GOAL STATEMENT:
• TO REUCE THE WASTAGE DOMMER PROCESS WASTAGE BROKEN DOMM INTO 2.2 % TO 1.0%
• PROJECT DURATION: JULY.2015- NOV.2015.
TEAM LEADER:MR.VIVEK RASTOGI
• CROSS FUNCTIONAL TEAM:
• MR.L.VIJAYA RAGAVAN
• MR.SUBHASH KUMAR
• MR.LOKESH
• MR.PRAKASH PAREEK
• MR.UDAY NARAYAN CHAUHAN
FISH BONE DIAGRAM:
MACHINEMEN
METHODE MATERIAL
BROKEN DOMM
Axis centre( wobbling.)
Un skilled operator
concentration
TRAINING
Head stock tailstock drive belt
Quartz un uniform
Loading
Head stock holding
Less heat
Cylinder pressure uniform
Forming wheel stroke
DETAILS OF CORRECTIVE ACTION APPLIED
• HEAD STOCK AND TAILSTOCK AXIS CENTRE UNIFORMLY MATCHED.(PREVIOUSLY WOBBLING
FOUNDED IN HEAD STOCK SIDE)
• HEAD STOCK SIDE BEARING CHANGED
• HEAD STOCK AND TAIL STOCK HOLDING CYLINDER PRESSURE 2BAR UNIFORMLY MAINTAINED
TO AVOID
• HEAD STOCK AND TAIL STOCK BELT CHANGED(PREVIOUSLY HEAD STOCK SIDE BELT FOUNDED
LOOSE)
DATA (PRDOUCTION & DEFECTS) BEFORE
CORRECTIVE ACTION
PRODN QTY BROKEN
DOMM
DEFORMED
DOMM
%BROKEN
DOMM%
DEFORMED
DOMM%
JULY.15
15780 117 69 0.74 0.44
AUG.15
4223 78 40 1.85 0.95
SEP.15
10972 200 100 1.82 0.91
OCT.15
12140 232 52 1.91 0.43
BROKEN DOMM BEFORE
(GRAPH)CORRECCTIVE ACTION
15780
4223
10972
12140
117 78 200 23269 40 100 52
0.74
1.85 1.82
1.91
0.44
0.95 0.91
0.43
0.00
0.50
1.00
1.50
2.00
2.50
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
JULY.15 AUG.15 SEP.15 OCT.15 NOV.15 DEC.15
DOMMER DEFECT TREND BEFORECORRECTIVEACTION
PRODN .QTY BROKEN DOMM DEFORMED DOMM % BROKEN DOMM %DEFORMED DOMM
DATA (PRDOUCTION & DEFECTS) AFTER
CORRECTIVE ACTION
DOMMER DEFECTS FROM JULY.15-DEC.15
PRODN .QTY BROKEN DOMM DEFORMED DOMM % BROKEN DOMM %DEFORMED DOMM
JULY.15 15780 117 69 0.74 0.44
AUG.15 4223 78 40 1.85 0.95
SEP.15 10972 200 100 1.82 0.91
OCT.15 12140 232 52 1.91 0.43
NOV.15 7541 44 22 0.58 0.29
DEC.15
BROKEN DOMM AFTER CORRECTIVE
ACTION(GRAPH)
15780
4223
10972
12140
7541
117 78 200 232 4469 40 100 52 22
0.74
1.85 1.82
1.91
0.58
0.44
0.95 0.91
0.43
0.29
0.00
0.50
1.00
1.50
2.00
2.50
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
JULY.15 AUG.15 SEP.15 OCT.15 NOV.15 DEC.15
DOMMER DEFECT TREND AFTERCORRECTIVE ACTION
PRODN .QTY BROKEN DOMM DEFORMED DOMM % BROKEN DOMM %DEFORMED DOMM
THANKS FOR THE SUPPORT OF
MAINTENANCE TEAM &PRODN TEAM
NEXT TARGET TO REDUCE THE WASTAGE IS 0.5%

More Related Content

What's hot

APM Best Practices - Reliability Added Value
APM Best Practices - Reliability Added ValueAPM Best Practices - Reliability Added Value
APM Best Practices - Reliability Added Value
Stork
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and conceptsRohit Singh
 
Tpm ppt
Tpm pptTpm ppt
01-VSM-VSD-Training-Presentation-20140406-pptx.pptx
01-VSM-VSD-Training-Presentation-20140406-pptx.pptx01-VSM-VSD-Training-Presentation-20140406-pptx.pptx
01-VSM-VSD-Training-Presentation-20140406-pptx.pptx
abdullahmohamed10900
 
Office Kaizen
Office KaizenOffice Kaizen
Office Kaizen
Willington Nameplate
 
Maintenance Excellence
Maintenance ExcellenceMaintenance Excellence
Maintenance Excellence
Bernard Redmond
 
Value stream mapping- lean manufacturing tool
Value stream mapping- lean manufacturing toolValue stream mapping- lean manufacturing tool
Value stream mapping- lean manufacturing tool
bhanutomar
 
5s Warehouse Floor Marking and 5s Floor Signs Tape Catalog
 5s Warehouse Floor Marking and 5s Floor Signs Tape Catalog 5s Warehouse Floor Marking and 5s Floor Signs Tape Catalog
5s Warehouse Floor Marking and 5s Floor Signs Tape Catalog
5s Warehouse
 
Raw material Handling
Raw material HandlingRaw material Handling
Raw material Handling
Inderjeet Singh Sidhu
 
Case-study about build MES Integration System
Case-study about build MES Integration SystemCase-study about build MES Integration System
Case-study about build MES Integration System
Przemyslaw Wojtunik
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing Tools
Jagriti Prasad
 
Tpm basic
Tpm basicTpm basic
Tpm basic
Paul Robere
 
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Shanti Pless
 
Waste bin signs
Waste bin signsWaste bin signs
OPL - One Point Lesson
OPL - One Point LessonOPL - One Point Lesson
OPL - One Point Lesson
5S BALAMURUGAN
 
Production and Operations Management
Production and Operations ManagementProduction and Operations Management
Production and Operations Management
Mayank Jain
 
MATERIAL STORAGE HANDLING PRESERVATION.pptx
MATERIAL STORAGE  HANDLING  PRESERVATION.pptxMATERIAL STORAGE  HANDLING  PRESERVATION.pptx
MATERIAL STORAGE HANDLING PRESERVATION.pptx
ssuser0f0529
 
Equipment reliability l2
Equipment reliability l2Equipment reliability l2
Equipment reliability l2
Matthew Clemens
 
Digitization in supply chain management
Digitization in supply chain managementDigitization in supply chain management
Digitization in supply chain management
Hae-Goo Song
 

What's hot (20)

APM Best Practices - Reliability Added Value
APM Best Practices - Reliability Added ValueAPM Best Practices - Reliability Added Value
APM Best Practices - Reliability Added Value
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Tpm ppt
Tpm pptTpm ppt
Tpm ppt
 
01-VSM-VSD-Training-Presentation-20140406-pptx.pptx
01-VSM-VSD-Training-Presentation-20140406-pptx.pptx01-VSM-VSD-Training-Presentation-20140406-pptx.pptx
01-VSM-VSD-Training-Presentation-20140406-pptx.pptx
 
Office Kaizen
Office KaizenOffice Kaizen
Office Kaizen
 
Maintenance Excellence
Maintenance ExcellenceMaintenance Excellence
Maintenance Excellence
 
Value stream mapping- lean manufacturing tool
Value stream mapping- lean manufacturing toolValue stream mapping- lean manufacturing tool
Value stream mapping- lean manufacturing tool
 
5s Warehouse Floor Marking and 5s Floor Signs Tape Catalog
 5s Warehouse Floor Marking and 5s Floor Signs Tape Catalog 5s Warehouse Floor Marking and 5s Floor Signs Tape Catalog
5s Warehouse Floor Marking and 5s Floor Signs Tape Catalog
 
Raw material Handling
Raw material HandlingRaw material Handling
Raw material Handling
 
Case-study about build MES Integration System
Case-study about build MES Integration SystemCase-study about build MES Integration System
Case-study about build MES Integration System
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing Tools
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
 
Waste bin signs
Waste bin signsWaste bin signs
Waste bin signs
 
OPL - One Point Lesson
OPL - One Point LessonOPL - One Point Lesson
OPL - One Point Lesson
 
Production and Operations Management
Production and Operations ManagementProduction and Operations Management
Production and Operations Management
 
MATERIAL STORAGE HANDLING PRESERVATION.pptx
MATERIAL STORAGE  HANDLING  PRESERVATION.pptxMATERIAL STORAGE  HANDLING  PRESERVATION.pptx
MATERIAL STORAGE HANDLING PRESERVATION.pptx
 
5 s program
5 s program5 s program
5 s program
 
Equipment reliability l2
Equipment reliability l2Equipment reliability l2
Equipment reliability l2
 
Digitization in supply chain management
Digitization in supply chain managementDigitization in supply chain management
Digitization in supply chain management
 

Recently uploaded

ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Self-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptxSelf-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptx
iemerc2024
 
AIR POLLUTION lecture EnE203 updated.pdf
AIR POLLUTION lecture EnE203 updated.pdfAIR POLLUTION lecture EnE203 updated.pdf
AIR POLLUTION lecture EnE203 updated.pdf
RicletoEspinosa1
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
Kamal Acharya
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
Divyam548318
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
awadeshbabu
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 

Recently uploaded (20)

ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Self-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptxSelf-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptx
 
AIR POLLUTION lecture EnE203 updated.pdf
AIR POLLUTION lecture EnE203 updated.pdfAIR POLLUTION lecture EnE203 updated.pdf
AIR POLLUTION lecture EnE203 updated.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 

Presentation of dommer scrap reduction

  • 1.
  • 2.
  • 3.
  • 4. GOAL STATEMENT: • TO REUCE THE WASTAGE DOMMER PROCESS WASTAGE BROKEN DOMM INTO 2.2 % TO 1.0% • PROJECT DURATION: JULY.2015- NOV.2015.
  • 5. TEAM LEADER:MR.VIVEK RASTOGI • CROSS FUNCTIONAL TEAM: • MR.L.VIJAYA RAGAVAN • MR.SUBHASH KUMAR • MR.LOKESH • MR.PRAKASH PAREEK • MR.UDAY NARAYAN CHAUHAN
  • 6.
  • 7. FISH BONE DIAGRAM: MACHINEMEN METHODE MATERIAL BROKEN DOMM Axis centre( wobbling.) Un skilled operator concentration TRAINING Head stock tailstock drive belt Quartz un uniform Loading Head stock holding Less heat Cylinder pressure uniform Forming wheel stroke
  • 8. DETAILS OF CORRECTIVE ACTION APPLIED • HEAD STOCK AND TAILSTOCK AXIS CENTRE UNIFORMLY MATCHED.(PREVIOUSLY WOBBLING FOUNDED IN HEAD STOCK SIDE) • HEAD STOCK SIDE BEARING CHANGED • HEAD STOCK AND TAIL STOCK HOLDING CYLINDER PRESSURE 2BAR UNIFORMLY MAINTAINED TO AVOID • HEAD STOCK AND TAIL STOCK BELT CHANGED(PREVIOUSLY HEAD STOCK SIDE BELT FOUNDED LOOSE)
  • 9. DATA (PRDOUCTION & DEFECTS) BEFORE CORRECTIVE ACTION PRODN QTY BROKEN DOMM DEFORMED DOMM %BROKEN DOMM% DEFORMED DOMM% JULY.15 15780 117 69 0.74 0.44 AUG.15 4223 78 40 1.85 0.95 SEP.15 10972 200 100 1.82 0.91 OCT.15 12140 232 52 1.91 0.43
  • 10. BROKEN DOMM BEFORE (GRAPH)CORRECCTIVE ACTION 15780 4223 10972 12140 117 78 200 23269 40 100 52 0.74 1.85 1.82 1.91 0.44 0.95 0.91 0.43 0.00 0.50 1.00 1.50 2.00 2.50 0 2000 4000 6000 8000 10000 12000 14000 16000 18000 JULY.15 AUG.15 SEP.15 OCT.15 NOV.15 DEC.15 DOMMER DEFECT TREND BEFORECORRECTIVEACTION PRODN .QTY BROKEN DOMM DEFORMED DOMM % BROKEN DOMM %DEFORMED DOMM
  • 11. DATA (PRDOUCTION & DEFECTS) AFTER CORRECTIVE ACTION DOMMER DEFECTS FROM JULY.15-DEC.15 PRODN .QTY BROKEN DOMM DEFORMED DOMM % BROKEN DOMM %DEFORMED DOMM JULY.15 15780 117 69 0.74 0.44 AUG.15 4223 78 40 1.85 0.95 SEP.15 10972 200 100 1.82 0.91 OCT.15 12140 232 52 1.91 0.43 NOV.15 7541 44 22 0.58 0.29 DEC.15
  • 12. BROKEN DOMM AFTER CORRECTIVE ACTION(GRAPH) 15780 4223 10972 12140 7541 117 78 200 232 4469 40 100 52 22 0.74 1.85 1.82 1.91 0.58 0.44 0.95 0.91 0.43 0.29 0.00 0.50 1.00 1.50 2.00 2.50 0 2000 4000 6000 8000 10000 12000 14000 16000 18000 JULY.15 AUG.15 SEP.15 OCT.15 NOV.15 DEC.15 DOMMER DEFECT TREND AFTERCORRECTIVE ACTION PRODN .QTY BROKEN DOMM DEFORMED DOMM % BROKEN DOMM %DEFORMED DOMM
  • 13. THANKS FOR THE SUPPORT OF MAINTENANCE TEAM &PRODN TEAM NEXT TARGET TO REDUCE THE WASTAGE IS 0.5%