Great photos illustrate LNG fuel bunkering logistics in Sweden. Truck to ship LNG loading of Seagas, transport LNG, ship to ship Seagas LNG bunkering fuel to Viking Grace, and description of LNG bunkering process.
Presentation for the award-winning paper of the same name, presented in Power-Gen Asia 2013 by Kari Punnonen, Area BDM, Oil & Gas Business, Wärtsilä Power Plants.
Download the paper at: http://www.wartsila.com/file/Wartsila/en/1278537230339a1267106724867-Small_and_Medium_size_LNG_for_Power_Production_KPunnonen.pdf
Great photos illustrate LNG fuel bunkering logistics in Sweden. Truck to ship LNG loading of Seagas, transport LNG, ship to ship Seagas LNG bunkering fuel to Viking Grace, and description of LNG bunkering process.
Presentation for the award-winning paper of the same name, presented in Power-Gen Asia 2013 by Kari Punnonen, Area BDM, Oil & Gas Business, Wärtsilä Power Plants.
Download the paper at: http://www.wartsila.com/file/Wartsila/en/1278537230339a1267106724867-Small_and_Medium_size_LNG_for_Power_Production_KPunnonen.pdf
LNG Marine Fuel Adoption, How Soon, Which Routes, and Vessel TypesJohn Hatley PE
Provides insights into the rate of LNG marine fuel adoption, How Soon, Which routes, & Vessel Types. Key attributes of volume limited and weight limited ships on oceans or coastal voyages are considered along with key elements to demonstrate the early, fast, slow, and last adopters for LNG fuel.
Poyry - How can small-scale LNG help grow the European gas market? - Point of...Pöyry
A large new market for natural gas is under rapid development whilst also reducing emissions. LNG is reaching markets previously inaccessible to pipeline gas; as a fuel for transport and for communities remote from the gas grid. A significant development is the use of LNG in marine transport, which currently uses heavy fuel oils.
Supporting an lng fuelled marine industry future across the entire gas value ...Wärtsilä Marine Solutions
This presentation was given by our Gasbassadors Anil Soni & Mattias Jansson at an LNG bunkering seminar in Langfang, Hebei. It was hosted by ENN , SGMF & CCS. Sponsored by Wartsila & GTT.
In this presentation, they presented the different challenges that the offshore industry is facing & how LNG technology offers a viable option in these challenging markets.
This presentation was given by our Gasbassador Nicolas Leong at the 4th edition of the Myanmar Power Summit.
Wärtsilä Development & Financial Services (WDFS) is a
global project development and customer financing function
WDFS has a global team of 16 project developers and
financing professionals based in Finland, India, the
Netherlands, Singapore, Dubai, Brazil and the United States
The scope of WDFS project development includes engine
power plants, PV power plants, Engine – PV Hybrids and
LNG infrastructure.
WDFS has successfully developed and closed over 30 IPP
projects (approx. 3700 MW) around the world since 1991
The presentation gives an excellent overview of the LNG Bunkering infrastructure around the world. The data comes from public available sources and has been compiled and presented by DNV GL.
Please note that the presentation is dated January 2014.
STEP 2018 Annual Conference - Chris Dunn, HySeas III, a Zero Emission Scottis...STEP_scotland
STEP 2018 Conference. Chris Dunn. Evolution of the “green propulsion” systems being pioneered at Ferguson Marine with an insight into the progress of HySeas III – the project that will deliver the world’s first seagoing hydrogen fuel cell ropax ferry in 2020.
Determining the Viability of a Small Scale LNG ProjectWärtsilä
Presented by Sampo Suvisaari, Wärtsilä Energy Solutions at the Platts 16th Annual LNG Conference Houston, Texas, February 9-10, 2017. This presentation showcases small scale LNG project examples, the LNG value chain, LNG terminals, barges and power plants for small scale projects, sources of LNG available for small scale projects and keys to successful projects within this environment.
As the LNG market continues to grow internationally FSRUs have become an increasingly important component, in particular to smaller and growing economies worldwide. With 11 active FSRUs and over 40 approved and planned for the following years, the growth rate for FSRUs is increasing steeply. FSRU operations are likely to surge by 100% in the next two years as Governments and private companies continue to take advantage of a faster, cheaper and more flexible means of re-gasifying LNG.
The 2nd Annual FSRU International 2014 Summit is the ONLY FSRU summit taking place in the Middle East, with a larger geographical focus including the Middle East, Eastern Mediterranean, India, Indonesia and Africa. FSRU 2014 provides you with a platform to hear the latest existing and planned FSRU operations in Indonesia, India, Jordan, Kuwait, Lebanon and other regional hot spots and investment areas. We are pleased to be the ONLY event in the region to draw together the leading international players in this exciting new area of the LNG industry to forge working relationships and fast-track new projects.
LNG Marine Fuel Adoption, How Soon, Which Routes, and Vessel TypesJohn Hatley PE
Provides insights into the rate of LNG marine fuel adoption, How Soon, Which routes, & Vessel Types. Key attributes of volume limited and weight limited ships on oceans or coastal voyages are considered along with key elements to demonstrate the early, fast, slow, and last adopters for LNG fuel.
Poyry - How can small-scale LNG help grow the European gas market? - Point of...Pöyry
A large new market for natural gas is under rapid development whilst also reducing emissions. LNG is reaching markets previously inaccessible to pipeline gas; as a fuel for transport and for communities remote from the gas grid. A significant development is the use of LNG in marine transport, which currently uses heavy fuel oils.
Supporting an lng fuelled marine industry future across the entire gas value ...Wärtsilä Marine Solutions
This presentation was given by our Gasbassadors Anil Soni & Mattias Jansson at an LNG bunkering seminar in Langfang, Hebei. It was hosted by ENN , SGMF & CCS. Sponsored by Wartsila & GTT.
In this presentation, they presented the different challenges that the offshore industry is facing & how LNG technology offers a viable option in these challenging markets.
This presentation was given by our Gasbassador Nicolas Leong at the 4th edition of the Myanmar Power Summit.
Wärtsilä Development & Financial Services (WDFS) is a
global project development and customer financing function
WDFS has a global team of 16 project developers and
financing professionals based in Finland, India, the
Netherlands, Singapore, Dubai, Brazil and the United States
The scope of WDFS project development includes engine
power plants, PV power plants, Engine – PV Hybrids and
LNG infrastructure.
WDFS has successfully developed and closed over 30 IPP
projects (approx. 3700 MW) around the world since 1991
The presentation gives an excellent overview of the LNG Bunkering infrastructure around the world. The data comes from public available sources and has been compiled and presented by DNV GL.
Please note that the presentation is dated January 2014.
STEP 2018 Annual Conference - Chris Dunn, HySeas III, a Zero Emission Scottis...STEP_scotland
STEP 2018 Conference. Chris Dunn. Evolution of the “green propulsion” systems being pioneered at Ferguson Marine with an insight into the progress of HySeas III – the project that will deliver the world’s first seagoing hydrogen fuel cell ropax ferry in 2020.
Determining the Viability of a Small Scale LNG ProjectWärtsilä
Presented by Sampo Suvisaari, Wärtsilä Energy Solutions at the Platts 16th Annual LNG Conference Houston, Texas, February 9-10, 2017. This presentation showcases small scale LNG project examples, the LNG value chain, LNG terminals, barges and power plants for small scale projects, sources of LNG available for small scale projects and keys to successful projects within this environment.
As the LNG market continues to grow internationally FSRUs have become an increasingly important component, in particular to smaller and growing economies worldwide. With 11 active FSRUs and over 40 approved and planned for the following years, the growth rate for FSRUs is increasing steeply. FSRU operations are likely to surge by 100% in the next two years as Governments and private companies continue to take advantage of a faster, cheaper and more flexible means of re-gasifying LNG.
The 2nd Annual FSRU International 2014 Summit is the ONLY FSRU summit taking place in the Middle East, with a larger geographical focus including the Middle East, Eastern Mediterranean, India, Indonesia and Africa. FSRU 2014 provides you with a platform to hear the latest existing and planned FSRU operations in Indonesia, India, Jordan, Kuwait, Lebanon and other regional hot spots and investment areas. We are pleased to be the ONLY event in the region to draw together the leading international players in this exciting new area of the LNG industry to forge working relationships and fast-track new projects.
A presentation by Laura Peinke, lead business development, SBIDZ, South Africa. Delivered during African Ports Evolution 2015 in Durban, South Africa.
More like this on www.transportworldafrica.co.za
Santos has been active in Indonesia since the 1990s and now operates three producing assets, is developing a fourth and has an exciting exploration program.
Ports Development in Myanmar (BURMA) together with the development of Special Economic Zones (SEZs), and supply base options for Myanmar Oil and Gas Offshore Industry
1. OFFSHORE SUPPORT & PRODUCTION FACILITY
BUSINESS UNIT
RADIANT UTAMA GROUP
PRESENTATION
2015
2. List of Projects
Newly Awarded and Current
Projects
• CNOOC SES LTD. – FSO Widuri
Terminal
• SANTOS (SAMPANG) PTY. LTD. –
FPSO Sea Good 101
• TOTAL E&P INDONESIE – Dredging
Package No.2
• TOTAL E&P INDONESIE – Dredging
Package No.9
• TOTAL E&P INDONESIE – River
Crossing and River Banks
Potential Projects
• TOTAL E&P INDONESIE –
Dredging Package No.1
• SANTOS INDONESIA – Ande-Ande
Lumut Development Project
• HUSKY-CNOOC MADURA LTD. –
Floating Production Unit for the
MDA-MBH Field Development
• TOTAL E&P INDONESIE – Charter
of AHT, Tugboat, Crewboat,
Seabus
• TOTAL E&P INDONESIE –
Production Facility Maintenance
3. MOPU
Current Project
Project Name
MOPU Conversion and Operating Services
Duration of the Project
10 years + 5 years
Project Duration
April 2006 – April 2017
Contract Value
USD xxx
Daily Rate : xxx
X-Brace per day: USD xxx
Peluang per day: USD xxx
Booster Compressor per day : USD xxx
Brief Description of the Project
This project is intended for the installation of MOPU in Maleo Area for
Santos Indonesia. The facility supplies over 40% of gas to the industry
located in East Java. Due to that reason, MOPU has become one of the
most important asset of Local Government in East Java.
PT. Supraco Lines together with its Parent Company, PT. Radiant Utama
Interinsco, Tbk. has provided full services for this project, starting from
Engineers and Crews, installation of MOPU on site, Gas Production and
MOPU maintenance.
4. Charter FSO for Widuri Terminal
Project Name
Charter for One (1) Unit
Floating Storage Offloading (FSO)
for Widuri Terminal
Duration of the Project
5 years fixed + 5 add. Years
Project Type
Consortium (fee-based)
Commencement Date
December 2014 – May 2019
Contract Value
USD XXX
Daily Rate XXX FSO Federal II
Brief Description of the Project
This project is to replace existing FPSO, Lentera Bangsa, owned and operated by Trada Maritim
Tbk. Due to explosion, the project is suspended & terminated.
The converted FSO will be dedicated to accommodate oil production from Charterer oilfield
concessions offshore North West Java.
The FSO is now on mooring process in Widuri Terminal.
Current Project
5. Provision of Oyong Production Barge Services
Project Name
Provision of Oyong Production Barge
Services
Duration of the Project
1 year fixed + 1 additional year
Project Type
Consortium with RUI and Apexindo (fee-based)
Commencement Date
September 2013 – September 2014
Contract Value
USD xxx
Daily Rate USD xxx
Brief Description of the Project
This project is dedicated to support Santos by providing FPSO in Oyong Area.
FPSO Seagood 101
Current Project
6. Dredging & Lifting Services – Package No. 2
• Project Name
Provision of 1 Unit 150 T Crane Barge
and its Package for Dredging and
Lifting/Add. Works (Package-2)
• Duration of the Project
3 years
• Project Type
Asset Based
• Estimated Commencement Date
June 2014 – June 2017
• Estimated Contract Value
USD 8 millions
• Brief Description of the Project
This project main intention is to perform
dredging activities in shallow waters and
coastal sea of the Mahakam Contract area in
East Kalimantan.
This project is just recently commenced on
October 2014.
•
Current Project
7. Dredging & Lifting Services – Package No. 9
• Project Name
Provision of 1 Unit Crane Barge
and its Package for Dredging and
Lifting/Add. Works (Package-9)
• Duration of the Project
3 years
• Project Type
Asset Based
• Estimated Commencement Date
January 2014 – January 2017
• Contract Value
USD 9 millions
• Brief Description of the Project
This project main intention is to perform
dredging activities in shallow waters and
coastal sea of the Mahakam Contract area in
East Kalimantan.
This project starts on May 2014
•
Current Project
8. PRODUCED WATER TREATMENT RENTAL
Future Project
Hi-Flow Test Skid Project Name
Produced Water Treatment Rental
Services
Duration of the Project
6 months
Project Type
Rental
Duration of Projecy
November 2014 – May 2015
Contract Value
USD xxx
Sales xxx
Project Information
The Produced Water Treatment (PWT) to maintain quality of produced and effluent water
prior to disposal overboard. The quality of produced formation water disposed overboard
will be in accordance with Indonesian environmental regulation as a minimum.
For offshore installations, the maximum oil content in waste water is 50 mg/L. The
facilities will be designed by the Contractor to meet an environmental target of 25 mg/L.
Continuous on-line oil-in-water monitoring equipment shall be installed for continuous
monitoring and recording of effluent oil levels.