Contents 
• Introduction (Diesel Shed & Diesel Locomotives) 
• Day 1 to 2 (Maintenance) 
• Day 3 to 5 (Starting System, Generator, Motors & Batteries) 
• Day 6 to 7 (Fuel-Oil System) 
• Day 8 to 9 (Air Compressor) 
• Day 10 to 11 (Braking System ) 
• Day 12 to 13 (Safety Devices) 
• Day 14 to 15 (Lubrication) 
• Manufacturing 
• Engine Block, Turbo-Supercharger, Water Cooling System 
• Pictures & Certificate
INTRODUCTION 
(Diesel Shed & Diesel Locomotives) 
Brief History:- 
Ratlam Diesel Shed, Located on the main line 
between Delhi-Mumbai, started with a meager holding of 15 
locomotives on 1st May 1967. As on today the shed has 
holding of 126 locos comprising of WDM2A, WDM3A, 
Inferior Service (WDM2A)-14, WDS6-04 and WDS4B-07 
class locomotives.
Brief Details of Diesel Shed Ratlam 
Year Of Establishment 1st May, 1967 
ISO Certification Year 
ISO : 9001-2008 
ISO : 14001-2004 
ISO : 18001-2007 
Integrated Management System Certification achieved on 04.09.2009 
( OSAS ) 
(Occupational Health & Safety Assurance Series) 
Total LOCO Homing Capacity 100 Locos 
Employees Strength 1120 
No. of Officers 08 
No. of Supervisors 132 
Total Area 119000 m2 (Approx.) 
Covered Area 6902 m2 (Approx.) 
Percentage of Staff housed in Railway 
Quarters 
24.75% 
Power Consumption 2400 Unit per day (Avg.) 
Water Consumption 1.5 Lacks liters/day 
Shed Consumption of Fuel 488.6liters/Loco/Month (Avg.)
Purpose of Diesel Shed 
Maintenance 
Service 
Fix Time Fix Distance 
Repair 
When Problem 
Occur in 
Locomotive
Starting System of Locomotive 
(Generator, Motor, Battery) 
Engine Generator 
Exciter 
Generator No. of Batteries- 8 (9 VOLT 
each) 
Motor 1 
(735V)+ (400 
HP) 
Motor 2 
(735V)+ (400 
HP) 
Motor 3 
(735V)+ (400 
HP) 
Motor 4 
(735V)+ (400 
HP) 
Motor 5 
(735V)+ (400 
HP) 
Motor 6 
(735V)+ (400 
HP) 
Motor Control Device – 
Armature current control 
reactor (ACCR) 
(A.C. supply)
Power Transmission System - Electrical & Mechanical, 
The 400 HP is transmitted by each motor to each Wheel axle
Fuel-Oil System
Air Compressor 
Supply of Air From Compressor 
From MR Tank No.1 – Sand Gear 
Viper Motor 
Air Compressor 
Horn 
MR Safety valve 
From MR Tank No.2 – All Braking Systems 
MR Pressure Gauge 
Air Pressure at MR Tanks – 10 kg/cm²
Braking System In Diesel Locomotive 
Types of Braking System 
• Air Brake – 1) Independent(without load) 
2) Automatic (Whole train is 
connected). 
3) Emergency. 
• Dynamic Brake – Electrical. 
Brake Pipe Pressure – 5 kg/cm²
Lubrication System 
Lube Oil Pressure - (Max.) 9.5kg/cm² 
(Min.) 1.6kg/cm² 
CRANK SHAFT OF V-SHAPED DIESEL ENGINE LUBE OIL SYSTEM IN V-SHAPED DIESEL ENGINE
Safety Devices 
Locomotive Idle Locomotive Shutdown 
VCD System 
( Vigilance Control Device) 
OSTA System 
( Over Speed Trip Assembly) 
Automatically operated when RPM will increase more 
than 1000. 
GR (Ground Relay) LWS (Low Water Switch) 
DMR (Dead mains relay) OPS (oil pressure switch) 
Operate when oil pressure reduced to 1.3 kg/cm² 
PCS (Power cut off switch) Safety auxiliary Relay (SAR) 
ETS (Engine Temperature Switch) 
Circuit Breaker 
[Operate when temp. of water is increased above 93˚c ]
Manufacturers 
• Manufacturers Alco (American Locomotive Company), DLW (Diesel Locomotive Works, Varanasi) 
• Engine Alco 251-B, 16 cylinder, 2,600 hp (2,430 hp site rating) with Alco 710/720/?? turbo 
supercharged engine. 1,000 rpm max, 400 rpm idle; 228 mm x 266 mm bore/stroke; compression ratio 
12.5:1. Direct fuel injection, centrifugal pump cooling system (2,457 l/min at 1,000 rpm), fan driven by eddy 
current clutch (86 hp at 1,000 rpm) 
• Governor GE 17MG8 / Woodward's 8574-650 / Medha MEG 601 
• Transmission Electric, with BHEL TG 10931 AZ generator (1,000 rpm, 770 V, 4,520 amperes) 
• Traction motors GE752 (original Alco models) (405 hp), BHEL 4906 BZ (AZ?) (435 hp) and (newer) 4907 
AZ (with roller bearings) 
• Axle load 18.8 tones, total weight 112.8 t 
• Bogies Alco design cast frame trimount (Co-Co) bogies 
The class WDM-2 is Indian Railways' workhorse diesel locomotive. The first units were imported fully built from 
the American Locomotive Company (Alco) in 1962. Since 1964, it has been manufactured in India by the Diesel 
Locomotive Works (DLW), Varanasi. The model name stands for broad gauge (W), diesel (D), mixed traffic (M) engine. 
The WDM-2 is the most common diesel locomotive of Indian Railways. the gear ratio is 65:18.
Engine Block
Turbo-Super Charger
Water Cooling System 
Water Present in whole loco – 1210 Liters
PICTURES
Certificate
THANK YOU !!! 
Any Query ?

More Related Content

What's hot

INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
Meerut Institute of Engineering and Technology
 
Electric locomotive ppt
Electric locomotive pptElectric locomotive ppt
Electric locomotive ppt
Subhash kumar
 
DLW varanasi summer training report
DLW varanasi summer training reportDLW varanasi summer training report
DLW varanasi summer training report
shubham chaurasiya
 
Diesel loco shed
Diesel loco shedDiesel loco shed
Diesel loco shed
Abhishek dayal
 
Dlw locomotive workshop
Dlw locomotive workshopDlw locomotive workshop
Dlw locomotive workshop
Shivam Prajapati
 
Indian railway Mechanical workshop Gorakhpur ppt
Indian railway Mechanical workshop  Gorakhpur pptIndian railway Mechanical workshop  Gorakhpur ppt
Indian railway Mechanical workshop Gorakhpur ppt
Sandeep Yadav
 
Indian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care CentreIndian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care CentreRao Khola
 
Automobile chassis,types of automobile
Automobile chassis,types of automobileAutomobile chassis,types of automobile
Automobile chassis,types of automobile
kgmahesh123
 
central railway internship report
central railway internship reportcentral railway internship report
central railway internship report
rahul waghmare
 
DLW training PPT
DLW   training  PPTDLW   training  PPT
DLW training PPT
Eshver chandra
 
Summer training repoart on dlw ,varanasi
Summer training repoart on dlw ,varanasiSummer training repoart on dlw ,varanasi
Summer training repoart on dlw ,varanasi
ARJUN MAURYA
 
Project Report -Trainee Engineer At Diesel Locomotive Shed, Indian Railways
Project Report -Trainee Engineer At Diesel Locomotive Shed, Indian RailwaysProject Report -Trainee Engineer At Diesel Locomotive Shed, Indian Railways
Project Report -Trainee Engineer At Diesel Locomotive Shed, Indian RailwaysAditya Bhattacharjee
 
Summer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSummer Training Report, DLW Varanasi
Summer Training Report, DLW Varanasi
SHAILESH SHUKLA
 
Air brake system in indian railways
Air brake system in indian railwaysAir brake system in indian railways
Air brake system in indian railways
Ramkumar Niluroutu
 
Automobile Engineering ppt
Automobile Engineering  pptAutomobile Engineering  ppt
Automobile Engineering ppt
mahesh kumar
 
diesel shed izzatnagar report part 2
diesel shed izzatnagar report part 2diesel shed izzatnagar report part 2
diesel shed izzatnagar report part 2
Mechanical Engineering Student
 
4 weeks at internship - DLW VARANASI (U.P.) By Parvind Gupta
4 weeks at internship - DLW VARANASI (U.P.) By Parvind Gupta4 weeks at internship - DLW VARANASI (U.P.) By Parvind Gupta
4 weeks at internship - DLW VARANASI (U.P.) By Parvind Gupta
Parvind Gupta
 
electric traction
electric tractionelectric traction
electric traction
utkarsh srivastav
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New Delhi
Prabjeet Singh
 
Diesel Locomotive Works (DLW)
 Diesel Locomotive Works (DLW) Diesel Locomotive Works (DLW)
Diesel Locomotive Works (DLW)
Neha Gethe
 

What's hot (20)

INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
 
Electric locomotive ppt
Electric locomotive pptElectric locomotive ppt
Electric locomotive ppt
 
DLW varanasi summer training report
DLW varanasi summer training reportDLW varanasi summer training report
DLW varanasi summer training report
 
Diesel loco shed
Diesel loco shedDiesel loco shed
Diesel loco shed
 
Dlw locomotive workshop
Dlw locomotive workshopDlw locomotive workshop
Dlw locomotive workshop
 
Indian railway Mechanical workshop Gorakhpur ppt
Indian railway Mechanical workshop  Gorakhpur pptIndian railway Mechanical workshop  Gorakhpur ppt
Indian railway Mechanical workshop Gorakhpur ppt
 
Indian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care CentreIndian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care Centre
 
Automobile chassis,types of automobile
Automobile chassis,types of automobileAutomobile chassis,types of automobile
Automobile chassis,types of automobile
 
central railway internship report
central railway internship reportcentral railway internship report
central railway internship report
 
DLW training PPT
DLW   training  PPTDLW   training  PPT
DLW training PPT
 
Summer training repoart on dlw ,varanasi
Summer training repoart on dlw ,varanasiSummer training repoart on dlw ,varanasi
Summer training repoart on dlw ,varanasi
 
Project Report -Trainee Engineer At Diesel Locomotive Shed, Indian Railways
Project Report -Trainee Engineer At Diesel Locomotive Shed, Indian RailwaysProject Report -Trainee Engineer At Diesel Locomotive Shed, Indian Railways
Project Report -Trainee Engineer At Diesel Locomotive Shed, Indian Railways
 
Summer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSummer Training Report, DLW Varanasi
Summer Training Report, DLW Varanasi
 
Air brake system in indian railways
Air brake system in indian railwaysAir brake system in indian railways
Air brake system in indian railways
 
Automobile Engineering ppt
Automobile Engineering  pptAutomobile Engineering  ppt
Automobile Engineering ppt
 
diesel shed izzatnagar report part 2
diesel shed izzatnagar report part 2diesel shed izzatnagar report part 2
diesel shed izzatnagar report part 2
 
4 weeks at internship - DLW VARANASI (U.P.) By Parvind Gupta
4 weeks at internship - DLW VARANASI (U.P.) By Parvind Gupta4 weeks at internship - DLW VARANASI (U.P.) By Parvind Gupta
4 weeks at internship - DLW VARANASI (U.P.) By Parvind Gupta
 
electric traction
electric tractionelectric traction
electric traction
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New Delhi
 
Diesel Locomotive Works (DLW)
 Diesel Locomotive Works (DLW) Diesel Locomotive Works (DLW)
Diesel Locomotive Works (DLW)
 

Viewers also liked

Diesel shed engine,lucknow
Diesel shed engine,lucknowDiesel shed engine,lucknow
Diesel shed engine,lucknowyogesh_17
 
Drone (Quadcopter) full project report by Er. ASHWANI DIXIT
Drone (Quadcopter) full project report by    Er. ASHWANI DIXITDrone (Quadcopter) full project report by    Er. ASHWANI DIXIT
Drone (Quadcopter) full project report by Er. ASHWANI DIXIT
Ashwani Dixit
 
Indian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~iIndian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~i
haxxo24
 
Lawn Mower Minor Project report For MITM Ujjain
Lawn Mower Minor Project report For MITM UjjainLawn Mower Minor Project report For MITM Ujjain
Lawn Mower Minor Project report For MITM Ujjain
Ashwani Dixit
 
Presentaion on BHEL- Diesel Locomotive
Presentaion on BHEL- Diesel LocomotivePresentaion on BHEL- Diesel Locomotive
Presentaion on BHEL- Diesel LocomotiveAbhishek Agarwal
 
Railway loco ppt
Railway loco ppt Railway loco ppt
Railway loco ppt
Anand Dwivedi
 
Loco diesel shed, pulera
Loco diesel shed, puleraLoco diesel shed, pulera
Loco diesel shed, pulera
ashjm
 
diesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedidiesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedi
somesh dwivedi
 
Synopsis of a Drone ( Quadcopter )
Synopsis of a Drone ( Quadcopter )Synopsis of a Drone ( Quadcopter )
Synopsis of a Drone ( Quadcopter )
Ashwani Dixit
 
Lawn mower presentation
Lawn mower presentationLawn mower presentation
Lawn mower presentation
Ashwani Dixit
 
Quadcopter Final Report
Quadcopter Final ReportQuadcopter Final Report
Quadcopter Final ReportKevin Osman
 
railway ppt ratlam shed
railway ppt ratlam shedrailway ppt ratlam shed
railway ppt ratlam shed
rahul mali
 
Sanjeev inds
Sanjeev indsSanjeev inds
Sanjeev inds
sanjeev kumar shah
 
project file on diesel loco
project file on diesel loco project file on diesel loco
project file on diesel loco
kamalkant rajpoot
 
presentation industrial trainning at Locomotive workshop lucknow
presentation industrial trainning at Locomotive workshop lucknowpresentation industrial trainning at Locomotive workshop lucknow
presentation industrial trainning at Locomotive workshop lucknow
Tushar Seth
 
Diesel loco modernization
Diesel loco modernizationDiesel loco modernization
Diesel loco modernizationAmitoj Kaur
 
Automatic air suspension system
Automatic air suspension systemAutomatic air suspension system
Automatic air suspension system
praveeshkuttu
 
Project
ProjectProject
Project
Ajeet Kumar
 
Railway training report
Railway training reportRailway training report
Railway training report
Deepak kango
 

Viewers also liked (20)

Diesel shed engine,lucknow
Diesel shed engine,lucknowDiesel shed engine,lucknow
Diesel shed engine,lucknow
 
Drone (Quadcopter) full project report by Er. ASHWANI DIXIT
Drone (Quadcopter) full project report by    Er. ASHWANI DIXITDrone (Quadcopter) full project report by    Er. ASHWANI DIXIT
Drone (Quadcopter) full project report by Er. ASHWANI DIXIT
 
Indian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~iIndian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~i
 
Lawn Mower Minor Project report For MITM Ujjain
Lawn Mower Minor Project report For MITM UjjainLawn Mower Minor Project report For MITM Ujjain
Lawn Mower Minor Project report For MITM Ujjain
 
Presentaion on BHEL- Diesel Locomotive
Presentaion on BHEL- Diesel LocomotivePresentaion on BHEL- Diesel Locomotive
Presentaion on BHEL- Diesel Locomotive
 
Railway loco ppt
Railway loco ppt Railway loco ppt
Railway loco ppt
 
Loco diesel shed, pulera
Loco diesel shed, puleraLoco diesel shed, pulera
Loco diesel shed, pulera
 
diesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedidiesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedi
 
Synopsis of a Drone ( Quadcopter )
Synopsis of a Drone ( Quadcopter )Synopsis of a Drone ( Quadcopter )
Synopsis of a Drone ( Quadcopter )
 
Lawn mower presentation
Lawn mower presentationLawn mower presentation
Lawn mower presentation
 
Quadcopter Final Report
Quadcopter Final ReportQuadcopter Final Report
Quadcopter Final Report
 
railway ppt ratlam shed
railway ppt ratlam shedrailway ppt ratlam shed
railway ppt ratlam shed
 
Sanjeev inds
Sanjeev indsSanjeev inds
Sanjeev inds
 
project file on diesel loco
project file on diesel loco project file on diesel loco
project file on diesel loco
 
presentation industrial trainning at Locomotive workshop lucknow
presentation industrial trainning at Locomotive workshop lucknowpresentation industrial trainning at Locomotive workshop lucknow
presentation industrial trainning at Locomotive workshop lucknow
 
Diesel loco modernization
Diesel loco modernizationDiesel loco modernization
Diesel loco modernization
 
Automatic air suspension system
Automatic air suspension systemAutomatic air suspension system
Automatic air suspension system
 
Project
ProjectProject
Project
 
Railway training report
Railway training reportRailway training report
Railway training report
 
Railway Training ppt
Railway Training pptRailway Training ppt
Railway Training ppt
 

Similar to Presentation on diesel shed, ratlam

dokumen.tips_presentation-on-diesel-shed-ratlam.pdf
dokumen.tips_presentation-on-diesel-shed-ratlam.pdfdokumen.tips_presentation-on-diesel-shed-ratlam.pdf
dokumen.tips_presentation-on-diesel-shed-ratlam.pdf
InderjitSingh873009
 
Evaluation of Electric-Turbo-Compounding Technology applied to Marine Diesel-...
Evaluation of Electric-Turbo-Compounding Technology applied to Marine Diesel-...Evaluation of Electric-Turbo-Compounding Technology applied to Marine Diesel-...
Evaluation of Electric-Turbo-Compounding Technology applied to Marine Diesel-...
Bowman Power
 
The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...
The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...
The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...
Mohawk Innovative Technology
 
Nidec asi capability overview for lng and oil&gas applications
Nidec asi capability overview for lng and oil&gas applicationsNidec asi capability overview for lng and oil&gas applications
Nidec asi capability overview for lng and oil&gas applications
Nidec Corporation
 
DEMU-1600.pdf
DEMU-1600.pdfDEMU-1600.pdf
DEMU-1600.pdf
ArvindMaurya77
 
Googol qta5400 g1 2000kw 2500kva
Googol qta5400 g1 2000kw 2500kva Googol qta5400 g1 2000kw 2500kva
Googol qta5400 g1 2000kw 2500kva
Mark Wang
 
Googol qta5400 g5 2400kw 3000kva
Googol qta5400 g5 2400kw 3000kva Googol qta5400 g5 2400kw 3000kva
Googol qta5400 g5 2400kw 3000kva
Mark Wang
 
Voith Offshore Solutions
Voith Offshore SolutionsVoith Offshore Solutions
Voith Offshore SolutionsAndrea Venora
 
Ge ohv drive systems technology update 06082006 wmea
Ge ohv drive systems technology update 06082006 wmeaGe ohv drive systems technology update 06082006 wmea
Ge ohv drive systems technology update 06082006 wmea
boris ramos
 
Ind training ppt
Ind training pptInd training ppt
Ind training ppt
yamipatel
 
Greaves product familirization
Greaves product familirizationGreaves product familirization
Greaves product familirization
David P
 
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Arjun Gaur
 
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Arjun Gaur
 
new tech related to latest revisions as per gu.ppt
new tech related to latest revisions as per gu.pptnew tech related to latest revisions as per gu.ppt
new tech related to latest revisions as per gu.ppt
NiharRoy8
 
industrialtraining131119065512phpapp02784896.ppt
industrialtraining131119065512phpapp02784896.pptindustrialtraining131119065512phpapp02784896.ppt
industrialtraining131119065512phpapp02784896.ppt
NirmalM15
 
Integrated full electric propulsion IFEP
Integrated full electric propulsion IFEPIntegrated full electric propulsion IFEP
Integrated full electric propulsion IFEP
Amit Jain
 
DLW, VARANASI training report for LNCT college indore
DLW, VARANASI training report for LNCT college indoreDLW, VARANASI training report for LNCT college indore
DLW, VARANASI training report for LNCT college indore
SANJEET KUMAR
 

Similar to Presentation on diesel shed, ratlam (20)

dokumen.tips_presentation-on-diesel-shed-ratlam.pdf
dokumen.tips_presentation-on-diesel-shed-ratlam.pdfdokumen.tips_presentation-on-diesel-shed-ratlam.pdf
dokumen.tips_presentation-on-diesel-shed-ratlam.pdf
 
Evaluation of Electric-Turbo-Compounding Technology applied to Marine Diesel-...
Evaluation of Electric-Turbo-Compounding Technology applied to Marine Diesel-...Evaluation of Electric-Turbo-Compounding Technology applied to Marine Diesel-...
Evaluation of Electric-Turbo-Compounding Technology applied to Marine Diesel-...
 
The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...
The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...
The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...
 
Nidec asi capability overview for lng and oil&gas applications
Nidec asi capability overview for lng and oil&gas applicationsNidec asi capability overview for lng and oil&gas applications
Nidec asi capability overview for lng and oil&gas applications
 
DEMU-1600.pdf
DEMU-1600.pdfDEMU-1600.pdf
DEMU-1600.pdf
 
Googol qta5400 g1 2000kw 2500kva
Googol qta5400 g1 2000kw 2500kva Googol qta5400 g1 2000kw 2500kva
Googol qta5400 g1 2000kw 2500kva
 
1800REOZM_8_12b
1800REOZM_8_12b1800REOZM_8_12b
1800REOZM_8_12b
 
Googol qta5400 g5 2400kw 3000kva
Googol qta5400 g5 2400kw 3000kva Googol qta5400 g5 2400kw 3000kva
Googol qta5400 g5 2400kw 3000kva
 
Voith Offshore Solutions
Voith Offshore SolutionsVoith Offshore Solutions
Voith Offshore Solutions
 
Ge ohv drive systems technology update 06082006 wmea
Ge ohv drive systems technology update 06082006 wmeaGe ohv drive systems technology update 06082006 wmea
Ge ohv drive systems technology update 06082006 wmea
 
CTC PPT
CTC PPTCTC PPT
CTC PPT
 
Ind training ppt
Ind training pptInd training ppt
Ind training ppt
 
Greaves product familirization
Greaves product familirizationGreaves product familirization
Greaves product familirization
 
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
 
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
 
new tech related to latest revisions as per gu.ppt
new tech related to latest revisions as per gu.pptnew tech related to latest revisions as per gu.ppt
new tech related to latest revisions as per gu.ppt
 
industrialtraining131119065512phpapp02784896.ppt
industrialtraining131119065512phpapp02784896.pptindustrialtraining131119065512phpapp02784896.ppt
industrialtraining131119065512phpapp02784896.ppt
 
Integrated full electric propulsion IFEP
Integrated full electric propulsion IFEPIntegrated full electric propulsion IFEP
Integrated full electric propulsion IFEP
 
1000REOZM
1000REOZM1000REOZM
1000REOZM
 
DLW, VARANASI training report for LNCT college indore
DLW, VARANASI training report for LNCT college indoreDLW, VARANASI training report for LNCT college indore
DLW, VARANASI training report for LNCT college indore
 

Recently uploaded

AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 

Recently uploaded (20)

AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 

Presentation on diesel shed, ratlam

  • 1. MAHAKAL INSTITUTE OF TECHNOLOGY & MANAGEMENT, UJJAIN A Seminar Presentation On Vocational Training At DIESEL SHED RATLAM (Western Railway) Submitted by :- Ashwani Dixit M.E.- 1 (VII th Sem.) 0714CS111017 From 21/06/2014 to 05/07/2014 Submitted to :- MECHANICAL DEPARTMENT session 2014-15
  • 2. Contents • Introduction (Diesel Shed & Diesel Locomotives) • Day 1 to 2 (Maintenance) • Day 3 to 5 (Starting System, Generator, Motors & Batteries) • Day 6 to 7 (Fuel-Oil System) • Day 8 to 9 (Air Compressor) • Day 10 to 11 (Braking System ) • Day 12 to 13 (Safety Devices) • Day 14 to 15 (Lubrication) • Manufacturing • Engine Block, Turbo-Supercharger, Water Cooling System • Pictures & Certificate
  • 3. INTRODUCTION (Diesel Shed & Diesel Locomotives) Brief History:- Ratlam Diesel Shed, Located on the main line between Delhi-Mumbai, started with a meager holding of 15 locomotives on 1st May 1967. As on today the shed has holding of 126 locos comprising of WDM2A, WDM3A, Inferior Service (WDM2A)-14, WDS6-04 and WDS4B-07 class locomotives.
  • 4. Brief Details of Diesel Shed Ratlam Year Of Establishment 1st May, 1967 ISO Certification Year ISO : 9001-2008 ISO : 14001-2004 ISO : 18001-2007 Integrated Management System Certification achieved on 04.09.2009 ( OSAS ) (Occupational Health & Safety Assurance Series) Total LOCO Homing Capacity 100 Locos Employees Strength 1120 No. of Officers 08 No. of Supervisors 132 Total Area 119000 m2 (Approx.) Covered Area 6902 m2 (Approx.) Percentage of Staff housed in Railway Quarters 24.75% Power Consumption 2400 Unit per day (Avg.) Water Consumption 1.5 Lacks liters/day Shed Consumption of Fuel 488.6liters/Loco/Month (Avg.)
  • 5. Purpose of Diesel Shed Maintenance Service Fix Time Fix Distance Repair When Problem Occur in Locomotive
  • 6. Starting System of Locomotive (Generator, Motor, Battery) Engine Generator Exciter Generator No. of Batteries- 8 (9 VOLT each) Motor 1 (735V)+ (400 HP) Motor 2 (735V)+ (400 HP) Motor 3 (735V)+ (400 HP) Motor 4 (735V)+ (400 HP) Motor 5 (735V)+ (400 HP) Motor 6 (735V)+ (400 HP) Motor Control Device – Armature current control reactor (ACCR) (A.C. supply)
  • 7. Power Transmission System - Electrical & Mechanical, The 400 HP is transmitted by each motor to each Wheel axle
  • 9. Air Compressor Supply of Air From Compressor From MR Tank No.1 – Sand Gear Viper Motor Air Compressor Horn MR Safety valve From MR Tank No.2 – All Braking Systems MR Pressure Gauge Air Pressure at MR Tanks – 10 kg/cm²
  • 10. Braking System In Diesel Locomotive Types of Braking System • Air Brake – 1) Independent(without load) 2) Automatic (Whole train is connected). 3) Emergency. • Dynamic Brake – Electrical. Brake Pipe Pressure – 5 kg/cm²
  • 11. Lubrication System Lube Oil Pressure - (Max.) 9.5kg/cm² (Min.) 1.6kg/cm² CRANK SHAFT OF V-SHAPED DIESEL ENGINE LUBE OIL SYSTEM IN V-SHAPED DIESEL ENGINE
  • 12. Safety Devices Locomotive Idle Locomotive Shutdown VCD System ( Vigilance Control Device) OSTA System ( Over Speed Trip Assembly) Automatically operated when RPM will increase more than 1000. GR (Ground Relay) LWS (Low Water Switch) DMR (Dead mains relay) OPS (oil pressure switch) Operate when oil pressure reduced to 1.3 kg/cm² PCS (Power cut off switch) Safety auxiliary Relay (SAR) ETS (Engine Temperature Switch) Circuit Breaker [Operate when temp. of water is increased above 93˚c ]
  • 13. Manufacturers • Manufacturers Alco (American Locomotive Company), DLW (Diesel Locomotive Works, Varanasi) • Engine Alco 251-B, 16 cylinder, 2,600 hp (2,430 hp site rating) with Alco 710/720/?? turbo supercharged engine. 1,000 rpm max, 400 rpm idle; 228 mm x 266 mm bore/stroke; compression ratio 12.5:1. Direct fuel injection, centrifugal pump cooling system (2,457 l/min at 1,000 rpm), fan driven by eddy current clutch (86 hp at 1,000 rpm) • Governor GE 17MG8 / Woodward's 8574-650 / Medha MEG 601 • Transmission Electric, with BHEL TG 10931 AZ generator (1,000 rpm, 770 V, 4,520 amperes) • Traction motors GE752 (original Alco models) (405 hp), BHEL 4906 BZ (AZ?) (435 hp) and (newer) 4907 AZ (with roller bearings) • Axle load 18.8 tones, total weight 112.8 t • Bogies Alco design cast frame trimount (Co-Co) bogies The class WDM-2 is Indian Railways' workhorse diesel locomotive. The first units were imported fully built from the American Locomotive Company (Alco) in 1962. Since 1964, it has been manufactured in India by the Diesel Locomotive Works (DLW), Varanasi. The model name stands for broad gauge (W), diesel (D), mixed traffic (M) engine. The WDM-2 is the most common diesel locomotive of Indian Railways. the gear ratio is 65:18.
  • 16. Water Cooling System Water Present in whole loco – 1210 Liters
  • 18.
  • 20. THANK YOU !!! Any Query ?