SlideShare a Scribd company logo
GUJARAT TECHNOLOGICAL UNIVERSITY
ELECTRICAL ENGINEERING
B. E. SEMESTER: VII
Subject Name: Project
Subject Code: 170001
The project consists of two parts. The stage-I and stage-II. The student is
supposed to carry out stage-I in 7th
semester and stage-II in 8th
semester. The
stage-I has two parts. The first part is pre-project and the other part electrical
product survey. The electrical product survey is to be carried out only in 7th
semester.
PART-I (Pre-project)
(1 hour per week)
This is the main project of students. This part of the project is to be
continued in 7th and 8th semester. In the 7th
semester, the preliminary work
of the project is to be carried out. Group of students will work for the project
assigned or selected by the students, under the guidance of some faculty
member.
PART-II (Electrical Product Survey)
(1 hour per week)
(Only in 7th
Semester)
AIM: To make students understand and have exposure to various electrical
items/goods/materials which are available in the market. Students should
acquire the knowledge of available standard ratings of the
materials/goods/items etc as the case may be.
Teaching Scheme Evaluation Scheme
Theory Tutorial Practical Total University Exam
(E)
Mid Sem
Exam
(Theory)
(M)
Practical
(Internal)
Theory Practical
0 0 4 4 0 100 0 50
At department level the group of 4-5 students will survey the market by
personal visit to vendors, dealers, manufactures etc. as the case may be.
Preferably the same group members will work for both parts of project. So
that it is easier at the time of evaluation by external examiners. Students are
expected to do survey of any one category of items/materials out of the
following suggested but not limited to list of categories of electrical
items/goods/materials.
• Types of fuses
• Insulating materials and insulators
• Cables
• Switches (all types of switches, changeover switch)
• Switchgears (ELCB, MCB, MCCB, ACB etc)
• Rotating machines for industrial purpose
• Electrical home appliances and rotating machines for residential purpose
• Batteries (all types)
• Transformers
• Semi-conductor devices
• Luminaries and light sources
• Electrical components like resistors, inductors and capacitors
• Capacitors (DC and AC capacitors, capacitors for power factor corrections,
capacitors for induction furnaces etc)
• Electrical connectors
• Grounding grid elements like grounding rod, grounding pipe, etc
• Instruments sensors and transducers
• Electrical meters
• Electrical machines accessories
The group of students so formed is supposed to study/survey the total range
of the electrical items/goods/material assigned to them. And prepare a report
for the same. Students can take help of internet if required but it is
discouraged that the complete report is prepared from the various resource
material available on the internet.
At the department level, co-ordination of all groups should be done. The
group/groups of students can select the category of electrical material/goods
of their own choice.
The report of electrical product survey must include:
• Catalogues
• Pictures of the concerned items
• Working principle if applicable
• Some of the basic information viz. prices, specifications etc.
Finally, a presentation should be given by the concerned group of students in
front of the faculty members of the department. Duration of the presentation
should be half-hour per group. The report electrical product survey and pre-
project should be merged to prepare a comprehensive report.

More Related Content

Viewers also liked

Rogers vs koons and Jk Rowling defamation case
Rogers vs koons and Jk Rowling defamation caseRogers vs koons and Jk Rowling defamation case
Rogers vs koons and Jk Rowling defamation caseBhavisha Jangid
 
Living stone prove tecniche ebook
Living stone prove tecniche ebook  Living stone prove tecniche ebook
Living stone prove tecniche ebook Gerardo Marchitelli
 
The shocking truth that makes weight loss again
The shocking truth that makes weight loss againThe shocking truth that makes weight loss again
The shocking truth that makes weight loss againHàmzà Benmalék
 
Provocative news vs provocative headlines
Provocative news vs provocative headlinesProvocative news vs provocative headlines
Provocative news vs provocative headlinesBhavisha Jangid
 
Electrical machine design û 1
Electrical machine design û 1Electrical machine design û 1
Electrical machine design û 1ariwala palak
 

Viewers also liked (11)

гвардейцы 2006 2007
гвардейцы 2006 2007гвардейцы 2006 2007
гвардейцы 2006 2007
 
Rogers vs koons and Jk Rowling defamation case
Rogers vs koons and Jk Rowling defamation caseRogers vs koons and Jk Rowling defamation case
Rogers vs koons and Jk Rowling defamation case
 
Living stone prove tecniche ebook
Living stone prove tecniche ebook  Living stone prove tecniche ebook
Living stone prove tecniche ebook
 
The shocking truth that makes weight loss again
The shocking truth that makes weight loss againThe shocking truth that makes weight loss again
The shocking truth that makes weight loss again
 
@Aps ch
@Aps ch  @Aps ch
@Aps ch
 
Provocative news vs provocative headlines
Provocative news vs provocative headlinesProvocative news vs provocative headlines
Provocative news vs provocative headlines
 
MOLUSCO CONTAGIOSO
MOLUSCO CONTAGIOSOMOLUSCO CONTAGIOSO
MOLUSCO CONTAGIOSO
 
Electrical machine design û 1
Electrical machine design û 1Electrical machine design û 1
Electrical machine design û 1
 
Action photography
Action photographyAction photography
Action photography
 
Esporotricosis
EsporotricosisEsporotricosis
Esporotricosis
 
Fratura de diafisis humeral
Fratura de diafisis humeralFratura de diafisis humeral
Fratura de diafisis humeral
 

Similar to Project i

Es2 c0 15-2021
Es2 c0 15-2021Es2 c0 15-2021
Es2 c0 15-2021LaibaRao4
 
EEE-214 Electronics Lab Manual.pdf
EEE-214 Electronics Lab Manual.pdfEEE-214 Electronics Lab Manual.pdf
EEE-214 Electronics Lab Manual.pdfmAkEiTeAsY13
 
ELECTRICAL INSTRALLATION AND MAINTENANCE.docx
ELECTRICAL INSTRALLATION AND MAINTENANCE.docxELECTRICAL INSTRALLATION AND MAINTENANCE.docx
ELECTRICAL INSTRALLATION AND MAINTENANCE.docxemilatender
 
EIM7 week 1- DLL.docx
EIM7 week 1- DLL.docxEIM7 week 1- DLL.docx
EIM7 week 1- DLL.docxRaffyServano1
 
Module hand book
Module hand bookModule hand book
Module hand booktanavade
 
CONSUMER ELECTRONICS SERVICING.pptx
CONSUMER ELECTRONICS SERVICING.pptxCONSUMER ELECTRONICS SERVICING.pptx
CONSUMER ELECTRONICS SERVICING.pptxKathDivino
 
EIM Exploratory's DLL (Lesson 1 _LO1-LO2 Week 1).pdf
EIM Exploratory's DLL (Lesson 1 _LO1-LO2 Week 1).pdfEIM Exploratory's DLL (Lesson 1 _LO1-LO2 Week 1).pdf
EIM Exploratory's DLL (Lesson 1 _LO1-LO2 Week 1).pdfMatthew Angelo Gamboa
 
Fyp presentation
Fyp presentationFyp presentation
Fyp presentationKayDrive
 
Fyp presentations format
Fyp presentations formatFyp presentations format
Fyp presentations formatKayDrive
 
Online pedagogy 2 november 2010
Online pedagogy 2 november 2010Online pedagogy 2 november 2010
Online pedagogy 2 november 2010Yuslinda Yusof
 
Electronics_and_Robotics_G10.pdf.pdf
Electronics_and_Robotics_G10.pdf.pdfElectronics_and_Robotics_G10.pdf.pdf
Electronics_and_Robotics_G10.pdf.pdfJoelMalsi1
 
digital-electronics-5-sequential-circuit-notes.pdf
digital-electronics-5-sequential-circuit-notes.pdfdigital-electronics-5-sequential-circuit-notes.pdf
digital-electronics-5-sequential-circuit-notes.pdfAayush Patidar
 
ATM121-Automotive-Electronics.docx
ATM121-Automotive-Electronics.docxATM121-Automotive-Electronics.docx
ATM121-Automotive-Electronics.docx1992jef
 
Course Description File - Electrical machines Finalized (1).pdf
Course Description File - Electrical machines Finalized (1).pdfCourse Description File - Electrical machines Finalized (1).pdf
Course Description File - Electrical machines Finalized (1).pdfTehseenHussain5
 

Similar to Project i (20)

Es2 c0 15-2021
Es2 c0 15-2021Es2 c0 15-2021
Es2 c0 15-2021
 
elec365
elec365elec365
elec365
 
Cg eim
Cg eimCg eim
Cg eim
 
EEE-214 Electronics Lab Manual.pdf
EEE-214 Electronics Lab Manual.pdfEEE-214 Electronics Lab Manual.pdf
EEE-214 Electronics Lab Manual.pdf
 
ELECTRICAL INSTRALLATION AND MAINTENANCE.docx
ELECTRICAL INSTRALLATION AND MAINTENANCE.docxELECTRICAL INSTRALLATION AND MAINTENANCE.docx
ELECTRICAL INSTRALLATION AND MAINTENANCE.docx
 
EIM7 week 1- DLL.docx
EIM7 week 1- DLL.docxEIM7 week 1- DLL.docx
EIM7 week 1- DLL.docx
 
Module hand book
Module hand bookModule hand book
Module hand book
 
CONSUMER ELECTRONICS SERVICING.pptx
CONSUMER ELECTRONICS SERVICING.pptxCONSUMER ELECTRONICS SERVICING.pptx
CONSUMER ELECTRONICS SERVICING.pptx
 
EIM Exploratory's DLL (Lesson 1 _LO1-LO2 Week 1).pdf
EIM Exploratory's DLL (Lesson 1 _LO1-LO2 Week 1).pdfEIM Exploratory's DLL (Lesson 1 _LO1-LO2 Week 1).pdf
EIM Exploratory's DLL (Lesson 1 _LO1-LO2 Week 1).pdf
 
Fyp presentation
Fyp presentationFyp presentation
Fyp presentation
 
Fyp presentations format
Fyp presentations formatFyp presentations format
Fyp presentations format
 
EEE.pptx
EEE.pptxEEE.pptx
EEE.pptx
 
Online pedagogy 2 november 2010
Online pedagogy 2 november 2010Online pedagogy 2 november 2010
Online pedagogy 2 november 2010
 
Electronics_and_Robotics_G10.pdf.pdf
Electronics_and_Robotics_G10.pdf.pdfElectronics_and_Robotics_G10.pdf.pdf
Electronics_and_Robotics_G10.pdf.pdf
 
3320701.pdf
3320701.pdf3320701.pdf
3320701.pdf
 
2110011
21100112110011
2110011
 
digital-electronics-5-sequential-circuit-notes.pdf
digital-electronics-5-sequential-circuit-notes.pdfdigital-electronics-5-sequential-circuit-notes.pdf
digital-electronics-5-sequential-circuit-notes.pdf
 
ATM121-Automotive-Electronics.docx
ATM121-Automotive-Electronics.docxATM121-Automotive-Electronics.docx
ATM121-Automotive-Electronics.docx
 
Course Description File - Electrical machines Finalized (1).pdf
Course Description File - Electrical machines Finalized (1).pdfCourse Description File - Electrical machines Finalized (1).pdf
Course Description File - Electrical machines Finalized (1).pdf
 
Ali CV 1 6
Ali CV 1 6Ali CV 1 6
Ali CV 1 6
 

More from ariwala palak

Design of electrical machines
Design of electrical machines Design of electrical machines
Design of electrical machines ariwala palak
 
sdAdvanced microcontrollers &embedded system(department elective i)
sdAdvanced microcontrollers &embedded system(department elective i)sdAdvanced microcontrollers &embedded system(department elective i)
sdAdvanced microcontrollers &embedded system(department elective i)ariwala palak
 
Power system protection
Power system protectionPower system protection
Power system protectionariwala palak
 
Inter connected power system
Inter connected power systemInter connected power system
Inter connected power systemariwala palak
 
Industrial instrumentation
Industrial instrumentationIndustrial instrumentation
Industrial instrumentationariwala palak
 
Electrical engg. sem vii with project teaching scheme
Electrical engg. sem vii with project teaching schemeElectrical engg. sem vii with project teaching scheme
Electrical engg. sem vii with project teaching schemeariwala palak
 

More from ariwala palak (12)

gjune 2011
gjune 2011gjune 2011
gjune 2011
 
Design of electrical machines
Design of electrical machines Design of electrical machines
Design of electrical machines
 
sdAdvanced microcontrollers &embedded system(department elective i)
sdAdvanced microcontrollers &embedded system(department elective i)sdAdvanced microcontrollers &embedded system(department elective i)
sdAdvanced microcontrollers &embedded system(department elective i)
 
Power system protection
Power system protectionPower system protection
Power system protection
 
Inter connected power system
Inter connected power systemInter connected power system
Inter connected power system
 
Industrial instrumentation
Industrial instrumentationIndustrial instrumentation
Industrial instrumentation
 
Electrical engg. sem vii with project teaching scheme
Electrical engg. sem vii with project teaching schemeElectrical engg. sem vii with project teaching scheme
Electrical engg. sem vii with project teaching scheme
 
1709044
17090441709044
1709044
 
1709045
17090451709045
1709045
 
1709043
17090431709043
1709043
 
1709042
17090421709042
1709042
 
170904
170904170904
170904
 

Recently uploaded

Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdfKamal Acharya
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfAbrahamGadissa
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
 
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdfONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdfKamal Acharya
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfPipe Restoration Solutions
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdfAhmedHussein950959
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industriesMuhammadTufail242431
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdfKamal Acharya
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-IVigneshvaranMech
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdfKamal Acharya
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamDr. Radhey Shyam
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringC Sai Kiran
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edgePaco Orozco
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdfKamal Acharya
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdfKamal Acharya
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfAyahmorsy
 

Recently uploaded (20)

Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdfONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdf
 

Project i

  • 1. GUJARAT TECHNOLOGICAL UNIVERSITY ELECTRICAL ENGINEERING B. E. SEMESTER: VII Subject Name: Project Subject Code: 170001 The project consists of two parts. The stage-I and stage-II. The student is supposed to carry out stage-I in 7th semester and stage-II in 8th semester. The stage-I has two parts. The first part is pre-project and the other part electrical product survey. The electrical product survey is to be carried out only in 7th semester. PART-I (Pre-project) (1 hour per week) This is the main project of students. This part of the project is to be continued in 7th and 8th semester. In the 7th semester, the preliminary work of the project is to be carried out. Group of students will work for the project assigned or selected by the students, under the guidance of some faculty member. PART-II (Electrical Product Survey) (1 hour per week) (Only in 7th Semester) AIM: To make students understand and have exposure to various electrical items/goods/materials which are available in the market. Students should acquire the knowledge of available standard ratings of the materials/goods/items etc as the case may be. Teaching Scheme Evaluation Scheme Theory Tutorial Practical Total University Exam (E) Mid Sem Exam (Theory) (M) Practical (Internal) Theory Practical 0 0 4 4 0 100 0 50
  • 2. At department level the group of 4-5 students will survey the market by personal visit to vendors, dealers, manufactures etc. as the case may be. Preferably the same group members will work for both parts of project. So that it is easier at the time of evaluation by external examiners. Students are expected to do survey of any one category of items/materials out of the following suggested but not limited to list of categories of electrical items/goods/materials. • Types of fuses • Insulating materials and insulators • Cables • Switches (all types of switches, changeover switch) • Switchgears (ELCB, MCB, MCCB, ACB etc) • Rotating machines for industrial purpose • Electrical home appliances and rotating machines for residential purpose • Batteries (all types) • Transformers • Semi-conductor devices • Luminaries and light sources • Electrical components like resistors, inductors and capacitors • Capacitors (DC and AC capacitors, capacitors for power factor corrections, capacitors for induction furnaces etc) • Electrical connectors • Grounding grid elements like grounding rod, grounding pipe, etc • Instruments sensors and transducers • Electrical meters • Electrical machines accessories The group of students so formed is supposed to study/survey the total range of the electrical items/goods/material assigned to them. And prepare a report for the same. Students can take help of internet if required but it is discouraged that the complete report is prepared from the various resource material available on the internet. At the department level, co-ordination of all groups should be done. The group/groups of students can select the category of electrical material/goods of their own choice.
  • 3. The report of electrical product survey must include: • Catalogues • Pictures of the concerned items • Working principle if applicable • Some of the basic information viz. prices, specifications etc. Finally, a presentation should be given by the concerned group of students in front of the faculty members of the department. Duration of the presentation should be half-hour per group. The report electrical product survey and pre- project should be merged to prepare a comprehensive report.