This document is a curriculum vitae for Isiwu Emmanuel Uchenna. It summarizes his experience as a Rigger Foreman and Coating Application Technician since 1993, working on dynamically positioned derrick/lay barges in Nigeria, West Africa, the Gulf of Mexico, and Brazil. It also provides details of his education, qualifications, training, skills, and referees.
L'événement Channel Marketing IT de l'année : organisée par le CMIT, cette matinée fait le point sur les relations marketing entre les acteurs de la distribution informatique.
www.aressy.com/regardscroises
Gene Villeneuve - Moving from descriptive to cognitive analyticsIBM Sverige
As the scope of big data rapidly expands, so does the scope of the analytics that are necessary to extract insight from that data. It is simply impossible for humans or indeed rules-based engines to take that information to action. More and more, clients need analytics to make the best decisions possible; or better yet, embed those analytics into processes to automate the decision-making process, which they simply the answers based on the questions being asked at the point of impact. In order to address these rapidly evolving needs, we need to ensure the right analytics capability are deployed to suit each situation, each point of interaction and each decision point within a process. Join this session, and learn how IBM can provide a solution for the varying types of analytics: from descriptive to predictive to prescriptive to cognitive.
IBM Watson Ecosystem roadshow - Chicago 4-2-14cheribergeron
IBM Watson is powering a new generation of cognitive applications. Learn how IBM is partnering with visionaries and entrepreneurs to bring innovative cognitive applications to market through the IBM Watson Ecosystem.
Cognitive analytics: What's coming in 2016?IBM Analytics
Cognitive analytics is innovating and evolving rapidly. Expert predictions in this area are essential for organizations that plan to leverage cognitive analytics in their big data analytics strategies in 2016 and beyond. It is the core investment that organizations everywhere should make to stay relevant in the insight economy. IBM is the premier solution provider, with IBM Watson as its flagship cognitive analytics platform, for realizing the opportunities this innovative technology makes possible.
Learn more about IBM Analytics at http://ibm.co/advancedanalytics
Building microservices with Scala, functional domain models and Spring BootChris Richardson
In this talk you will learn about a modern way of designing applications that’s very different from the traditional approach of building monolithic applications that persist mutable domain objects in a relational database.We will talk about the microservice architecture, it’s benefits and drawbacks and how Spring Boot can help. You will learn about implementing business logic using functional, immutable domain models written in Scala. We will describe event sourcing and how it’s an extremely useful persistence mechanism for persisting functional domain objects in a microservices architecture.
Cet ebook collaboratif regroupe une trentaine de professionnels de la veille et des métiers du web. Ils nous livrent leurs réflexions, retours d'expérience et autres conseils sur la veille.
Pourquoi la fermeture de la Raffinerie Shell de Montréal Est est une aberration ? Quelle différence entre la réalité, la viabilité économique de la Raffinerie et les mythes, les rumeurs qui courent ?
Voici un document qui vous permettra de mieux comprendre la situation et de vous engager aux côtés des employés de la raffinerie Shell et de leurs familles !
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
6th International Conference on Machine Learning & Applications (CMLA 2024)ClaraZara1
6th International Conference on Machine Learning & Applications (CMLA 2024) will provide an excellent international forum for sharing knowledge and results in theory, methodology and applications of on Machine Learning & Applications.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...ssuser7dcef0
Power plants release a large amount of water vapor into the
atmosphere through the stack. The flue gas can be a potential
source for obtaining much needed cooling water for a power
plant. If a power plant could recover and reuse a portion of this
moisture, it could reduce its total cooling water intake
requirement. One of the most practical way to recover water
from flue gas is to use a condensing heat exchanger. The power
plant could also recover latent heat due to condensation as well
as sensible heat due to lowering the flue gas exit temperature.
Additionally, harmful acids released from the stack can be
reduced in a condensing heat exchanger by acid condensation. reduced in a condensing heat exchanger by acid condensation.
Condensation of vapors in flue gas is a complicated
phenomenon since heat and mass transfer of water vapor and
various acids simultaneously occur in the presence of noncondensable
gases such as nitrogen and oxygen. Design of a
condenser depends on the knowledge and understanding of the
heat and mass transfer processes. A computer program for
numerical simulations of water (H2O) and sulfuric acid (H2SO4)
condensation in a flue gas condensing heat exchanger was
developed using MATLAB. Governing equations based on
mass and energy balances for the system were derived to
predict variables such as flue gas exit temperature, cooling
water outlet temperature, mole fraction and condensation rates
of water and sulfuric acid vapors. The equations were solved
using an iterative solution technique with calculations of heat
and mass transfer coefficients and physical properties.
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSveerababupersonal22
It consists of cw radar and fmcw radar ,range measurement,if amplifier and fmcw altimeterThe CW radar operates using continuous wave transmission, while the FMCW radar employs frequency-modulated continuous wave technology. Range measurement is a crucial aspect of radar systems, providing information about the distance to a target. The IF amplifier plays a key role in signal processing, amplifying intermediate frequency signals for further analysis. The FMCW altimeter utilizes frequency-modulated continuous wave technology to accurately measure altitude above a reference point.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
1. CURRICULUM VITAE
INTRODUCTION
I have been working as an Experienced Rigger since 1993 at many locations within
Nigeria and around African countries. As a Rigger Foreman and Coating Application
Technician, with a dynamically positioned derrick/lay barges, the barge is the ideal
barge for pipe lay and construction activities in deep water fields. Equipped with both
“S” and “J” configuration & pipe lay capabilities, in excess of 1000 tons and also
perform tie – in and support functions. In West Africa, the Gulf of Mexico and Brazil.
The work has ranged from ships and barges. Installation of pipeline in Oil/Gas fields,
platforms, decks, jackets, risers. Etc.
Personal Details
Name: Isiwu Emmanuel Uchenna
L.G.A: Nsukka
State of Origin: Enugu State
Nationality: Nigeria
Date of Birth: 4TH April 1963
Religion: Christian
Contact Address:
Home Address: No 3 Omamoh Close Off Refinary Road Effurun-
Warri Delta State.
Mobile: +2348034743220,
+2348024646903,+2348052311784
Email Address: isiwuemm5boys@yahoo.com
Marital Status: Married
2. Attributes:
Efficient
Motivated
Accurate
Term Player
Approachable
Assertive
Professional
Enthusiastic
Educational Section
1973 - 1986 Standard Grades attained in English,
Mathematics, Biology, Economics, Commerce,
Literature in English, Agric. Science, Christian
Religious Knowledge and Government.
Education/Qualification
1973 – 1986 First School Leaving Certificate, SSCE/GCE
Ordinary Level.
Relevant Experience:
Dec. 6th
2011 – Date
Client; Total Upstream Companies in Nigeria USAN
Deep Water Development Project
(Deep Water District)
Company: Aldelia Nigeria Limited
Project: USAN Deep water Development Project
(Hook up Installation Project)
Vessel: USAN FPSO
Position: Rigger/Foreman (Marine Crew)
Duties: Deck Operations, Rigging & Lifting operations
General Marine Operations
March – August 2011
Client; Addax Petroleum (Nig) Ltd.
Company: Compact Manifold & Energy Services (CMES)
Project: Adanga Redevelopment Project TB-1921
Phase II,III & TPU Hook up Upgrade
8”Pipeline from 6w1 -7w1, 8” Pipeline from
AD31 –AD-22, 8” Pipeline from 7w1 -AD22
3. Installation & hook up of ADSI water injection
facility (120T)
Installation of KTMB platform (220ton) Hookup
TMMP Deck extension and upgrade
Vessel OPI International (ALB332 Derrick Lay Barge)
Ekulo Tornadoes, Hercules Jackup barge
(Tiger fish)
Position Rigger/Foreman
Duties Rigging and Lifting Operations, Installation of
Spools, Mechanical fittings, Installation of ball
valves, pipe handling & manifolds.
April – July 2009.
Client; Addax Petroleum (Nig) Ltd.
Company: West African Oilfield Services (WAOS).
Project: Adanga Redevelopment Project (HOOK-UP).
Vessel: Donaux Barge.
Position: Rigger “A”
Description: Rigger/Coater
Duties: Pipe Handling, Installation of Risers, Spools,
Installation of ball valves, hot boltings, manifold,
General Rigging and Lifting Operations.
January– March 2008
CLIENT: Exxon Mobile
Company: Acergy Globestar Engineering co. (Nig) Ltd.
Project: Green Field Project Nigerian Water
Vessel: Acergy Polaris Derrick Lay Barge
Position: Rigger “A”/Coater
Description: Employed as Rigger/Coater.
Duties: Pipe handling, rigging and lifting and lifting
operations including installation of jackets,
bridges.
April –July 2008
Client: Chevron (Angola)
Company: Acergy Globestar Engineering co. (Nig.) Ltd.
Project: Tombua Landana
Vessel: Acergy Polaris Derick Lay Barge.
Position: Rigger “A”
Description: Employed as Rigger/Coater.
Duties: Pipe handling, rigging and lifting operations
including installation of sub-sea structures, manifolds, riser spools, jumpers, templates
18” and 14” pipe laying in S-Lay mode. Etc.
4. May- June 2007
Client: Total FinaElf E&P Congo
Company: Acergy Globestar Engineering Co.(Nig) Ltd.
Project: Moho Bilondo
Vessel: Acergy Polaris Derick Lay Barge (DP)
Position: Rigger “A”
Description: Employed as Rigger/Coater
Duties: Pipe handling, Rigging and lifting operations,
flow lines installations 37Km x 16” pipeline,
laying in S-lay mode. General deck rigging. Etc.
June –August 2007
Client: British Petroleum (BP) Angola
Company: Acergy Globstar Engineering Co. (Nig.) Ltd.
Project: Greater Plutonio Block 16 Angola
Vessel: Acergy Polaris DLB (DP)
Position: Rigger “A”/Coater
Description: Employed as Rigger/Coater
Duties: Pipe handing, Rigging and liftling operations,
deployment of Subsea structures, manifolds,
jumpers, steel catenary risers, piles FFA,ILT)
Laying in stay mode riser protectors, 16” pipe
line S-lay mode. 1400m depth. Oil offloading
line (OOL) from buoy to FPSO. Flow line
installation in J-lay mode. Jumpers installation.
August –October2007
Client: Total E &P Congo
Company: Acergy Globestar Engineering Co. (Nig.) Ltd
Project: Total
Vessel: Acergy Polaris Derrick Lay barge (DP)
Position: Rigger “A”
Description: Employed as Rigger/Coater.
Pipelines.
Duties: pipe handling, rigging and lifting operations, 16”
8” and 6”pipelaying in S-lay mode. Flow
lines installation in J-lay mode with subsea
structure installation (suction pipe, FTA, ILT),
spools and jumpers installation, oil offloading
line (OOL) from buoy to FPSO)laying in S-lay
mode.
July 2005
5. Client: Total EPC 2B Nigeria
Company: Stolt Offshore SA Globstar Engineering Co.
(Nig.) Ltd.
Project: EPC 2B
Vessel: Seaway Polaris/Seaway Legend.
Position: Rigger “A”
Description: Employed as Deck Rigger.
Duties: Rigging and lifting operation, lowering concrete
mats over pipelines and in water survey.
Conventional Project
2005 -2006
Client: Chevron Angola
Company: Acergy Globestar Engineering (Nig.) Ltd.
Project: Benguala Belize
Vessel: Acergy Polaris Derick Lay Barge
Position: Rigger “A”
Description: Employed as Rigger/Coater
Duties: pipe handling, rigging and lifting operations
(100km of pipe laying in S-lay mode from depth
of 15m to 400m).
2006
Client: Elf Nigeria
Company: Acergy Globestar
Project: Amenam II
Vessel: Acergy Polaris Derick Lay Barge.
Position: Rigger “A”
Description: Employed as Rigger/Coater.
Duties: pipe handling, rigging and lifting operations
(Lifting 600tone jactet +heavy lift of 700tone,
and 80km pipe laying in depth of 30m)
March 2006
Client: Exxon mobile (FPSO ERHA) Nigeria
Company: Stolt Offshore Globestar Engineering Co. (Nig.)
Ltd.
Project: FPSO ERHA
Vessel: Seaway Polaris/Seaway Legend
Position: Rigger “A”
Description: Employed as Deck Rigger
Duties: Rigging and lifting operation installation of a
mooring bouy SBM and IWS Subsearigging, tie
in pipe line and risers.
June 2006
Client: Chevron Nigeria
Company: Acergy Globstar Engineering Co. (Nig.) Ltd.
6. Project: EPC 2B
Vessel: Acergy Polaris Derick Lay Barge
Position: Rigger “A” / Coater.
Description: Employed as Rigger/Coater.
Duties: pipe handling, rigging and lifting operations
(100m long bridge of 700tone, and 80km of pipe
laying in depth of 30m
August 2006
Client: Exxon Mobile
Company: Acergy Globestar
Project: Erha Project in Nigeria
Vessel: Acergy Polaris Derick Lay Barge
Position: Rigger “A”
Description: Employed as Rigger/Coater
Duties: Pipe handing, rigging and lifting operations,
Depth 1200m FPSO and buoy mooring lines
deployemtn (suction anchor +chain+cables) <
manifolds, jumpers, subseastructure installation.
SCR (steel catenary risers) from SHO pile to
FPSO (flexjoint hand-over to FPSO)laying in
slay mode, Riser protectors forFPSO risers
installation.
2000– 2001
Client: Total Angola
Company: Stolt Offshore SA Globstar Engineering Co.
(Nig) Ltd.
Project: Girassol Angola
Vessel: T.S.VSeaway Explorer
Position: Rigger: A”/Coater.
Description: Employed as Deck Rigger.
Duties: Lifting operations and General Riggings, towing
boundless from soyo beach to Girassol field,
towing three riser tower from Lobito Beach to
Girassol field and installation of the riser tower
in water depth of 1,400m fully monitored by
ROV.
2000 – 2001
Client: Total Angola
Company: Mc Dermott ETPM Globstar Enginering Co.
(Nig.) Ltd.
Project: Girassol Angola
Vessel: Seaway Polaris Derrick Lay Barge
7. Position: Rigger “A”/Coater.
Description: Employed as Rigger/Coater
Duties: First deep sea project for Mc demott ETPM in
water dept of 1,400m. Pipe handing and lifting
operations – first pipe laying in J- lay mode, first
deep sea operations fully monitored by ROVS.
Mooring line deployment and connection of
FPSO, three riser tower installations under water
manifolds, spools, subseastructures installations.
2001 – 2002
Client: Total Angola
Company: Stolt Offshore SA (Globstar Co. (Nig) Ltd.
Project: Girrassol Angola
Vessel: T.S.VSeaway Explorer
Position: Rigger “A”
Description: Employed as Deck Rigger
Duties: Lifting Operations and Rigging. Tie-in
operations fully montored by ROV and
transpnder.by MATIS tie-in machine. (Moodle
Advance Tie-in in system)
August 2002
Client: Chevron Texaco
Company: Acergy Globestar
Vessel: Acergy Polaris Derrick Lay Barge
Position: Rigger “A” / Coater
Description: Employed as Rigger/Coater
Duties: 30m to 700m water dept of pipe lay in S-lay
mode, installation of catenaries riser supports.
2003
Client: Chevron Texas
Company: Acergy Globestar
Project: Sanha Project Equatorial Guinea
Vessel: Acergy Polaris Derrick Lay Barge
Position: Rigger “A”
Description: Employed as Rigger/Coater
Duties: Jacket launching offshore: 700ton lift and
1000ton under the crane during upending in the
water.
Heavy pipe driving (200ton).
Training
Oct. 2014 UPSTREAM NIGERIA – Exxon Mobil
8. Offshore Emergency ResponseTeam Training
Module 2 – Permit holder/in work management
system + electronic permit to work/Global
Operation PBP Work Management System
(System 6-4 owner) Nov. 2013
Certified Banksman/Basic Rigger and Slinger
training in compliance with API-RP2D.3.1.4
Nov. 3rd 2014
Offshore Safety Training Centre
Certificate of Training – (T-BOSIET)
16th
– 18 May, 2012
*Helicopter Underwater EscapeTraining
(HUET)
* Survival at Sea (SAS) Course
* Basic First Aid (BFA)
* Basic Fire Fighting (BFF)
* Induction Course
CHARKINS MARITIME TRAINING
CENTRE
Elementary First Aid & Training Course
Personal Survival Techniques Training Courseat
the Charkins Maritime Training Centre, (Port
Harcourt, Nigeria) in accordancewith Section A-
V1/1-3 of the Revised STCW convention (1995)
Fire Prevention & Fire Fighting Techniques
Personal Survival Techniques Training Courseat
the Charkins Maritime Training Centre, (Port
Harcourt, Nigeria) in accordancewith Section A-
V1/1-2 of the Revised STCW convention (1995)
Personal, Safetyand Social Responsibilities
Training Course
Personal Survival Techniques Training Courseat
the Charkins Maritime Training Centre, (Port
Harcourt, Nigeria) in accordancewith Section A-
V1/1-4 of the Revised STCW convention (1995)
2010 Personal Survival Techniques Training Courseat
the Charkins Maritime Training Centre, (Port
9. Harcourt, Nigeria) in accordancewith Section A-
V1/1-1 of the Revised STCW convention (1995)
2003 Elementary First aid training courseat the
Regional maritime Academy (Accra Ghana) in
accordancewith section A-VI 1 – 3 of the revised
STCW Convention (1995).
Fire prevention & Fire fighting training courseat
the regional maritime Academy (Accra Ghana) in
accordancewith section A-VI/1-2 of the revised
STCW Convention (1995).
Personal Survival techniques Training Course at
the regional maritime Academy (Accra Ghana) in
accordancewith section A-VI 1-1 of the revised
STCW Convention (1995).
Personal Safety and Social Responsibility course
at the regional maritime Academy (Accra Ghana)
in accordancewith section A-VI 1-4 of the
revised STCW Convention (1995).
2004. The ContractorEmployee HSE course(Level 3)
(SPDC) Accredited HSE Consultant).
2004 Familiarization training on company procedure
GR-OPS-008“lifting Equipment lifting
operations on ships and barges (E.M.T.A)
approved D32/D33 Assessor.
2004 Has attended a safety and awareness Rigging and
lifting course. (E.M.T.A) Approved D32/D33
Assessor(Acergy Offshore).
2004 Rescue team leader Course/HSE, Hold on DSV
Acergy Polaris.
2005 IMCA- Introduction to working at height
technique and inspection of PPEtraining course.
2006 The contractorHSE Trainer and Consultancy
Services. (Rigger training Course). Has
successfully completed Rigging training course
organized in conjunction with Nigerian institute
of Safety professionals.
Course Contents
10. Rigging and Material Inspection
Determining Safe working Load
Communication at Work
Safe Material Handling…
2006 HSES Training and SupportServices African and
Mediterranean Region. (Offshore Safety Training
Course) has positively participated to the Acergy
behaving safety held in Acergy Polaris with
Acergy.
2009 Offshore Safety/First Aid Training Course.
Has positively participated to the first Aid
Training Curse held in Donaux Barge organized
by West African Oilfield Services (WAOS).
POSITION: RIGGER FOREMAN
Other Experience:
Safety Experience (Safety Officer), Scaffoldings
Technician, Coating Application Technician.
Socialskills and hobbies:
I enjoy working outdoors mostof the time; my hobbies are traveling, reading and
watching football.
Referees:
MR. CHRIS OZEGBE
Personal Manager
Acergy Globestar Engineering Co. (Nig.) Ltd.
Warri
Tel: +2348037081170.
MR. AWE ABAYOMI
Director / CEO
Walad Nig. Enterprises
No 281 Warri Sapele Road by First Marine Gate
Warri,Delta State, Nigeria.
+2348038103892
MR. ANDY GEORGE
Sparrows Offshores
Email: morph042@aol.com