
 
PROJECT STORYBOARD: Herding Cats Using Lean Six Sigma: How to Plan for and Ma...
PROJECT STORYBOARD: Herding Cats Using Lean Six Sigma: How to Plan for and Ma...PROJECT STORYBOARD: Herding Cats Using Lean Six Sigma: How to Plan for and Ma...
PROJECT STORYBOARD: Herding Cats Using Lean Six Sigma: How to Plan for and Ma...
GoLeanSixSigma.com
 

Similar to Project on Productivity Improvement. (20)

Stewartclyde4
Stewartclyde4Stewartclyde4
Stewartclyde4
 
PMI Global 2007 - Urucu/Manaus
PMI Global 2007 - Urucu/ManausPMI Global 2007 - Urucu/Manaus
PMI Global 2007 - Urucu/Manaus
 
Final Presentation Gap Reduction
Final Presentation   Gap ReductionFinal Presentation   Gap Reduction
Final Presentation Gap Reduction
 
Danone-a practitioner approach to packaging line productivity by Mathieu Lora...
Danone-a practitioner approach to packaging line productivity by Mathieu Lora...Danone-a practitioner approach to packaging line productivity by Mathieu Lora...
Danone-a practitioner approach to packaging line productivity by Mathieu Lora...
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
 
estee lauder - Productivity and Operational Capacity Improvement Plan
estee lauder - Productivity and Operational Capacity Improvement Planestee lauder - Productivity and Operational Capacity Improvement Plan
estee lauder - Productivity and Operational Capacity Improvement Plan
 
Internship Report - Tactical Supply Chain Improvements.pptx
Internship Report - Tactical Supply Chain Improvements.pptxInternship Report - Tactical Supply Chain Improvements.pptx
Internship Report - Tactical Supply Chain Improvements.pptx
 
White paper: How to build a real-time vehicle route optimiser
White paper: How to build a real-time vehicle route optimiserWhite paper: How to build a real-time vehicle route optimiser
White paper: How to build a real-time vehicle route optimiser
 
Hasan yousef 2017cv
Hasan yousef 2017cvHasan yousef 2017cv
Hasan yousef 2017cv
 
Rccp report
Rccp reportRccp report
Rccp report
 
Nokia manaus090828 final_presentation_vsa_v4
Nokia manaus090828 final_presentation_vsa_v4Nokia manaus090828 final_presentation_vsa_v4
Nokia manaus090828 final_presentation_vsa_v4
 
Resume_Damian
Resume_DamianResume_Damian
Resume_Damian
 
Javid Resume - New
Javid Resume - NewJavid Resume - New
Javid Resume - New
 
Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018
 
Chetan
ChetanChetan
Chetan
 
Projects
ProjectsProjects
Projects
 
05262016 resume
05262016 resume05262016 resume
05262016 resume
 
FC VSM Presentation Future State Aug 5 -7 2013
FC VSM Presentation Future State Aug 5 -7  2013FC VSM Presentation Future State Aug 5 -7  2013
FC VSM Presentation Future State Aug 5 -7 2013
 
Vikram_Resume_5 Years_PPC_B Tech_NIT K
Vikram_Resume_5 Years_PPC_B Tech_NIT KVikram_Resume_5 Years_PPC_B Tech_NIT K
Vikram_Resume_5 Years_PPC_B Tech_NIT K
 
PROJECT STORYBOARD: Herding Cats Using Lean Six Sigma: How to Plan for and Ma...
PROJECT STORYBOARD: Herding Cats Using Lean Six Sigma: How to Plan for and Ma...PROJECT STORYBOARD: Herding Cats Using Lean Six Sigma: How to Plan for and Ma...
PROJECT STORYBOARD: Herding Cats Using Lean Six Sigma: How to Plan for and Ma...
 

Project on Productivity Improvement.

  • 2.  Revisiting Process & Productivity Benchmarks, plan to reduce Complexities.  Focus shifted from Average Productivity to Person wise Hourly Productivity Tracking.  To eliminate Low Productivity Hours – Minimize Startup time & Lunch Break Time.  Identification of Grade wise Performers, Rewards for High Performer & Counseling/ Training for Low/ Medium Performers. To be reviewed every fortnight. Picking, Put away & Sorting on individual basis and Team wise tracking for Inward, Outward & GPS.  Daily Display of High & Low Performers in their respective areas and briefing at the start and end of the shift.  Project wise accountability assigned. To ensure accurate inventory by putting enough control/ Checks and daily reconcilliation.  Separate Team for Quality / Excellence and Exception Management. Productivity Improvement
  • 3. Inward Department: Concern: Overall productivity getting affected due to:  Time Lag between Vehicle change over at the Docks.  Mixed vehicles taking longer time to unload.  Issues related to Import Container.  Delay in X- Doc allocation during Peak.  LC Stocks waiting time at Stage is more then a day. Plan:  Productivity Tracking for GM & Apps separately .(Started from this week.)  To reduce time lag for vehicle changeover: (Started from this week) o Additional vehicle placed at the Dock 15 mints before First vehicle Unload. oSupervisor to print out QC Report and arrange for Pallets/ Stage before vehicle unload starts. oWith more staging area available now for Apps, Stage stocks to be moved to std Area & X-Doc Area ( Now defined) for further Processing so that the Dock Stage area is always available for vehicle Unload. Concern and Plan
  • 4. Inward: With the start of NEP, the Mixed vehicle cases should reduce. Feed back to SCS is being Provided for rest of the vehicles. Define limit to PO/SKU/XD/STD/Format/Vendor mixing proportion to arrive at a optimal unloading benchmark condition, and monitor the real unloading and Dock TAT productivity. Will complete this activity in two weeks by 29th Feb.  For Import Containers : Advance allocation & Inbound release from SCS Team.  Need support from IT Team to ensure minimal delay in X- Dock allocation. Change in Process for X-Doc to be initiated. Balancing of X-Doc & Standard ASN, During peak maximum X-Doc on any given day should not exceed 60%. Already discussed with Sankat & Team. LC Stocks – Now the stocks are expected for BB & BF Only. Change in Process from SO/ PO Process to intercompany PO ( ZTSP Document Type, already discussed with Sankat & Team) Concern and Plan
  • 5. Put away Department: Concern: Insufficient HPTS at all the shelving Floors increases idle Time, as the Pallet Movement from Unloading gate to aisle is also done by the Put away person.  in high depth bins transaction increases with no. of boxes, ( No of locations remains less)  Time spent in resolving discrepancies. Frequent Zone alignment , inter movement of Stocks. Aisles getting choked in Racks with Picked up stocks. Plan:  Dedicated resources for FRL & FLFL with complete accountability. Additional HPT’S to be inducted in shelving's (Indent raised from our end) Review time & motion for this activity and redefine benchmark which is currently 60 box per hour. To be completed by 20th Feb. Discrepancy resolution to be routed through Inventory Audit Team separately. Increase Putaway Audit to 30% once the New HHT Comes in.  Revisited Material Flow to ensure clutter Free Aisles. Focus to move the stocks immediately to packing area & GPS. Concern and Plan
  • 6. Picking (Shelving): Champion - Iliyash & Kishore Concern: Insufficient crates for Batch Pick – With 1.5 times crate turns per shift Pick task gets restricted to 6000 task only, for which picker either need to wait or work in extended shifts.  Short tasks & Inventory inaccuracy. Plan:  Increase the crate Turn Per shift to two Per shift. o Load balancing across all the PTL Zones and PTL to run with all the six Zones. o 2nd Shift for PTL during peak load to manage X-Doc & Batch Pick. oBatch Pick to happen in only one shift. o2000 New Crates to be inducted in system.  Short tasks to be minimized and inventory accuracy to be increased. o Picking & Put away Audit % to be increased to min 30%. oDaily short task analysis & Correction on the same day. o Hourly monitoring & daily feedback. Concern and Plan
  • 7. Picking (Racks): Champion – Srinidhi Concern:  Each/ IP Picking from Racks reduce Picking Speed. Choked Aisles due to lag in material flow, Insufficient HPT’s & Choked GPS. Left over of tail stocks increases no of Pick Location. Short task/ Inventory accuracy. Plan: Orders are being taken for Old SKU lying in Racks (Tail Stocks) but picked in IP/EA for clearance. Space created for mapping SKU’S to shelving which are Picked in IP/ Each. Material Flow maintained for Clutter free aisles. Hourly/ daily monitoring & Feed back.  To minimize short task & Ensure 100% Inventory accuracy. With installation of Sorting Racks for GM the productivity of X-Doc Break pack for GM will Improve. Will start from 17th Feb. Concern and Plan
  • 8. PTL : Concern:  Frequent change over of Zones due to shortage of HHT.  Imbalance Load across all the Zones, which leads to lower utilization.  Server capacity issue leads to data low error & Invalid Boxes. Plan:  Picking/ Sorting & X-Doc all aligned for load balancing. With Induction of new HHT’S will be able to run all the Six Zones simultaneously without frequent changes. Need IT support to overcome server capacity issues. Concern and Plan
  • 9. GPS : Concern: Staging area for keeping store sorted material was a major concern in GPS. Data accuracy is a concern as this activity is not captured in system. Time lag between cluster sorting and Store sorting due to PTL shifting. Plan: After PTL shifting & Outward from both the sides GPS has been Decongested. More DSD Lanes has been allocated for keeping ready stocks. With the induction of 3 BOPTS by 5th March, the time lag will be reduced to an extent. Monitor productivity separately manually both for cluster and store sorting in Apps and non Apps. Correct material flow will enhance productivity. Concern and Plan
  • 10. Outward : Concern:  Issue in availability of packed boxes from GPS due to delay in sorting & tracing the Boxes. Cluster Vehicle loading takes longer time due to LR Sticker pasting in every Boxes. Delay in getting SAP DC & Way bill generation. Plan:  Two major clusters Kulana & Neelmangla shifted to the other side. 100% Sorting will be ensured for these clusters. With Decongested GPS & DSD lanes for packed stocks, the packed stocks can be retrieved more efficiently. Productivity for DSD & Cluster Vehicle will be measured separately. Concern and Plan
  • 11. Inward: Measuring real time current productivity for all types combination vehicles separately and define slab for productivity benchmark. Put away: Measuring real time current productivity for shelving put away . Implementation of packing in packing area only and not in aisles. Picking: Picker wise display of weekly productivity trend with highlighting low and high performer. Addressing low performer on daily briefing. Identifying each pick sku in rack and moving to Shelving. PTL: Allocation of picker as per % allocation in Men’s/Ladies/Kid’s, so as to get continuous flow in PTL for sorting. GPS: Indentify stores that can be moved to cluster in consultation with SCS team, so that all DSD stores can have lanes allocated. Outward: Measuring real time current productivity for DSD and cluster vehicles separately considering vehicle size. Projects identified
  • 12. • Started displaying productivity trend for previous week, and addressing in daily briefing. • Identification & Counseling of low performer and knowing their constraints. • High performer will be appreciated and motivated with small rewards like chocolates for maintaining consistency and further improvement. Productivity tracking