Hasil Analisa data
Praktikum teknologi bahan dan konstruksi
Lubang
Ayakan
Persen Berat Butir yang Lewat Saringan Jenis Agregat Halus
Pasir Kasar Pasir Sedang Pasir Agak Halus Pasir Halus
(mm) BB BA BB BA BB BA BB BA
9,600 100 100 100 100 100 100 100 100
4,800 90 100 90 100 90 100 95 100
2,400 60 95 75 100 85 100 95 100
1,200 30 70 55 90 75 100 90 100
0,600 15 34 35 59 60 79 80 100
0,300 5 20 8 30 12 40 15 50
0,150 0 10 0 10 0 10 0 15
Sisa 0 0 0 0 0 0 0 0
Lubang
Ayakan (mm)
Berat Kumulatif Lewat
Ayakan (%)
Persen Berat Butir yang Lewat Saringan Jenis Agregat Halus
Pasir Kasar Pasir Sedang Pasir Agak Halus Pasir Halus
BB BA BB BA BB BA BB BA
Sisa 0 0 0 0 0 0 0 0 0
0,150 0,832 0 10 0 10 0 10 0 15
0,300 12,383 5 20 8 30 12 40 15 50
0,600 58,458 15 34 35 59 60 79 80 100
1,200 87,466 30 70 55 90 75 100 90 100
2,400 98,235 60 95 75 100 85 100 95 100
4,800 99,945 90 100 90 100 90 100 95 100
9,600 100,000 100 100 100 100 100 100 100 100
Hasil analisa gradasi agregat halus
No Berat Wadah
Berat Wadah +
Benda Uji
Berat Tertahan Kumulaitf (%)
(gram) (%)
Tertaha
n
Lolos
9,600 495,500 495,500 0,000 0,000 0,000 100,000
4,800 443,300 444,400 1,100 0,055 0,055 99,945
2,400 460,900 495,000 34,100 1,710 1,765 98,235
1,200 456,300 671,100 214,800 10,769 12,534 87,466
0,600 426,100 1004,700 578,600 29,008 41,542 58,458
0,300 423,900 1342,900 919,000 46,074 87,617 12,383
0,150 406,000 636,400 230,400 11,551 99,168 0,832
Pan 329,200 345,800 16,600 0,832
Jumlah 1994,600 100,000 242,680
Fine Modulus/Modulus Halus Butir(MHB) 2,427
0
10
20
30
40
50
60
70
80
90
100
Sisa 0,150 0,300 0,600 1,200 2,400 4,800 9,600
Berat
Kumulatif
Lewat
Ayakan
(%)
Lubang Ayakan (mm)
Pasir Kasar
BB BA Berat Kumulatif Lewat Ayakan (%)
0
10
20
30
40
50
60
70
80
90
100
Sisa 0,150 0,300 0,600 1,200 2,400 4,800 9,600
Berat
Kumulatif
Lewat
Ayakan
(%)
Lubang Ayakan (mm)
Pasir Sedang
BB BA Berat Kumulatif Lewat Ayakan (%)
0 0.832
12.383
58.458
87.466
98.235 99.945
100.000
0
10
20
30
40
50
60
70
80
90
100
Sisa 0,150 0,300 0,600 1,200 2,400 4,800 9,600
Berat
Kumulatif
Lewat
Ayakan
(%)
Lubang Ayakan (mm)
Pasir Agak Halus
BB BA Berat Kumulatif Lewat Ayakan (%)
0
10
20
30
40
50
60
70
80
90
100
Sisa 0,150 0,300 0,600 1,200 2,400 4,800 9,600
Berat
Kumulatif
Lewat
Ayakan
(%)
Berat Kumulatif Lewat Ayakan (%)
Pasir Halus
BB BA Berat Kumulatif Lewat Ayakan (%)
Lubang
ayakan
Persen Berat Butir yang Lewat Saringan Jenis Agregat kasar
Uk Maks 10mm Uk Maks 20mm Uk Maks 40mm
( mm ) BB BA BB BA BB BA
76,000 100,000 100,000 100,000 100,000 100,000 100,000
38,000 100,000 100,000 100,000 100,000 96,000 100,000
19,000 100,000 100,000 96,000 100,000 36,000 70,000
9,600 50,000 85,000 30,000 60,000 10,000 40,000
4,800 0,000 10,000 0,000 10,000 0,000 5,000
sisa 0,000 0,000 0,000 0,000 0,000 0,000
Lubang ayakan
(mm)
Berat
kumulatif
lewat
ayakan
(%)
Uk Maks 40mm Uk Maks 20mm Uk Maks 10mm
batas
bawah
batas atas
batas
bawah
batas atas
batas
bawah
batas atas
sisa 0 0 0 0 0 0 0
4,800 0,184 0 5 0 10 0 10
9,600 4,261 10 40 30 60 50 85
19,000 54,438 36 70 96 100 100 100
38,000 100,000 95 100 100 100 100 100
76,000 100,000 100 100 100 100 100 100
Hasil analisa gradasi agregat kasar
YG DIPAKAI
Lubang
ayakan
(mm)
Berat Tertinggal Berat Kumulatif
( gr ) (%) Tertahan(%) Lewat (%)
76,000 0,000 0,000 0,000 100,000
38,000 0,000 0,000 0,000 100,000
19,000 1136,600 45,562 45,562 54,438
9,600 1251,700 50,176 95,739 4,261
4,800 101,700 4,077 99,816 0,184
2,400 3,400 0,136 99,952 0,048
1,200 0,500 0,020 99,972 0,028
0,600 0,100 0,004 99,976 0,024
0,300 0,000 0,000 99,976 0,024
0,150 0,200 0,008 99,984 0,016
sisa 0,400 0,016
Jumlah 2494,600 100,000 740,977
0 0.184
4.261
54.438
100.000 100.000
0
20
40
60
80
100
sisa 4,800 9,600 19,000 38,000 76,000
Berat
kumulatif
lewat
ayakan
(%)
Lubang ayakan (mm)
Grafik Gradasi Kerikil Ukuran Maks 10 mm
Berat
kumulatif
lewat
ayakan (%)
Berat
kumulatif
lewat
ayakan (%)
batas
bawah 0
20
40
60
80
100
sisa 4,800 9,600 19,000 38,000 76,000
Berat
kumulatif
lewat
ayakan
(%)
Lubang ayakan (mm)
Grafik Gradasi Kerikil Ukuran Maks 20
mm
Berat
kumulati
f lewat
ayakan
(%)
batas
bawah
batas
atas
0
20
40
60
80
100
sisa 4,800 9,600 19,000 38,000 76,000
Berat
kumulatif
lewat
ayakan
(%)
Lubang ayakan (mm)
Grafik Gradasi Kerikil Ukuran Maks 40
mm
Berat
kumula
tif
lewat
ayakan
(%)
batas
bawah
HASIL MIX DESIGN KELOMPOK 10
PERHITUNGAN CAMPURAN BETON NORMAL DENGAN
METODE SNI 7656-2012
BETON TANPA TAMBAHAN UDARA
No. Data-data Nilai Satuan
1 Kuat tekan beton pada umur 28 hari
fc' = 20
Mpa
m (margin) = 7
fcr' = 27
2 Semen yang digunakan PCC
3 Berat jenis semen 2,949 kg/m3
4 Berat volume agregat kasar 1620 kg/m3
5 Modulus kehalusan agregat halus 2,427
6 Modulus kehalusan agregat kasar 7,410
7 Berat jenis SSD agregat halus 2,619
8 Berat jenis SSD agregat kasar 2,647
9 Absorpsi agregat halus 0,664 %
10 Absorpsi agregat kasar 0,154 %
11 Kadar air agregat halus 5,246 %
12 Kadar air agregat kasar 1,046 %
No. Tahapan Nilai Satuan
13 Slump diminta 75-100 mm
14 Agregat kasar yang digunakan dengan ukuran maksimum 20,000 mm
15 Perkiraan kebutuhan air pencampur (Tabel 2) 203,000 kg/m3
16 Rasio air-semen (Tabel 3) 0,582
17 Kadar semen (15/16) 348,797 kg/m3
18 Volume agregat kasar kering oven (Tabel 5) 0,666
19 Jumlah agregat kasar (18 x 4) 1078,920 kg/m3
20 Berat jenis beton basah (Tabel 6) 2350,833 kg/m3
21 Jumlah agregat halus (20-19-17-15) 720,116 kg/m3
No. Material Per m3 Satuan
22 Semen (17) 348,797 kg/m3
23 Air (15) 203,000 kg/m3
24 Agregat Halus (21) 720,116 kg/m3
25 Agregat Kasar (19) 1078,920 kg/m3
26 Jumlah (20) 2350,833 kg/m3
Volume Material
27 Semen (22)/((3) x 1000) 0,118 11%
28 Air ((23)/1000) 0,203 20,50%
29 Agregat Kasar (25)/((8) x 1000) 0,408 36,50%
30 Tingkat kadar udara (pemaparan ringan) 0,019 2%
31 Jumlah volume padat bahan selain agregat halus (28)+(29)+(30)+(27) 0,748 70%
32 Volume agregat halus dibutuhkan 1-(31) 0,252 30%
33 Jadi berat agregat halus yang dibutuhkan (32) x (7) x (1000) 659,864 kg/m3
34 JUMLAH Agregat Halus (33) 659,864 kg/m3
No. Material Berdasarkan perkiraan masa beton, kg
Berdasarkan perkiraan volume absolut bahan-
bahan, kg
35 Semen (22) 348,797 348,797
36 Air (23) 203,000 203,000
37 Agregat kasar (25) 1078,920 1078,920
38 Agregat halus (24), (33) 720,116 659,864
39 Jumlah 2350,833 2290,581
Koreksi terhadap kadar air
40 Kadar air agregat kasar 1,046 %
41 Kadar air agregat halus 5,246 %
42 Agregat kasar (Basah) ((37) x (1+((40)/100))) 1090,206 kg/m3
43 Agregat halus (Basah) ((38) x (1+((41)/100))) 757,893 kg/m3
44 Absorpsi agregat kasar 0,154
45 Absorpsi agregat halus 0,664
46 Perkiraan kebutuhan air yang ditambahkan 160,380
No. Material Berat Per m3 Satuan
47 Semen (22) 348,797 kg/m3
48 Air (46) 160,380 kg/m3
49 Agregat kasar (42) 1090,206 kg/m3
50 Agregat halus (43) 757,893 kg/m3
Jumlah 2357,276 kg/m3
No. Tahapan Berat Per m3 Satuan
51 Volume silinder 0,0053 m3
52 Jumlah sampel 13 Buah
53 Volume silinder kecil 0,0016 m3
54 Jumlah sampel 5 Buah
55 Volume kubus 0,0034 m3
56 Jumlah sampel 10 Buah
57 Semen ((47) x (51) x (52)) + ((47) x (53) x (54)) + (((47) x (55) x (56)) 38,682 Kg
58 Air ((48) x (51) x (52)) + ((48) x (53) x (54)) + (((48) x (55) x (56)) 17,786 Kg
59 Agregat Kasar ((49) x (51) x (52)) + ((49) x (53) x (54)) + (((49) x (55) x (56)) 120,904 Kg
60 Agregat Halus ((50) x (51) x (52)) + ((50) x (53) x (54)) + (((50) x (55) x (56)) 84,050 Kg
Faktor Keamanan
46,418
21,343
145,085
100,860
SEKIAN HASIL DATA DARI KELOMPOK
10

More Related Content

Similar to Presentasi Kelompok 10 askjhkjhdjshdkjhakjahskjhaskhdkasjhdhskdhaksjdshdahdjashdkjahdksjhdakjshk.pptx

Portofolio jacket platform dynamic analysis
Portofolio jacket platform dynamic analysisPortofolio jacket platform dynamic analysis
Portofolio jacket platform dynamic analysisKristoforusAnggara
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal ashleyyeap
 
System Integration
System IntegrationSystem Integration
System Integrationanjal3753
 
Peclet Number HDS Sizing Method for Stormwater Treatment
Peclet Number HDS Sizing Method for Stormwater TreatmentPeclet Number HDS Sizing Method for Stormwater Treatment
Peclet Number HDS Sizing Method for Stormwater TreatmentAquaShield, Inc.
 
El Paso Energy, Water, Recycling Program Results
El Paso Energy, Water, Recycling Program ResultsEl Paso Energy, Water, Recycling Program Results
El Paso Energy, Water, Recycling Program ResultsGregSchindler
 
Y5 Subtraction Complimentary Method (Counting Up)
Y5 Subtraction Complimentary Method (Counting Up)Y5 Subtraction Complimentary Method (Counting Up)
Y5 Subtraction Complimentary Method (Counting Up)teresa105
 
Concrete Mix design
Concrete Mix designConcrete Mix design
Concrete Mix designKAWSHIK29
 
Brtc test rate 2015 2016-22.11.15
Brtc test rate 2015 2016-22.11.15Brtc test rate 2015 2016-22.11.15
Brtc test rate 2015 2016-22.11.15AbidurRahman48
 
Economic Feasibility Study for Highway 640
Economic Feasibility Study for Highway 640Economic Feasibility Study for Highway 640
Economic Feasibility Study for Highway 640Sadegh Tabatabaei
 
Increasing rainfall-use efficiency for dryland crops on duplex soils. Peter Sale
Increasing rainfall-use efficiency for dryland crops on duplex soils. Peter SaleIncreasing rainfall-use efficiency for dryland crops on duplex soils. Peter Sale
Increasing rainfall-use efficiency for dryland crops on duplex soils. Peter SaleJoanna Hicks
 
Benefits of Using Angle Heads for VMC|Kuvam Technologies
  Benefits of Using Angle Heads for VMC|Kuvam Technologies  Benefits of Using Angle Heads for VMC|Kuvam Technologies
Benefits of Using Angle Heads for VMC|Kuvam TechnologiesKuvam Technologies Pvt. Ltd.
 
MethaneDigester Design
MethaneDigester DesignMethaneDigester Design
MethaneDigester Designhkhandker
 

Similar to Presentasi Kelompok 10 askjhkjhdjshdkjhakjahskjhaskhdkasjhdhskdhaksjdshdahdjashdkjahdksjhdakjshk.pptx (20)

Japan 3 setting threshold and trends of reported data08.12.08
Japan 3   setting threshold and trends of reported data08.12.08Japan 3   setting threshold and trends of reported data08.12.08
Japan 3 setting threshold and trends of reported data08.12.08
 
150509326 tabel-baja-profil-wf-pdf
150509326 tabel-baja-profil-wf-pdf150509326 tabel-baja-profil-wf-pdf
150509326 tabel-baja-profil-wf-pdf
 
Portofolio jacket platform dynamic analysis
Portofolio jacket platform dynamic analysisPortofolio jacket platform dynamic analysis
Portofolio jacket platform dynamic analysis
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
 
System Integration
System IntegrationSystem Integration
System Integration
 
Packing Characteristics_old
Packing Characteristics_oldPacking Characteristics_old
Packing Characteristics_old
 
Peclet Number HDS Sizing Method for Stormwater Treatment
Peclet Number HDS Sizing Method for Stormwater TreatmentPeclet Number HDS Sizing Method for Stormwater Treatment
Peclet Number HDS Sizing Method for Stormwater Treatment
 
El Paso Energy, Water, Recycling Program Results
El Paso Energy, Water, Recycling Program ResultsEl Paso Energy, Water, Recycling Program Results
El Paso Energy, Water, Recycling Program Results
 
Y5 Subtraction Complimentary Method (Counting Up)
Y5 Subtraction Complimentary Method (Counting Up)Y5 Subtraction Complimentary Method (Counting Up)
Y5 Subtraction Complimentary Method (Counting Up)
 
Concrete Mix design
Concrete Mix designConcrete Mix design
Concrete Mix design
 
Torque pernos
Torque pernosTorque pernos
Torque pernos
 
Brtc test rate 2015 2016-22.11.15
Brtc test rate 2015 2016-22.11.15Brtc test rate 2015 2016-22.11.15
Brtc test rate 2015 2016-22.11.15
 
Strauto 2015
Strauto 2015Strauto 2015
Strauto 2015
 
Economic Feasibility Study for Highway 640
Economic Feasibility Study for Highway 640Economic Feasibility Study for Highway 640
Economic Feasibility Study for Highway 640
 
Revit Samples
Revit SamplesRevit Samples
Revit Samples
 
Revit Samples
Revit SamplesRevit Samples
Revit Samples
 
Increasing rainfall-use efficiency for dryland crops on duplex soils. Peter Sale
Increasing rainfall-use efficiency for dryland crops on duplex soils. Peter SaleIncreasing rainfall-use efficiency for dryland crops on duplex soils. Peter Sale
Increasing rainfall-use efficiency for dryland crops on duplex soils. Peter Sale
 
Benefits of Using Angle Heads for VMC|Kuvam Technologies
  Benefits of Using Angle Heads for VMC|Kuvam Technologies  Benefits of Using Angle Heads for VMC|Kuvam Technologies
Benefits of Using Angle Heads for VMC|Kuvam Technologies
 
MethaneDigester Design
MethaneDigester DesignMethaneDigester Design
MethaneDigester Design
 
Sewer sediment halcrow apr08
Sewer sediment halcrow apr08Sewer sediment halcrow apr08
Sewer sediment halcrow apr08
 

Recently uploaded

Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdfKamal Acharya
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectRased Khan
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdfAhmedHussein950959
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxwendy cai
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...Amil baba
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdfKamal Acharya
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGKOUSTAV SARKAR
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdfKamal Acharya
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientistgettygaming1
 
retail automation billing system ppt.pptx
retail automation billing system ppt.pptxretail automation billing system ppt.pptx
retail automation billing system ppt.pptxfaamieahmd
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfKamal Acharya
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringDr. Radhey Shyam
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdfKamal Acharya
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxMd. Shahidul Islam Prodhan
 
Electrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineElectrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineJulioCesarSalazarHer1
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdfKamal Acharya
 
shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxVishalDeshpande27
 

Recently uploaded (20)

Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker project
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdf
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
retail automation billing system ppt.pptx
retail automation billing system ppt.pptxretail automation billing system ppt.pptx
retail automation billing system ppt.pptx
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
Electrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineElectrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission line
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptx
 

Presentasi Kelompok 10 askjhkjhdjshdkjhakjahskjhaskhdkasjhdhskdhaksjdshdahdjashdkjahdksjhdakjshk.pptx

  • 1. KELOMPOK 10 Hasil Analisa data Praktikum teknologi bahan dan konstruksi
  • 2. Lubang Ayakan Persen Berat Butir yang Lewat Saringan Jenis Agregat Halus Pasir Kasar Pasir Sedang Pasir Agak Halus Pasir Halus (mm) BB BA BB BA BB BA BB BA 9,600 100 100 100 100 100 100 100 100 4,800 90 100 90 100 90 100 95 100 2,400 60 95 75 100 85 100 95 100 1,200 30 70 55 90 75 100 90 100 0,600 15 34 35 59 60 79 80 100 0,300 5 20 8 30 12 40 15 50 0,150 0 10 0 10 0 10 0 15 Sisa 0 0 0 0 0 0 0 0 Lubang Ayakan (mm) Berat Kumulatif Lewat Ayakan (%) Persen Berat Butir yang Lewat Saringan Jenis Agregat Halus Pasir Kasar Pasir Sedang Pasir Agak Halus Pasir Halus BB BA BB BA BB BA BB BA Sisa 0 0 0 0 0 0 0 0 0 0,150 0,832 0 10 0 10 0 10 0 15 0,300 12,383 5 20 8 30 12 40 15 50 0,600 58,458 15 34 35 59 60 79 80 100 1,200 87,466 30 70 55 90 75 100 90 100 2,400 98,235 60 95 75 100 85 100 95 100 4,800 99,945 90 100 90 100 90 100 95 100 9,600 100,000 100 100 100 100 100 100 100 100 Hasil analisa gradasi agregat halus
  • 3. No Berat Wadah Berat Wadah + Benda Uji Berat Tertahan Kumulaitf (%) (gram) (%) Tertaha n Lolos 9,600 495,500 495,500 0,000 0,000 0,000 100,000 4,800 443,300 444,400 1,100 0,055 0,055 99,945 2,400 460,900 495,000 34,100 1,710 1,765 98,235 1,200 456,300 671,100 214,800 10,769 12,534 87,466 0,600 426,100 1004,700 578,600 29,008 41,542 58,458 0,300 423,900 1342,900 919,000 46,074 87,617 12,383 0,150 406,000 636,400 230,400 11,551 99,168 0,832 Pan 329,200 345,800 16,600 0,832 Jumlah 1994,600 100,000 242,680 Fine Modulus/Modulus Halus Butir(MHB) 2,427 0 10 20 30 40 50 60 70 80 90 100 Sisa 0,150 0,300 0,600 1,200 2,400 4,800 9,600 Berat Kumulatif Lewat Ayakan (%) Lubang Ayakan (mm) Pasir Kasar BB BA Berat Kumulatif Lewat Ayakan (%) 0 10 20 30 40 50 60 70 80 90 100 Sisa 0,150 0,300 0,600 1,200 2,400 4,800 9,600 Berat Kumulatif Lewat Ayakan (%) Lubang Ayakan (mm) Pasir Sedang BB BA Berat Kumulatif Lewat Ayakan (%) 0 0.832 12.383 58.458 87.466 98.235 99.945 100.000 0 10 20 30 40 50 60 70 80 90 100 Sisa 0,150 0,300 0,600 1,200 2,400 4,800 9,600 Berat Kumulatif Lewat Ayakan (%) Lubang Ayakan (mm) Pasir Agak Halus BB BA Berat Kumulatif Lewat Ayakan (%) 0 10 20 30 40 50 60 70 80 90 100 Sisa 0,150 0,300 0,600 1,200 2,400 4,800 9,600 Berat Kumulatif Lewat Ayakan (%) Berat Kumulatif Lewat Ayakan (%) Pasir Halus BB BA Berat Kumulatif Lewat Ayakan (%)
  • 4. Lubang ayakan Persen Berat Butir yang Lewat Saringan Jenis Agregat kasar Uk Maks 10mm Uk Maks 20mm Uk Maks 40mm ( mm ) BB BA BB BA BB BA 76,000 100,000 100,000 100,000 100,000 100,000 100,000 38,000 100,000 100,000 100,000 100,000 96,000 100,000 19,000 100,000 100,000 96,000 100,000 36,000 70,000 9,600 50,000 85,000 30,000 60,000 10,000 40,000 4,800 0,000 10,000 0,000 10,000 0,000 5,000 sisa 0,000 0,000 0,000 0,000 0,000 0,000 Lubang ayakan (mm) Berat kumulatif lewat ayakan (%) Uk Maks 40mm Uk Maks 20mm Uk Maks 10mm batas bawah batas atas batas bawah batas atas batas bawah batas atas sisa 0 0 0 0 0 0 0 4,800 0,184 0 5 0 10 0 10 9,600 4,261 10 40 30 60 50 85 19,000 54,438 36 70 96 100 100 100 38,000 100,000 95 100 100 100 100 100 76,000 100,000 100 100 100 100 100 100 Hasil analisa gradasi agregat kasar
  • 5. YG DIPAKAI Lubang ayakan (mm) Berat Tertinggal Berat Kumulatif ( gr ) (%) Tertahan(%) Lewat (%) 76,000 0,000 0,000 0,000 100,000 38,000 0,000 0,000 0,000 100,000 19,000 1136,600 45,562 45,562 54,438 9,600 1251,700 50,176 95,739 4,261 4,800 101,700 4,077 99,816 0,184 2,400 3,400 0,136 99,952 0,048 1,200 0,500 0,020 99,972 0,028 0,600 0,100 0,004 99,976 0,024 0,300 0,000 0,000 99,976 0,024 0,150 0,200 0,008 99,984 0,016 sisa 0,400 0,016 Jumlah 2494,600 100,000 740,977 0 0.184 4.261 54.438 100.000 100.000 0 20 40 60 80 100 sisa 4,800 9,600 19,000 38,000 76,000 Berat kumulatif lewat ayakan (%) Lubang ayakan (mm) Grafik Gradasi Kerikil Ukuran Maks 10 mm Berat kumulatif lewat ayakan (%) Berat kumulatif lewat ayakan (%) batas bawah 0 20 40 60 80 100 sisa 4,800 9,600 19,000 38,000 76,000 Berat kumulatif lewat ayakan (%) Lubang ayakan (mm) Grafik Gradasi Kerikil Ukuran Maks 20 mm Berat kumulati f lewat ayakan (%) batas bawah batas atas 0 20 40 60 80 100 sisa 4,800 9,600 19,000 38,000 76,000 Berat kumulatif lewat ayakan (%) Lubang ayakan (mm) Grafik Gradasi Kerikil Ukuran Maks 40 mm Berat kumula tif lewat ayakan (%) batas bawah
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11. HASIL MIX DESIGN KELOMPOK 10 PERHITUNGAN CAMPURAN BETON NORMAL DENGAN METODE SNI 7656-2012 BETON TANPA TAMBAHAN UDARA No. Data-data Nilai Satuan 1 Kuat tekan beton pada umur 28 hari fc' = 20 Mpa m (margin) = 7 fcr' = 27 2 Semen yang digunakan PCC 3 Berat jenis semen 2,949 kg/m3 4 Berat volume agregat kasar 1620 kg/m3 5 Modulus kehalusan agregat halus 2,427 6 Modulus kehalusan agregat kasar 7,410 7 Berat jenis SSD agregat halus 2,619 8 Berat jenis SSD agregat kasar 2,647 9 Absorpsi agregat halus 0,664 % 10 Absorpsi agregat kasar 0,154 % 11 Kadar air agregat halus 5,246 % 12 Kadar air agregat kasar 1,046 %
  • 12. No. Tahapan Nilai Satuan 13 Slump diminta 75-100 mm 14 Agregat kasar yang digunakan dengan ukuran maksimum 20,000 mm 15 Perkiraan kebutuhan air pencampur (Tabel 2) 203,000 kg/m3 16 Rasio air-semen (Tabel 3) 0,582 17 Kadar semen (15/16) 348,797 kg/m3 18 Volume agregat kasar kering oven (Tabel 5) 0,666 19 Jumlah agregat kasar (18 x 4) 1078,920 kg/m3 20 Berat jenis beton basah (Tabel 6) 2350,833 kg/m3 21 Jumlah agregat halus (20-19-17-15) 720,116 kg/m3
  • 13. No. Material Per m3 Satuan 22 Semen (17) 348,797 kg/m3 23 Air (15) 203,000 kg/m3 24 Agregat Halus (21) 720,116 kg/m3 25 Agregat Kasar (19) 1078,920 kg/m3 26 Jumlah (20) 2350,833 kg/m3 Volume Material 27 Semen (22)/((3) x 1000) 0,118 11% 28 Air ((23)/1000) 0,203 20,50% 29 Agregat Kasar (25)/((8) x 1000) 0,408 36,50% 30 Tingkat kadar udara (pemaparan ringan) 0,019 2% 31 Jumlah volume padat bahan selain agregat halus (28)+(29)+(30)+(27) 0,748 70% 32 Volume agregat halus dibutuhkan 1-(31) 0,252 30% 33 Jadi berat agregat halus yang dibutuhkan (32) x (7) x (1000) 659,864 kg/m3 34 JUMLAH Agregat Halus (33) 659,864 kg/m3
  • 14. No. Material Berdasarkan perkiraan masa beton, kg Berdasarkan perkiraan volume absolut bahan- bahan, kg 35 Semen (22) 348,797 348,797 36 Air (23) 203,000 203,000 37 Agregat kasar (25) 1078,920 1078,920 38 Agregat halus (24), (33) 720,116 659,864 39 Jumlah 2350,833 2290,581 Koreksi terhadap kadar air 40 Kadar air agregat kasar 1,046 % 41 Kadar air agregat halus 5,246 % 42 Agregat kasar (Basah) ((37) x (1+((40)/100))) 1090,206 kg/m3 43 Agregat halus (Basah) ((38) x (1+((41)/100))) 757,893 kg/m3 44 Absorpsi agregat kasar 0,154 45 Absorpsi agregat halus 0,664 46 Perkiraan kebutuhan air yang ditambahkan 160,380
  • 15. No. Material Berat Per m3 Satuan 47 Semen (22) 348,797 kg/m3 48 Air (46) 160,380 kg/m3 49 Agregat kasar (42) 1090,206 kg/m3 50 Agregat halus (43) 757,893 kg/m3 Jumlah 2357,276 kg/m3 No. Tahapan Berat Per m3 Satuan 51 Volume silinder 0,0053 m3 52 Jumlah sampel 13 Buah 53 Volume silinder kecil 0,0016 m3 54 Jumlah sampel 5 Buah 55 Volume kubus 0,0034 m3 56 Jumlah sampel 10 Buah 57 Semen ((47) x (51) x (52)) + ((47) x (53) x (54)) + (((47) x (55) x (56)) 38,682 Kg 58 Air ((48) x (51) x (52)) + ((48) x (53) x (54)) + (((48) x (55) x (56)) 17,786 Kg 59 Agregat Kasar ((49) x (51) x (52)) + ((49) x (53) x (54)) + (((49) x (55) x (56)) 120,904 Kg 60 Agregat Halus ((50) x (51) x (52)) + ((50) x (53) x (54)) + (((50) x (55) x (56)) 84,050 Kg
  • 17. SEKIAN HASIL DATA DARI KELOMPOK 10