This document provides an overview of the room and pillar mining method and presents a flowchart of the room and pillar mining process. The room and pillar method involves creating a grid of rooms and pillars to extract ore bodies dipping less than 50 degrees. The key is establishing optimal room and pillar sizes to maximize ore recovery while maintaining safety. The flowchart shows the sequential steps of the room and pillar mining process, from initial planning to extraction to closure. Major steps include geological data collection, pillar and room dimension calculation, drilling, blasting, mucking, hauling, and supporting as needed until the mineral is fully extracted or no more is discovered.