This document presents a project report on modifying and expanding the production layout of Krohne Marshall, a company that manufactures flow meters. It aims to minimize travel time and costs from raw materials to finished products while meeting increasing production demands. The report includes an introduction to the company, problem statement, objectives, literature review on plant layout concepts, data collection on current processes and material flows, and proposed design of a new layout. Various layout types are considered and a product layout is selected. The design phase involves iterations to optimize department locations. The new layout is implemented and evaluated based on reduced material travel distances and creation of a better work environment to support future growth.